HOSP_Q_As_0002.pdf

PDF 126 KB Posted

Attached to
HOSP 318915 Rehabilitate Park Bathhouses
Solicitation number
140P2025R0004
Issued by

About this file

This is a Q&A document dated December 12, 2024, addressing bidder questions for a National Park Service bathhouse rehabilitation project. The document contains six questions and answers covering various aspects of the solicitation.

Key details include: The pre-bid job walk is scheduled for December 17, 2024, with potential for a follow-on walk if requested in writing. The bid date extension is under consideration in response to contractors' request for more time due to holiday season impacts. Regarding project experience requirements, the agency clarified that projects do not need to be completed to be considered - any percentage of completion is acceptable, though substantial completion is defined as receiving a building certificate of occupancy. The document also confirms there are no known endangered species that could affect construction, and clarifies that "Part I" of referenced drawings may refer to full-size versions rather than reduced drawings.

View the file

Other files

File Type Posted
Sol_140P2025R0004_Amd_0008.pdf PDF
QA_Contractor_Answers_January_2025_0008.pdf PDF
Sol_140P2025R0004_Amd_0007.pdf PDF
Second_PreBid_Site_Visit_Sign_In_Sheet_0007.pdf PDF
B08_Solit_PSP_Vol_II_GenRefs_0006.doc DOC document
Sol_140P2025R0004_Amd_0006.pdf PDF
QA_Contractor_Answers_January_2025_0006.pdf PDF
Sol_140P2025R0004_Amd_0005.pdf PDF
Sol_140P2025R0004_Amd_0004.pdf PDF
HOSP_CD_Final_Submittal_20231027_Reduced_Drawings_2_0004.pdf PDF
Sol_140P2025R0004_Amd_0003.pdf PDF
Prebid_Sign_in_Sheet_0003.pdf PDF
Sol_140P2025R0004_Amd_0002.pdf PDF
Sol_140P2025R0004_Amd_0001.pdf PDF
B08_Section_J_Attachment_8_Wage_Determination.pdf PDF
B08_Section_J_Attachment_4_HOSP_CD_Part_lI_20231027_Reduced_Drawings.pdf PDF
B08_Section_J_Attachment_11_Construction_Contract_Administration.pdf PDF
B08_Section_J_Attachment_6__Div_2_thru_Div_49_REVISED_FINAL_CD_2024_10_9.pdf PDF
B08_Section_J_Attachment_3_Roofs_Specs_CDRev_240223.pdf PDF
B08_Section_J_Attachment_12__Vol_II_SubKPlan.pdf PDF
B08_Section_J_Attachment_1_Libbey_Specs_CDRev_240223_Reduced_File_Size.pdf PDF
B08_Section_J_Attachment_9_Volume_I.pdf PDF
B08_Section_J_Attachment_7__REVISED_FINAL_CD_SET_2024_10_9.pdf PDF
Sol_140P2025R0004.pdf PDF
B08_Section_J_Attachment_5__Division_01_ShortForm_GeneralRequirements__REVISED_FINAL_CD_2024_10_9.pdf PDF
B08_Clauses_and_Provisions.pdf PDF
B08_Section_J_Attachment_10_Volume_II.pdf PDF
B08_Section_J_Attachment_2_Maurice_Specs_CDRev_240223_Reduced_File_Size.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers – 12/12/2024

1. We have downloaded 08_Section_J_Attachment_4_HOSP_CD_Part_II_20231027_Reduced_Drawings, however Part I of the plan set seems to be missing. Can you please add the Part I plans to Sam.gov so that we have the entire document to review?

Answer:

There is no Part I concerning the ‘Reduced Drawings’, Part I may be referencing a copy of the ‘full-size’ drawings.

2. We respectfully request that the job walk be rescheduled until after the first of the new year, or to schedule a second job walk to allow for sufficient time to review the plans that have yet to be released.

The pre-bid job walk is scheduled for December 17, 2024; follow-on job-walk may be considered if a written request is submitted.

3. We respectfully request the bid date to be extended to the end of January. Typically, during the holidays, we lose a couple of weeks, and a lot of subcontractors won’t look at the project until after the new year. This extra time would allow subcontractors to produce competitive bid proposals for your project, resulting in a more competitively bid project overall. Thank you for your time and consideration.

An extension of the bid date is being considered.

4. Is it acceptable for projects to be classified as 'in progress'? If so, what percentage of completion is considered appropriate to meet the requirements?

The projects shall not be classified as ‘in progress’; substantial completion is achieved when a building certificate of occupancy is received from the AHJ. In some instances the Contracting Officer will provide the contractor a letter of ‘Beneficial Occupancy’ on areas that are deemed complete – this can happen at any stage of construction.

5. In FACTOR 2 – PROJECT EXPERIENCE, it states: "Submit the attached 'Project Experience' form addressing specific experience aspects below for up to five (5) relevant projects completed in the last five (5) years. Separate forms should be submitted for each project." We currently have several projects underway, each at different stages of completion. In some cases, agencies specify a minimum percentage of completion for a project to be eligible for consideration. For example, we have a school project that is approximately 75% complete and shares some similar components. Would it be acceptable to submit this project, given its current stage, for Project Experience consideration? Could you please clarify how complete these projects for FACTOR 2- PROJECT EXPERIENCE need to be?

Any percentage of completion is acceptable.

6. Are there any endangered species that could potentially affect construction that we should be aware of?

None known of at this time.

File details come from the government source that posted it. Updated .