This submittal procedures specification outlines requirements for submitting shop drawings, product data, samples, and other submittals for the CHOH 245002 287711 - Locks and Wall project. Action submittals such as product data and shop drawings must be submitted in PDF format using the National Park Service's CM-16 transmittal form and will be reviewed within 30 days for initial submittals and 15 days for resubmits. Informational submittals must also be submitted in PDF format and will be reviewed within 11 days. The specification defines procedures for electronic submittals, identification numbering, distribution of final submittals, and use of submittals for construction. The related federal contract opportunity is for locks and wall work for CHOH 245002 287711 through the National Park Service.

View the file

Other files

File Type Posted
Sol_140P2022R0130_Amd_0008.pdf PDF
B09_CHOH_245002_287711_Amd_8_-_QA_0008.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_8_-_SF_30_Signed_0008.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_SF_30_Signed_0007.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_MD_Wage_Rates_3-24-23_0007.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_QA_0007.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_7_-_DC_Wage_Rates_3-31-23_0007.pdf PDF
Sol_140P2022R0130_Amd_0007.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013233_PhotoDocs_2023_04_03_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013100_ProjectMngmntCoor_Update_2023_04_05_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_061900_TIMBER_MITER_GATES_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_WQC-DC-2022-98_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_Revised_Bid_Schedule_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_CHOH_245002___287711_-_AMENDMENT_6_DRAWINGS__0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013100_ProjectMngmntCoor_Update_2023_04_05_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_Corrected_Price_List_update_4-3-23_0006.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_6_-_CHOH_245002-287711_QA_2023_04_06_0006.XLS XLS spreadsheet
Sol_140P2022R0130_Amd_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013216_ConstructionSchedule_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_024120_SELECTIVE_STRUCTURE_DEMOLITION_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_061900_TIMBER_MITER_GATES_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_013233_PhotoDocs_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_024120_SELECTIVE_STRUCTURE_DEMOLITION_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_013216_ConstructionSchedule_2023_04_03_0006.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_051200_rev1_0005.PDF PDF
Sol_140P2022R0130_Amd_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-__ADDENDUM_5_DRAWINGS_Updated_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_330125_SEWER_LINING_CIPP_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_Price_List_update_2023_03_28_0005.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_5_-_061900_rev1_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_SF30_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_312000_EARTHWORK_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_033000_rev11_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_Price_List_update_2023_03_28_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_011000_SummaryOfWork_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_012700_rev1_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_SF24_Bid_Bond_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_QA_v3_0005.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_3_-_041000_Mortar_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_Corrected_Price_List_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_Corrected_Price_List_0004.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_3_-_015000_Temp_Facl_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_SF-30_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_QA_v2_0004.xlsx XLSX spreadsheet
Sol_140P2022R0130_Amd_0004.pdf PDF
Sol_140P2022R0130_Amd_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03_-_Attach_1_140P2022R0130_Questions_-_2_27_2023_0003.xlsx XLSX spreadsheet
B10_CHOH_245002_287711_Amd_03_-_Attach_2__012700_DefinitionOfContractLineItems_Updated_2-17-23_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03-_Attach_4_SF30_with_updated_CLIN_0028_Signed_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03_-_Attach_3_S0_01A_DESIGN_NOTES_REV_1_0003.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHOH – 245002 & 287711 01 33 23 - 1

101921 SUBMITTAL PROCEDURE

CHOH 245002 & 287711

SECTION 01 33 23 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

1.2 DEFINITIONS

A. Action Submittals: Written, graphic information, and physical samples that require Government’s responsive action.

B. Informational Submittals: Written information that does not require Government’s responsive action. Submittals may be rejected for not complying with requirements.

C. File Transfer Protocol (FTP): Communications protocol that enables transfer of files to and from another computer over a network and that serves as the basis for standard Internet protocols. An FTP site is a portion of a network located outside of network firewalls within which internal and external users are able to access files.

D. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems used for representing documents in a device-independent and display resolution-independent fixed-layout document format.

1.3 GENERAL SUBMITTAL PROCEDURES

A. General: Prepare and submit submittals required by individual Specification Sections and in some cases as requested in drawings. Types of submittals are indicated in individual specific sections.

1. Contracting Officer (CO) reserves right to require submittals in addition to those called for in individual sections.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. Review for legibility, accuracy, completeness, and compliance with Contract Documents.

1. Coordinate submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of Work so processing will not be delayed because of need for concurrent review coordination.

CHOH – 245002 & 287711 01 33 23 - 2

a. Contracting Officer reserves right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Submittal List: Submittal list is attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements. The requirements of individual Specification Sections and terms and conditions of the Contract still apply regardless of what is shown on submittal list.

D. Processing Time: Allow time for submittal review, including time for re-submittals, as follows.

Time for review shall commence when e-mail notification is received by Contracting Officer (or designee) indicating submittal has been posted on NPS management software website and is ready for review. When Contracting Officer has completed review, e-mail notification will be sent to Contractor indicating submittal has been processed. No extension of Contract Time will be authorized because of failure to transmit submittals in advance of Work to permit processing, including re-submittals.

1. Action Submittals

a. Initial Review: Allow 30 business days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.

b. Re-submittal Review: Allow 15 business days for review of each re-submittal.

2. Informational submittals

a. Review: Allow 11 business days for review of each submittal.

E. Approved Equals:

1. For each item proposed as an "approved equal," submit supporting data, including:

a. Drawings and samples as appropriate.

b. Comparison of the characteristics of the proposed item with that specified.

c. Changes required in other elements of the work because of the substitution.

d. Name, address, and telephone number of vendor.

e. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

2. A request for approval constitutes a representation that Contractor:

a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

b. Will provide the same warranties for the proposed item as for the item specified.

c. Has determined that the proposed item is compatible with interfacing items.

d. Will coordinate installation of an approved item and make changes required in other elements of the work because of the substitution.

e. Waives claims for additional expenses that may be incurred as a result of the substitution.

CHOH – 245002 & 287711 01 33 23 - 3

F. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows:

1. Transmittal Form (CM-16): All submittals shall be transmitted using National Park Service Transmittal Form (CM-16). The form can be downloaded from the DSC Workflows website's Submittal Review page and completed on the NPS/DSC management software website. No action will be taken on a submittal item unless accompanied by this Transmittal Form.

a. Complete the general information at the top of form.

b. Provide all required information based on submittal type

c. Attach all related documents.

d. Sign the Contractor section at bottom of the Transmittal Form (CM-16).

2. Physical samples: Complete Transmittal Form (CM-16) on the NPS/DSC management software website as described above. Deliver physical sample to the Contracting Officer (or designee) on site for processing. All comments and actions will be documented on the Transmittal Form (CM-16) on the NPS/DSC management software website.

G. Identification: Submittal number or other unique identifier, including revision identifier.

1. Submittal number shall use a sequential number (e.g. .001). Re-submittals shall include alphabetic suffix after another decimal point (e.g. .001.A).

H. Re-submittals: Make re-submittals using same process used with initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in the title block on the Transmittal Form (CM-16) and clearly indicate extent of revision.

3. Re-submit submittals until they are marked "Approved" or "Approved with notations".

I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, and others as necessary for performance of construction activities.

J. Use for Construction: Use only final submittals with mark indicating "Approved" or "Approved with notations". Ensure notations have been incorporated and, at a minimum, keep one copy of final approved submittal on site for use during construction.

1.4 CONTRACTOR’S USE OF CAD FILES

A. General: At Contractor’s written request, copies of CAD (Computer Aided Design) files will be provided to Contractor for Contractor’s use in connection with Project, subject to:

1. Files provided as is; no format or other changes to files or changes to objects in the drawing will be done by the Government.

2. Items in CAD files may not be drawn accurately to scale. Contractor shall not rely on the accuracy of items drawn in CAD files.

https://www.nps.gov/dscw/con_subreview21.htm

CHOH – 245002 & 287711 01 33 23 - 4

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS

A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each submittal to show which products and options are applicable.

3. As applicable, include:

a. Manufacturer’s product specifications.

b. Manufacturer’s installation instructions: When Contract Documents require compliance with manufacturer’s printed instructions, provide one complete set of instructions to Contracting Officer and keep another complete set of instructions at the project site until substantial completion.

c. Manufacturer’s catalog cuts: Submit only pertinent pages; mark each page of standard printed data to identify specific products proposed for use.

d. Wiring diagrams showing factory-installed wiring.

e. Printed performance curves.

f. Operational range diagrams.

g. Compliance with specified referenced standards.

h. Testing by recognized testing agency.

4. Submit product data in PDF (portable document format) file format before or concurrent with samples.

B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in Contract Documents. As applicable, include:

a. Dimensions

b. Identification of products

c. Fabrication and installation drawings

d. Roughing-in and setting diagrams

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring

f. Shopwork manufacturing instructions

g. Templates and patterns

h. Schedules

i. Notation of coordination requirements

j. Notation of dimensions established by field measurement

k. Relationship to adjoining construction clearly indicated

l. Seal and signature of professional engineer if specified

m. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring

2. Submit shop drawings as PDF electronic file

CHOH – 245002 & 287711 01 33 23 - 5

C. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Complete and post the Transmittal Form (CM-16) on the NPS/DSC management software website for processing and documentation of action on submitted samples.

3. Identification: Attach label on unexposed side of Samples that includes:

a. Generic description of Sample

b. Product name and name of manufacturer

c. Sample source

d. Submittal Number and title of appropriate Specification Section

4. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

5. Samples for Initial Selection: Submit manufacturer’s color charts consisting of units or sections of units showing full range of colors, textures, and patterns available.

a. Number of Samples: Submit full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer’s product line. Contracting Officer will return with options selected.

6. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

D. Number of Samples: Submit four sets of Samples. Contracting Officer will retain three Sample sets; remainder will be returned. Construction Materials: Contractor is encouraged to submit products made out of recycled or environmentally responsible material. Every effort will be made by National Park Service to approve these materials.

2.2 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals required by individual Specification Sections.

1. Post informational submittals as PDF electronic files directly to the NPS management software website.

2. Certificates and Certifications: Provide a notarized statement with signature of entity responsible for preparing certification. Certificates and certifications shall be signed by officer or other individual authorized to sign documents on behalf of that entity.

3. Informational submittals that do not comply with requirements specified in Contract Documents will be rejected and one copy will be returned.

CHOH – 245002 & 287711 01 33 23 - 6

B. Coordination Drawings: Comply with requirements specified in Section 01 31 00 "Project Management and Coordination."

C. Contractors Construction Schedule: Comply with requirements specified in Section 01 32 16 "Construction Schedule."

D. Accident Prevention Plan: Comply with requirements specified in Section 01 35 23 "Safety Requirements."

E. Schedule of Values: Comply with requirements specified in Section 01 32 16 "Construction Schedule."

F. Waste Recycling Plan: Comply with requirements specified in Section 01 74 19 "Construction Waste Management and Disposal."

G. Quality Control Plan: Comply with requirements specified in Section 01 40 00 "Quality Requirements."

H. Storm Water Pollution Prevention Plan: Comply with requirements specified in Section 01 57 23 "Temporary Storm Water Pollution Prevention" and storm water permit requirements identified in Section 01 31 00 "Project Management and Coordination."

I. Indoor Air Quality Management Plan: Comply with requirements specified in Section 01 57 19.11 "Indoor Air Quality Management."

J. Leadership in Energy and Environmental Design (LEED™) Submittals: Comply with requirements specified in Section 01 81 13.13 "Sustainable Design Requirements - LEED for New Construction and Major Renovations," Section 01 81 13.16 "Sustainable Design Requirements - LEED for Commercial Interiors," Section 01 81 13.19 "Sustainable Design Requirements - LEED for Core and Shell Development," and Section 01 81 13.23 "Sustainable Design Requirements - LEED for Schools."

K. Qualification Data: Prepare written information demonstrating capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.

L. Welding Certificates: Prepare written certification that welding procedures and personnel comply with Contract Documents. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on American Welding Society (AWS) forms. Include names of firms and personnel certified.

M. Installer Certificates: Prepare written statements on manufacturer’s letterhead certifying Installer complies with Contract Documents and, where required, is authorized by manufacturer for this specific Project.

N. Manufacturer Certificates: Prepare written statements on manufacturer’s letterhead certifying manufacturer complies with Contract Documents. Include evidence of manufacturing experience where required.

O. Product Certificates: Prepare written statements on manufacturer’s letterhead certifying product complies with Contract Documents.

CHOH – 245002 & 287711 01 33 23 - 7

P. Material Certificates: Prepare written statements on manufacturer’s letterhead certifying material complies with Contract Documents.

Q. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting test results of material for compliance with requirements in Contract Documents.

R. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements in Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

S. Research/Evaluation Reports: Prepare written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.

T. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in Contract Documents.

U. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

V. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in Contract Documents.

W. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements specified in Section 01 78 23 "Operation and Maintenance Data."

X. Design Data: Prepare written and graphic information, including: performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable.

Provide name and version of software, if any, used for calculations. Include page numbers.

Y. Manufacturer’s Instructions: Prepare written or published information documenting manufacturer’s recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

Z. Manufacturer’s Field Reports: Prepare written information documenting factory-authorized service representative’s tests and inspections. As applicable, include:

1. Statement on condition of substrates and their acceptability for installation of product.

2. Summary of installation procedures being followed, compliance with requirements and, if not, what corrective action was taken.

CHOH – 245002 & 287711 01 33 23 - 8

3. Results of operational and other tests and a statement of whether observed performance complies with the requirements.

AA. Permit Compliance Products: Prepare required information for compliance with permit provisions. Products include written notification of project startup, suspension, and completion of work; photo documentation of site conditions; reports; and drawings.

PART 3 - EXECUTION

3.1 CONTRACTOR’S REVIEW

A. Review each submittal and check for coordination with other Work of Contract and for compliance with Contract Documents. Note corrections and field dimensions.

3.2 CONTRACTING OFFICER’S ACTION

A. General: Submittals will be disapproved without technical review if identification information is missing, not filled in, or if placed on back of submittal; an incorrect format of submittals is provided; transmittal form is incorrectly filled out; submittals are not coordinated; or submittals do not show evidence of Contractor’s approval.

1. Any work done or orders for materials or services placed before approval shall be at Contractor’s own risk.

B. Action Submittals: Contracting Officer will review each submittal, generate comments on corrections or modifications required, and indicate appropriate action on the Transmittal Form (CM-16). Submittal will be marked as defined below:

1. APPROVED: Acceptable with no corrections.

2. APPROVED WITH NOTATIONS: Minor corrections or clarifications required.

Comments are clear and no further review is required. Contractor shall address review comments when proceeding with the work.

3. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. Contracting Officer will identify reasons for disapproval. Contractor shall revise and resubmit with changes clearly identified.

C. Informational Submittals: Contracting Officer will review each submittal and will either accept or reject it.

D. Partial submittals are not acceptable, will be considered non-responsive, and will be returned without review.

END OF SECTION 01 33 23

PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.
1.2 DEFINITIONS
A. Action Submittals: Written, graphic information, and physical samples that require Government’s responsive action.
B. Informational Submittals: Written information that does not require Government’s responsive action. Submittals may be rejected for not complying with requirements.
C. File Transfer Protocol (FTP): Communications protocol that enables transfer of files to and from another computer over a network and that serves as the basis for standard Internet protocols. An FTP site is a portion of a network located outside of ...
D. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems used for representing documents in a device-independent and display resolution-independent fixed-layout document format.
1.3 GENERAL SUBMITTAL PROCEDURES
A. General: Prepare and submit submittals required by individual Specification Sections and in some cases as requested in drawings. Types of submittals are indicated in individual specific sections.
1. Contracting Officer (CO) reserves right to require submittals in addition to those called for in individual sections.
B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. Review for legibility, accuracy, completeness, and compliance with Contract Documents.
1. Coordinate submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
2. Coordinate transmittal of different types of submittals for related parts of Work so processing will not be delayed because of need for concurrent review coordination.
a. Contracting Officer reserves right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
C. Submittal List: Submittal list is attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements. The requirements of individual Specification Sections and terms and conditions of the Contra...
D. Processing Time: Allow time for submittal review, including time for re-submittals, as follows. Time for review shall commence when e-mail notification is received by Contracting Officer (or designee) indicating submittal has been posted on NPS man...
1. Action Submittals
a. Initial Review: Allow 30 business days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.
b. Re-submittal Review: Allow 15 business days for review of each re-submittal.
2. Informational submittals
a. Review: Allow 11 business days for review of each submittal.
E. Approved Equals:
1. For each item proposed as an "approved equal," submit supporting data, including:
a. Drawings and samples as appropriate.
b. Comparison of the characteristics of the proposed item with that specified.
c. Changes required in other elements of the work because of the substitution.
d. Name, address, and telephone number of vendor.
e. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of re...
2. A request for approval constitutes a representation that Contractor:
a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
b. Will provide the same warranties for the proposed item as for the item specified.
c. Has determined that the proposed item is compatible with interfacing items.
d. Will coordinate installation of an approved item and make changes required in other elements of the work because of the substitution.
e. Waives claims for additional expenses that may be incurred as a result of the substitution.
F. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows:
1. Transmittal Form (CM-16): All submittals shall be transmitted using National Park Service Transmittal Form (CM-16). The form can be downloaded from the DSC Workflows website's Submittal Review page and completed on the NPS/DSC management software w...
a. Complete the general information at the top of form.
b. Provide all required information based on submittal type
c. Attach all related documents.
d. Sign the Contractor section at bottom of the Transmittal Form (CM-16).

2. Physical samples: Complete Transmittal Form (CM-16) on the NPS/DSC management software website as described above. Deliver physical sample to the Contracting Officer (or designee) on site for processing. All comments and actions will be documented ...

G. Identification: Submittal number or other unique identifier, including revision identifier.
1. Submittal number shall use a sequential number (e.g. .001). Re-submittals shall include alphabetic suffix after another decimal point (e.g. .001.A).
H. Re-submittals: Make re-submittals using same process used with initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in the title block on the Transmittal Form (CM-16) and clearly indicate extent of revision.
3. Re-submit submittals until they are marked "Approved" or "Approved with notations".
I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, and others as necessary for performance of construction activities.
J. Use for Construction: Use only final submittals with mark indicating "Approved" or "Approved with notations". Ensure notations have been incorporated and, at a minimum, keep one copy of final approved submittal on site for use during construction.
1.4 CONTRACTOR’S USE OF CAD FILES
A. General: At Contractor’s written request, copies of CAD (Computer Aided Design) files will be provided to Contractor for Contractor’s use in connection with Project, subject to:
1. Files provided as is; no format or other changes to files or changes to objects in the drawing will be done by the Government.
2. Items in CAD files may not be drawn accurately to scale. Contractor shall not rely on the accuracy of items drawn in CAD files.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS
A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each submittal to show which products and options are applicable.
3. As applicable, include:
a. Manufacturer’s product specifications.
b. Manufacturer’s installation instructions: When Contract Documents require compliance with manufacturer’s printed instructions, provide one complete set of instructions to Contracting Officer and keep another complete set of instructions at the proj...
c. Manufacturer’s catalog cuts: Submit only pertinent pages; mark each page of standard printed data to identify specific products proposed for use.
d. Wiring diagrams showing factory-installed wiring.
e. Printed performance curves.
f. Operational range diagrams.
g. Compliance with specified referenced standards.
h. Testing by recognized testing agency.

4. Submit product data in PDF (portable document format) file format before or concurrent with samples.

B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Fully illustrate requirements in Contract Documents. As applicable, include:
a. Dimensions
b. Identification of products
c. Fabrication and installation drawings
d. Roughing-in and setting diagrams
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring
f. Shopwork manufacturing instructions
g. Templates and patterns
h. Schedules
i. Notation of coordination requirements
j. Notation of dimensions established by field measurement
k. Relationship to adjoining construction clearly indicated
l. Seal and signature of professional engineer if specified
m. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring

2. Submit shop drawings as PDF electronic file

C. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.
1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.
2. Complete and post the Transmittal Form (CM-16) on the NPS/DSC management software website for processing and documentation of action on submitted samples.
3. Identification: Attach label on unexposed side of Samples that includes:
a. Generic description of Sample
b. Product name and name of manufacturer
c. Sample source
d. Submittal Number and title of appropriate Specification Section
4. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.
5. Samples for Initial Selection: Submit manufacturer’s color charts consisting of units or sections of units showing full range of colors, textures, and patterns available.
a. Number of Samples: Submit full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer’s product line. Contracting Officer will return with options selected.

6. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that...

D. Number of Samples: Submit four sets of Samples. Contracting Officer will retain three Sample sets; remainder will be returned. Construction Materials: Contractor is encouraged to submit products made out of recycled or environmentally responsible m...

2.2 INFORMATIONAL SUBMITTALS
A. General: Prepare and submit Informational Submittals required by individual Specification Sections.
1. Post informational submittals as PDF electronic files directly to the NPS management software website.
2. Certificates and Certifications: Provide a notarized statement with signature of entity responsible for preparing certification. Certificates and certifications shall be signed by officer or other individual authorized to sign documents on behalf o...
3. Informational submittals that do not comply with requirements specified in Contract Documents will be rejected and one copy will be returned.
B. Coordination Drawings: Comply with requirements specified in Section 01 31 00 "Project Management and Coordination."
C. Contractors Construction Schedule: Comply with requirements specified in Section 01 32 16 "Construction Schedule."
D. Accident Prevention Plan: Comply with requirements specified in Section 01 35 23 "Safety Requirements."
E. Schedule of Values: Comply with requirements specified in Section 01 32 16 "Construction Schedule."
F. Waste Recycling Plan: Comply with requirements specified in Section 01 74 19 "Construction Waste Management and Disposal."
G. Quality Control Plan: Comply with requirements specified in Section 01 40 00 "Quality Requirements."
H. Storm Water Pollution Prevention Plan: Comply with requirements specified in Section 01 57 23 "Temporary Storm Water Pollution Prevention" and storm water permit requirements identified in Section 01 31 00 "Project Management and Coordination."
I. Indoor Air Quality Management Plan: Comply with requirements specified in Section 01 57 19.11 "Indoor Air Quality Management."
J. Leadership in Energy and Environmental Design (LEED™) Submittals: Comply with requirements specified in Section 01 81 13.13 "Sustainable Design Requirements - LEED for New Construction and Major Renovations," Section 01 81 13.16 "Sustainable Design...
K. Qualification Data: Prepare written information demonstrating capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information s...
L. Welding Certificates: Prepare written certification that welding procedures and personnel comply with Contract Documents. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on American Welding Society (A...
M. Installer Certificates: Prepare written statements on manufacturer’s letterhead certifying Installer complies with Contract Documents and, where required, is authorized by manufacturer for this specific Project.
N. Manufacturer Certificates: Prepare written statements on manufacturer’s letterhead certifying manufacturer complies with Contract Documents. Include evidence of manufacturing experience where required.
O. Product Certificates: Prepare written statements on manufacturer’s letterhead certifying product complies with Contract Documents.
P. Material Certificates: Prepare written statements on manufacturer’s letterhead certifying material complies with Contract Documents.
Q. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting test results of material for compliance with requirements in Contract Documents.
R. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements in Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing a...
S. Research/Evaluation Reports: Prepare written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.
T. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requireme...
U. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendatio...
V. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its fi...
W. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements specified in Section 01 78 23 "Operation and Maintenance Data."
X. Design Data: Prepare written and graphic information, including: performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loa...
Y. Manufacturer’s Instructions: Prepare written or published information documenting manufacturer’s recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephon...
Z. Manufacturer’s Field Reports: Prepare written information documenting factory-authorized service representative’s tests and inspections. As applicable, include:
1. Statement on condition of substrates and their acceptability for installation of product.
2. Summary of installation procedures being followed, compliance with requirements and, if not, what corrective action was taken.
3. Results of operational and other tests and a statement of whether observed performance complies with the requirements.

AA. Permit Compliance Products: Prepare required information for compliance with permit provisions. Products include written notification of project startup, suspension, and completion of work; photo documentation of site conditions; reports; and draw...

PART 3 - EXECUTION
3.1 CONTRACTOR’S REVIEW
A. Review each submittal and check for coordination with other Work of Contract and for compliance with Contract Documents. Note corrections and field dimensions.
3.2 CONTRACTING OFFICER’S ACTION
A. General: Submittals will be disapproved without technical review if identification information is missing, not filled in, or if placed on back of submittal; an incorrect format of submittals is provided; transmittal form is incorrectly filled out; ...
1. Any work done or orders for materials or services placed before approval shall be at Contractor’s own risk.
B. Action Submittals: Contracting Officer will review each submittal, generate comments on corrections or modifications required, and indicate appropriate action on the Transmittal Form (CM-16). Submittal will be marked as defined below:
1. APPROVED: Acceptable with no corrections.
2. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. Comments are clear and no further review is required. Contractor shall address review comments when proceeding with the work.
3. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. Contracting Officer will identify reasons for disapproval. Contractor shall revise and resubmit with changes clearly identi...
C. Informational Submittals: Contracting Officer will review each submittal and will either accept or reject it.
D. Partial submittals are not acceptable, will be considered non-responsive, and will be returned without review.