B08_SF1442_Attachment_9_Solit_PSP_Vol_II_HazMat.doc

DOC document 52 KB Posted

Attached to
SHEN 151064 Convert Community Water Systems from Springs to Well
Solicitation number
140P2019R0080
Issued by

About this file

1442 Attachment 9 Volume 2 Hazardous Materials

View the file

Other files

File Type Posted
B08_SF1442_UPDATED_Attachment_10_Solit_PSP_Vol_II_PriceSched.xlsx XLSX spreadsheet
B08_SF30_140P2019R0080_Amendment_0005.pdf PDF
B08_SF30_140P2019R0080_Amendment_0004.pdf PDF
B08_SF30_140P2019R0080_Amendment_0003.pdf PDF
B08_SF1442_Attachment_1_Specifications-FINAL.pdf PDF
B08_SF1442_Attachment_2_Drawings-FINAL.pdf PDF
B08_SF1442_Attachment_13_Geotechnical_Report.pdf PDF
B08_SF30_140P2019R0080_Amendment_0002.pdf PDF
B08_SF1442_Attachment_3_Wage_Determination.pdf PDF
B08_SF30_140P2019R0080_Amendment_0001.pdf PDF
Site_Visit.docx DOCX document
B08_SF1442_Attachment 2_Drawings.pdf PDF
B08_SF1442_Attachment_1_Specifications.pdf PDF
B08_SF1442_Attachment_12_SF24-16.pdf PDF
B08_SF1442_Attachment_5_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_SF1442_Attachment_4_Solit_PSP_Cover.rtf RTF text file
B08_SF1442_Attachment_2_Drawings.pdf PDF
B08_SF1442_140P2019R0080.pdf PDF
B08_SF1442_Attachment_11_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
B08_SF1442_Attachment_10_Solit_PSP_Vol_II_PriceSched.xlsx XLSX spreadsheet
B08_SF1442_Attachment_8_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_SF1442_Attachment_3_Wage_Determination.pdf PDF
B08_SF1442_Attachment_7_Solit_PSP_Vol_II_Equals.doc DOC document
B08_SF1442_Attachment_6_Solit_PSP_Vol_I_ProjExp_REQD.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAZARDOUS MATERIALS IDENTIFICATION LISTING

In accordance with Clause 52.223-3, Hazardous Material Identification and Material Safety Data, of the Contract, contractor is required to identify any hazardous materials that will be delivered under this contract.

List below all known hazardous materials to be used in performance of the work and submit with the proposal/bid. If material components are unknown at the time of submission, respond with a statement to that effect.

File details come from the government source that posted it.