This document contains a request for information (RFI) related to a solicitation for the rehabilitation of a historic sheriff's house at First State National Historical Park in New Castle, Delaware. The solicitation seeks proposals for renovations to the building including structural repairs, new mechanical and electrical systems, and exhibit fabrication and installation. Responses to 42 questions posed by potential offerors provide clarification on requirements for the project and address topics such as the treatment of existing doors and casings, roof replacement details, security and AV systems specifications, exhibit component production, and lead abatement procedures. The RFI establishes a proposal due date that remains unchanged from the original solicitation and directs all further questions to two points of contact.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2021R0148 x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

FRST 24074510/08/20210006

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/16/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1. Incorporate DRAFT RFIs.

2. Proposal due date and time remain unchanged.

3. All other solicitation provisions and clauses remain unchanged.

Direct all questions and proposals to both; jennifer_braaten@nps.gov and tony_jasper@nps.gov.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Tony Jasper

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

FRST 240745

Rehabilitation Historic Sheriff's House

Solicitation Number 140P2021R0148

Solicitation Period RFI's

# Question Govt. Response

For Volume 1, Factor 1 – Experience, Subfactor 1A – Project

Experience, the following is stated with regard to the number of projects offerors are responsible to submit

“Submit the attached "Project Experience" form addressing specific experience elements below for up to 3 relevant projects completed in the last 15 years” (RFP p.46). In the

Key Trades paragraph, this is countered by asking for “The offeror shall submit a maximum of three (3) exhibit projects

(Samples of Work) produced within the last five (5) years”

(RFP p.46). Please clarify if this key trades paragraph should be last 15 years to match the preceding paragraph and/or if the key trades paragraph is an optional requirement for submission.

The language in the solicitation is correct, the Key Trades requirement is from the last 5 years, not 15 years. Also, the Key

Trades submission is not optional.

For Volume 1, the following is said for the organization and submission, “Include folders and files for electronic formats named as follows:” (RFP p.46). Please clarify if these factors are to be separate documents or be incorporated into a larger Volume 1 document. In other words, would the National Parks Service prefer 1 PDF with each Factor tabbed/bookmarked or does the NPS desire each Factor to be submitted as a separate PDF file in a

Volume 1 zipped folder?

The Volume 1 submission should just be one PDF file, and the

Volume 2 submission should be one PDF file.

Note #12 on planSP1.1 The plans mention that in some cases to run piping perpendicular to the thru floor joists.

This cannot be accomplished.

Design Team disagrees. Please refer to the entire keynote #12 on

SP1.1. Additionally, see detail F on S3.5 for penetrations of joist members.

Can some soffits be added for some of the piping that is to run perpendicular to the joists?

No soffits are permitted unless specifically called out and detailed in the contract documents.

Plans show risers from floor to floor in the wall. Will the wall be insulated so the wet pipe riser does not freeze in cold weather?

There is no wet sprinkler piping shown within any of the exterior walls.

Do we provide any safety factor in our hydraulic calculations?

Yes, refer to specification sections 211313 1.5.E.1 and 211316

1.5.E.1 for the required sprinkler system safety factor

Will we be able to submit change orders for escalating material costs through the duration of the project?

No, this contract will be awarded as a firm fixed price contract.

Regarding Security and Video Surveillance Systems - Can the requirement for a BICSI / RRDD certification be waived and or can this service be subcontracted? Also, can the requirement for Cisco CCNP certified engineer be waived and or can this service be subcontracted?

Certification requirements cannot be waived, but the services can be subcontracted to an owner approved subcontractor

Would the National Parks Service accept natural gas substitutions for the heat pump VRF system to allow for reduced electrical load and higher efficiency?

No. Construction shall follow drawings and specs.

Is the Electrician providing and installing grounding from the Main Ground Buss Bar to the Telecommunications

Ground Buss Bar?

The ground bars and associated cabling are indicated on the grounding and bonding diagram on 2/E6.2. Electricians traditionally furnish and install these grounding and bonding components, however, it is not the intent of the Contract Document drawings and specifications to delineate which trade or subcontractor must perform which portion of the Work.

Work has been indicated on the electrical drawings as a matter of organizing the information (rather than assigning Work) so that the users of the documents can find the information they need in order to fulfill their responsibilities. The assignment of Work is solely the responsibility of the Prime(or General) Contractor.

Is the Electrician providing & installing all Sleeves & Fire

Stop?

Sleeves for raceway and cable penetrations of non-fire-rated construction are specified under Division 26. Penetration firestopping is specified under

Division 7. Electricians traditionally furnish and install sleeves and sleeve seals for electrical raceways and cabling. Electricians occasionally furnish and install firestopping as it relates to their Work. As stated in the response to question 10, It is not the intent of the Contract Document drawings and specifications to delineate which trade or subcontractor must perform which portion of the Work. The assignment of Work is solely the responsibility of the Prime (or General) Contractor.

Is Electrician or GC providing & installing the Plywood

Backboards?

While plywood backboards are specified under Division 27 and are indicated on sheets E1.1 and E6.3, it is not the intent of the Contract

Document drawings and specifications to delineate which trade or subcontractor must perform which portion of the Work. The assignment of Work is solely the responsibility of the Prime (or General) Contractor.

Is the Electrician providing & installing all Junction Boxes, Pull Boxes & Outlet Boxes?

Raceways and boxes for electrical systems are specified under Division 26.

Pathways for communications systems are specified under Division 27.

Raceways,conduits, boxes, cabinets and related components are indicated on the electrical (E), security (ES), and fire alarm (FA) drawings. While electricians traditionally furnish and install raceways and boxes for electrical, communications, fire alarm, and security systems, the assignment of Work is solely the responsibility of the Prime (or General)

Contractor.

Is the Electrician providing & installing all cable pathways

(OSP Duct Bank, Cable Tray, Conduit, Innerduct etc.)?

Cable pathways, duct bank, cable tray, conduit, etc. are specified under

Divisions 26 and 27 and are indicated on the electrical (E), security (ES), and fire alarm (FA) drawings. While electricians traditionally furnish and install these components, the assignment of Work is solely the responsibility of the Prime (or General) Contractor.

A7.5/2 notes fix door frame on 1 side. Door schedule notes a lot of repair. Do the national parks service have someone covering all of these repairs?

Door/door frame repair is part of contract. Schedule lists "level of repair", Spec 06 03 12 Historic Wood Repair defines those levels.

None of the elevations or notes mention door casings yet they are shown on A8.1. Are these needed anywhere?

All existing door casings are to remain and/or be repaired unless noted otherwise. New door openings are to receive wood casings as indicated on door schedule. See sheet A8.1

X3.06 – Graphic Panel Grids – Elev. 1 notes “Adj” support & wood trim. These are panels w/ specific dimensions & are fastened together. Please clarify adjustable note.

This refers not to the word "adjustable", but rather "adjacent"

18 What finish is STN-1 on the frame on pg. X2.03/1? Per specification 09 93 00 3.5A stain is to match existing.

Where does the ballot box go?

The ballot box is part of Graphic Rails 7. Location is shown on Sheet

X1.01

The cased opening from Hall 102 to Exhibit 103 looks dark like its new. I don’t see anything else on it though. Please confirm if you need this. If so, spec?

E13 is an existing cased opening. See sheet A8.1 for any required repair work

Will subcontractors need to provide a Bid Bond and/or

Performance Bond?

NPS will not require subcontractors to be bonded, only the prime contractor is required to submit bid/performance/payment bonds.

I am with xxxxxxxxxxx, we were the exhibit design sub consultant to GWWO on this project. We were wondering if we were able to join a fabrication team as a sub consultant for the media programming or if we are excluded since we were the original exhibit designers?

No firms that were part of the design work will be able to be a subcontractor for the construction effort.

Can you clarify what metal roof areas, if any, are being replaced. The drawings indicate coating the metal roofs in a few different area's as per note 7.4.

1/AD.2 Note 7.1 is to remove standing seam roof. See Roof Plan A

1.3, note Roof Type 3, and sheet AC.2 for detail 2 Metal Roof - New.

There is a Dell computer specified however there are no details. That particular model is available in several different configurations. Also, computers are normally provided and maintained by a company’s IT department.

Can we please get more information on this element and if they have people to manage it?

Under further review. Additional information to be provided.

There are a lot of “Exhibit” components to this museum that are directly related to the AV Equipment. Can you put me in touch with the vendor that will be building those components?

Exhibit components as well as AV Equipment is included in this contract.

There is a “Table” display/touchscreen. Will the company creating the exhibit portion of this project also be making the support for that display?

Additional information to be provided. Of note: the exhibits are part of this contract.

Lastly for now, will any of our components be mounted to the structure walls? Or just to exhibit surfaces?

Under further review. Additional information to be provided.

3/X2.03- What material is this poster made of? No

Millwork required

Please change reference from "TYPE G-1 GRAPHIC" to "GRAPHIC

TYPE 4", see also the "GRAPHIC SCHEDULE on drwg X0.00.

Are all Graphics supplied or do they need to be purchased

(photos, images, drawings, etc.)?

All electronic files for graphics are to be supplied to the successful bidder. The bidder is responsible for producing and installing final graphics per the "GRAPHIC SCHEDULE".

4/X2.03- The PNT-4 blue area- is this an MDF panel?? Yes, please refer to "GRAPHIC TYPE 3" on the "GRAPHIC SCHEDULE"

1/X2.01- Please provide specs and direction for what materials are required for the “framed Repro Object”.

This is a reproduction of a historic flag that will be provided by the owner or purchased by the fabricator and will be framed and installed by the successful bidder.

Can more details be provided for the acrylic vitrine and sloped riser box at Interactive #5? Are the sloped riser boxes MDF??

See also drwg. 4/ X3.09. Yes, the riser box is MDF w/ "PNT-1A

FINISH"

Specifications -

Division 33 – Utilities

33 01 30.73 Manhole Rehabilitation

Does this apply to this project? If so where – which manholes? (I did not see on the plans/drawings where this spec. / work is noted to be performed)

Sewer manhole at the end of the santiary line to be replaced to the northeast of the building is to be rehabilitated per the specification section 330130.73.

Reference drawing X3.12 – Details, Room 103, Display shelving –

Shelf schedule calls out for shelves to be Maple, horizontal dividers are called out WD-1 (white oak), no callout noted for the vertical dividers or for the slatwall. Need clarification.

All shelves to be solid, Grade A or prime WD-1. All horizontal and vertical dividers are to be WD-1 (veneer ply with hardwood trimmed edges).

Slatwall is called out as PNL-5 on the "FINISH SCHEDULE", w/ "PNT-1A

FINISH"

Reference drawing X1.03 - AV1, no detail indicated on drawings for the frame around AV1. See drwg. 1A on new drwg X2.03

Is there any actual lead abatement anticipated to a part of this project?

Lead abatement is a part of this package as included in 02 83 13 and the hazardous materials report.

37 Will a lead abatement scope of work be issued for the project?

No separate scope will be issued. A hazardous material survey was done

July 2019 and the report is included in the solicitation package. Further 02

83 13 requires the submittal of a lead compliance plan.

Will the government define what, if any, clearance criteria will be required for possible lead abatement work?

Under further review.

Can an ADA signage schedule be provided along with ADA signage specifications? A separate ADA signage schedule and specification will not be provided

We are aware that the area of temporary barricades will not be large enough to facilitate dumpsters. Have any locations been designated for dumpster (i.e. Market Street) as was the location of dumpster from the abatement services?

Nothing has been designated. The contractor would need to get these locations approved by the Park and governing municipality.

What is the expectations of the lead presence on the materials that are either being reused or demolished? Many of our subcontractors have questions about what guidelines that need to be followed.

Under further review. Additional information to be provided.

Can we quote two interior storms seperated with horizontal mullion at the mid-rail on all Type A and Type B Windows?

Submit proposal per drawings and specs.

Can we quote all interior storms as fixed (still removable with glazer cup). ? Submit proposal per drawings and specs.