B09__Amd_1_presentation_site_visit_0001.pdf
PDF 3 MB Posted
- Solicitation number
- 140P2021R0114
About this file
This document provides an overview of a proposed construction project at the Hanalei Valley Viewpoint within the Hanalei National Wildlife Refuge on Kauai. The project will involve site improvements at the viewpoint including access, staging areas, and construction activities. Special precautions must be taken to avoid impacts to threatened and endangered species that may be present such as the Nene goose and Hawaiian hoary bat. All required permits have been obtained and NEPA compliance has been completed.
The related federal contract opportunity is solicitation number 140P2021R0114 for construction services at the Hanalei Valley Viewpoint within the Hanalei National Wildlife Refuge. The solicitation includes specifications, drawings, and provisions relating to pricing, representations and certifications, instructions to offerors, and evaluation factors. The contracting officers for this project are Joelle Mascarenas and Brian Tollensdorf at the National Park Service National Office. The closing date for questions is [date] and final proposal submissions are due by [date].
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overview and Background
Hanalei NWR Part of Kaua‘i National Wildlife Refuge Complex Established in 1972, Conserve T&E species, 917 acres Environmental education, interpretation, wildlife viewing, and preservation of cultural heritage
Hanalei Valley Viewpoint – Proposed site improvements
Construction
Project access and staging Access will be from the highway, no heavy equipment or construction vehicles allowed through neighboring private property
Staging is at site and in HDOT ROW along highway Construction on Kuhio Highway https://hidot.hawaii.gov/2021-hanalei-hill-landslide/ https://hidot.hawaii.gov/2021-hanalei-hill-landslide/
Threatened & Endangered species Nēnē (Hawaiian goose) and Hawaiian hoary bat
(ʻōpeʻapeʻa) No clearing of trees or vegetation taller than 15 feet from June 1 to Sept 15.
If T&E species are within 100 feet of the work area, contractors must immediately suspend work, contact USFWS and not continue work until the species leaves the site on itʻs own accord.
If a nēnē nest is discovered within the project area, the contractor must suspend work and immediately coordinate with USFWS on how to proceed.
Permitting and Compliance BMPs and SHPD Section 106: avoid visual impacts to
Hanalei Valley by using setbacks, landscaping, grading, and architectural methods, and avoid construction impacts such as bulldozer push and erosion run-off.
Class 1 zoning and NPDES permits are in progress NEPA / EA Compliance has been Completed CDUA is completed
Contracting Information Contract documents and future amendment(s) can be obtained at sam.gov In addition to the specifications and drawings, pay close attention to the following sections of the solicitation:
Section A – SF 1442 (Solicitation, Offer, & Award Form) Section B – Contract Price Schedule Section K – Annual Reps & Certs, Telecom Section L – Instructions to Offerors Section M – Evaluation Factors for Award
Contracting POCs and Timeline Contracting Officer (CO)
- Joelle Mascarenas joelle_mascarenas@nps.gov
- Brian Tollensdorf brian_tollensdorf@nps.gov mailto:joelle_mascarenas@nps.gov mailto:brian_tollensdorf@nps.gov
Any Questions?
Mahalo for your time
| Hanalei Valley Viewpoint |
| Overview and Background |
| Hanalei NWR |
| Hanalei Valley Viewpoint – Proposed site improvements |
| Hanalei Valley Viewpoint – Proposed site improvements |
| Hanalei Valley Viewpoint – Proposed site improvements |
| Construction |
| Project access and staging |
| Threatened & Endangered species |
| Permitting and Compliance |
| Contracting Information |
| Contracting POCs and Timeline |
| Any Questions?�Mahalo for your time |