Amendment_08_Revised_FINAL_RFIs_0008.pdf
PDF 229 KB Posted
- Attached to
- Re-Solicit: FRST 240745 - Rehab Sheriff House
- Solicitation number
- 140P2021R0148
About this file
This amendment to the solicitation provides responses to questions from offerors. The solicitation is for the rehabilitation of the historic sheriff's house at First State National Historical Park in New Castle, Delaware. Key details include that the requirement is for exhibit fabrication, audiovisual equipment, and rehabilitation of the building in accordance with preservation standards. Electronic files for graphics will be provided to the successful offeror. The submission date for proposals remains October 18, 2021, with anticipated notice to proceed on December 13, 2021 and a period of performance in line with the original solicitation. Hazardous materials including lead and asbestos were previously surveyed. The scope of work includes repair of doors, windows, and plaster as well as repointing of brick and stone masonry.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2021R0148 x x
0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
FRST 24074510/12/20210008
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/16/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
1. Revise FINAL RFIs.
2. Proposal due date and time remain unchanged.
3. All other solicitation provisions and clauses remain unchanged.
Direct all questions and proposals to both; jennifer_braaten@nps.gov and tony_jasper@nps.gov.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Tony Jasper
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
FRST 240745
Rehabilitation Historic Sheriff's House
Solicitation Number 140P2021R0148
Solicitation Period RFI's
# Question Govt. Response
For Volume 1, Factor 1 – Experience, Subfactor 1A – Project
Experience, the following is stated with regard to the number of projects offerors are responsible to submit
“Submit the attached "Project Experience" form addressing specific experience elements below for up to 3 relevant projects completed in the last 15 years” (RFP p.46). In the
Key Trades paragraph, this is countered by asking for “The offeror shall submit a maximum of three (3) exhibit projects
(Samples of Work) produced within the last five (5) years”
(RFP p.46). Please clarify if this key trades paragraph should be last 15 years to match the preceding paragraph and/or if the key trades paragraph is an optional requirement for submission.
The language in the solicitation is correct, the Key Trades requirement is from the last 5 years, not 15 years. Also, the Key
Trades submission is not optional.
For Volume 1, the following is said for the organization and submission, “Include folders and files for electronic formats named as follows:” (RFP p.46). Please clarify if these factors are to be separate documents or be incorporated into a larger Volume 1 document. In other words, would the National Parks Service prefer 1 PDF with each Factor tabbed/bookmarked or does the NPS desire each Factor to be submitted as a separate PDF file in a
Volume 1 zipped folder?
The Volume 1 submission should just be one PDF file, and the
Volume 2 submission should be one PDF file.
Note #12 on planSP1.1 The plans mention that in some cases to run piping perpendicular to the thru floor joists.
This cannot be accomplished.
Design Team disagrees. Please refer to the entire keynote #12 on
SP1.1. Additionally, see detail F on S3.5 for penetrations of joist members.
Can some soffits be added for some of the piping that is to run perpendicular to the joists?
No soffits are permitted unless specifically called out and detailed in the contract documents.
Plans show risers from floor to floor in the wall. Will the wall be insulated so the wet pipe riser does not freeze in cold weather?
There is no wet sprinkler piping shown within any of the exterior walls.
Do we provide any safety factor in our hydraulic calculations?
Yes, refer to specification sections 211313 1.5.E.1 and 211316
1.5.E.1 for the required sprinkley system safety factor
Will we be able to submit change orders for escalating material costs through the duration of the project?
No, this contract will be awarded as a firm fixed price contract.
Regarding Security and Video Surveillance Systems - Can the requirement for a BICSI / RRDD certification be waived and or can this service be subcontracted? Also, can the requirement for Cisco CCNP certified engineer be waived and or can this service be subcontracted?
Certification requirements cannot be waived, but the services can be subcontracted to an owner approved subcontractor
Would the National Parks Service accept natural gas substitutions for the heat pump VRF system to allow for reduced electrical load and higher efficiency?
No. Construction shall follow drawings and specs.
Is the Electrician providing and installing grounding from the Main Ground Buss Bar to the Telecommunications
Ground Buss Bar?
The ground bars and associated cabling are indicated on the grounding and bonding diagram on 2/E6.2. Electricians traditionally furnish and install these grounding and bonding components, however, it is not the intent of the Contract Document drawings and specifications to delineate which trade or subcontractor must perform which portion of the Work.
Work has been indicated on the electrical drawings as a matter of organizing the information (rather than assigning Work) so that the users of the documents can find the information they need in order to fulfill their responsibilities. The assignment of Work is solely the responsibility of the Prime(or General) Contractor.
Is the Electrician providing & installing all Sleeves & Fire
Stop?
Sleeves for raceway and cable penetrations of non-fire-rated construction are specified under Division 26. Penetration firestopping is specified under
Division 7. Electricians traditionally furnish and install sleeves and sleeve seals for electrical raceways and cabling. Electricians occasionally furnish and install firestopping as it relates to their Work. As stated in the response to question 10, It is not the intent of the Contract Document drawings and specifications to delineate which trade or subcontractor must perform which portion of the Work. The assignment of Work is solely the responsibility of the Prime (or General) Contractor.
Is Electrician or GC providing & installing the Plywood
Backboards?
While plywood backboards are specified under Division 27 and are indicated on sheets E1.1 and E6.3, it is not the intent of the Contract
Document drawings and specifications to delineate which trade or subcontractor must perform which portion of the Work. The assignment of Work is solely the responsibility of the Prime (or General) Contractor.
Is the Electrician providing & installing all Junction Boxes, Pull Boxes & Outlet Boxes?
Raceways and boxes for electrical systems are specified under Division 26.
Pathways for communications systems are specified under Division 27.
Raceways,conduits, boxes, cabinets and related components are indicated on the electrical (E), security (ES), and fire alarm (FA) drawings. While electricians traditionally furnish and install raceways and boxes for electrical, communications, fire alarm, and security systems, the assignment of Work is solely the responsibility of the Prime (or General)
Contractor.
Is the Electrician providing & installing all cable pathways
(OSP Duct Bank, Cable Tray, Conduit, Innerduct etc.)?
Cable pathways, duct bank, cable tray, conduit, etc. are specified under
Divisions 26 and 27 and are indicated on the electrical (E), security (ES), and fire alarm (FA) drawings. While electricians traditionally furnish and install these components, the assignment of Work is solely the responsibility of the Prime (or General) Contractor.
A7.5/2 notes fix door frame on 1 side. Door schedule notes a lot of repair. Do the national parks service have someone covering all of these repairs?
Door/door frame repair is part of contract. Schedule lists "level of repair", Spec 06 03 12 Historic Wood Repair defines those levels.
None of the elevations or notes mention door casings yet they are shown on A8.1. Are these needed anywhere?
All existing door casings are to remain and/or be repaired unless noted otherwise. New door openings are to receive wood casings as indicated on door schedule. See sheet A8.1
X3.06 – Graphic Panel Grids – Elev. 1 notes “Adj” support & wood trim. These are panels w/ specific dimensions & are fastened together. Please clarify adjustable note.
This refers not to the word "adjustable", but rather "adjacent"
18 What finish is STN-1 on the frame on pg. X2.03/1? Per specification 09 93 00 3.5A stain is to match existing.
Where does the ballot box go?
The ballot box is part of Graphic Rails 7. Location is shown on Sheet
X1.01
The cased opening from Hall 102 to Exhibit 103 looks dark like its new. I don’t see anything else on it though. Please confirm if you need this. If so, spec?
E13 is an existing cased opening. See sheet A8.1 for any required repair work
Will subcontractors need to provide a Bid Bond and/or
Performance Bond?
NPS will not require subcontractors to be bonded, only the prime contractor is required to submit bid/performance/payment bonds.
I am with xxxxxxxxxxx, we were the exhibit design sub consultant to GWWO on this project. We were wondering if we were able to join a fabrication team as a sub consultant for the media programming or if we are excluded since we were the original exhibit designers?
Unfortunately, no firms that were part of the design work will be able to be a subcontractor for the construction effort.
Can you clarify what metal roof areas, if any, are being replaced. The drawings indicate coating the metal roofs in a few different area's as per note 7.4.
1/AD.2 Note 7.1 is to remove standing seam roof. See Roof Plan A
1.3, note Roof Type 3, and sheet AC.2 for detail 2 Metal Roof - New.
There is a Dell computer specified however there are no details. That particular model is available in several different configurations. Also, computers are normally provided and maintained by a company’s IT department.
Can we please get more information on this element and if they have people to manage it?
As specified the Dell computer is to be a Precision 3930
Workstation. The included link shows the computer pre-configured.https://nam10.safelinks.protection.outlook.com/?url=ht tps%3A%2F%2Fwww.dell.com%2Fen-us%2Fwork%2Fshop%2Fworkstations-isv-certified%2Fprecision-
3930-rack-workstation%2Fspd%2Fprecision-3930r-workstation%2Fxctop3930rus%3Fview%3Dconfigurations%26config urationid%3Dbacd8d0e-fe54-4e3e-8299-
4f26516e31c2&data=04%7C01%7C%7C0b43e180a9da434407ed08d
98cd1c03c%7C9cad90d394e74d7886a4a09f6fa733e9%7C1%7C0%7
C637695654788005657%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiM
C4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D
%7C1000&sdata=IKNKhpz5aFd%2BUJKiqJdJnXV9nfDlVqL9AF9iGZPz
Rgs%3D&reserved=0
Monitor as specified is a dell 24"
There are a lot of “Exhibit” components to this museum that are directly related to the AV Equipment. Can you put me in touch with the vendor that will be building those components?
Exhibit components as well as AV Equipment is included in this contract.
There is a “Table” display/touchscreen. Will the company creating the exhibit portion of this project also be making the support for that display?
The exhibits are part of the contract. Specific Means and Methods are not directed; however, the table display is included in the contract documents and therefore should be constructed as part of the exhibit contract.
Lastly for now, will any of our components be mounted to the structure walls? Or just to exhibit surfaces?
components shall be fastened securely
3/X2.03- What material is this poster made of? No
Millwork required
Please change reference from "TYPE G-1 GRAPHIC" to "GRAPHIC
TYPE 4", see also the "GRAPHIC SCHEDULE on drwg X0.00.
Are all Graphics supplied or do they need to be purchased
(photos, images, drawings, etc.)?
All electronic files for graphics are to be supplied to the successful bidder. The bidder is responsible for producing and installing final graphics per the "GRAPHIC SCHEDULE".
4/X2.03- The PNT-4 blue area- is this an MDF panel?? Yes, please refer to "GRAPHIC TYPE 3" on the "GRAPHIC SCHEDULE"
1/X2.01- Please provide specs and direction for what materials are required for the “framed Repro Object”.
This is a reproduction of a historic flag that will be purchased by the fabricator and will be framed and installed by the successful bidder.
Can more details be provided for the acrylic vitrine and sloped riser box at Interactive #5? Are the sloped riser boxes MDF??
See also drwg. 4/ X3.09. Yes, the riser box is MDF w/ "PNT-1A
FINISH"
Specifications -
Division 33 – Utilities
33 01 30.73 Manhole Rehabilitation
Does this apply to this project? If so where – which manholes? (I did not see on the plans/drawings where this spec. / work is noted to be performed)
Sewer manhole at the end of the santiary line to be replaced to the northeast of the building is to be rehabilitated per the specification section 330130.73.
Reference drawing X3.12 – Details, Room 103, Display shelving –
Shelf schedule calls out for shelves to be Maple, horizontal dividers are called out WD-1 (white oak), no callout noted for the vertical dividers or for the slatwall. Need clarification.
All shelves to be solid, Grade A or prime WD-1. All horizontal and vertical dividers are to be WD-1 (veneer ply with hardwood trimmed edges).
Slatwall is called out as PNL-5 on the "FINISH SCHEDULE", w/ "PNT-1A
FINISH"
Reference drawing X1.03 - AV1, no detail indicated on drawings for the frame around AV1. See drwg. 1A on new drwg X2.03
Is there any actual lead abatement anticipated to a part of this project?
Lead abatement is a part of this package as included in 02 83 13, the hazardous materials report. Lead-based paint will be disturbed during the course of construction/rehabilitation. It is not the intent of this project to perform lead-based paint abatement; however, Contractor is responsible for ensuring compliance with all OSHA, Delaware, and EPA requirements dor the disturbance of lead-based and/or lead-containing paints.
37 Will a lead abatement scope of work be issued for the project?
No separate scope will be issued. A hazardous material survey was done
July 2019 and the report is included in the solicitation package. Further 02
83 13 requires the submittal of a lead compliance plan.
Will the government define what, if any, clearance criteria will be required for possible lead abatement work?
A wipe clearance is not included. Air sampling, waste characterization, and visual inspections will provide QA throughout the project. Please refer to specification section 02 83 13.
Can an ADA signage schedule be provided along with ADA signage specifications? A separate ADA signage schedule and specification will not be provided
We are aware that the area of temporary barricades will not be large enough to facilitate dumpsters. Have any locations been designated for dumpster (i.e. Market Street) as was the location of dumpster from the abatement services?
Nothing has been designated. The contractor would need to get these locations approved by the Park and governing municipality.
What is the expectations of the lead presence on the materials that are either being reused or demolished? Many of our subcontractors have questions about what guidelines that need to be followed.
It is not the intent of this project to abate lead-based and/or lead-containing paint from the structure. Lead-based paint will be impacted during the course of rehabilitation. The Contractor is responsible for adhereing to OSHA, EPA, and Delware requirements per the specifications. Contactors should be familiar with training, engineering controls, work practices, material/waste handling, and transportration and disposal requirements established within the regulations.
Can we quote two interior storms seperated with horizontal mullion at the mid-rail on all Type A and Type B Windows?
Submit proposal per drawings and specs.
Can we quote all interior storms as fixed (still removable with glazer cup). ? Submit proposal per drawings and specs.
With the proposal date moved to October 18, what is the new
Notice to Proceed and Anticipated Start Date for this project so we can revise our schedule and narratives?
Period of Performance number of days remains unchanged. Anticipated
NTP is 12/13/2021
Given the new submission date, would NPS want an alternate for winter conditions based on the outside work?
It is anticipated that the schedule would be developed based on the expected time of award.
46 Is this a LEED Certified Project?
No, but it shall comply with applicable Federal Sustainability requirements. See 01 81 13 Sustainable Design Requirements for Non
LEED projects for more detail.
47 Are there any provisions for hunting season schedules? No
Are there any protected species occupying or have a history of occupying the building? (Example: Bats)
No federally listed or proposed species or critical habitat under the jurisdiction of the USFWS occur in the area that will be affected by the project.
Are there limitations to the number of contractor vehicles who will need to park in the area? (original RFP RFI) See 01 50 00 Temporary Facilities and Controls Section 3.3.A.C Parking.
Has any HAZMAT testing been performed on any plaster, paint, flooring or flooring adhesive, or insulation? (original RFP RFI)
Yes. please review the Hazardous Materials Survey performed July 22, 2019. Asbestos was only found in ceiling tile and suspected but untested in roofing materials. The celing tiles were abated in Nov 2020. There was possible asbestos in the basement soil which was abated at the same time.
The plans refer to the Sec of the Interiors guidelines for rehabilitation of historic buildings. The ASTM codes for masonry which relate only to Portland cements and new brick.
Will codes ASTM E2260, C141 and 1713 be incorporated into the specifications. (original RFP RFI)
Reference standards ASTM E2260, ASTM C1713, and ASTM C141 apply to specification 04 03 43 Historic Brick and Masonry Repointing. In addition, see reference standards called out in specification 04 05 11 which is referenced within 04 03 43 and thus also apply.
The drawings refer to the North wall saying we should just clean the stone, does this mean removing the plaster from the
North exterior wall where the old jail used to be attached?
Then brush cleaning the actual stone? That plaster was meant for an internal wall, not an external one. (original RFP RFI)
See sheet A3.2, note 4.7 "Clean stone, masonry and stucco". Also refer to specification 04 01 10 Masonry Cleaning. Plaster removal on the exterior north wall is not called for in either in the plans or specifications.
Confirming that the cisterns in the basement are to be filled and not repaired and left to be part of the experience. (original
RFP RFI)
Treat as per "Z" in Structural Repair Schedule as shown on sheet S1.0.
Will there be a mainenance term (maintenance bond) for this project? (original RFP RFI)
A maintenance bond is not required. Please review FAR 52.246-21, Warranty of Construction, for maintenance period (1 year from final
Government acceptance or Government possession).
Has the building, walls, ceilings, trim, etc previously been tested for lead paint or asbestos? (original RFP RFI)
Yes. Please review the Hazardous Materials Survey performed July 22, 2019. As noted above, asbestos was only found in ceiling tile and suspected but untested in roofing materials. The celing tiles were abated in Nov 2020. There was possible asbestos in the basement soil which was abated at the same time.
What extent do we want to repair plaster cracks? If entire wall has cracks throughout, do we want to skim coat the entire wall surface? (original RFP RFI)
See spec section 09 03 20 with requirements for plaster crack repair.
The existing wood windows, sills, etc. look to need attention, but not really mentioned in the details of work to be completed. Are we to leave them out of the bid or will it be addressed in an addendum? (original RFP RFI)
Drawings note painting windows both interior and exterior. Spec Section
06 03 12 Historic Wood Repair lists levels of repair and includes trim, millwork, windows, doors, etc. Section 1.3 Quantities describes levels of treatment and quantities.
Since no trailers are allowed due to historic district, where are we to store items removed that are to be reinstalled? (original RFP
RFI)
Means and methods are up to the contractor. See section 01 11 00
Summary of Work paragraph 1.3 Contractor Use of Premises.
Will historic items in need of a refinish be allowed to be removed from the property and restored/refinished off site? (original RFP
RFI)
Yes. Location to be reviewed as submitted in the Historic Preservation
Treatment Plan per 01 35 91. Part 1.5 Storage and Protection addresses this.