This document contains questions and answers regarding a solicitation to renovate theatrical stage rigging machinery systems at a National Park Service site. The solicitation seeks contractors to replace two main circuit breaker cabinets and install a new motor control room. Dimensions are requested for the replacement cabinets to ensure they will fit in the existing spaces. Details are also asked about available space and any demolition required for the new motor control room. Finally, the document provides dimensions for the grid opening needed to lift the replacement main circuit breaker cabinets into place.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amend04 Question Answer
2.6(M)(1)b) specifies that the MCCs must fit into the space provided. Please provide details of the existing MCCs or the available space for the replacement MCC once the existing MCC is removed (H,W,D).
In all cases it is the responsibility of the contractor to confirm site conditions and that the new equipment will fit into the desired locations. It is the design intent that MCC 1A and 1B will be installed in the locations similar to the green cabinets shown in image DSL corner. The space for MCC 2 must be confirmed after the demo of the side lighting equipment. It should be noted that the height from the grid surface to the underside of the loft block beams is 7’6” (see TR131)
Please specify the available space for the MCR.
(H,W,D)
In all cases it is the responsibility of the contractor to confirm site conditions and that the new equipment will fit into the desired locations. It is the design intent that MCR be located at stage level on stage right. The contractor will be required to work directly with the Park Service to determine what abandoned rigging automation equipment must be removed from site before the new MCR can be installed. Some demo is likely to be required.
What are the dimensions of the grid opening of lifting MCCs?
The grid opening is created by removing three removable panels and it creates an opening approximately 7’x7’ see images 5984 and 5985.