B08_SF1442_Attachment_7_Solit_PSP_Vol_II_Equals.doc

DOC document 52 KB Posted

Attached to
SHEN 151064 Convert Community Water Systems from Springs to Well
Solicitation number
140P2019R0080
Issued by

About this file

1442 Attachment 7 Volume 2 Equals

View the file

Other files

File Type Posted
B08_SF1442_UPDATED_Attachment_10_Solit_PSP_Vol_II_PriceSched.xlsx XLSX spreadsheet
B08_SF30_140P2019R0080_Amendment_0005.pdf PDF
B08_SF30_140P2019R0080_Amendment_0004.pdf PDF
B08_SF30_140P2019R0080_Amendment_0003.pdf PDF
B08_SF1442_Attachment_1_Specifications-FINAL.pdf PDF
B08_SF1442_Attachment_2_Drawings-FINAL.pdf PDF
B08_SF1442_Attachment_13_Geotechnical_Report.pdf PDF
B08_SF30_140P2019R0080_Amendment_0002.pdf PDF
B08_SF1442_Attachment_3_Wage_Determination.pdf PDF
B08_SF30_140P2019R0080_Amendment_0001.pdf PDF
Site_Visit.docx DOCX document
B08_SF1442_Attachment 2_Drawings.pdf PDF
B08_SF1442_Attachment_1_Specifications.pdf PDF
B08_SF1442_Attachment_9_Solit_PSP_Vol_II_HazMat.doc DOC document
B08_SF1442_Attachment_12_SF24-16.pdf PDF
B08_SF1442_Attachment_5_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_SF1442_Attachment_4_Solit_PSP_Cover.rtf RTF text file
B08_SF1442_Attachment_2_Drawings.pdf PDF
B08_SF1442_140P2019R0080.pdf PDF
B08_SF1442_Attachment_11_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
B08_SF1442_Attachment_10_Solit_PSP_Vol_II_PriceSched.xlsx XLSX spreadsheet
B08_SF1442_Attachment_8_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_SF1442_Attachment_3_Wage_Determination.pdf PDF
B08_SF1442_Attachment_6_Solit_PSP_Vol_I_ProjExp_REQD.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No.
Paragraph No.
Product/Model No.
Proposed Product/Model No.

A.

By submitting the proposed equal, the contractor certifies that it:

1.

Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2.

Will provide, as a minimum, the same warranties for the proposed item as for the item specified.

3.

Has determined that the proposed item is compatible with interfacing items.

4.

Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5.

Waives all claims for additional expenses that may be incurred as a result of the substitution.

B.

The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.