This document contains questions and answers related to a federal solicitation for renovating theatrical stage rigging machinery systems at the Wolf Trap National Park for the Performing Arts. The solicitation seeks to upgrade rigging and hoisting equipment, including retrofitting the lighting bridge and concert ceiling pod winches with redundant load brakes, limit switches, and motor encoding. Bidders must meet Davis-Bacon wage requirements and the scope of work includes structural reinforcement of the T-track support frame. As-built rigging drawings are available to assist with sizing additional motor equipment. The National Park Service is the contracting agency and work must be complete to allow use of upgraded systems for the 2021 or 2022 performance seasons.

View the file

Other files

File Type Posted
Amend P0006 - SF30_0006.pdf PDF
Sol_140P2020R0063_Amd_0006.pdf PDF
140P2020R0063_0005.pdf PDF
Sol_140P2020R0063_Amd_0005.pdf PDF
Attach 01 QandA 0004_0004.pdf PDF
Attach 02 QandA Photos 0004_0004.pdf PDF
140P2020R0063 0004_0004.pdf PDF
Sol_140P2020R0063_Amd_0004.pdf PDF
Attach 03 TR261_0003.pdf PDF
SF30 Amend 0003_0003.pdf PDF
Attach 04 TR261A_0003.pdf PDF
Attach 07 Shell Pod_0003.pdf PDF
Attach 02 A21 Section A A_0003.pdf PDF
Attach 06 TR262A_0003.pdf PDF
Attach 05 TR262_0003.pdf PDF
Attach 01 Q A_0003.pdf PDF
Sol_140P2020R0063_Amd_0003.pdf PDF
Attch 5 R56 Arbor Guide Shoe Assembly w Bolt Pattern_0002.pdf PDF
Attch 7 R86 Light Bridge Winch Assembly_0002.pdf PDF
Attch 6 R57 Rope Lock Assembly Bolt Pattern_0002.pdf PDF
Attch 2 R41 R18 Acoustical Reflector Winch Units_0002.pdf PDF
Attch 4 R55 Arbor Frame Parts_0002.pdf PDF
Attch 3 R38 R15 Acoustical Reflector Winch Unit_0002.pdf PDF
140P2020R0063 0002 SF30_0002.pdf PDF
Sol_140P2020R0063_Amd_0002.pdf PDF
Atch 04 ContractPriceSchedule_0001.pdf PDF
Atch 05 Section H Special Clause 04_0001.pdf PDF
Atch 02 PreBid_Agenda_0001.pdf PDF
Atch 01 Site Visit Attendees July 22 2020_0001.pdf PDF
140P2020R0063_P0001_0001.pdf PDF
Atch 07 WOTR 226756 Questions an Answer_0001.pdf PDF
Sol_140P2020R0063_Amd_0001.pdf PDF
Atch 06 52.211-18 Variatian Est Qty Clause_0001.pdf PDF
Atch 03 PreProposal Presentation-Post Meeting_0001.pdf PDF
B08_140P2020R0063.pdf PDF
B08_ATCH_1_Specs.pdf PDF
Sol_140P2020R0063.pdf PDF
B08_ATCH_7_SubKPlanForm.doc DOC document
B08_ATCH_2B_Drawings.pdf PDF
B08_ATCH_8_Equals.doc DOC document
B08_ATCH_5_Experience.docx DOCX document
B08_ATCH_6_PP_Questionaire.docx DOCX document
B08_ATCH_4_BidBond.pdf PDF
B08_ATCH_9_GenRefs.doc DOC document
B08_ATCH_3_General Decision Number VA20200178 02072020.pdf PDF
B08_ATCH_2A_Drawings.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QuestionAnswer
1Who was the design consultant?The Design Consultant is listed within the definition of the Specifications
2Does the Park or NPS have a list of suggested local electricians?No
3If a contractor chooses to replace the head blocks instead of rebearing is that acceptable?Yes, as long as they meet the specifications and drawing set.
4What work is expected to be done in Phase 1 and Phase 2; We need a breakdown of expectation.There are no expectations as to the order of events. But whole systems must be usable for the 2021 season. Counterweight rigging system for instance must be ready to use for either the 2021 season or at the end of the contract (ready for the 2022 season)
5Is an X-ray scan really required for the facility inspection.Reference to an X-ray scan (Radiography) was listed in 05 12-00-8 Section 3.3 C.4.a&b. It is listed as a procedure for inspecting structural steel weld testing. Radiography or ultrasound testing are also listed as alternatives.
6Are there any labor requirements.Davis Bacon Act applies to this project, the most up-to-date wage decision is attached to the base solicitation. Additionally, per Union Stagehands, the IATSE contract with our WT Foundation specifically addresses and excludes this type of work from their jurisdiction. Contractor may employ local IA members in a seperate agreement.
7If we are working in the winter what is the average temp in the building. I am looking at productivity of the workers.Average temperature can be derived from NWS data. Spaces where work is present are not conditioned.
8Is temp heat an option if we use an external heat source that would add no moisture or fumes to the air. United Rentals has a force air heat that burns diesel in a unit that sits outside and a plastic vent would be run into the building. Only looking to have a temp of 50 in the building.Given the area of the backstage, it is undecided that any portable system will be able to achieve this goal. This unit can do what they want but NPS is checking about diesel emissions in the park.
9During the walk thru it was hard to tell what is all on the grid. What is the path across the grid to take down equipment.Carry to Stage Right area. Removable Grid Panel is located beyond SR Light Ladders and last lift line well. Located on Drawing.
10IS there a way for us to get the current hole patterns on the Arbor Guide Shoes and Lock Rail LocksAs-Built Rigging drawings that have been verified are R-55, R-56, R-57
11Confirm Scope on T wall only pertains to the T - Track and not the Steel Support Structure.Scope includes Steel Support Structure being properly tied to building structure. Currently, T-Track frame hangs from attachments at grid level only. Hanging in Tension was attempt to straight
12Confirm the lock rail to be replaced.This question is being reviewed and will be answered in a future addendum
13Can we use J bar instead of T- Bar in doing so the is a chance that it would only take a minor retro fit to redo the comp chain systemSection 11 61 33-14 Sect 2.4 B.3. indicates providing one of the following Tee Bar, J-Guide or I-Guide.
14Spec says 2.8 Retrofit of Lighting bridge A. add redundant load side brake and B. Add encoding to lighting bridge motor. Question: Are there drawings with detail of the hoist, with motor data to be able to size the added equipment?As-Built Rigging drawing R-86 Available
15Spec says 2.9 Retrofit of Concert Ceiling Pod Winches B. Add redundant load side brake and C. Add limit switch and encoding to concert ceiling pod motors. Question: Are there drawings of the system and detail of the hoist, with motor data to be able to size the added equipment?As-Built Rigging drawing R-38 & R-41 Available