Attach 01 QandA 0004_0004.pdf

PDF 78 KB Posted

Attached to
WOTR 226765 - Renovate Theatrical Stage Rigging Ma
Solicitation number
140P2020R0063
Issued by

About this file

This document contains questions and answers regarding a solicitation to renovate theatrical stage rigging machinery systems at a National Park Service site. The solicitation seeks contractors to replace two main circuit breaker cabinets and install a new motor control room. Dimensions are requested for the replacement cabinets to ensure they will fit in the existing spaces. Details are also asked about available space and any demolition required for the new motor control room. Finally, the document provides dimensions for the grid opening needed to lift the replacement main circuit breaker cabinets into place.

View the file

Other files

File Type Posted
Amend P0006 - SF30_0006.pdf PDF
Sol_140P2020R0063_Amd_0006.pdf PDF
140P2020R0063_0005.pdf PDF
Sol_140P2020R0063_Amd_0005.pdf PDF
Attach 02 QandA Photos 0004_0004.pdf PDF
140P2020R0063 0004_0004.pdf PDF
Sol_140P2020R0063_Amd_0004.pdf PDF
Attach 03 TR261_0003.pdf PDF
SF30 Amend 0003_0003.pdf PDF
Attach 04 TR261A_0003.pdf PDF
Attach 07 Shell Pod_0003.pdf PDF
Attach 02 A21 Section A A_0003.pdf PDF
Attach 06 TR262A_0003.pdf PDF
Attach 05 TR262_0003.pdf PDF
Attach 01 Q A_0003.pdf PDF
Sol_140P2020R0063_Amd_0003.pdf PDF
Attch 5 R56 Arbor Guide Shoe Assembly w Bolt Pattern_0002.pdf PDF
Attch 7 R86 Light Bridge Winch Assembly_0002.pdf PDF
Attch 6 R57 Rope Lock Assembly Bolt Pattern_0002.pdf PDF
Attch 2 R41 R18 Acoustical Reflector Winch Units_0002.pdf PDF
Attch 4 R55 Arbor Frame Parts_0002.pdf PDF
Attch 1 WOTR 226756 Questions an Answer_0002.xlsx XLSX spreadsheet
Attch 3 R38 R15 Acoustical Reflector Winch Unit_0002.pdf PDF
140P2020R0063 0002 SF30_0002.pdf PDF
Sol_140P2020R0063_Amd_0002.pdf PDF
Atch 04 ContractPriceSchedule_0001.pdf PDF
Atch 05 Section H Special Clause 04_0001.pdf PDF
Atch 02 PreBid_Agenda_0001.pdf PDF
Atch 01 Site Visit Attendees July 22 2020_0001.pdf PDF
140P2020R0063_P0001_0001.pdf PDF
Atch 07 WOTR 226756 Questions an Answer_0001.pdf PDF
Sol_140P2020R0063_Amd_0001.pdf PDF
Atch 06 52.211-18 Variatian Est Qty Clause_0001.pdf PDF
Atch 03 PreProposal Presentation-Post Meeting_0001.pdf PDF
B08_140P2020R0063.pdf PDF
B08_ATCH_1_Specs.pdf PDF
Sol_140P2020R0063.pdf PDF
B08_ATCH_7_SubKPlanForm.doc DOC document
B08_ATCH_2B_Drawings.pdf PDF
B08_ATCH_8_Equals.doc DOC document
B08_ATCH_5_Experience.docx DOCX document
B08_ATCH_6_PP_Questionaire.docx DOCX document
B08_ATCH_4_BidBond.pdf PDF
B08_ATCH_9_GenRefs.doc DOC document
B08_ATCH_3_General Decision Number VA20200178 02072020.pdf PDF
B08_ATCH_2A_Drawings.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amend04 Question Answer

2.6(M)(1)b) specifies that the MCCs must fit into the space provided. Please provide details of the existing MCCs or the available space for the replacement MCC once the existing MCC is removed (H,W,D).

In all cases it is the responsibility of the contractor to confirm site conditions and that the new equipment will fit into the desired locations. It is the design intent that MCC 1A and 1B will be installed in the locations similar to the green cabinets shown in image DSL corner. The space for MCC 2 must be confirmed after the demo of the side lighting equipment. It should be noted that the height from the grid surface to the underside of the loft block beams is 7’6” (see TR131)

Please specify the available space for the MCR.

(H,W,D)

In all cases it is the responsibility of the contractor to confirm site conditions and that the new equipment will fit into the desired locations. It is the design intent that MCR be located at stage level on stage right. The contractor will be required to work directly with the Park Service to determine what abandoned rigging automation equipment must be removed from site before the new MCR can be installed. Some demo is likely to be required.

What are the dimensions of the grid opening of lifting MCCs?

The grid opening is created by removing three removable panels and it creates an opening approximately 7’x7’ see images 5984 and 5985.

File details come from the government source that posted it. Updated .