This solicitation package requests proposals for rehabilitation and reconstruction work on locks and canal walls. The National Park Service seeks to repair locks 1, 2 and 5 on the Chesapeake and Ohio Canal as well as reconstruct walls along the Georgetown Canal. Offerors must submit pricing for base requirements and option line items using the provided bid schedule format, which includes unit prices and totals for lock gate replacement, repairs, sediment removal and other structural work. Proposals are also requested for wall reconstruction and repairs at multiple locations using quantities and unit pricing. The solicitation identifies response requirements, prevailing wage rates, small business participation goals and other standard contract clauses. Evaluation will consider price and technical factors. The anticipated award date is not provided.

View the file

Other files

File Type Posted
Sol_140P2022R0130_Amd_0008.pdf PDF
B09_CHOH_245002_287711_Amd_8_-_QA_0008.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_8_-_SF_30_Signed_0008.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_SF_30_Signed_0007.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_MD_Wage_Rates_3-24-23_0007.pdf PDF
B09_CHOH_245002_287711_Amd_7_-_QA_0007.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_7_-_DC_Wage_Rates_3-31-23_0007.pdf PDF
Sol_140P2022R0130_Amd_0007.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013233_PhotoDocs_2023_04_03_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013100_ProjectMngmntCoor_Update_2023_04_05_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_061900_TIMBER_MITER_GATES_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_WQC-DC-2022-98_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_Revised_Bid_Schedule_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_CHOH_245002___287711_-_AMENDMENT_6_DRAWINGS__0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013100_ProjectMngmntCoor_Update_2023_04_05_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_Corrected_Price_List_update_4-3-23_0006.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_6_-_CHOH_245002-287711_QA_2023_04_06_0006.XLS XLS spreadsheet
Sol_140P2022R0130_Amd_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_013216_ConstructionSchedule_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_024120_SELECTIVE_STRUCTURE_DEMOLITION_0006.pdf PDF
B09_CHOH_245002_287711_Amd_6_-_061900_TIMBER_MITER_GATES_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_013233_PhotoDocs_2023_04_03_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_024120_SELECTIVE_STRUCTURE_DEMOLITION_0006.docx DOCX document
B09_CHOH_245002_287711_Amd_6_-_013216_ConstructionSchedule_2023_04_03_0006.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_051200_rev1_0005.PDF PDF
Sol_140P2022R0130_Amd_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-__ADDENDUM_5_DRAWINGS_Updated_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_330125_SEWER_LINING_CIPP_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_Price_List_update_2023_03_28_0005.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_5_-_061900_rev1_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_SF30_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_312000_EARTHWORK_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_033000_rev11_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_Price_List_update_2023_03_28_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_011000_SummaryOfWork_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_012700_rev1_0005.PDF PDF
B09_CHOH_245002_287711_Amd_5_-_SF24_Bid_Bond_0005.pdf PDF
B09_CHOH_245002_287711_Amd_5_-_QA_v3_0005.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_3_-_041000_Mortar_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_013323_Submittal_Procedures_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_Corrected_Price_List_0004.xlsx XLSX spreadsheet
B09_CHOH_245002_287711_Amd_3_-_015000_Temp_Facl_Update_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_SF-30_0004.pdf PDF
B09_CHOH_245002_287711_Amd_3_-_QA_v2_0004.xlsx XLSX spreadsheet
Sol_140P2022R0130_Amd_0004.pdf PDF
Sol_140P2022R0130_Amd_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03_-_Attach_1_140P2022R0130_Questions_-_2_27_2023_0003.xlsx XLSX spreadsheet
B10_CHOH_245002_287711_Amd_03_-_Attach_2__012700_DefinitionOfContractLineItems_Updated_2-17-23_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03-_Attach_4_SF30_with_updated_CLIN_0028_Signed_0003.pdf PDF
B10_CHOH_245002_287711_Amd_03_-_Attach_3_S0_01A_DESIGN_NOTES_REV_1_0003.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 04/22/2022

Document No.

140P2022R0130 Document Title

CHOH 245002 287711 – Repair Canal Inlet Lock 1 and Lift Locks 1,2 and 5 (CHOH 245002) and Reconstruct Georgetown Canal Walls (CHOH 287711)

PART I – THE SCHEDULE

SECTION A – SOLICITATION / CONTRACT FORM

Solicitation, Offer, and Award (SF-1442) - pages 1- 3 of this package

SECTION B – BID SCHEDULE

CONTRACT PRICE SCHEDULE

SOLICITATION NUMBER: 140P2022R0130

PARK - PMIS: Chesapeake and Ohio Canal (CHOH) 245002/287711 PROJECT TITLE: Repair Canal Inlet Lock 1 and Lift Locks 1,2 and 5 (CHOH 245002) and Reconstruct Georgetown Canal Walls (CHOH 287711)

Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of summation error, the total corrected amounts govern. Round totals & extended prices to whole dollars. Refer to section “H” of this solicitation for additional information regarding contract options

BID SCHEDULE 1

CHOH 245002 – REPAIR LOCKS 1, 2, & 5

CONTRACT LINE

ITEM NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI)

TITLE QUANTITY UNIT OF

MEASURE

UNIT

PRICE

TOTAL

PRICE

Lock 5 (Upper Gate & Sill Replacement, Controls, Culvert Replacement, Channel Armoring, and Wall Replacement)

1 LS

0002 Lock 5 Relining Bypass Pipe 210 LF 0003 Lock 5 Bridge Replacement 1 LS 0004 Guard Lock 1 LS

0005 Guard Lock Mortared Stone Wall Reconstruction – New Stone 227 CF

0006 Guard Lock Mortared Stone Wall Construction – Salvaged Stone 51 CF

0007 Guard Lock – Concrete Wall 700 CF

0008 Guard Lock – Sediment Removal & Disposal 122 CY

0009 Guard Lock – Debris Removal Offsite 1 LS

0010 Lift Lock 1 1 LS

Document No.

140P2022R0130 Document Title

CHOH 245002 287711 – Repair Canal Inlet Lock 1 and Lift Locks 1,2 and 5 (CHOH 245002) and Reconstruct

0011 Lift Lock 1 - Repointing 6,000 SF

0012 Lift Lock 1 – Sediment Removal & Disposal 178 CY

0013 Lift Lock – Dutchman Repair (including shoring) 378 CF

0014 Lift Lock 1 – Foundation Repair 42 CY 0015 Lift Lock 2 1 LS 0016 Lift Lock 2 – Repointing 7,000 SF

0017 Lift Lock 2 – Sediment Removal & Disposal 69 CY

0018 Lift Lock 2 – Dutchman Repair (including shoring) 294 SF

0019 Lift Lock 2 – Foundation Repair 49 CY

0020 Level 1 – Drainage Improvements & Fence Repairs 1 LS

0021 Level 2 – Wall Repairs 1 LS SCHEDULE 1 TOTAL BASE PRICE (Contract Line Item Number 0001 through 0021) ----------

0022 Option 1: Lock 5, Inlet Lock SW Wall Repair 1 LS

0023 Option 2: Lock 5 Masonry Repair 1 LS

0024 Option 3: Lock 5, Replace 24" Bypass Pipe 200 LF

0025 Option 4: Inlet Lock Bridge Replacement 1 LS

0026 Option 5: Level 1 North Wall 1 LS 0027 Option 6: Level 1 South Wall 1 LS

0028 Option 7: Level 2 South Wall Repairs 1 LS

0029 Option 8: Lock 1 Downstream Lock Gates 1 LS

SCHEDULE 1 TOTAL PRICE FOR OPTIONS (Contract Line Items 0022 through 0029) ---- SCHEDULE 1 TOTAL PRICE FOR BASE AND OPTIONS (Contract Line Items 0001 through 0029) -----------------

All measurement and payment information is included in the project specifications, Section 012700.

Document No.

140P2022R0130 Document Title

CHOH 245002 287711 – Repair Canal Inlet Lock 1 and Lift Locks 1,2 and 5 (CHOH 245002) and Reconstruct

BID SCHEDULE 2

CHOH 287711 – REPAIR GEORGETOWN WALL

CONTRACT LINE

ITEM NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI)

TITLE QUANTITY UNIT OF

MEASURE

UNIT

PRICE

TOTAL

PRICE

0030 34th St. Wall 1 LS

34th St. Wall – Mortared Stone Wall Reconstruction 2,700 CF

0032 34th St. Wall – Concrete Foundation 540 CF

0033 1046 Potomac St. Wall 1 LS

0034 1046 Potomac St. – Mortared Stone Wall Reconstruction 1,050 CF

0035 1046 Potomac St. – Repointing 18 SF 0036 3207 Grace St. Wall 1 LS

0037 3207 Grace St. – Mortared Stone Wall Façade 250 CF

0038 Wisconsin Ave. Wall 1 LS

Wisconsin Ave. – Mortared Stone Wall Reconstruction – Salvaged Stone

355 CF

0040 Wisconsin Ave. – Repointing 480 SF

Wisconsin Ave. – Drylaid Stone Wall Reconstruction – Salvaged Stone – Includes Coping

225 CF

SCHEDULE 2 TOTAL BASE PRICE (Contract Line Items 0030 through 0041) ------- SCHEDULE 1 & 2 TOTAL PRICE FOR ALL CLINS (Contract Line Items 0001 through 0041) - All measurement and payment information is included in the project specifications, Section 012700.

SECTION C – SPECIFICATIONS / DRAWINGS

The work of this contract is for the rehabilitation of lift locks 1, 2, and 5 and reconstruction of the Georgetown Canal wall.

PART I – THE SCHEDULE
SECTION A – SOLICITATION / Contract Form
SECTION B – Bid Schedule
SECTION C – Specifications / Drawings
SECTION D – packing and marking
SECTION E – Inspection and Acceptance
SECTION F – Deliveries or Performance
52.211-10 Commencement, Prosecution, and Completion of Work - Alternate I (Apr 1984)
52.211-12 Liquidated Damages—Construction (Sep 2000)
52.211-13 Time Extensions (Sept 2000)
52.211-18 Variation in Estimated Quantity (Apr 1984)
52.242-14 Suspension of Work (Apr 1984)
SECTION G – Contract Administration Data
1452.201-70 Authorities and Delegations (Sep 2011)
1452.204-70 Release of Claims—Department of the Interior (Jul 1996)
Notice To Contractors - Contractor Performance Assessment Reporting System (Dec 2015)
Electronic Invoicing and Payment Requirements – Internet Payment Platform (Apr 2013)
SECTION H – Special Contract Requirements
Special Clause 1: Option for Additional Services—Separately Priced Line Items
Special Clause 2: Key Personnel
Special Clause 3: Key Trades
Special Clause 4: Small Business Participation
Special Clause 5: Working in Federal Buildings or Federally Controlled Indoor Workspaces
52.246-12 Inspection of Construction (Aug 1996)
PART II – Contract Clauses
SECTION I – Contract Clauses
Clauses Incorporated by Reference
1452.203-70 Restrictions on Endorsements (Jul 1996)
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees Of Whistleblower Rights (JUN 2020)
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021)
52.204-25 Prohibition on Contracting for Certain Telecommunications and video Surveillance Services and Equipment (Aug 2020)
1452.215-70 Examination of Records by the Department of the Interior (Apr 1984)
52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Sep 2021)
52.222-54 Employment Eligibility Verification (Nov 2021)
52.223-9 Estimate of Percentage of Recovered Material Content for EPA- Designated Products—Alternate I (May 2008)
52.225-11 Buy American – Construction Materials Under Trade Agreements (Nov 2021)
1452.228-70 Liability Insurance. (Jul 1996)
52.236-1 Performance of Work by the Contractor (Apr 1984)
52.236-2 Differing Site Conditions (Apr 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)
52.236-5 Material and Workmanship (Apr 1984)
52.236-6 Superintendence by the Contractor (Apr 1984)
52.236-7 Permits and Responsibilities (Nov 1991)
52.236-8 Other Contracts (Apr 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)
52.236-10 Operations and Storage Areas (Apr 1984)
52.236-11 Use and Possession Prior to Completion (Apr 1984)
52.236-12 Cleaning Up (Apr 1984)
52.236-13 Accident Prevention (Nov 1991)
52.236-14 Availability and Use of Utility Services (Apr 1984)
52.236-15 Schedules for Construction Contracts (Apr 1984)
52.236-17 Layout of Work. (Apr 1984)
52.236-21 Specifications and Drawings for Construction (Feb 1997)
52.236-26 Preconstruction Conference (Feb 1995)
1452.236-70 Prohibition Against Use of Lead-based Paint (Jul 1996)
52.252-2 Clauses Incorporated by Reference (Feb 1998)
Authorized Deviations in Clauses. (Nov 2020)
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – List of Attachments
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – Representations, Certifications and Other Statements of Offerors
Provisions Incorporated by Reference
52.229-11 Tax on Certain Foreign Procurements – Notice of Representation (Jun 2020)
52.204-8 Annual Representations and Certifications (Jan 2022)
52.204-24 Representations Regarding Certain Telecommunications and Video Surveillance Services and Equipment (Nov 2021)
52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020)
52.209-7 Information Regarding Responsibility Matters (Oct 2018)
52.209-13 Violation of Arms Control Treaties or Agreements-Certification (Nov 2021)
SECTION L – Instructions, Conditions and Notices to OFFERORS
Provisions Incorporated by Reference
52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions. (Jun 1988)
1452.215-71 Use and Disclosure of Proposal Information—Department of the Interior (Apr 1984)
52.216-1 Type of Contract (Apr 1984)
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999)
52.225-12 Notice of Buy American Requirement – Construction Materials Under Trade Agreements (May 2014)
52.228-1 Bid Guarantee (Sep 1996)
52.233-2 Service of Protest Department of the Interior (Sept 2006) (Deviation) (Jul 1996)
52.236-27 Site Visit (Construction) – Alternate I (Feb 1995)
52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
52.252-5 Authorized Deviations in Provisions (Nov 2020)
Instructions for the Submission of Offers and Other Information
SECTION M – Evaluation Factors for Award
A. BASIS FOR AWARD
B. EVALUATION PROCESS
C. EVALUATION FACTORS
Special Provision 1: Evaluation of Options