B09_CHOH_245002_287711_Amd_6_-_013233_PhotoDocs_2023_04_03_0006.docx

DOCX document 32 KB Posted

Attached to
CHOH 245002 287711 -Locks and Wall
Solicitation number
140P2022R0130
Issued by

About this file

This document outlines requirements for photo documentation on a federal construction project. It requires the contractor to take digital photographs on a monthly basis to document construction progress, as well as before construction begins and during key milestones. The photos must be a minimum of 8 megapixels and 3200 by 2400 pixels, in JPEG format. The contractor must submit photos electronically within 7 days of being taken with detailed file names noting the date, time and location. At project completion, the contractor must provide all photos on a DVD in sRGB color format along with an index listing each photo's file name, date, time and description. This project involves repairs and construction of locks and walls at a National Park Service site, as indicated in the related federal contract opportunity for solicitation number 140P2022R0130.

View the file

Other files

File Type Posted
Sol_140P2022R0130_Amd_0008.pdf PDF
B09_CHOH_245002_287711_Amd_8_-_QA_0008.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_8_-_SF_30_Signed_0008.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_SF_30_Signed_0007.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_MD_Wage_Rates_3-24-23_0007.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_QA_0007.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_7_-_DC_Wage_Rates_3-31-23_0007.pdf PDF
Sol_140P2022R0130_Amd_0007.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013233_PhotoDocs_2023_04_03_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013100_ProjectMngmntCoor_Update_2023_04_05_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_061900_TIMBER_MITER_GATES_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_WQC-DC-2022-98_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_Revised_Bid_Schedule_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_CHOH_245002___287711_-_AMENDMENT_6_DRAWINGS__0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013100_ProjectMngmntCoor_Update_2023_04_05_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_Corrected_Price_List_update_4-3-23_0006.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_6_-_CHOH_245002-287711_QA_2023_04_06_0006.XLS XLS spreadsheet
Sol_140P2022R0130_Amd_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013216_ConstructionSchedule_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_024120_SELECTIVE_STRUCTURE_DEMOLITION_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_061900_TIMBER_MITER_GATES_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_024120_SELECTIVE_STRUCTURE_DEMOLITION_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_013216_ConstructionSchedule_2023_04_03_0006.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_051200_rev1_0005.PDF PDF
Sol_140P2022R0130_Amd_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-__ADDENDUM_5_DRAWINGS_Updated_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_330125_SEWER_LINING_CIPP_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_Price_List_update_2023_03_28_0005.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_5_-_061900_rev1_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_SF30_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_312000_EARTHWORK_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_033000_rev11_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_Price_List_update_2023_03_28_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_011000_SummaryOfWork_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_012700_rev1_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_SF24_Bid_Bond_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_QA_v3_0005.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_3_-_041000_Mortar_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_013323_Submittal_Procedures_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_Corrected_Price_List_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_Corrected_Price_List_0004.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_3_-_015000_Temp_Facl_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_SF-30_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_QA_v2_0004.xlsx XLSX spreadsheet
Sol_140P2022R0130_Amd_0004.pdf PDF
Sol_140P2022R0130_Amd_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03_-_Attach_1_140P2022R0130_Questions_-_2_27_2023_0003.xlsx XLSX spreadsheet
B10_CHOH_245002_287711_Amd_03_-_Attach_2__012700_DefinitionOfContractLineItems_Updated_2-17-23_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03-_Attach_4_SF30_with_updated_CLIN_0028_Signed_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03_-_Attach_3_S0_01A_DESIGN_NOTES_REV_1_0003.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHOH 245002 & 287711

SECTION 01 32 33 – PHOTO DOCUMENTATION

GENERAL

SUMMARY

Section includes administrative and procedural requirements for:

Existing condition images Periodic construction images See Section 01 77 00 "Closeout Procedures" for a complete listing of closeout documents.

See Section 01 79 00 "Demonstration and Training" for submitting videotapes of demonstration of equipment and training of National Park Service (NPS) personnel.

SUBMITTALS

Construction Images: Submit images electronically within 7 days of taking the image. Include:

Date, time and number (sequentially number all images) in filename.

Description of vantage point, indicating location, direction (by compass point), and elevation or story of construction.

Submit digital images exactly as originally recorded in digital camera, without alteration, or modifications using image-editing software.

Closeout: Submit complete set of digital image electronic files as a Project Record Document. Submit on Hard-drive or FTP as well as Digital Video Disc (DVD).

Provide index as separate file on Disc. List each image as a file name with number, date, and time. Include description and or vantage point image was taken.

Submit images that have the same aspect ratio as the sensor, un-cropped.

PRODUCTS

FORMAT REQUIREMENTS

Media: DVD-R Archival Gold.

Media Labels: Archival DVD labeling markers, archival labels, or direct print.

Images: Provide sRGB (standard Red Green Blue) color images in JPEG (Joint Photographic Experts Group) format. Minimum sensor size of 8 megapixels, and at image resolution of not less than 3200 by 2400, and 300 dpi (dots per inch).

EXECUTION

CONSTRUCTION IMAGES

General: Take digital images using the maximum range of depth of field, in-focus, to clearly show the Work. No blurry or out-of-focus areas accepted.

Maintain index with each set of Construction images and identify the number, date, time, and description for each.

Maintain one set of images accessible in field office at Project site available for reference.

Existing Condition Images: Before and when starting construction, take color digital images of Project site and surrounding properties, including existing items to remain during construction, from different vantage points.

Flag and construction limits before recording construction images.

Take a minimum of 10 separate images at each individual work area to show existing conditions adjacent to property before starting Work.

Take a minimum of 14 images of existing buildings either on or adjoining property to accurately record physical conditions at start of construction.

Include horizontal and vertical scales for reference.

Include photos of walls before vegetation is removed as well as after.

Periodic Construction Images: Take minimum of 25 color, digital images monthly, coinciding with cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last images were taken.

Additional Images: Contracting Officer may issue requests for additional images.

Three days advance, where feasible.

In emergency situations, take additional images within 24 hours of request.

Additional images include, but are not limited to:

Immediate follow-up when on-site events result in construction damage or losses.

Fabrication locations away from Project site.

Substantial Completion of a major phase or component of Work.

Extra record images at time of final acceptance.

Prior to anticipated heavy rainfall or flooding events.

END OF SECTION 01 32 33