This document contains questions and answers regarding a solicitation to rehabilitate the Crane Flat Campground in Yosemite National Park. The solicitation involves replacing existing water spigots at four of the five comfort stations, and installing a new spigot at the comfort station in Loop D, including new 1-inch water lines. The contractor will provide 24-inch corrugated polyethylene pipe and perform compaction testing and survey work. Archeological, biological, and tribal monitoring services will be provided by the National Park Service.

View the file

Other files

File Type Posted
B09_Amd_4_Crane_Flat_Campground_-_Loop_E_Improvement_Plans-Signed_-_Revision_0004.pdf PDF
B09_Amd_4_Crane_Flat_Campground_-_Loop_B_Revised_0004.pdf PDF
B09_Amd_4_Q_and_A_0004.pdf PDF
B09_Amd_4_Crane_Flat_Campground_-_Loop_C_Revised_0004.pdf PDF
Sol_140P2021R0098_Amd_0004.pdf PDF
B09_Amd_4_CD_Changes_0004.xlsx XLSX spreadsheet
B09_Amd_4_Crane_Flat_Campground_-_Loop_A_Improvement_Plans-Signed_-_Revision_0004.pdf PDF
B09_Amd_4_04_41_00_Dry_Stacked_Stone_Walls_-_REVISED_0004.pdf PDF
B09_Amd_4_Crane_Flat_Campground_-_Loop_D_Revised_0004.pdf PDF
Sol_140P2021R0098_Amd_0003.pdf PDF
B09_Amd_2_Drawings_Loop_E_8-10-2021_0002.pdf PDF
B09_Amd_2_Drawings_Loop_A_8-10-2021_0002.pdf PDF
Sol_140P2021R0098_Amd_0002.pdf PDF
B09_Amd_1_YOSE_312448_CONTRACT_PRICE_SCHEDULE_0001.xlsx XLSX spreadsheet
B09_Amd_1_Geotech_Investigation_Crane_Flat_Water_System_0001.pdf PDF
B09_Amd_1_Specs_04_41_00_Dry_Stacked_Stone_Walls_8-3-2021_0001.pdf PDF
B09_Amd_1_Specs_01_27_00_Definition_of_Contract_Line_Items_0001.pdf PDF
B09_Amd_1_Sign-In_Sheet_0001.xlsx XLSX spreadsheet
B09_Amd_1_Yosemite_Crane_Flat_Soil_Condition_Assessment_Report_Technicon_0001.pdf PDF
Sol_140P2021R0098_Amd_0001.pdf PDF
B09_Amd_1_Q_and_A_0001.pdf PDF
B09_Amd_1_Specs_31_37_10_Riprap_8-3-2021_0001.pdf PDF
B09_Amd_1_Site_Visit_Tri_Fold_YOSE_Crane_Flat_0001.docx DOCX document
B08_Forms_for_use_in_proposalsubmission.pdf PDF
A06_Crane_Flat_Campground_-_Loop_E_Improvement_Plans-Signed.pdf PDF
Sol_140P2021R0098.pdf PDF
B03_Wage_Determination_CA20200018_07162021.pdf PDF
A06_Crane_Flat_SWPPP_July_2021.pdf PDF
A06_Crane_Flat_Campground_-_Loop_A_Improvement_Plans-Signed.pdf PDF
A06_Crane_Flat_Campground_-_LOOP_D_Improvement_Plans.pdf PDF
B08_Solicit_140P2021R0098.pdf PDF
A06_Crane_Flat_Campground_-_LOOP_B_Improvement_Plans.pdf PDF
A16_JOFOC_BrandName_YOSE_312448.pdf PDF
A06_Crane_Flat_Campground_-_LOOP_C_Improvement_Plans.pdf PDF
A06_CRANE_FLAT_FINAL_CONSTRUCTION_SPECS_REV_0_7-1-2021.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q11: Sheet C2.1 for Loop B indicates to “replace an existing water spigot” and “install spigot.”

The two locations are fairly close and it is not clear if we are installing 2 spigots or just replacing the one existing spigot. Furthermore, the detail 4 on Sheet C5.8 indicates that the spigot will connect to a 1” water line. Is the 1” waterline existing or is a new 1” waterline to be installed with the spigot? Same goes for the 24” corrugated polyethylene pipe. Is that existing or will that be new?

A11: Four of the 5 comfort stations have existing spigots, which will be replaced. The spigots can tie into the existing water line. The comfort station at the front of Loop D does not have a water spigot, one will be installed. Assume new 1” water line to be installed.

The contractor will provide 24” Corrugated Polyethylene pipe as part of the contract.

Q12: It is unclear who is providing the archeologist, biologist, and tribal member for this project. Is that provided by the NPS?

A12: Archeologist, biologist, and tribal monitor to be provided by NPS.

Q13: I believe that I saw this correctly but the contractor is to provide compaction testing and survey. Could you confirm?

A13: Contractor to provide compaction testing and survey stake-out.