B09_CHOH_245002_287711_Amd_5_-_033000_rev11_0005.PDF

PDF 201 KB Posted

Attached to
CHOH 245002 287711 -Locks and Wall
Solicitation number
140P2022R0130
Issued by

About this file

This technical specification covers cast-in-place concrete work for the CHOH 245002 & 287711 project located at National Park Service sites. The specification includes requirements for concrete materials, mix designs, formwork, reinforcement, placement, finishing, and repair work. Concrete classes defined are Class A for retaining walls, beams, and slabs on grade with minimum compressive strengths ranging from 5000 to over 5000 psi depending on exposure class. Finishing requirements include float finishes for surfaces to receive trowel finishes and trowel finishes with specified surface tolerances for exposed slabs. The specification also provides details on concrete curing, form removal, and field quality control testing to be performed by an independent testing agency.

View the file

Other files

File Type Posted
Sol_140P2022R0130_Amd_0008.pdf PDF
B09_CHOH_245002_287711_Amd_8_-_QA_0008.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_8_-_SF_30_Signed_0008.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_SF_30_Signed_0007.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_MD_Wage_Rates_3-24-23_0007.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_QA_0007.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_7_-_DC_Wage_Rates_3-31-23_0007.pdf PDF
Sol_140P2022R0130_Amd_0007.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013233_PhotoDocs_2023_04_03_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013100_ProjectMngmntCoor_Update_2023_04_05_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_061900_TIMBER_MITER_GATES_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_WQC-DC-2022-98_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_Revised_Bid_Schedule_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_CHOH_245002___287711_-_AMENDMENT_6_DRAWINGS__0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013100_ProjectMngmntCoor_Update_2023_04_05_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_Corrected_Price_List_update_4-3-23_0006.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_6_-_CHOH_245002-287711_QA_2023_04_06_0006.XLS XLS spreadsheet
Sol_140P2022R0130_Amd_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013216_ConstructionSchedule_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_024120_SELECTIVE_STRUCTURE_DEMOLITION_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_061900_TIMBER_MITER_GATES_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_013233_PhotoDocs_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_024120_SELECTIVE_STRUCTURE_DEMOLITION_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_013216_ConstructionSchedule_2023_04_03_0006.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_051200_rev1_0005.PDF PDF
Sol_140P2022R0130_Amd_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-__ADDENDUM_5_DRAWINGS_Updated_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_330125_SEWER_LINING_CIPP_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_Price_List_update_2023_03_28_0005.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_5_-_061900_rev1_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_SF30_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_312000_EARTHWORK_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_Price_List_update_2023_03_28_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_011000_SummaryOfWork_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_012700_rev1_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_SF24_Bid_Bond_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_QA_v3_0005.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_3_-_041000_Mortar_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_013323_Submittal_Procedures_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_Corrected_Price_List_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_Corrected_Price_List_0004.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_3_-_015000_Temp_Facl_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_SF-30_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_QA_v2_0004.xlsx XLSX spreadsheet
Sol_140P2022R0130_Amd_0004.pdf PDF
Sol_140P2022R0130_Amd_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03_-_Attach_1_140P2022R0130_Questions_-_2_27_2023_0003.xlsx XLSX spreadsheet
B10_CHOH_245002_287711_Amd_03_-_Attach_2__012700_DefinitionOfContractLineItems_Updated_2-17-23_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03-_Attach_4_SF30_with_updated_CLIN_0028_Signed_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03_-_Attach_3_S0_01A_DESIGN_NOTES_REV_1_0003.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHOH - 245002 & 287711 03 30 00 - 1

CAST-IN-PLACE CONCRETE

CHOH 245002 & 287711

SECTION 03 30 00 – CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. This section consists of requirements for Cast-In-Place concrete work, including concrete materials, mix design, formwork, reinforcement, placement and finishing procedures, and other items required in producing of the work.

2. This section also includes repair patching of existing concrete.

1.3 DEFINITIONS

A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash, slag cement, other pozzolans, and silica fume;

materials subject to compliance with requirements.

B. Water/Cement Ratio (w/cm): The ratio by weight of water to cementitious materials.

C. Form-Facing Material: Temporary structure or mold for the support of concrete while the concrete is setting and gaining sufficient strength to be self-supporting.

D. Formwork: The total system of support of freshly placed concrete, including the mold or sheathing that contacts the concrete, as well as supporting members, hardware, and necessary bracing.

1.4 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following:

a. Contractor's superintendent.

b. Independent testing agency responsible for concrete design mixtures.

c. Concrete Subcontractor.

CHOH - 245002 & 287711 03 30 00 - 2

2. Review the following:

a. Special inspection and testing and inspecting agency procedures for field quality control.

b. Construction joints, control joints, isolation joints, and joint-filler strips.

c. Cold and hot weather concreting procedures.

d. Concrete finishes and finishing.

e. Curing procedures.

f. Forms and form-removal limitations.

g. Shoring and reshoring procedures.

h. Concrete repair procedures.

i. Concrete protection.

j. Initial curing and field curing of field test cylinders (ASTM C31/C31M.)

k. Protection of field cured field test cylinders.

1.5 ACTION SUBMITTALS

A. General:

1. Submit the following in accordance with the conditions of The Construction Contract and

Division 1 Specification Sections.

2. Do not proceed with the construction of the cast-in-place concrete in the project, including fabrication of the formwork, until all samples, product data, mock-up and shop drawings have been approved by the COR.

B. Product Data: For each of the following:

1. Portland cement.

2. Fly ash.

3. Slag cement.

4. Silica fume.

5. Aggregates.

6. Admixtures:

a. Include limitations of use, including restrictions on cementitious materials, supplementary cementitious materials, air entrainment, aggregates, temperature at time of concrete placement, relative humidity at time of concrete placement, curing conditions, and use of other admixtures.

CHOH - 245002 & 287711 03 30 00 - 3

7. Curing materials.

8. Each type of steel reinforcement.

9. Bar Supports.

10. Mechanical splice couplers, if useds.

11. Bond Breaker.

12. Repair materials.Concrete Patch Material

13. Form ties.

14. Waterstops.

15. Form-release agent.

C. Design Mixtures: For each concrete mixture, include the following:

1. Mixture identification.

2. Minimum 28-day compressive strength.

3. Durability exposure class.

4. Maximum w/cm.

5. Calculated equilibrium unit weight, for lightweight concrete.

6. Slump limit.

7. Air content.

8. Nominal maximum aggregate size.

9. Indicate amounts of mixing water to be withheld for later addition at Project site if permitted.

10. Intended placement method.

11. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

D. Shop Drawings:

1. Steel Reinforcement Shop Drawings: Prepare drawings under the supervision of a professional structural engineer registered in the local jurisdiction with placing drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcements. Comply with ACI 315 and ACI detailing manual SP-66, showing bar schedules, stirrup spacing, bent bar diagrams, and arrangement of concrete reinforcement. Include special reinforcement required for openings through concrete structures.

CHOH - 245002 & 287711 03 30 00 - 4

2. Formwork Shop Drawings: Prepared by, and signed and sealed by, a qualified professional engineer responsible for their preparation, detailing fabrication, assembly, and support of forms.

a. For exposed vertical concrete walls, indicate dimensions and form tie locations.

b. Indicate dimension and locations of construction and movement joints required to construct the structure in accordance with ACI 301:

1) Location of construction joints is subject to approval of the CO.

c. Indicate location of waterstops.

d. Indicate proposed schedule and sequence of stripping of forms, shoring removal, and reshoring installation and removal.

E. Color and Texture Samples

1. Submit a concrete samples for color and texture of base each concrete patching mix:

a. Submit – 12”x12”x1.5” samples for exposed aggregate finished concrete using smooth form material for review and approval by COR. The observed face of each sample shall receive specified treatment.

a. Samples shall be 12”x12’x4”/

b. All color and texture samples shall nearly match color and texture of existing concrete. Submit color and texture samples as requested by COR. Do not begin construction until color and texture samples have been approved by COR.

F. Mock-up for Formed Concrete Work:

1. After all samples, product data and shop drawings for the Mock-up are approved, construct mock-ups of the concrete work in a location approved by the COR, and as described below.

2. Mock-ups and mock-up submissions for the concrete work shall consist of the following:

a. Mock-ups shall be as detailed.

b. Prepare and submit a “Lessons Learned” report after completion of each mock-up for review and discussion with the Project Team.

c. Additional mock-ups or partial mock-ups shall be required if the above mock-ups are deficient in producing the quality required for the project.

3. Mock-ups shall consist of the following:

a. Foundation of a size and reinforcement adequate to support the work at the designated location.

b. Scope of Visual Mock-ups:

1) Retaining Wall: 10’ tall by 10’ long.

CHOH - 245002 & 287711 03 30 00 - 5

2) Concrete Slab: (4) test panels at least 4 feet by 4 feet in area and at least 8 inches in thickness.

3) Reinforce all mock-ups in a similar detail shown on the drawings and add necessary reinforcing and supports to maintain stability.

4) Use approved form facing materials, reinforcement and accessories and assemble formwork using methods as intended for construction and to achieve the specified requirements.

5) Place concrete with methods to be used in construction, including anticipated time delays. Place concrete to achieve the specified requirements.

6) Finish all exposed hardened surfaces of the wall with specified finish treatments.

7) Use same concrete design mixes, inclusive of specified admixtures, for the mock-ups as will be use din the construction of the final formed wall.

G.F. Concrete Schedule: For each location of each Class of concrete indicated in "Concrete Mixtures"

Article, including the following:

1. Concrete Class designation.

2. Location within Project.

3. Exposure Class designation.

4. Formed Surface Finish designation and final finish.

5. Curing process.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For the following:

1. Installer: Include copies of applicable ACI certificates.

2. Ready-mixed concrete manufacturer.

3. Testing agency: Include copies of applicable ACI certificates.

3.4. Concrete Maintenance Specialist Qualifications

B. Material Certificates: For each of the following, signed by manufacturers:

1. Cementitious materials.

2. Admixtures.

3. Curing compounds.

4. Adhesives.

CHOH - 245002 & 287711 03 30 00 - 6

5. Semirigid joint filler.

6. Joint-filler strips.

7. Repair materials.

C. Material Test Reports: For the following, from a qualified testing agency:

1. Portland cement.

2. Fly ash.

3. Slag cement.

4. Blended hydraulic cement.

5. Silica fume.

6. Aggregates.

7. Admixtures

8. Steel Reinforcement.

9. Mechanical splice couplers.

D. Preconstruction Test Reports: For each mix design.

E. Field quality-control reports.

1.7 QUALITY ASSURANCE

A. Installer Qualifications: A qualified installer who employs Project personnel qualified as an ACI-certified Flatwork Technician and Finisher and a supervisor who is a certified ACI Flatwork

Concrete Finisher/Technician or an ACI Concrete Flatwork Technician with experience installing and finishing concrete:

1. Post-Installed Concrete Anchors Installers: ACI-certified Adhesive Anchor Installer.

2. Abrasive blast work shall be performed by a blasting contractor that specializes in the type of work to be performed, with a minimum of 5 years documented successful experience and shall be performed by skilled workers thoroughly trained and certified in the necessary trade.

B. Concrete Maintenance Qaulifications: Engage and experience concrete maintenance firm that employs installers and supervisors who are trained and approved by manufacturer to perform work for concrete patch repair. Firm shall have completed work similar in material, design, and extent to that indicated for this project with a record of successful in-service performance of at least 3 years.

B.C. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C94 requirements for production facilities and equipment.

CHOH - 245002 & 287711 03 30 00 - 7

C.D. Laboratory Testing Agency Qualifications: A testing agency qualified in accordance with

ASTM C1077 and ASTM E329 for testing indicated and employing an ACI-certified Concrete

Quality Control Technical Manager:

1. Personnel performing laboratory tests shall be an ACI-certified Concrete Strength Testing

Technician and Concrete Laboratory Testing Technician, Grade I. Testing agency laboratory supervisor shall be an ACI-certified Concrete Laboratory Testing Technician, Grade II.

D.E. Field Quality Control Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.

1.8 PRECONSTRUCTION TESTING

A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on each concrete mixture.

1. Include the following information in each test report:

a. Admixture dosage rates.

b. Slump.

c. Air content.

d. Seven-day compressive strength.

e. 28-day compressive strength.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Comply with ASTM C94 and ACI 301.

1.10 FIELD CONDITIONS

A. Cold-Weather Placement: Comply with ACI 301 and ACI 306.1 and as follows:

1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

2. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.

3. Do not use frozen materials or materials containing ice or snow.

4. Do not place concrete in contact with surfaces less than 35 deg F, other than reinforcing steel.

5. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

CHOH - 245002 & 287711 03 30 00 - 8

B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1, and as follows:

1. Maintain concrete temperature at time of discharge to not exceed 95 deg F.

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

1.11 PERFORMANCE REQURIEMENTS

A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork, shores, and reshores in accordance with ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.

1. Design wood panel forms in accordance with APA's "Concrete Forming

Design/Construction Guide."

2. Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.

B. Design, engineer, erect, shore, brace, and maintain insulating concrete forms in accordance with

ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.

C. Responsibility for the design of cast-in-place Exposed-to-View concrete to be in conformance with the requirements of the drawings and specifications. All work shall be performed using he highest standards of quality for visual and durable concrete and shall rest with the contractor.

PART 2 - PRODUCTS

2.1 CONCRETE, GENERAL

A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract

Documents.

2.2 CONCRETE MATERIALS

A. Source Limitations:

1. Obtain all concrete mixtures from a single ready-mixed concrete manufacturer for entire

Project.

2. Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant.

3. Obtain aggregate from single source.

4. Obtain each type of admixture from single source from single manufacturer.

B. Cementitious Materials:

CHOH - 245002 & 287711 03 30 00 - 9

1. Portland Cement: ASTM C150, Type I or Type III.

2. Fly Ash: ASTM C618, Class C or F.

3. Slag Cement: ASTM C989, Grade 100 or 120.

4. Silica Fume: ASTM C1240 amorphous silica.

C. Normal-Weight Aggregates: ASTM C33, coarse aggregate or better, graded. Provide aggregates from a single source.

1. Alkali-Silica Reaction: Comply with the following:

a. Expansion Result of Aggregate: For both fine and coarse aggregate, not more than

0.04 percent (non-reactive) at one-year when tested in accordance with

ASTM C1293.

2. Coarse-Aggregate:

a. Maximum Coarse-Aggregate Size: 1 inch (25 mm) nominal.

b. ASTM C-33. Washed, hard, natural crushed grey stone, as required to match existing exposed aggregate of the adjacent Waste Weir #2.

3. Fine Aggregate:

a. ASTM C-33. Hard, natural sand, or manufactured sand. Particles finer than a 50 screen shall be light or neutral in color and shall be in small quantities that will not affect the consistency of the color presentation.

b. Free of materials with deleterious reactivity to alkali in cement.

D. Air-Entraining Admixture: ASTM C260.

E. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride in steel-reinforced concrete.

1. Water-Reducing Admixture: ASTM C494, Type A.

2. Retarding Admixture: ASTM C494, Type B.

3. Water-Reducing and -Retarding Admixture: ASTM C494, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C494, Type F.

5. High-Range, Water-Reducing and -Retarding Admixture: ASTM C494, Type G.

6. Plasticizing and Retarding Admixture: ASTM C1017, Type II.

F. Water and Water Used to Make Ice: ASTM C94, potable.

G. Non-Set-Accelerating Corrosion-Inhibiting Admixture: Commercially formulated, non-set-accelerating, anodic inhibitor or mixed cathodic and anodic inhibitor; capable of forming a protective barrier and minimizing chloride reactions with steel reinforcement in concrete.

CHOH - 245002 & 287711 03 30 00 - 10

1. Products:

a. Degussa Corporation; Protectosil Dry CIT.

b. Sika Corporation; FerroGard-901.

c. Cortec Corporation; MCI 2005NS.

2.3 CONCRETE PATCHING MATERIAL

A. Only use patching mortars that are recommended by manufacturer for each applicable horizontal, vertical, or overhead use orientation. Place patching mortar as specified by manufacturer.

B. Color and Aggregate Texture: Provide patching mortar and aggregates of colors and sizes necessary to produce patching mortar that matches existing, adjacent, exposed concrete. Blend several aggregates if necessary to achieve suitable matches.

C. Coarse Aggregate for Patching Mortar: ASTM C33/C33M, washed aggregate, Size No. 8, Class

5S. Add to patching-mortar mix only as permitted by patching-mortar manufacturer.

D. Polymer-Modified, Cementitious Patching Mortar: packaged, dry mix for repair of concrete and that contains a non-redispersible latex additive as either a dry powder or a separate liquid that is added during mixing. Compressive Strength: Not less than 5000 psi (34.5 MPa) at 28 days when tested according to ASTM C109/C109M.

2.32.4 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A615, Grade 60, deformed.

B. Plain-Steel Welded-Wire Reinforcement: ASTM A1064, plain, fabricated from as-drawn steel wire into flat sheets.

2.42.5 REINFORCEMENT ACCESSORIES

A. Joint Dowel Bars: ASTM A615, Grade 60, plain-steel bars, cut true to length with ends square and free of burrs.

B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place.

1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with

CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

a. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or

CRSI Class 2 stainless steel bar supports.

C. Steel Tie Wire: ASTM A1064, annealed steel, not less than 0.0508 inch in diameter.

CHOH - 245002 & 287711 03 30 00 - 11

2.52.6 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI’s “Manual of Standard Practice.”

2.62.7 CURING MATERIALS

A. Moisture-Retaining Cover: ASTM C171, polyethylene film burlap-polyethylene sheet.

1. Color:

a. Ambient Temperature Below 50 deg F: Black.

b. Ambient Temperature between 50 deg F and 85 deg F: Any color.

c. Ambient Temperature Above 85 deg F: White.

B. Water: Potable or complying with ASTM C1602.

2.72.8 FORM-FACING MATERIALS

A. As-Cast Surface Form-Facing Material:

1. Provide continuous, true, and smooth concrete surfaces.

2. Furnish in largest practicable sizes to minimize number of joints.

3. Acceptable Materials: As required to comply with Surface Finish designations specified in

Section 033000 "Cast-In-Place Concrete, and as follows:

a. Plywood, metal, or other approved panel materials.

b. Exterior-grade plywood panels, suitable for concrete forms, complying with

DOC PS 1, and as follows:

1) APA Structural 1 Plyform, B-B or better; mill oiled and edge sealed.

2.82.9 RELATED MATERIALS

A. Expansion- and Isolation-Joint-Filler Strips: ASTM D1751, asphalt-saturated cellulosic fiber or

ASTM D1752, cork or self-expanding cork.

B. Bond Breaker: Provide sheet vapor retarder, Class C: ASTM E1745, Class C; not less than 10 mils thick. Provide stainless steel screws to fasten into place on vertical surface of masonry.

C. Self-Expanding Butyl Strip Waterstops: Manufactured rectangular or trapezoidal strip, butyl rubber with sodium bentonite or other hydrophilic polymers, for adhesive bonding to concrete, 3/4 by 1 inch.

D. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.

CHOH - 245002 & 287711 03 30 00 - 12

E. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.

1. Formulate form-release agent with rust inhibitor for steel form-facing materials.

2. Form release agent for form liners shall be acceptable to form liner manufacturer.

F. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.

1. Furnish units that leave no corrodible metal closer than 1 inch (25 mm) to the plane of exposed concrete surface.

2. Furnish ties that, when removed, leave holes no larger than 1 inch (25 mm) in diameter in concrete surface.

2.92.10 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301.

1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:

1. Fly Ash or Other Pozzolans: 25 percent by mass.

2. Slag Cement: 50 percent by mass.

3. Silica Fume: 10 percent by mass.

4. Total of Fly Ash or Other Pozzolans, Slag Cement, and Silica Fume: 50 percent by mass, with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding

10 percent by mass.

5. Total of Fly Ash or Other Pozzolans and Silica Fume: 35 percent by mass with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.

1. Use high-range water-reducing or plasticizing admixture in concrete, as required, for placement and workability.

2. Use water-reducing and -retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.

3. Use water-reducing admixture in pumped concrete, and concrete with a w/cm below 0.50.

CHOH - 245002 & 287711 03 30 00 - 13

2.11 CONCRETE MIXTURES, SELF CONSOLITATING CONCRETE

A. Prepare the design mixture for self consolidating concrete on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301.

B. Maintain flowability of the mix using High Range Water Reducing Admixtures.

C. Design mix to have resistance to segregation.

D. Design mix to achieve minimum 5000 psi compression strength at 28 days.

E. Design mix to achieve:

1. Slump text ASTM C1611 of 18 inches to 30 inches spread

2. Visual Stability Index ASTM C1611 of 0 or 1

3. T50 Test ASTM C1611 of less than 6 seconds

F. Acceptable mixes include SIKACRETE SELF CONSOLODATING CONCRETE or similar approved equal.

2.102.12 CONCRETE MIXTURES

A. Class A: Retaining Walls, Beams and Slab on Grade:

1. Exposure Class: ACI 318 W1.

2. Minimum Compressive Strength: As Indicated

3. Maximum w/cm: As Indicated.

4. Slump Limit: 4 inches, plus or minus 1 inch.

5. Air Content:

a. Exposure Class F1: 5.0 percent, plus or minus 1.5 percent at point of delivery for concrete containing 3/4-inch nominal maximum aggregate size.

6. Corrosion-Inhibiting Admixture.

B. Flowable Fill: See SECTION 31 23 23

2.112.13 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with

ASTM C94, and furnish batch ticket information.

B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete in accordance with

ASTM C94. Mix concrete materials in appropriate drum-type batch machine mixer.

1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than five minutes after ingredients are in mixer, before any part of batch is released.

2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd.

CHOH - 245002 & 287711 03 30 00 - 14

3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verification of Conditions:

1. Before placing concrete, verify that installation of concrete forms, accessories, and reinforcement, and embedded items is complete and that required inspections have been performed.

2. Do not proceed until unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Provide reasonable auxiliary services to accommodate field testing and inspections, acceptable to testing agency, including the following:

1. Daily access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Secure space for storage, initial curing, and field curing of test samples, including source of water and continuous electrical power at Project site during site curing period for test samples.

4. Security and protection for test samples and for testing and inspection equipment at Project site.

3.3 INSTALLATION OF EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining Work that is attached to or supported by cast-in-place concrete.

1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of ANSI/AISC 303.

3.4 INSTALLATION OF STEEL REINFORCEMENT

A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.

B. Accurately position, support, and secure reinforcement against displacement.

1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.

CHOH - 245002 & 287711 03 30 00 - 15

2. Do not tack weld crossing reinforcing bars.

C. Preserve clearance between bars of not less than 1 inch, not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.

D. Provide concrete coverage in accordance with ACI 318.

E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

F. Splices: Lap splices as indicated on Drawings.

1. Bars indicated to be continuous, and all vertical bars shall be lapped not less than 36 bar diameters at splices, or 24 inches, whichever is greater.

2. Stagger splices in accordance with ACI 318.

3. Mechanical Splice Couplers: Install in accordance with manufacturer's instructions.

G. Install welded-wire reinforcement in longest practicable lengths.

1. Support welded-wire reinforcement in accordance with CRSI "Manual of Standard

Practice."

a. For reinforcement less than W4.0 or D4.0, continuous support spacing shall not exceed 12 inches.

2. Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches for plain wire and 8 inches for deformed wire.

3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.

4. Lace overlaps with wire.

3.5 JOINTS

A. Construct joints true to line, with faces perpendicular to surface plane of concrete.

B. Construction Joints: Coordinate with concrete placement sequence:

1. Install so strength and appearance of concrete are not impaired, at locations indicated on

Drawings or as approved by CO.

2. Place joints perpendicular to main reinforcement.

a. Continue reinforcement across construction joints unless otherwise indicated.

3. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete.

3.6 INSTALLATION OF WATERSTOPS

A. Self-Expanding Strip Waterstops: Install in construction joints and at other locations indicated on

Drawings, according to manufacturer's written instructions, by adhesive bonding, mechanically fastening, and firmly pressing into place.

CHOH - 245002 & 287711 03 30 00 - 16

1. Install in longest lengths practicable.

2. Locate waterstops in center of joint unless otherwise indicated on Drawings.

3. Protect exposed waterstops during progress of the Work.

3.7 INSTALLATION OF FORMWORK

A. Comply with ACI 301.

B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 and to comply with the Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete" for as-cast finishes.

C. Limit concrete surface irregularities as follows:

1. Surface Finish-2.0: ACI 117 Class B, 1/4 inch.

D. Construct forms tight enough to prevent loss of concrete mortar:

1. Minimize joints.

2. Exposed Concrete: Symmetrically align joints in forms.

E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.

1. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.

2. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.

3. Install keyways, reglets, recesses, and other accessories, for easy removal.

F. Do not use rust-stained, steel, form-facing material.

G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.

1. Provide and secure units to support screed strips

2. Use strike-off templates or compacting-type screeds.

H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible.

1. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar.

2. Locate temporary openings in forms at inconspicuous locations.

I. Do not chamfer exterior corners and edges of permanently exposed concrete.

J. At construction joints, overlap forms onto previously placed concrete not less than 12 inches.

CHOH - 245002 & 287711 03 30 00 - 17

K. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work:

1. Determine sizes and locations from trades providing such items.

2. Obtain written approval of CO prior to forming openings not indicated on Drawings.

L. Construction and Movement Joints:

1. Construct joints true to line with faces perpendicular to surface plane of concrete.

2. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by COR.

3. Place joints perpendicular to main reinforcement.

4. Locate joints for beams, slabs, joists, and girders in the middle third of spans:

a. Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.

5. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

M. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection.

1. Locate ports and openings in bottom of vertical forms, in inconspicuous location, to allow flushing water to drain.

2. Close temporary ports and openings with tight-fitting panels, flush with inside face of form, and neatly fitted, so joints will not be apparent in exposed concrete surfaces.

N. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

O. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.

P. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

3.8 REMOVING AND REUSING FORMS

A. Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F (10 deg C) for 24 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations, and curing and protection operations need to be maintained.

1. Leave formwork for beam soffits, joists, slabs, and other structural elements that support weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength.

CHOH - 245002 & 287711 03 30 00 - 18

2. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.

B. Clean and repair surfaces of forms to be reused in the Work.

1. Split, frayed, delaminated, or otherwise damaged form-facing material are unacceptable for exposed surfaces.

2. Apply new form-release agent.

C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints.

1. Align and secure joints to avoid offsets.

2. Do not use patched forms for exposed concrete surfaces unless approved by CO.

3.9 SHORING AND RESHORING INSTALLATION

A. Comply with ACI 318 and ACI 301 for design, installation, and removal of shoring and reshoring.

1. Do not remove shoring or reshoring until measurement of slab tolerances is complete.

3.10 CONCRETE PLACEMENT

A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.

1. Immediately prior to concrete placement, inspect vapor retarder for damage and deficient installation, and repair defective areas.

2. Provide continuous inspection of vapor retarder during concrete placement and make necessary repairs to damaged areas as Work progresses.

B. Notify COR and testing and inspection agencies 24 hours prior to commencement of concrete placement.

C. Do not add water to concrete during delivery, at Project site, or during placement unless approved by COR in writing, but not to exceed the amount indicated on the concrete delivery ticket.

1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.

D. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301, but not to exceed the amount indicated on the concrete delivery ticket.

1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.

E. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.

1. If a section cannot be placed continuously, provide construction joints as indicated.

CHOH - 245002 & 287711 03 30 00 - 19

2. Deposit concrete to avoid segregation.

3. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.

4. Consolidate placed concrete with mechanical vibrating equipment in accordance with

ACI 301.

a. Do not use vibrators to transport concrete inside forms.

b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer.

c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.

d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.

F. Deposit and consolidate concrete for slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.

1. Do not place concrete floors and slabs in a checkerboard sequence.

2. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.

3. Maintain reinforcement in position on chairs during concrete placement.

4. Screed slab surfaces with a straightedge and strike off to correct elevations.

5. Level concrete, cut high areas, and fill low areas.

6. Slope surfaces uniformly where required.

7. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface.

8. Do not further disturb slab surfaces before starting finishing operations.

G. Flowable Fill Placement: The material shall completely fill all voids adjacent to the flowable fill zone. At no time during the back filling operation shall driven equipment be allowed to operate closer than four feet, measured horizontally, to any part of a structure.

3.11 FINISHING FORMED SURFACES

A. As-Cast Surface Finishes:

1. ACI 301 Surface Finish SF-2.0: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams.

a. Patch voids larger than 3/4 inch wide or 1/2 inch deep.

CHOH - 245002 & 287711 03 30 00 - 20

b. Remove projections larger than 1/4 inch.

c. Patch tie holes.

d. Surface Tolerance: ACI 117 Class B.

e. Locations: Apply to concrete surfaces exposed to public view, or to be covered with a coating or covering material applied directly to concrete.

B. Related Unformed Surfaces:

1. At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a color and texture matching adjacent formed surfaces.

2. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.

3. Where a roughened surface is indicated, provide a surface roughened to ¼” amplitude or

ICRI CSP8.

3.12 FINISHING SLABS

A. Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.

B. Float Finish:

1. When bleedwater sheen has disappeared and concrete surface has stiffened sufficiently to permit operation of specific float apparatus, consolidate concrete surface with power-driven floats or by hand floating if area is small or inaccessible to power-driven floats.

2. Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture and complies with ACI 117 (ACI A117M) tolerances for conventional concrete.

3. Apply float finish to surfaces to receive trowel finish.

C. Trowel Finish:

1. After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel.

2. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance.

3. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.

4. Do not add water to concrete surface.

5. Do not apply hard-troweled finish to concrete, which has a total air content greater than 3 percent.

6. Apply a trowel finish to surfaces exposed to view.

CHOH - 245002 & 287711 03 30 00 - 21

7. Finish surfaces to the following tolerances, in accordance with ASTM E1155, for a randomly trafficked floor surface:

a. Slabs on Ground:

1) Finish and measure surface so gap at any point between concrete surface and an unleveled, freestanding, 10-ft.- long straightedge resting on two high spots and placed anywhere on the surface does not exceed 1/4 inch.

3.13 CONCRETE CURING

A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

1. Comply with ACI 301 and ACI 306.1 for cold weather protection during curing.

2. Comply with ACI 301 and ACI 305.1 for hot-weather protection during curing.

3. Maintain moisture loss no more than 0.2 lb/sq. ft. x h (1 kg/sq. m x h), calculated in accordance with ACI 305.1, before and during finishing operations.

B. Curing Formed Surfaces: Comply with ACI 308.1 as follows:

1. Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces.

2. Cure concrete containing color pigments in accordance with color pigment manufacturer's instructions.

3. If forms remain during curing period, moist cure after loosening forms.

4. If removing forms before end of curing period, continue curing for remainder of curing period, as follows:

a. Continuous Fogging: Maintain standing water on concrete surface until final setting of concrete.

b. Continuous Sprinkling: Maintain concrete surface continuously wet.

c. Absorptive Cover: Pre-dampen absorptive material before application; apply additional water to absorptive material to maintain concrete surface continuously wet.

d. Water-Retention Sheeting Materials: Cover exposed concrete surfaces with sheeting material, taping, or lapping seams.

e. Membrane-Forming Curing Compound: Apply uniformly in continuous operation by power spray or roller in accordance with manufacturer's written instructions.

1) Recoat areas subject to heavy rainfall within three hours after initial application.

2) Maintain continuity of coating and repair damage during curing period.

C. Curing Unformed Surfaces: Comply with ACI 308.1 as follows:

CHOH - 245002 & 287711 03 30 00 - 22

1. Begin curing immediately after finishing concrete.

3.14 TOLERANCES

A. Conform to ACI 117.

3.15 CONCRETE SURFACE REPAIRS FOR DEFECTIVE NEW CONCRETE

A. Defective Concrete:

1. Repair and patch defective areas when approved by CO.

2. Remove and replace concrete that cannot be repaired and patched to CO's approval.

B. Patching Mortar: Mix dry-pack patching mortar, consisting of 1 part portland cement to 2-1/2 parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing.

C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning.

1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than

1/2 inch in any dimension to solid concrete.

a. Limit cut depth to 3/4 inch.

b. Make edges of cuts perpendicular to concrete surface.

c. Clean, dampen with water, and brush-coat holes and voids with bonding agent.

d. Fill and compact with patching mortar before bonding agent has dried.

e. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.

2. Repair defects on surfaces exposed to view by blending white portland cement and standard portland cement, so that, when dry, patching mortar matches surrounding color.

a. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching.

b. Compact mortar in place and strike off slightly higher than surrounding surface.

3. Repair defects on concealed formed surfaces that will affect concrete's durability and structural performance as determined by CO.

D. Repairing Unformed Surfaces:

1. Test unformed surfaces, such as floors and slabs, for finish, and verify surface tolerances specified for each surface.

a. Correct low and high areas.

CHOH - 245002 & 287711 03 30 00 - 23

b. Test surfaces sloped to drain for trueness of slope and smoothness; use a sloped template.

2. Repair finished surfaces containing surface defects, including spalls, popouts, honeycombs, rock pockets, crazing, and cracks in excess of 0.01 inch wide or that penetrate to reinforcement or completely through unreinforced sections regardless of width, and other objectionable conditions.

3. After concrete has cured at least 14 days, correct high areas by grinding.

4. Correct localized low areas during, or immediately after, completing surface-finishing operations by cutting out low areas and replacing with patching mortar.

a. Finish repaired areas to blend into adjacent concrete.

5. Repair defective areas, except random cracks and single holes 1 inch or less in diameter, by cutting out and replacing with fresh concrete.

a. Remove defective areas with clean, square cuts, and expose steel reinforcement with at least a 3/4-inch clearance all around.

b. Dampen concrete surfaces in contact with patching concrete and apply bonding agent.

c. Mix patching concrete of same materials and mixture as original concrete, except without coarse aggregate.

d. Place, compact, and finish to blend with adjacent finished concrete.

e. Cure in same manner as adjacent concrete.

6. Repair random cracks and single holes 1 inch or less in diameter with patching mortar.

a. Groove top of cracks and cut out holes to sound concrete, and clean off dust, dirt, and loose particles.

b. Dampen cleaned concrete surfaces and apply bonding agent.

c. Place patching mortar before bonding agent has dried.

d. Compact patching mortar and finish to match adjacent concrete.

e. Keep patched area continuously moist for at least 72 hours.

E. Perform structural repairs of concrete, subject to CO's approval, using epoxy adhesive and patching mortar.

F. Repair materials and installation not specified above may be used, subject to CO's approval.

3.16 CONCRETE PATCH REPAIRS FOR EXISTING CONCRETE

A. . Mix products, in clean containers, according to manufacturer's written instructions. Do not add water, thinners, or additives unless recommended by manufacturer. When practical, use manufacturer's premeasured packages to ensure that materials are mixed in proper proportions.

CHOH - 245002 & 287711 03 30 00 - 24

When premeasured packages are not used, measure ingredients using graduated measuring containers; do not estimate quantities or use shovel or trowel as unit of measure.

B. Do not mix more materials than can be used thin time limits recommended by manufacturer.

Discard materials that have begun to set.

C. Notify COR seven days in advance of dates when areas of deteriorated concrete will be located.

Locate areas of deteriorated using hammer and mark boundaries. Mark areas for removal by simplifying and squaring off boundaries.

D. Remove delaminated material and deteriorated concrete surface material. Roughen surface of concrete to produce a surface profile matching CSP 4 according to ICRI 310.2. Sweep and vacuum roughened surface to remove debris. If existing reinforcement is encountered, do not damage the rebars.

E. Wet-cure cementitious patching materials, including polymer-modified cementitious patching materials, for not less than seven days by water-fog spray or water-saturated absorptive cover.

3.163.17 FIELD QUALITY CONTROL

A. Special Inspections: Engage a special inspector to perform field tests and inspections and prepare testing and inspection reports.

B. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

1. Testing agency shall be responsible for providing curing container for composite samples on Site and verifying that field-cured composite samples are cured in accordance with

ASTM C31.

2. Testing agency shall immediately report to CO, Contractor, and concrete manufacturer any failure of Work to comply with Contract Documents.

3. Testing agency shall report results of tests and inspections, in writing, to Owner, CO, Contractor, and concrete manufacturer within 48 hours of inspections and tests.

a. Test reports shall include reporting requirements of ASTM C31, ASTM C39, and

ACI 301, including the following as applicable to each test and inspection:

1) Project name.

2) Name of testing agency.

3) Names and certification numbers of field and laboratory technicians performing inspections and testing.

4) Name of concrete manufacturer.

5) Date and time of inspection, sampling, and field testing.

6) Date and time of concrete placement.

CHOH - 245002 & 287711 03 30 00 - 25

7) Location in Work of concrete represented by samples.

8) Date and time sample was obtained.

9) Truck and batch ticket numbers.

10) Design compressive strength at 28 days.

11) Concrete mixture designation, proportions, and materials.

12) Field test results.

13) Information on storage and curing of samples before testing, including curing method and maximum and minimum temperatures during initial curing period.

14) Type of fracture and compressive break strengths at seven days and 28 days.

C. Batch Tickets: For each load delivered, submit three copies of batch delivery ticket to testing agency, indicating quantity, mix identification, admixtures, design strength, aggregate size, design air content, design slump at time of batching, and amount of water that can be added at

Project site.

D. Inspections:

1. Headed bolts and studs.

2. Verification of use of required design mixture.

3. Concrete placement, including conveying and depositing.

4. Curing procedures and maintenance of curing temperature.

5. Verification of concrete strength before removal of shores and forms from beams and slabs.

6. Steel-reinforcement placement.

7. Batch Plant Inspections: On a random basis, as determined by CO.

E. Concrete Tests: Testing of composite samples of fresh concrete obtained in accordance with

ASTM C 172 shall be performed in accordance with the following requirements:

1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd., but less than 25 cu. yd., plus one set for each additional 50 cu.

yd. or fraction thereof.

a. When frequency of testing provides fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.

2. Slump: ASTM C143/C143M:

a. One test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture.

CHOH - 245002 & 287711 03 30 00 - 26

b. Perform additional tests as indicated on the drawings.

3. Air Content: ASTM C231 pressure method, for normal-weight concrete.

a. One test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

4. Concrete Temperature: ASTM C1064:

a. One test hourly when air temperature is 40 deg F ite sample.

5. Unit Weight: ASTM C567 fresh unit weight of structural lightweight concrete.

a. One test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

6. Compression Test Specimens: ASTM C31:

a. Cast and laboratory cure two sets of three 4-inch by 8-inch cylinder specimens for each composite sample.

b. Cast, initial cure, and field cure two sets of three standard cylinder specimens for each composite sample.

7. Compressive-Strength Tests: ASTM C39.

a. Test one set of three laboratory-cured specimens at seven days and one set of two specimens at 28 days.

b. Test one set of three field-cured specimens at seven days and one set of two specimens at 28 days.

c. A compressive-strength test shall be…