B08 Solic Sec J Attachment 2 - NCRO Drawing Package (Part 3 - Vol 1_pgs 175 - 349 Drawings)

View the file

Other files

File Type Posted
B09_Amendment0010_SF30_140P2019R0068.pdf PDF
Door_Sched_NPS_A6.23.pdf PDF
B09_Solit_General_References_Form.pdf PDF
B09_Solit_Hazardous_Materials.pdf PDF
Door_Sched_NPS_A6.20.pdf PDF
NCRO_251176_-_Prebid_RFI_Summary_190626.1_Amend_0010_Responses.pdf PDF
Door_Sched_NPS_A6.22.pdf PDF
Door_Sched_NPS_A6.24.pdf PDF
Door_Sched_NPS_A6.21.pdf PDF
B08_Solit_PSP_Vol_II_Equals.pdf PDF
B08__Amendment_0009_140P2019R0068_FINAL.pdf PDF
B09_Amendment0008_Form_SF30_.pdf PDF
140P2019R0068_-_Interested_Parties_List.pdf PDF
B09_Amendment0004_Form_SF30_.pdf PDF
B09_Amendment0003_Form_SF30.pdf PDF
B09_Amendment0002_Form_SF30_.pdf PDF
B09_Amendment0001_Form_SF30.pdf PDF
B09_Amendment0006_Form_SF30.pdf PDF
B09_Amendment0007_Form_SF30_and_attachment_Released_6-21-19.pdf PDF
B09_Amendment0005_Form_SF30.pdf PDF
B08_Solicitation_Form_1442_-_140P2019R0068_Revised_6-20-2019_Amendment0004.pdf PDF
B11_Pre-Bid_Proposal_Conference_Site_Visit__Sign-in_Sheet.pdf PDF
B08_Solicitation_Form_1442_-_140P2019R0068_Revised_6-7-2019_Amendment0003.pdf PDF
B11_NCRO201409_PreBid_Agenda_Revised_Amendment0003.pdf PDF
B11_NCRO201409_PreBid_Agenda_Revised.pdf PDF
B11_NCRO201409_PreBid_Agenda.pdf PDF
B08_Solicitation_Form_1442_-_140P2019R0068.pdf PDF
B08_Solic_Sec_J_Attachm_3_-PSP_Vol_II_SubKPlanForm_NCRO201409.pdf PDF
B08_Solic_Sec_J_Attachm_4_-_DC190002_5-22-19_Wage_Determination.pdf PDF
B08_Solic_Sec_J_Attachm_6_-_PPQ_Form.pdf PDF
Drawings_Volume_II.pdf PDF
Drawings_Volume_I_pgs_1-174.pdf PDF
Drawings_-_Roof.pdf PDF
Specification_Package_Volume_I_and_Volume_II.pdf PDF
B08_Solic_Sec_J__Attach_1_-_NCRO_Specification_Package.pdf PDF
B08_Solic_Sec_J_Attachm_5_-_Project_Experience_Form.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M A

T C

H L I N

E M

A T

C H

L I N

E

1. ALL EXISTING FIRE ALARM APPLIANCES, INCLUDING

ASSOCIATED CIRCUITS AND CONDUITS, SHALL BE REMOVED.

C

T C

H L I N

E M

A T

C H

L I N

E

T C

H L I N

E M

A T

C H

L I N

E

MATCHLINE MATCHLINE

MATCHLINE MATCHLINE

EXISTING SILENT KNIGHT 5820 FACP TO REMAIN AND BE RELOCATED. REFER TO

DRAWING FA1.18 FOR NEW LOCATION OF PANEL.

T C

H L I N

E M

A T

C H

L I N

E M

A T

C H

L I N

E

TS

TS

W1

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

TS

TS

C

W

C

W

C

PROVIDE NEW SILENT KNIGHT MODEL SK5820XL-EVS OR

EQUIVALENT FIRE ALARM CONTROL PANEL.

PROVIDE DEDICATED 120 VAC 20 AMP CIRCUIT TO FACP.

REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

PROVIDE TWO TELEPHONE LINES WITHIN FACP BUILT-IN

DIGITAL ALARM COMMUNICATION TRANSMITTER.

PROVIDE ADDRESSABLE MONITOR MODULES TO MONITOR

WATER FLOW AND VALVE SUPERVISION OF THE FIRST

FLOOR ZONE CONTROL VALVE ASSEMBLY. REFER TO FIRE

SUPPRESSION DRAWING SP1.1 FOR LOCATION.

PROVIDE TAMPER SWITCH FOR FACP CABINET DOOR.

PROVIDE ADDRESSABLE MONITOR TAMPER SWITCH TO

INDICATE WHEN FACP CABINET DOOR IS OPENED.

PROVIDE ADDRESSABLE MONITOR MODULE FOR VALVE

SUPERVISION OF BOTTOM OF ELEVATOR SHAFT CONTROL

VALVE. REFER TO FIRE SUPPRESSION DRAWING SP1.1

FOR LOCATION.

TAP SPEAKER AT

WATT.

PROVIDE ADDRESSABLE MONITOR MODULE FOR VALVE

SUPERVISION OF BASE OF RISER CONTROL VALVE. REFER

TO FIRE SUPPRESSION DRAWING SP1.1 FOR LOCATION.

PROVIDE MANUAL PULL STATION ON MULLION. ROUTE

FIRE ALARM CABLE CONCEALED WITHIN MULLION.

PROVIDE DEDICATED 120 VAC 20 AMP CIRCUIT TO SERVE

AMP AND NAP PANEL. REFER TO ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

PROVIDE NOTIFICATION APPLIANCE UNDER LOBBY

BRIDGE. COORDINATE CONDUIT ROUTING AND APPLIANCE

LOCATION WITH ELECTRICAL AND ARCHITECTURAL.

PROVIDE HEAT DETECTOR IN VESTIBULE PER IBC

SECTION 903.1.1.1. DETECTOR SHALL BE RATED FOR HIGH

TEMPERATURE.

PROVIDE TWO ADDRESSABLE MONITOR MODULES FOR

GENERATOR RUNNING AND TWO ADDRESSABLE MONITOR

MODULES FOR GENERATOR FAULT. TWO MODULES SHALL

BE CONNECTED TO WINGS A, B, AND C FIRE ALARM

SYSTEM AND TWO SHALL BE CONNECTED TO WING D FIRE

ALARM SYSTEM. CONTRACTOR SHALL PROVIDE

CONNECTION TO WING D. ALL MODULES SHALL BE

INSTALLED WITHIN 3 FEET OF THE GENERATOR

CONTROLLER/ANNUNCIATOR PANEL.

PROVIDE DUCT SMOKE SENSOR PRIOR TO RETURN AIR

RISER FOR AHU-1. REFER TO MECHANICAL DRAWINGS

FOR LOCATION OF RETURN RISER.

PROVIDE ADDRESSABLE RELAY MODULE WITHIN THREE

FEET OF SECURITY ACCESS CONTROL PANEL. SWITCH

ACTIVATION AT THE FACP SHALL UNLOCK ALL STAIRWELL

DOORS WITHIN WING A.

PROVIDE SWITCH INTEGRAL TO FACP FOR STAIR

UNLOCKING. UPON ACTIVATION ALL STAIRWAY DOORS IN

WINGS A, B, AND C SHALL UNLOCK.

PROVIDE REMOTE TEST STATIONS FOR DUCT SMOKE

DETECTORS IN AN ACCESSIBLE LOCATION STACKED ON

WALL WITHIN ROOM A153.

1. UNO, TAP SPEAKER AT 1/2 WATT.

T C

H L I N

E M

A T

C H

L I N

E M

A T

C H

L I N

E

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

TS

C

C

W

C

C

W W

C

C

C

C

TAP SPEAKER AT

WATT.

PROVIDE ADDRESSABLE MONITOR MODULES FOR VALVE

SUPERVISION AND WATER FLOW DETECTION OF SECOND

FLOOR ZONE CONTROL ASSEMBLY. REFER TO FIRE

SUPPRESSION DRAWING SP1.2 FOR LOCATION.

PROVIDE DEDICATED 120VAC, 20AMP CIRCUIT TO NAP. REFER

TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE SMOKE SENSOR ON SECOND FLOOR CEILING ABOVE

FIRE ALARM CONTROL EQUIPMENT LOCATED ON FIRST FLOOR

BELOW.

PROVIDE DUCT SMOKE SENSOR PRIOR TO RETURN AIR RISER

FOR AHU-1. REFER TO MECHANICAL DRAWINGS FOR LOCATION

OF RETURN RISER.

PROVIDE REMOTE TEST STATIONS FOR DUCT SMOKE

DETECTORS IN AN ACCESSIBLE LOCATION STACKED ON WALL

WITHIN ROOM A254A.

TS

C

C

C

C

C

C

C C

C

C

C

C

C

C

C

C

C

C

C

C

E

TS

C

C

C

C

C

C

TAP SPEAKER AT

WATT.

PROVIDE ADDRESSABLE MONITOR MODULE FOR VALVE

SUPERVISION OF TOP OF ELEVATOR SHAFT SPRINKLERS.

REFER TO FIRE SUPPRESSION DRAWING SP1.3 FOR LOCATION.

PROVIDE HEAT DETECTOR WITHIN 24-INCHES OF SPRINKLER.

PROVIDE ADDRESSABLE MONITOR MODULES FOR VALVE

SUPERVISION AND WATER FLOW DETECTION OF SECOND

FLOOR ZONE CONTROL ASSEMBLY. REFER TO FIRE

SUPPRESSION DRAWING SP1.3 FOR LOCATION.

PROVIDE SMOKE SENSOR PRIOR TO RETURN AIR RISER FOR

AHU-1. PROVIDE SENSOR IN ACCORDANCE WITH NFPA 72

SECTION A.17.7.5.4.2.2. REFER TO MECHANICAL DRAWINGS FOR

LOCATION OF OPENINGS.

TS

W

W W

W

W

W

W

W

TS

AR

AR

W

TS

C

E

C

E

W

E T

C R

E T

C S

PROVIDE ADDRESSABLE MONITOR MODULES FOR VALVE

SUPERVISION AND WATER FLOW DETECTION OF

PENTHOUSE FLOOR ZONE CONTROL ASSEMBLY. REFER

TO FIRE SUPPRESSION DRAWING SP1.4 FOR LOCATION.

PROVIDE ADDRESSABLE MONITOR MODULES FOR VALVE

SUPERVISION OF ELEVATOR MACHINE ROOM

SPRINKLERS. REFER TO FIRE SUPPRESSION DRAWING

SP1.4 FOR LOCATION.

PROVIDE HEAT DETECTOR WITHIN 24-INCHES OF EACH

SPRINKLER.

PROVIDE DUCT SMOKE SENSOR ON RETURN SIDE OF

AHU-1 IN AN ACCESSIBLE LOCATION. REFER TO

MECHANICAL DRAWINGS FOR LOCATION OF RETURN

RISER.

PROVIDE DUCT SMOKE SENSOR ON RETURN SIDE OF

AHU-2 IN AN ACCESSIBLE LOCATION. REFER TO

MECHANICAL DRAWINGS FOR LOCATION OF RETURN

RISER.

PROVIDE ADDRESSABLE RELAY MODULE FOR AHU

RETURN DUCT SMOKE SENSOR AND ANY SMOKE

SENSOR ASSOCIATED WITH THE RETURN AIR SYSTEM.

RELAY SHALL BE LOCATED WITHIN 3 FEET OF AHU

MOTOR. UPON ANY SMOKE SENSOR ACTIVATION

ASSOCIATED WITH THE RETURN AIR SYSTEM, AHU SHALL

SHUT DOWN. REFER TO MECHANICAL DRAWINGS FOR

MOTOR LOCATION.

PROVIDE ADDRESSABLE MODULES WITHIN 3 FEET OF

ELEVATOR CONTROLLER. REFER TO ELECTRICAL

DRAWINGS FOR LOCATION OF ELEVATOR CONTROLLER

PROVIDE ADDRESSABLE MODULES FOR ELEVATOR

PRIMARY DESIGNATED RECALL, SECONDARY

ALTERNATIVE RECALL AND FIREFIGHTER HAT

LIGHT INTERMITTENT FLASHING. REFER TO DETAIL 6 ON

FA5.1.

PROVIDE ADDRESSABLE MODULES WITHIN 3 FEET OF

EACH SHUNT TRIP BREAKER. REFER TO ELECTRICAL

DRAWINGS FOR LOCATION OF ELEVATOR SHUNT TRIP

BREAKER. PROVIDE ADDRESSABLE RELAY MODULE FOR

ELEVATOR SHUNT TRIP AND ADDRESSABLE MONITOR

MODULE FOR SHUNT TRIP POWER CIRCUIT MONITORING.

REFER TO DETAIL 5 ON FA5.1.

TAP SPEAKER AT 1/4 WATT.

PROVIDE REMOTE TEST STATIONS FOR DUCT SMOKE

DETECTORS IN AN ACCESSIBLE LOCATION STACKED ON

WALL WITHIN PENTHOUSE.

1. UNO, TAP SPEAKER AT 1-WATT.

T C

H L I N

E M

A T

C H

L I N

E

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

W

110 WP

PROVIDE TWO ADDRESSABLE MONITOR MODULES FOR THE

O.S.&Y. BACKFLOW PREVENTER VALVES. REFER TO FIRE

SUPPRESSION DRAWING SP1.5 FOR LOCATION.

PROVIDE ADDRESSABLE MONITOR MODULE FOR LOW WATER

PRESSURE SENSOR SWITCH.

TAP SPEAKER AT

-WATT.

PROVIDE WEATHER-PROOF AUDIO-VISUAL NOTIFICATION

APPLIANCE ON DEDICATED CIRCUIT FROM THE FACP WHICH

SHALL ANNUNCIATE UPON WATER FLOW.

PROVIDE ADDRESSABLE MONITOR MODULE FOR THE

STANDPIPE WATER FLOW SWITCH. REFER TO FIRE

SUPPRESSION DRAWING SP1.5 FOR LOCATION.

PROVIDE THREE ADDRESSABLE MONITOR MODULES FOR THE

LOADING DOCK DRY SYSTEM VALVE SUPERVISORY SWITCH,

HI/LOW AIR SUPERVISORY SWITCH AND ALARM PRESSURE

SWITCH. REFER TO FIRE SUPPRESSION DRAWING SP1.5 FOR

LOCATION.

PROVIDE ADDRESSABLE RELAY MODULE WITHIN THREE FEET

OF SECURITY ACCESS CONTROL PANEL. SWITCH ACTIVATION

AT THE FACP SHALL UNLOCK ALL STAIRWELL DOORS WITHIN

WING C.

PROVIDE REMOTE TEST STATIONS FOR DUCT SMOKE

DETECTORS FOR RTU-1 AND RTU-2 LOCATED ON THE ROOF OF

WING C IN AN ACCESSIBLE LOCATION STACKED ON WALL

WITHIN CLOSET ADJACENT TO WAITING AREA C126.

T C

H L I N

E M

A T

C H

L I N

E

MATCHLINE MATCHLINE

C

C

C

C

C

C

CC

C

C

C

C

TS

C, WP

C

C, WP

C

C

C

TAP SPEAKER AT

WATT.

PROVIDE ADDRESSABLE MONITOR MODULE FOR VALVE

SUPERVISION OF BASE OF RISER CONTROL VALVE. REFER TO

FIRE SUPPRESSION DRAWING SP1.6 FOR LOCATION.

PROVIDE DEDICATED 120VAC, 20AMP CIRCUIT TO NAP. REFER

TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE ONE ADDRESSABLE MONITOR MODULE FOR

GENERATOR RUNNING AND ONE ADDRESSABLE MONITOR

MODULES FOR GENERATOR FAULT. MODULES SHALL BE

CONNECTED TO WINGS A, B, AND C FIRE ALARM SYSTEM.

PROVIDE DUCT SMOKE SENSOR PRIOR TO RETURN AIR RISER

FOR AHU-2. REFER TO MECHANICAL DRAWINGS FOR LOCATION

OF RETURN RISER.

PROVIDE REMOTE TEST STATION FOR DUCT SMOKE DETECTOR

IN AN ACCESSIBLE LOCATION ON WALL WITHIN ROOM B128A.

C

C

C

C

C

C

C

C

C

C

C

C

C

C CC

C

C

C

C

C

C

W

AR

AR

AR

TAP SPEAKER AT

WATT.

PROVIDE DUCT SMOKE SENSOR ON RETURN SIDE OF RTU-1 IN AN

ACCESSIBLE LOCATION. REFER TO MECHANICAL DRAWINGS FOR

LOCATION OF RETURN RISER.

PROVIDE DUCT SMOKE SENSOR ON RETURN SIDE OF RTU-2 IN AN

ACCESSIBLE LOCATION. REFER TO MECHANICAL DRAWINGS FOR

LOCATION OF RETURN RISER.

PROVIDE ADDRESSABLE RELAY MODULE FOR AHU RETURN DUCT SMOKE

SENSOR. RELAY SHALL BE LOCATED WITHIN 3 FEET OF AHU MOTOR FOR

AHU SHUTDOWN UPON DUCT SMOKE SENSOR ACTIVATION. REFER TO

MECHANICAL DRAWINGS FOR MOTOR LOCATION.

PROVIDE ADDRESSABLE RELAY MODULE WITHIN THREE FEET OF

SECURITY ACCESS CONTROL PANEL. SWITCH ACTIVATION AT THE FACP

SHALL UNLOCK ALL STAIRWELL DOORS WITHIN WING B.

PROVIDE DUCT SMOKE SENSOR PRIOR TO RETURN AIR RISER FOR AHU-2.

REFER TO MECHANICAL DRAWINGS FOR LOCATION OF RETURN RISER.

PROVIDE REMOTE TEST STATION FOR DUCT SMOKE DETECTOR IN AN

ACCESSIBLE LOCATION ON WALL WITHIN ROOM B228.

TS

TSAI

AI

AI

TS

AP

N A

P

T V

S S

C

C

C

C

C

C

C

CC

C

C

C

TSAI

W, WP

C

RELOCATE EXISTING SILENT KNIGHT 5820 FACP TO THIS LOCATION.

PROVIDE DEDICATED 120 VAC 20 AMP CIRCUIT TO FACP. REFER TO

ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE TWO TELEPHONE LINES WITHIN FACP BUILT-IN DIGITAL ALARM

COMMUNICATION TRANSMITTER.

PROVIDE TAMPER SWITCH FOR FACP CABINET DOOR. PROVIDE

ADDRESSABLE MONITOR TAMPER SWITCH TO INDICATE WHEN FACP

CABINET DOOR IS OPENED.

PROVIDE TWO ADDRESSABLE MONITOR MODULES FOR THE O.S.&Y.

BACKFLOW PREVENTER VALVES. REFER TO FIRE SUPPRESSION DRAWING

SP1.8 FOR LOCATION.

PROVIDE ADDRESSABLE MONITOR MODULE FOR LOW WATER PRESSURE

SENSOR SWITCH. REFER TO FIRE SUPPRESSION DRAWING SP1.8 FOR

LOCATION.

PROVIDE DEDICATED 120VAC, 20AMP CIRCUIT TO NAP. REFER TO

ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE ADDRESSABLE MONITOR MODULES TO MONITOR WATER FLOW

AND VALVE SUPERVISION OF THE FIRST FLOOR ZONE CONTROL VALVE

ASSEMBLY.REFER TO FIRE SUPPRESSION DRAWING SP1.8 FOR LOCATION.

PROVIDE ADDRESSABLE MONITOR MODULE FOR VALVE SUPERVISION OF

BOTTOM OF ELEVATOR SHAFT CONTROL VALVE. REFER TO FIRE

SUPPRESSION DRAWING SP1.8 FOR LOCATION.

PROVIDE MANUAL PULL STATION ON MULLION. ROUTE FIRE ALARM CABLE

CONCEALED WITHIN MULLION.

PROVIDE WEATHER-PROOF AUDIO-VISUAL NOTIFICATION APPLIANCE ON

DEDICATED CIRCUIT FROM THE FACP WHICH SHALL ANNUNCIATE UPON

WATER FLOW.

PROVIDE DUCT SMOKE SENSOR PRIOR TO RETURN AIR RISER FOR AHU-3. .

REFER TO MECHANICAL DRAWINGS FOR LOCATION OF RETURN RISER.

PROVIDE ADDRESSABLE RELAY MODULE WITHIN THREE FEET OF SECURITY

ACCESS CONTROL PANEL. SWITCH ACTIVATION AT THE FACP SHALL

UNLOCK ALL STAIRWELL DOORS WITHIN WING A.

PROVIDE SWITCH INTEGRAL TO FACP FOR STAIR UNLOCKING. UPON

ACTIVATION ALL STAIRWAY DOORS IN WING D SHALL UNLOCK.

PROVIDE REMOTE TEST STATION FOR DUCT SMOKE DETECTOR IN AN

ACCESSIBLE LOCATION ON WALL WITHIN ROOM D144.

AI

AI TS

C

C

E

AI TS

PROVIDE ADDRESSABLE MONITOR MODULES FOR VALVE

SUPERVISION AND WATER FLOW DETECTION OF SECOND

FLOOR ZONE CONTROL ASSEMBLY. REFER TO FIRE

SUPPRESSION DRAWING SP1.9 FOR LOCATION.

PROVIDE HEAT SENSOR WITHIN 24-INCHES OF SPRINKLER.

PROVIDE ADDRESSABLE MONITOR MODULE FOR VALVE

SUPERVISION OF TOP OF ELEVATOR SHAFT SPRINKLERS.

REFER TO FIRE SUPPRESSION DRAWING SP1.9 FOR LOCATION.

PROVIDE DUCT SMOKE SENSOR PRIOR TO RETURN AIR RISER

FOR AHU-3. REFER TO MECHANICAL DRAWINGS FOR LOCATION

OF RETURN RISER.

PROVIDE REMOTE TEST STATION FOR DUCT SMOKE DETECTOR

IN AN ACCESSIBLE LOCATION ON WALL WITHIN ROOM D244.

AI TS

AI

W

P

W3

W 7

AI TS

AR

PROVIDE ADDRESSABLE MONITOR MODULES FOR VALVE SUPERVISION AND

WATER FLOW DETECTION OF PENTHOUSE FLOOR ZONE CONTROL ASSEMBLY.

REFER TO FIRE SUPPRESSION DRAWING SP1.10 FOR LOCATION.

PROVIDE ADDRESSABLE MONITOR MODULES FOR VALVE SUPERVISION OF

ELEVATOR MACHINE ROOM SPRINKLERS. REFER TO FIRE SUPPRESSION DRAWING

SP1.10 FOR LOCATION.

PROVIDE HEAT DETECTOR WITHIN 24-INCHES OF EACH SPRINKLER.

PROVIDE DUCT SMOKE SENSOR ON RETURN SIDE OF AHU-3 IN AN ACCESSIBLE

LOCATION. REFER TO MECHANICAL DRAWINGS FOR LOCATION OF RETURN RISER.

PROVIDE ADDRESSABLE RELAY MODULE FOR AHU RETURN DUCT SMOKE SENSOR

AND ANY SMOKE SENSOR ASSOCIATED WITH THE RETURN AIR SYSTEM. RELAY

SHALL BE LOCATED WITHIN 3 FEET OF AHU MOTOR. UPON ANY SMOKE SENSOR

ACTIVATION ASSOCIATED WITH THE RETURN AIR SYSTEM, AHU SHALL SHUT

DOWN. REFER TO MECHANICAL DRAWINGS FOR MOTOR LOCATION.

PROVIDE ADDRESSABLE MODULE WITHIN 3 FEET OF ELEVATOR CONTROLLER.

REFER TO ELECTRICAL DRAWINGS FOR LOCATION OF ELEVATOR CONTROLLER

PROVIDE ADDRESSABLE MODULES FOR ELEVATOR PRIMARY DESIGNATED

RECALL, SECONDARY ALTERNATIVE RECALL AND FIREFIGHTER HAT LIGHT

INTERMITTENT FLASHING. REFER TO DETAIL 6 ON FA5.1.

PROVIDE ADDRESSABLE MODULES WITHIN 3 FEET OF EACH SHUNT TRIP

BREAKER. REFER TO ELECTRICAL DRAWINGS FOR LOCATION OF ELEVATOR

SHUNT TRIP BREAKER. PROVIDE ADDRESSABLE RELAY MODULE FOR ELEVATOR

SHUNT TRIP AND ADDRESSABLE MONITOR MODULE FOR SHUNT TRIP POWER

CIRCUIT MONITORING. REFER TO DETAIL 5 ON FA5.1.

PROVIDE REMOTE TEST STATION FOR DUCT SMOKE DETECTOR IN AN

ACCESSIBLE LOCATION STACKED ON WALL WITHIN PENTHOUSE.

E T

C R

E T

C S

C

E

C

E

W

UTILIZE SPRINKLER/STANDPIPE RISER OR EXPRESS DRAIN FLOOR

PENETRATION FOR CONDUIT PASSAGE THROUGH FLOOR. TYPICAL

FOR ALL FIRE ALARM RISERS IN STAIRWELLS. COORDINATE WITH

SPRINKLER CONTRACTOR.

FIRE ALARM CONDUIT RISER

EXPRESS DRAIN RISER

SPRINKLER/STANDPIPE RISER

TO VALVE TAMPER/SUPERVISORY SWITCH

WATERFLOW SWITCH

ADDRESSABLE INTERFACE DEVICE

TO SPRINKLER SYSTEM

MANUAL PULL STATION

CONDUIT TO NEXT DEVICES OR FACP

48"

4" SQUARE, DEEP BACKBOX

4" SQUARE EXTENSION RING

CEILING SUPPORT BRIDGE

SUSPENDED CEILING TILE

WITH HOLE CUT AS NEEDED

COMBINATION AUDIO-VISUAL

FIRE ALARM NOTIFICATION DEVICE

FIRE ALARM AUDIO

NOTIFICATION DEVICE

FIRE ALARM VISUAL

NOTIFICATION DEVICE

STANDARD OR DEEP 4"

OCTAGON WIRING BOX

DETECTOR IDENTIFICATION

CLEAR LED LENS

NOTES:

1. PROVIDE MINIMUM 12"x12"x4" DEEP NEMA 1 TERMINAL BOX WITH SCREW COVER (CONTRACTOR

SHALL VERIFY REQUIRED BOX SIZE). LABEL "FIRE ALARM-ELEVATOR RECALL CONNECTIONS" WITH

ASSOCIATED ELEVATOR NUMBERS.

2. LOCATE ERTC WITHIN THREE FEET OF ASSOCIATED ELEVATOR DISPATCH CONTROL CENTER.

3. ONE CONTROL RELAY SHALL CAUSE FIRE HAT LIGHT TO ILLUMINATE STEADILY UPON ACTIVATION

OF FIRE ALARM INITIATING DEVICE LOCATED ON EACH FLOOR SERVED BY THE ELEVATOR AND

ARRANGED TO INITIATE PHASE 1 EMERGENCY RECALL OPERATIONS. THE SECOND CONTROL RELAY

SHALL CAUSE FIRE HAT LIGHT TO ILLUMINATE INTERMITTENTLY ONLY UPON ACTIVATION OF FIRE

ALARM DEVICE IN ELEVATOR EQUIPMENT ROOM, ELEVATOR PULLEY ROOM OR HOISTWAY.

SLC TO NEXT DEVICE

SLC TO NEXT DEVICE

TO ELEVATOR CONTROLLERS

ELEVATOR DESIGNATED PRIMARY

AND SECONDARY (ALTERNATE)

RECALL FLOOR CONTROL CIRCUITS,

INTERFACE POINTS

SEE NOTES 1 AND

2, THIS DETAIL

EMT (TYPICAL)

ELEVATOR DESIGNATED FIRE HAT LIGHT

CONTROL CIRCUIT INTERFACE POINT.

SEE NOTE 3, THIS DETAIL

NOTES:

1. POWER SUPPLY TO ALL SHUNT TRIP CIRCUIT BREAKERS IN EMR.

ADDRESSABLE

INTERFACE

MODULE

NO

NC

120VAC RELAY

TERMINAL

STRIP

ADDRESSABLE

OUTPUT MODULE

120VAC SHUNT

TRIP POWER

TO ELEVATOR

POWER

PANEL(S)

SHUNT TRIP

CIRCUIT

BREAKER, SEE

NOTE 1 THIS

DETAIL

END OF LINE SUPERVISION

DEVICE

ADDRESSABLE INTERFACE MODULE TO

MONITOR ACTIVATION OF SHUNT TRIP

TO NEXT DEVICE

1. PROVIDE MINIMUM 12"x12"x4" DEEP NEMA 1 TERMINAL BOX WITH SCREW COVER

(CONTRACTOR SHALL VERIFY REQUIRED BOX SIZE). LABEL "FIRE ALARM ELEVATOR SHUNT

TRIP CONNECTION" WITH ASSOCIATED ELEVATOR NUMBERS.

2. LOCATE TERMINAL BOX, WITHIN THREE FEET OF ASSOCIATED SHUNT TRIP CIRCUIT

BREAKER/DISCONNECT DEVICE. REFER TO ELECTRICAL DRAWINGS FOR EXACT LOCATION.

NOTES

AI

AR

R

SLC TO NEXT DEVICE

120v SHUNT TRIP POWER

TO ELEVATOR POWER PANEL

SHUNT TRIP CIRCUIT BREAKER

SLC TO NEXT DEVICE

EMT (TYPICAL)

SEE NOTES 1 & 2

ELEVATOR POWER SHUT TRIP

CONTROL CIRCUIT INTERFACE

POINT

ADDRESSABLE LOAD CONTROL FIELD

RELAY WITH 24DC COIL AND 2 SETS

OF NORMALLY OPEN AND NORMALLY

CLOSED (DPDT) CONTACTS RATED AT

120 VAC, 4 AMPS, INDUCTIVE.

ADDRESSABLE INTERFACE

MODULE

ADDRESSABLE RELAY

FACP NAP4

TVSS

DACT

TVSS

AI

W,WP

AI

TS

AI

AI

TS

AI

AI

TS

AI

P

AR

P

E

AI

TS

AI

TS

AI

AP

E

P

FACP

DACT

TVSS

AI

AI

TS

AI AI

TS

AI

TS

NAP1

TVSS

NAP2

TVSS

NAP3

TVSS

AI

TS

AI

AI

TS

AI

AI

TS

AI

AI

TS

AI AI

APTS

AI

TS

W,WP

P

E

E

E

P

AMP

AI

TS

AI

WF

AI

AP

AI

PS

AR

EXISTING SILENT KNIGHT 5820 FACP.

DEDICATED 120 VAC 20 AMP CIRCUIT TO PANEL.

TAMPER SWITCH FOR FACP CABINET DOOR.

NEW SILENT KNIGHT FACP.

DEDICATED CIRCUIT FROM FACP TO EXTERIOR NOTIFICATION

APPLIANCE. ACTIVATION SHALL OCCUR UPON WATER FLOW.

ADDRESSABLE MONITOR MODULES FOR THE LOADING DOCK

DRY SYSTEM VALVE SUPERVISORY SWITCH, HI/LOW AIR

SUPERVISORY SWITCH AND ALARM PRESSURE SWITCH. .

POWER CIRCUIT FOR FRACTIONAL HP RISER MOUNT AIR

COMPRESSOR. REFER TO ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

ADDRESSABLE MONITOR MODULE FOR LOW WATER PRESSURE

SENSOR SWITCH.

ADDRESSABLE MONITOR MODULES FOR VALVE SUPERVISORY

AND WATER FLOW SWITCH FOR FLOOR ZONE CONTROL

ASSEMBLY.

1. RISER DIAGRAM IS SCHEMATIC IN NATURE, REFER TO

INDIVIDUAL FLOOR PLANS FOR EXACT LOCATIONS AND

QUANTITIES OF EQUIPMENT.

2. REFER TO PANEL/CIRCUIT SCHEDULE ON FA6.1 FOR CIRCUIT

QUANTITY, ORIGINATION, AND ASSOCIATE ZONE.

3. REFER TO CIRCUIT SCHEDULE FOR ADDITIONAL INFORMATION

ON NOTIFICATION APPLIANCES.

1. THE SCOPE OF THIS PROJECT INCLUDES PROVIDING A COMPLETE COMBINATION

AUTOMATIC SPRINKLER/MANUAL WET STANDPIPE SYSTEM THROUGHOUT THE NCR

HEADQUARTERS BUILDING (WINGS A, B, AND C) AND PROVIDING A COMPLETE

AUTOMATIC SPRINKLER SYSTEM THROUGHOUT THE USPP BUILDING (WING D) AS

INDICATED ON THE DRAWINGS AND AS DESCRIBED IN THE SPECIFICATIONS. THIS

INCLUDES ALL PIPING, WATER FLOW ALARM SWITCHES, VALVE SUPERVISORY

SWITCHES, CHECK VALVES, CONTROL VALVES, BACKFLOW PREVENTERS, FIRE

DEPARTMENT CONNECTIONS, PIPING, HANGERS, SPRINKLERS, AND ALL

ASSOCIATED EQUIPMENT. ALL EQUIPMENT PROVIDED SHALL BE UL LISTED.

2. ALL WORK AND INSTALLATION SHALL CONFORM TO THE APPLICABLE CODES AND

STANDARDS INCLUDING:

NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS (2010).

NFPA 14: STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE

SYSTEMS (2010)

NFPA 25: STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF

WATER-BASED FIRE PROTECTION SYSTEMS (2011).

NPS-NCR FIRE PROTECTION SYSTEM REQUIREMENTS REV 9/30/2014.

INTERNATIONAL BUILDING CODE (2012)

3. AVAILABLE FLOW AND PRESSURE FOR THE NEW SPRINKLER SYSTEMS ARE

HYDRAULICALLY BASED ON THE WATER DISTRIBUTION SYSTEM IMPROVEMENTS

TO NPS-NCR & USPP HEADQUARTERS PROJECT (PMIS 201409 DATED 8/15/14) BEING

CONSTRUCTED AHEAD OF THE NCRO HAINS POINT FACILITIES PROJECT. IF THE

NEW WATERLINE IS NOT CONSTRUCTED AS INDICATED ON PMIS 201409, THE

EXISTING SITE WATER SUPPLY MAY NOT PROVIDE THE NFPA 13 REQUIRED

PRESSURE AND FLOW TO THE WINGS A,B,C AND WING D SPRINKLER SYSTEMS.

4. UNLESS NOTED OTHERWISE ON THE DRAWINGS, THE DESIGN INTENT IS TO

CONCEAL ALL SPRINKLER PIPE ABOVE THE CEILINGS ON ALL FLOORS OF THE

BUILDINGS.

5. FINAL SPRINKLER LOCATIONS SHALL BE COORDINATED IN THE FIELD. COORDINATE

SPRINKLERS WITH ALL OBSTRUCTIONS SUCH CEILING JOISTS, BEAMS AND

DUCTWORK. SPRINKLER SHOP DRAWINGS SHALL BE PREPARED AND SUBMITTED

IN ACCORDANCE WITH NFPA 13.

6. QUICK RESPONSE, ORDINARY TEMPERATURE SPRINKLERS SHALL BE PROVIDED

THROUGHOUT UNLESS REQUIRED TO BE INTERMEDIATE OR HIGH TEMPERATURE

RATED PER NFPA 13.

7. PRIOR TO CLOSE IN OF CEILINGS, WALLS OR SOFFITS CONTAINING SPRINKLER

PIPE, THE CONTRACTOR SHALL HAVE THE COR WITNESS AND VERIFY

HYDROSTATIC TESTING WITHOUT ANY LOSS IN PRESSURE AND VISUAL LEAKAGE.

8. A COMBINATION INSPECTOR'S TEST CONNECTION, DRAIN ASSEMBLY AND RELIEF

VALVE SHALL BE PROVIDED FOR EACH SPRINKLER ZONE CONTROL VALVE

ASSEMBLY.

9. THE FOLLOWING WATER FLOW TEST DATA WAS PERFORMED BY DC WATER

(REFER TO WATER SITE PLAN).

DATE - 2/20/2014

STATIC - 66 PSI

RESIDUAL - 59 PSI

FLOW - 2,859 GPM

THIS DATA IS FOR INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR AND

PROVIDE A NEW WATER FLOW TEST WITHIN ONE YEAR FROM THE START OF

INSTALLATION.

10. PIPE SIZES SHOWN HAVE BEEN VERIFIED BY HYDRAULIC CALCULATIONS.

ALTERNATE PIPE SIZES IS PERMITTED IF HYDRAULIC CALCULATIONS ARE

SUBMITTED AND APPROVED BY THE COR.

11. SPRINKLERS SHALL BE PROVIDED AT LEAST 18 INCHES FROM ANY AIR DEVICES.

12. INSPECTOR'S TEST CONNECTION SHALL BE LOCATED AT THE MOST REMOTE

HYDRAULIC POINT OF THE SYSTEM. PIPING SHALL BE TERMINATED AT THE

EXTERIOR OF THE BUILDING ONTO A SPLASH BLOCK.

13. A MINIMUM OF 80 INCHES SHALL BE MAINTAINED BETWEEN FLOOR AND LOWEST

POINT OF VALVES, FITTINGS, AND PIPE IN STAIRWELLS AND OTHER AREAS OF

EXPOSED PIPE. IN MECHANICAL ROOMS AND UNOCCUPIED SPACES. CONTRACTOR

SHALL MAINTAIN 80 INCHES HEADROOM CLEARANCE TO THE EXTENT PRACTICAL.

14. ALL AREAS OF THE BUILDINGS ARE CONSIDERED CONDITIONED; THAT IS

TEMPERATURES WILL REMAIN ABOVE 40 F.

15. ALL SPRINKLER PIPING SHALL BE BLACK IRON, SCHEDULE 40 FM LISTED AND

APPROVED PIPE, WITH ROLLED GROOVES.

16. THE STEEL PIPING SYSTEMS INCLUDING VALVES, PIPING, PIPE SLEEVES, HANGERS

AND ACCESSORIES SHALL BE CLEANED, PRE-TREATED, PRIMED AND PAINTED.

COATINGS SHALL BE APPLIED ONLY TO CLEAN, DRY SURFACES USING CLEAN

BRUSHES. SURFACES SHALL BE CLEANED TO REMOVE ALL DUST, DIRT, RUST AND

LOOSE MILL SCALE. DUE CARE SHALL BE EXERCISED TO AVOID PAINTING OF

SPRINKLERS OR ALLOWING ANY PAINT TO DRIP OR SPLATTER ANYWHERE IN THE

BUILDINGS. ANY EXPOSED SPRINKLER PIPE SHALL BE PAINTED ONE COAT TO

MATCH EXISTING ADJACENT WALL OR CEILING SURFACE, AND RED ENAMEL BANDS

4 INCHES WIDE SHALL BE PAINTED AT 10 FOOT INTERVALS. ALL OTHER AREAS

SHALL BE PAINTED ONE COAT IN ITS ENTIRETY WITH RED ENAMEL.

17. ANY INFORMATION CONFLICTS BETWEEN THE SPECIFICATIONS AND DRAWINGS

SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. THE

CONTRACTOR SHALL NOT PROCEED WITH ANY WORK, EXCEPT AT THEIR OWN

RISK, UNTIL CLARIFICATIONS OF THE CONFLICTS ARE ISSUED TO THE

CONTRACTOR BY THE COR.

18. ALL DIMENSIONS AND CONDITIONS SHALL BE VERIFIED AT JOB SITE CONCERNING

THE WORK BEFORE PROCEEDING WITH EITHER FABRICATION OR INSTALLATION OF

NEW WORK. LOCATION OF SYSTEMS, PIPING, RISERS AND SPRINKLERS ARE

APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY

THE LOCATION OF ALL SYSTEM COMPONENTS. ANY DISCREPANCIES WITH THESE

DRAWINGS SHALL BE REPORTED TO THE COR IMMEDIATELY.

19. CONTRACTOR SHALL BE RESPONSIBLE FOR AVOIDING CONFLICTS WITH LIGHTS,

FIXTURES, DIFFUSERS, GRILLS, FIRE ALARM DEVICES, DUCTS, PIPING, CONDUIT,

STRUCTURAL MEMBERS AND ALL OTHER OBSTRUCTIONS ENCOUNTERED. THE

CONTRACTOR IS ADVISED SOME AREAS REQUIRE EXTENSIVE COORDINATION OF

SPRINKLER PIPE WITHIN EXISTING SPACES, SUCH AS MECHANICAL EQUIPMENT,

DUCTS, PIPING, CONDUIT, STRUCTURAL MEMBERS, WIRE TROUGH, ETC.

20. ALL SPRINKLER AND STANDPIPE PIPING SHALL BE INSTALLED SO THAT ALL

PORTIONS FOR EACH SYSTEM CAN BE DRAINED BACK THROUGH THE DRAIN

VALVE(S). WHERE PIPING CANNOT BE DRAINED BACK TO THE SPRINKLER ZONE

CONTROL ASSEMBLY DRAIN VALVES, PROVIDE AUXILIARY DRAINS IN ACCORDANCE

WITH NFPA 13. ALL DRAINS SHALL BE PIPING TO THE OUTSIDE.

21. ALL DAMAGE TO WALLS, CEILINGS, FLOORS, AND STRUCTURAL MEMBERS FROM

PENETRATIONS, INSTALLATIONS OR OTHER ACTIONS OF THE CONTRACTOR SHALL

BE PATCHED, REPAIRED AND PAINTED WITH NEW MATERIALS BY THE

CONTRACTOR TO MATCH ADJACENT WORK, WHETHER SPECIFICALLY NOTED OR

NOT.

22. ALL NECESSARY PERMITS AND APPROVALS SHALL BE OBTAINED PRIOR TO

CONDUCTING ANY WELDING AND CUTTING OPERATIONS.

23. ALL WALL AND FLOOR PARTITIONS SHALL BE CORE DRILLED. PROVIDE PIPE

SLEEVES FOR ALL WALL AND FLOOR PENETRATIONS AS INDICATED IN THE

SPECIFICATIONS. ALL PENETRATIONS SHALL IN WALLS, CEILINGS AND FLOORS

SHALL BE SEALED TO THE FULL THICKNESS OF THE PENETRATIONS WITH

APPROVED FIRE STOPPING MATERIAL OF EQUAL OR GREATER FIRE RESISTANCE.

REFER TO ARCHITECTURAL DRAWINGS FOR FIRE RESISTANCE RATING

REQUIREMENTS AND LOCATIONS.

24. CONTRACTOR SHALL NOT CUT, DRILL OR BURN ANY STRUCTURAL MEMBERS

UNLESS PREVIOUSLY APPROVED BY THE CONTRACTING OFFICER. THE

CONTRACTOR SHALL NOT CUT OR PATCH STRUCTURAL WORK IN A MANNER THAT

WOULD RESULT IN A REDUCTION OF LOAD-CARRYING OR LOAD-DEFLECTION

RATIO.

25. ALL WORK SHALL BE COORDINATED WITH THE COR, INCLUDING ACCESS TO THE

SITE AND BUILDINGS. SCHEDULE WORK TO MINIMIZE DISRUPTION TO OCCUPANTS.

WORK SHALL BE PROPERLY SECURED WITH BARRIERS SO AS NOT TO CREATE A

SAFETY HAZARD. MATERIALS SUCH AS TOOLS, LADDERS AND INSTALLATION

MATERIAL SHALL BE KEPT TO A MINIMUM.

26. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EQUIPMENT,

FURNISHINGS, FIXTURES AND CONTENTS OF THE SPACE FROM DAMAGE, DUST

WATER AND DEBRIS ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE

FOR DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS AND

CONSTRUCTION MATERIALS ON A DAILY BASIS, AND RESTORING TO

PRE-CONSTRUCTION CONDITION AS WORK IS COMPLETED.

27. ANY NEW CORES IN EXISTING REINFORCED CONCRETE SLABS SHALL BE LOCATED

TO AVOID CUTTING JOISTS, BEAMS OR REBAR. CONTRACTOR IS REQUIRED TO

LOCATE BY GPR SCAN OR SIMILAR INVESTIGATION AND MARK LOCATIONS ON

FLOOR. CORES SHALL BE PLACED TO AVOID CUTTING EXISTING REBAR. IF IT IS

NOT FEASIBLE TO AVOID CUTTING REBAR THAN CONTRACTOR IS REQUIRED

SUBMIT SKETCHES INDICATING REBAR LOCATIONS ALONG WITH SUGGESTED

OPENING LOCATIONS TO CONTRACTING OFFICIAL FOR APPROVAL. ALLOW 2

WEEKS FOR REVIEW. FOR OPENINGS IN ROOF DECK OR COMPOSITE SLAB ON

DECK REFER TO TYPICAL DETAILS.

28. THE TERM "PROVIDE" SHALL MEAN THE CONTRACTOR SHALL FURNISH, INSTALL

AND CONNECT FOR A COMPLETE AND OPERATIONAL SYSTEM.

NEW WORK DEVICE LINE TYPE

PIPE SIZE

SPRINKLER RISER

EXPRESS DRAIN RISER

O.S.&Y. CONTROL VALVE WITH SUPERVISORY SWITCH

BUTTERFLY CONTROL VALVE WITH SUPERVISORY SWITCH

BUTTERFLY CONTROL VALVE WITH SUPERVISORY SWITCH ON

RISER OR ELBOW

DELUGE VALVE IN VERTICAL POSITION

BACKFLOW PREVENTOR IN VERTICAL POSITION

DRY PIPE VALVE

DRY PIPE VALVE IN VERTICAL POSITION

GLOBE VALVE

CHECK VALVE

ZONE CONTROL ASSEMBLY

WATER FLOW SWITCH

90° ELBOW TURNED AWAY FROM VIEWER

45° ELBOW TURNED AWAY FROM VIEWER

TEE TURNED AWAY FROM VIEWER

PIPE CONTINUATION

CAP

PRESSURE GAUGE

QUICK RESPONSE UPRIGHT SPRINKLER

CONCEALED PENDENT SPRINKLER

DRY SIDEWALL SPRINKLER

FIRE HOSE VALVE - PLAN VIEW

FIRE HOSE VALVE - SIDE VIEW

SPRINKLER ZONE

START OF WORK INDICATOR

KEY NOTE INDICATOR

HYDRAULIC NODE INDICATOR

DETAIL IDENTIFICATION NUMBER

DETAIL BUBBLE

SHEET DETAIL IS SHOWN ON

SECTION IDENTIFICATION NUMBER

SECTION BUBBLE

SHEET SECTION IS SHOWN ON

ACM

AFF

ATC

BM

BOB

CON

CONC

CONF

COR

CSA

CSM

DEMO

DN

ELEC

EXIST

ETR

FDC

FL

FM

F.S.

FT

GYP

IBC

IN

LAT

LTH

MECH

NFPA

NIC

NO

NPS

OH1

OH2

RM

SERV

SPH

STL

TELE

UL

UNO

ASBESTOS CONTAINING MATERIAL

ABOVE FINISHED FLOOR

ACOUSTICAL TILE CEILING

BEAM

BOTTOM OF BEAM

CONCRETE SLAB AND BEAMS

CONCRETE

CONFERENCE

CONTRACTING OFFICER REPRESENTATIVE

CONCEALED SPLINE SUSPENDED ACOUSTICAL TILE

CONCEALED METAL SPLINE SUSPENDED ACOUSTICAL

TILE

DEMOLITION

DOWN

ELECTRICAL

EXISTING

EXISTING TO REMAIN

FIRE DEPARTMENT CONNECTION

FLOOR

FACTORY MUTUAL

FLOW SWITCH

FEET

GYPSUM BOARD ON WOOD OR METAL JOISTS

INTERNATIONAL BUILDING CODE

INCH

LAY-IN ACOUSTICAL TILE - SUSPENDED

LIGHT HAZARD

MECHANICAL

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NATIONAL PARK SERVICE

ORDINARY HAZARD-GROUP 1

ORDINARY HAZARD-GROUP 2

ROOM

SERVICE

SPECIAL HAZARD

STEEL DECK

TELEPHONE

UNDERWRITERS LABORATORIES

UNLESS NOTED OTHERWISE

ALL AREAS ARE TO BE CONSIDERED LIGHT HAZARD (0.10 GPM/SQ FT

OVER 1500 SQ FT) UNLESS NOTED OTHERWISE.

ORDINARY HAZARD, GROUP 1

0.15 GPM/SQ FT OVER 1500 SQ FT

FLOW HYDRANT 2

TEST HYDRANT

FLOW HYDRANT 1

PROJECT SITE

D

T C

H L I N

E M

A T

C H

L I N

E M

A T

C H

L I N

E

D

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL STANDPIPE AND SPRINKLER COMPONENTS IN THE STAIRS,

INCLUDING BUT NOT LIMITED TO THE VERTICAL STANDPIPE

RISER, VERTICAL DRAIN RISER, THE FIRE HOSE VALVES AND

THE SPRINKLER ZONE CONTROL ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

CEILING INFORMATION. SEE LIFE SAFETY DRAWINGS FOR FIRE

RATED WALL LOCATIONS.

PROVIDE 4" STANDPIPE ISOLATION INDICATING CONTROL VALVE WITH

SUPERVISORY SWITCH.

PROVIDE 2

" EXPRESS MAIN DRAIN PIPED TO THE EXTERIOR.

TERMINATE DRAIN AT GALVANIZED 45-DEGREE ELBOW

APPROXIMATELY 6" ABOVE FINISHED GRADE. PROVIDE A CONCRETE

SPLASH BLOCK.

PROVIDE 2

" FIRE HOSE VALVE, CAP AND CHAIN. HOSE VALVE

LOCATION SHOWN ROTATED FOR CLARITY, LOCATE ADJACENT TO

WALL BELOW SPRINKLER ZONE CONTROL ASSEMBLY. PROVIDE A

SECOND 2

" FIRE HOSE VALVE IN STAIR FOR FORWARD FLOW

TESTING THE BACKFLOW PREVENTER. LABEL AS "FORWARD FLOW

TEST FOR BACKFLOW PREVENTER"

PROVIDE 4" SPRINKLER ZONE CONTROL ASSEMBLY FOR FIRST FLOOR

SPRINKLER ZONE, INCLUDING INDICATING CONTROL VALVE WITH

SUPERVISORY SWITCH, CHECK VALVE, WATER FLOW SWITCH,

PRESSURE GAUGE, COMBINATION INSPECTOR'S TEST AND DRAIN

INCLUDING RELIEF VALVE. RELIEF VALVE TO BE

-INCH IN SIZE AND

SET TO OPERATE AT 175 PSI. TEST AND DRAIN TO BE CONNECTED

TO COMMON DRAIN RISER.

PROVIDE CONCEALED SPRINKLER PROTECTION UNDERNEATH LOBBY

BRIDGE. COORDINATE WITH ARCHITECTURAL AND ELECTRICAL FOR

PIPE ROUTING. REFER TO DETAIL A ON SHEET SP5.2 FOR

INSTALLATION DETAIL.

PROVIDE A SUPERVISED CONTROL VALVE FOR ELEVATOR PIT

SPRINKLER.

PROVIDE DRY SIDEWALL SPRINKLER IN VESTIBULE. COORDINATE

WITH ARCHITECTURAL FOR SPRINKLER PIPE ROUTING WITHIN MENS

ROOM.

SUPPRESSION SHALL NOT BE PROVIDED IN VESTIBULE PER IBC

SECTION 903.3.1.1.1 EXCEPTION 4.

ROUTE 6" PIPE TO SERVE STANDPIPE RISER AND 2

" EXPRESS MAIN

DRAIN ABOVE DOOR IN STAIRWELL.

T C

H L I N

E M

A T

C H

L I N

E M

A T

C H

L I N

E

PROVIDE 2

" FIRE HOSE VALVE, CAP AND CHAIN. HOSE VALVE

LOCATION SHOWN ROTATED FOR CLARITY, LOCATE ADJACENT

TO WALL BELOW SPRINKLER ZONE CONTROL ASSEMBLY.

PROVIDE 4" SPRINKLER ZONE CONTROL ASSEMBLY FOR

SECOND FLOOR SPRINKLER ZONE, INCLUDING INDICATING

CONTROL VALVE WITH SUPERVISORY SWITCH, CHECK VALVE,

WATER FLOW SWITCH, PRESSURE GAUGE, COMBINATION

INSPECTOR'S TEST AND DRAIN INCLUDING RELIEF VALVE.

RELIEF VALVE TO BE

-INCH IN SIZE AND SET TO OPERATE AT

175 PSI.

SPRINKLER HEAD LAYOUT IN TWO STORY LOBBY IS SHOWN

FOR ARCHITECTURAL PURPOSES. LOCATIONS HAVE BEEN

COORDINATED WITH OBSTRUCTIONS IN THE CEILING. HEADS

SHALL BE LOCATED AS SYMMETRICALLY AS POSSIBLE. ALL

HEADS SHALL BE SPACED AND INSTALLED IN ACCORDANCE

WITH NFPA 13. DEVIATIONS FROM THE LAYOUT SHALL BE

COORDINATED WITH THE ARCHITECT.

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL STANDPIPE AND SPRINKLER COMPONENTS IN THE STAIRS,

INCLUDING BUT NOT LIMITED TO THE VERTICAL STANDPIPE

RISER, VERTICAL DRAIN RISER, THE FIRE HOSE VALVES AND

THE SPRINKLER ZONE CONTROL ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

CEILING INFORMATION. SEE LIFE SAFETY DRAWINGS FOR FIRE

RATED WALL LOCATIONS.

PROVIDE 2

" FIRE HOSE VALVE, CAP AND CHAIN. HOSE VALVE

LOCATION SHOWN ROTATED FOR CLARITY, LOCATE ADJACENT

TO WALL BELOW SPRINKLER ZONE CONTROL ASSEMBLY.

PROVIDE 4" SPRINKLER ZONE CONTROL ASSEMBLY FOR THIRD

FLOOR SPRINKLER ZONE, INCLUDING INDICATING CONTROL

VALVE WITH SUPERVISORY SWITCH, CHECK VALVE, WATER

FLOW SWITCH, PRESSURE GAUGE, COMBINATION INSPECTOR'S

TEST AND DRAIN INCLUDING RELIEF VALVE. RELIEF VALVE TO

BE

-INCH IN SIZE AND SET TO OPERATE AT 175 PSI.

PROVIDE SUPERVISED CONTROL VALVE FOR TOP OF

ELEVATOR SHAFT SPRINKLER.

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL STANDPIPE AND SPRINKLER COMPONENTS IN THE STAIRS,

INCLUDING BUT NOT LIMITED TO THE VERTICAL STANDPIPE

RISER, VERTICAL DRAIN RISER, THE FIRE HOSE VALVES AND

THE SPRINKLER ZONE CONTROL ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

PROVIDE TWO 2

" FIRE HOSE VALVE, CAP AND CHAIN. HOSE

VALVE LOCATION SHOWN ROTATED FOR CLARITY, LOCATE

ADJACENT TO WALL.

PROVIDE 4" SPRINKLER ZONE CONTROL ASSEMBLY FOR THE

PENTHOUSE SPRINKLER ZONE, INCLUDING INDICATING

CONTROL VALVE WITH SUPERVISORY SWITCH, CHECK VALVE,

WATER FLOW SWITCH, PRESSURE GAUGE, COMBINATION

INSPECTOR'S TEST AND DRAIN INCLUDING RELIEF VALVE.

RELIEF VALVE TO BE

-INCH IN SIZE AND SET TO OPERATE AT

175 PSI.

PROVIDE SUPERVISED CONTROL VALVE FOR ELEVATOR

MACHINE ROOM SPRINKLER(S).

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL STANDPIPE AND SPRINKLER COMPONENTS IN THE STAIRS,

INCLUDING BUT NOT LIMITED TO THE VERTICAL STANDPIPE

RISER, VERTICAL DRAIN RISER, THE FIRE HOSE VALVES AND

THE SPRINKLER ZONE CONTROL ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

CEILING INFORMATION. SEE LIFE SAFETY DRAWINGS FOR FIRE

RATED WALL LOCATIONS.

5. SPRINKLERS AND SPRINKLER MAINS ARE SHOWN FOR

INFORMATION PURPOSES ONLY. CONTRACTOR SHALL

PROVIDE THEIR OWN SPRINKLER PIPING CONFIGURATION AND

SPRINKLER LAYOUT PER NFPA 13 TO MEET ALL HYDRAULIC

REQUIREMENTS.

BUILDING A PENTHOUSE

0.15

VARIES

62.6 487.0

65.8 487.0

T C

H L I N

E M

A T

C H

L I N

E

6" INCOMING FIRE SUPPRESSION WATER SUPPLY - REFER TO

PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE 6" VERTICAL DOUBLE DETECTOR CHECK BACKFLOW

PREVENTER INCLUDING OS&Y INDICATING CONTROL VALVES

WITH SUPERVISORY SWITCHES. UTILIZE STANDPIPE FIRE

DEPARTMENT HOSE VALVE(S) IN STAIR TO PERFORM FORWARD

FLOW TEST OF BACKFLOW PREVENTER. PROVIDE WATER

FLOW SWITCH UPSTREAM OF THE BACKFLOW PREVENTER FOR

THE STANDPIPE SYSTEM.

PROVIDE 6" RISER FOR THE FEED TO THE FIRE DEPARTMENT

CONNECTION INCLUDING CHECK VALVE AND AUTOMATIC BALL

DRIP.

PROVIDE 2" DRY PIPE VALVE FOR THE LOADING DOCK DRY

SPRINKLER SYSTEM. ROUTE DRY VALVE DRAIN TO BUILDING

EXTERIOR. PROVIDE CONCRETE SPLASH BLOCK.

PROVIDE BRASS WALL MOUNTED FOUR WAY (6 x (4) 2

") FIRE

DEPARTMENT CONNECTION. PROVIDE CAST IRON SLEEVE AND

WEATHERPROOF SEAL AROUND THE ENTRY PIPE.

PROVIDE LOW WATER PRESSURE SENSOR SET TO THE

LOWEST PRESSURE REQUIRED TO OPERATE THE

HYDRAULICALLY MOST DEMANDING SYSTEM.

PROVIDE AN INSPECTOR'S TEST CONNECTION AT THE REMOTE

END OF THE DRY PIPE SYSTEM. PROVIDE CONCRETE SPLASH

BLOCK.

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL STANDPIPE AND SPRINKLER COMPONENTS IN THE STAIRS,

INCLUDING BUT NOT LIMITED TO THE VERTICAL STANDPIPE

RISER, VERTICAL DRAIN RISER, THE FIRE HOSE VALVES AND

THE SPRINKLER ZONE CONTROL ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

CEILING INFORMATION. SEE LIFE SAFETY DRAWINGS FOR FIRE

RATED WALL LOCATIONS.

5. ALL DRY SPRINKLER SYSTEM PIPING SHALL BE SLOPED IN

ACCORDANCE WITH NFPA 13. BRANCHLINES SHALL BE

PITCHED AT LEAST 1/2" PER 10 FEET AND MAINS SHALL BE

PITCHED AT LEAST 1/4" PER 10 FEET. CONTRACTOR SHALL BE

RESPONSIBLE FOR ENSURING PROPER SLOPE THROUGHOUT

THE SYSTEM. PIPING SHALL DRAIN BACK TO THE DRY VALVE

WHERE POSSIBLE. AUXILIARY DRAINS SHALL BE PROVIDED IN

ANY AREAS WHERE DRAINAGE BACK TO THE VALVE IS NOT

POSSIBLE.

T C

H L I N

E M

A T

C H

L I N

E

MATCHLINE MATCHLINE

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL STANDPIPE AND SPRINKLER COMPONENTS IN THE STAIRS,

INCLUDING BUT NOT LIMITED TO THE VERTICAL STANDPIPE

RISER, VERTICAL DRAIN RISER, THE FIRE HOSE VALVES AND

THE SPRINKLER ZONE CONTROL ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

CEILING INFORMATION. SEE LIFE SAFETY DRAWINGS FOR FIRE

RATED WALL LOCATIONS.

PROVIDE 4" STANDPIPE ISOLATION INDICATING CONTROL

VALVE WITH SUPERVISORY SWITCH.

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL STANDPIPE AND SPRINKLER COMPONENTS IN THE STAIRS,

INCLUDING BUT NOT LIMITED TO THE VERTICAL STANDPIPE

RISER, VERTICAL DRAIN RISER, THE FIRE HOSE VALVES AND

THE SPRINKLER ZONE CONTROL ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

CEILING INFORMATION. SEE LIFE SAFETY DRAWINGS FOR FIRE

RATED WALL LOCATIONS.

COORDINATE FIRE HOSE VALVE LOCATION WITH

ARCHITECTURAL TO ALLOW NEEDED CLEARANCE AROUND

ROOF HATCH LADDER.

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL SPRINKLER COMPONENTS IN THE STAIRS, INCLUDING BUT

NOT LIMITED TO THE VERTICAL SPRINKLER RISER, VERTICAL

DRAIN RISER AND THE SPRINKLER ZONE CONTROL

ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

CEILING INFORMATION. SEE LIFE SAFETY DRAWINGS FOR FIRE

RATED WALL LOCATIONS.

6" INCOMING FIRE SUPPRESSION WATER SUPPLY - REFER TO PLUMBING

DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE 6" VERTICAL DOUBLE DETECTOR CHECK BACKFLOW PREVENTE

INCLUDING OS&Y INDICATING CONTROL VALVES WITH SUPERVISORY

SWITCHES.

PROVIDE 4" SPRINKLER RISER. INCLUDE (2) 2

" FIRE HOSE VALVES IN

STAIR FOR FORWARD FLOW TESTING THE BACKFLOW PREVENTE. LABEL

AS "FORWARD FLOW TEST VALVES FOR BACKFLOW PREVENTER

PROVIDE 4" RISER FOR THE FEED TO THE FIRE DEPARTMENT

CONNECTION INCLUDING CHECK VALVE AND AUTOMATIC BALL DRIP.

PROVIDE LOW WATER PRESSURE SENSOR SET TO THE LOWEST

PRESSURE REQUIRED TO OPERATE THE HYDRAULICALLY MOST

DEMANDING SYSTEM.

PROVIDE BRASS WALL MOUNTED TWO WAY (4 x (2) 2

") FIRE

DEPARTMENT CONNECTION. PROVIDE CAST IRON SLEEVE AND

WEATHERPROOF SEAL AROUND THE ENTRY PIPE.

PROVIDE 2

" EXPRESS MAIN DRAIN PIPED TO THE EXTERIOR. TERMINATE

DRAIN AT GALVANIZED 45-DEGREE ELBOW APPROXIMATELY 6" ABOVE

FINISHED GRADE. PROVIDE A CONCRETE SPLASH BLOCK.

PROVIDE 4" SPRINKLER ZONE CONTROL ASSEMBLY FOR FIRST FLOOR

SPRINKLER ZONE, INCLUDING INDICATING CONTROL VALVE WITH

SUPERVISORY SWITCH, CHECK VALVE, WATER FLOW SWITCH, PRESSURE

GAUGE COMBINATION INSPECTOR'S TEST AND DRAIN INCLUDING RELIEF

VALVE. RELIEF VALVE TO BE

-INCH IN SIZE AND SET TO OPERATE AT 175

PSI. TEST AND DRAIN TO BE CONNECTED TO COMMON DRAIN RISER.

PROVIDE SUPERVISED CONTROL VALVE FOR ELEVATOR PIT SPRINKLER.

B

PROVIDE 4" SPRINKLER ZONE CONTROL ASSEMBLY FOR FIRST

FLOOR SPRINKLER ZONE, INCLUDING INDICATING CONTROL

VALVE WITH SUPERVISORY SWITCH, CHECK VALVE, WATER

FLOW SWITCH, PRESSURE GAUGE, COMBINATION INSPECTOR'S

TEST AND DRAIN INCLUDING RELIEF VALVE. RELIEF VALVE TO

BE

-INCH IN SIZE AND SET TO OPERATE AT 175 PSI. TEST AND

DRAIN TO BE CONNECTED TO COMMON DRAIN RISER.

PROVIDE SUPERVISED CONTROL VALVE FOR TOP OF

ELEVATOR SHAFT SPRINKLER.

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL SPRINKLER COMPONENTS IN THE STAIRS, INCLUDING BUT

NOT LIMITED TO THE VERTICAL SPRINKLER RISER, VERTICAL

DRAIN RISER AND THE SPRINKLER ZONE CONTROL

ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

PROVIDE 4" SPRINKLER ZONE CONTROL ASSEMBLY FOR FIRST

FLOOR SPRINKLER ZONE, INCLUDING INDICATING CONTROL

VALVE WITH SUPERVISORY SWITCH, CHECK VALVE, WATER

FLOW SWITCH, PRESSURE GAUGE, COMBINATION INSPECTOR'S

TEST AND DRAIN INCLUDING RELIEF VALVE. RELIEF VALVE TO

BE

-INCH IN SIZE AND SET TO OPERATE AT 175 PSI. TEST AND

DRAIN TO BE CONNECTED TO COMMON DRAIN RISER.

PROVIDE SUPERVISED CONTROL VALVE FOR ELEVATOR

MACHINE ROOM SPRINKLER(S).

1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL

EQUIPMENT, FURNISHINGS. FIXTURES AND CONTENTS OF THE

SPACES FROM DAMAGE, DUST, WATER AND DEBRIS

ASSOCIATED WITH WORK. CONTRACTOR IS RESPONSIBLE FOR

DAILY CLEAN UP, INCLUDING REMOVAL OF ALL TRASH, DEBRIS

AND CONSTRUCTION MATERIALS ON A DAILY BASIS, AND

RESTORING TO PRE-CONSTRUCTION CONDITION AS WORK IS

COMPLETED.

2. PROVIDE SPRINKLER PIPING SUCH THAT THE ENTIRE

SPRINKLER SYSTEM WILL DRAIN BACK TO THE EXPRESS DRAIN

RISER.

3. MAINTAIN ALL REQUIRED STAIR EGRESS CLEARANCES FOR

ALL SPRINKLER COMPONENTS IN THE STAIRS, INCLUDING BUT

NOT LIMITED TO THE VERTICAL SPRINKLER RISER, VERTICAL

DRAIN RISER AND THE SPRINKLER ZONE CONTROL

ASSEMBLIES.

4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL WALL AND

CEILING INFORMATION. SEE LIFE SAFETY DRAWINGS FOR FIRE

RATED WALL LOCATIONS.

5. SPRINKLERS AND SPRINKLER MAINS ARE SHOWN FOR

INFORMATION PURPOSES ONLY. CONTRACTOR SHALL

PROVIDE THEIR OWN SPRINKLER PIPING CONFIGURATION AND

SPRINKLER LAYOUT PER NFPA 13 TO MEET ALL HYDRAULIC

REQUIREMENTS.

BUILDING D PENTHOUSE

0.15

VARIES

55.5 465.0

65.7 465.0

PROVIDE 6" VERTICAL DOUBLE DETECTOR CHECK BACKFLOW

PREVENTER INCLUDING OS&Y INDICATING CONTROL VALVES

WITH SUPERVISORY SWITCHES.

PROVIDE FEED TO THE FIRE DEPARTMENT CONNECTION

INCLUDING CHECK VALVE AND AUTOMATIC BALL DRIP.

PROVIDE STANDPIPE RISER INDICATING CONTROL VALVE WITH

SUPERVISORY SWITCH.

PROVIDE 2

" FIRE HOSE VALVE, CAP AND CHAIN.

PROVIDE 2

" FIRE HOSE VALVE, CAP AND CHAIN. PROVIDE A

SECOND 2

" FIRE HOSE VALVE IN STAIR FOR FORWARD FLOW

TESTING THE BACKFLOW PREVENTER. LABEL AS "FORWARD

FLOW TEST FOR BACKFLOW PREVENTER"

PROVIDE 4" SPRINKLER ZONE CONTROL ASSEMBLY FOR

SPRINKLER ZONE, INCLUDING INDICATING CONTROL VALVE

WITH SUPERVISORY SWITCH, CHECK VALVE, WATER FLOW

SWITCH, PRESSURE GAUGE, COMBINATION INSPECTOR'S TEST

AND DRAIN INCLUDING RELIEF VALVE.

PROVIDE 2" DRY PIPE VALVE FOR THE LOADING DOCK DRY

SPRINKLER SYSTEM.

1. RISER DIAGRAM IS SCHEMATIC IN NATURE, REFER TO

SPRINKLER PLANS FOR EQUIPMENT LOCATIONS AND

QUANTITIES. NOT ALL SPRINKLER EQUIPMENT IS SHOWN ON

RISER DIAGRAM.

04/25/2016

1. DRAWINGS, SPECIFICATIONS, ADDENDUMS, SKETCHES AND OTHER DOCUMENTATION

COMPRISE THE PROJECT CONTRACT DOCUMENTS AND MUST BE USED IN

COMBINATION, TO FACILITATE THE REMOVAL OF THE EXISTING TELECOMMUNICATIONS

SYSTEM PER THE DRAWINGS AND SPECIFICATIONS.

2. THE DRAWINGS INDICATE THE GENERAL PROPOSED LOCATION OF EQUIPMENT, CABLE

PATHWAYS AND OUTLETS. LOCATION OF EQUIPMENT AND OUTLETS AND OTHER

SUPPORTING ITEMS TO BE COORDINATED WITH ALL OTHER EXISTING UTILITIES AND

TRADES.

3. THE TERM "CONTRACTOR" MEANS CONTRACTOR RESPONSIBLE FOR ALL WORK

DEFINED IN THE DRAWINGS AND SPECIFICATIONS.

4. THE TERM "REMOVE" MEANS DISCONNECT ALL COMPONENTS OF THE LOW VOLTAGE

COMMUNICATIONS SYSTEM AND REMOVE FROM SITE.

5. COORDINATE ALL DRAWINGS AND SPECIFICATIONS PRIOR TO COMMENCING WORK.

ANY CONFLICT BETWEEN DRAWINGS AND SPECIFICATIONS SHALL BE BROUGHT TO THE

COR'S ATTENTION IMMEDIATELY. THE CONTRACTOR SHALL NOT PROCEED WITH ANY

WORK EXCEPT AT THEIR OWN RISK UNTIL CLARIFICATION OF CONFLICTS ARE ISSUED

TO THE CONTRACTOR BY THE COR.

6. FIELD VERIFY AND COORDINATE ALL DEVICE LOCATIONS AND POWER REQUIREMENTS.

WHERE CONFLICTS OCCUR, COORDINATE AND VERIFY FINAL LOCATIONS WITH THE

COR PRIOR TO INSTALLATION.

7. PROVIDE COORDINATION AND VERIFICATION OF ALL CONDITIONS INCLUDING

EQUIPMENT AND DEVICES INSTALLED BY OTHER TRADES, THE WORK OF THE

CONTRACTOR AND SUBCONTRACTORS.

8. DETAIL REFERENCES ARE NOT NECESSARILY NUMBERED INCREMENTALLY. A GAP IN

NUMBERING DOES NOT INDICATE MISSING INFORMATION. DETAIL NAMES AND

NUMBERS ARE SPECIFIC TO THIS DESIGN PACKAGE AND DO NOT CORRESPOND TO

OTHER PUBLISHED DOCUMENTS.

9. ALL EXISTING CONDUIT SHALL BE REMOVED UNLESS NOTED OTHERWISE.

AFF

AV

BCT

C

CAT

CATV

CM

COR

CT

EF

EMI

EMT

ER

FO

IMT

ITS

LAN

MAX

MIN

MISC

MM

MTD

NTS

OC

OPE

OSP

PC

PP

PR

RM

RMU

SM

SP

STP

TBB

TBD

TE

TGB

TMGB

TR

TYP

UON

UPS

UTP

VAC

VDC

VP

WM

WOA

WPE

ABOVE FINISHED FLOOR

AUDIO VISUAL

BONDING CONDUCTOR FOR TELECOMMUNICATIONS

CONDUIT

CATEGORY

COMMUNITY ANTENNA TELEVISION

CEILING MOUNTED

CONTRACTING OFFICER REPRESENTATIVE

CABLE TRAY

ENTRANCE FACILITY

ELECTRICAL MAGNETIC INTERFERANCE

ELECTRICAL METALLIC TUBING

EQUIPMENT ROOM

FIBER OPTIC

INTERMEDIATE METALLIC TUBING

INFORMATION TECHNOLOGY SYSTEMS

LOCAL AREA NETWORK

MAXIMUM

MINIMUM

MISCELLANEOUS

MULTIMODE

MOUNTED

NOT TO SCALE

ON CENTER

OWNER PROVIDED EQUIPMENT

OUTSIDE PLANT

PERSONAL COMPUTER

PATCH PANEL

PAIR

ROOM

RACK MOUNTING UNIT (1.75")

SINGLEMODE

SERVICE PROVIDER

SHIELDED TWISTED PAIR

TELECOMMUNICATIONS BONDING BACKBONE

TO BE DETERMINED

TELECOMMUNICATION ENCLOSURE

TELECOMMUNICATIONS GROUNDING BUSBAR

TELECOMMUNICATIONS MAIN GROUNDING BUSBAR

TELECOMMUNICATIONS ROOM

TYPICAL

UNLESS OTHERWISE NOTED

UNINTERRUPTED POWER SUPPLY

UNSHIELDED TWISTED PAIR

VOLTS ALTERNATING CURRENT

VOLTS DIRECT CURRENT

VANDAL PROOF

WALL MOUNTED

WORK AREA OUTLET

WEATHER PROOF ENCLOSURE

EXISTING TO REMAIN LINE-TYPE

EXISTING TO BE REMOVED LINE-TYPE

EXISTING WALL MOUNTED DROP SET TO BE REMOVED

CATV DISH ANTENNA

KEYNOTE TAG

DETAIL NUMBER

DETAIL IDENTIFICATION BUBBLE

SHEET DETAIL IS SHOWN ON

SHEET DETAIL IS TAKEN FROM

ELEVATION NUMBER

ELEVATION IDENTIFICATION BUBBLE

SHEET ELEVATION IS SHOWN ON

SHEET ELEVATION IS TAKEN FROM

T C

H L I N

E M

A T

C H

L I N

E M

A T

C H

L I N

E

REMOVE ALL HORIZONTAL WORK AREA OUTLET CABLING (i.e. 4-PAIR

UTP CAT-3 CABLE, JACKS, BACK BOXES, AND

" SUPPORT CONDUIT

ALONG WITH SUPPORT PATHWAYS SUCH AS CEILING MOUNTED

J-HOOKs, TO TR-138G. TO INCLUDE RELATED SUPPORT HARDWARE

INSIDE TR SUCH AS CROSS CONNECT WIRES, PATCH CORDS, PATCH

PANELS, AND 66 AND/OR 110 CONNECTING BLOCKS. REMOVE ALL

ABANDONED 25-PAIR COPPER UTP CABLES THAT ARE CUT NEAR THE

TR's CEILING.

ALL OUTSIDE PLANT COPPER AND FIBER CABLE ARE TO REMAIN,

(TWO-100-PAIR, AND ONE 12-STRAND FIBER). PROTECT IN PLACE

DURING RENOVATION UNTIL NEW CONSTRUCTION IS COMPLETE.

SEE NEW WORK SHEET SET FOR INFORMATION ABOUT OSP CABLING

SYSTEM.

TYP

1. REFERENCE TD0.0 FOR SYMBOLS AND ABBREVIATIONS.

TYP

TYP

TELECOM ROOM

TR-138G

T C

H L I N

E M

A T

C H

L I N

E

EXISTING TR SHALL BE REMOVED.

REMOVE ALL HORIZONTAL WORK AREA OUTLET CABLING (i.e.

4-PAIR UTP CAT-3 CABLE, JACKS, BACK BOXES, AND

SUPPORT CONDUIT ALONG WITH SUPPORT PATHWAYS SUCH

AS CEILING MOUNTED J-HOOKs, TO TR-240B. TO INCLUDE

RELATED SUPPORT HARDWARE INSIDE TR SUCH AS CROSS

CONNECT WIRES, PATCH CORDS, PATCH PANELS, AND 66

AND/OR 110 CONNECTING BLOCKS. REMOVE ALL ABANDONED

25-PAIR COPPER UTP CABLES THAT ARE CUT NEAR THE TR's

CEILING.

EXISTING VERIZON DEMARK ROOM. FUTURE LOCATION FOR

NEW SERVER ROOM. ALL OUTSIDE PLANT COPPER AND FIBER

CABLE ARE TO REMAIN, PROTECT IN PLACE DURING

RENOVATION. SEE NEW WORK SHEET SET FOR INFORMATION

ABOUT NEW SERVER ROOM AND NEW DEMARK LAYOUT.

1. REFERENCE TD0.0 FOR SYMBOLS AND ABBREVIATIONS.

TYP

TYP

1. REFERENCE TD0.0 FOR SYMBOLS AND ABBREVIATIONS.

EXISTING TR SHALL BE REMOVED.

REMOVE ALL HORIZONTAL WORK AREA OUTLET CABLING (i.e.

4-PAIR UTP CAT-3 CABLE, JACKS, BACK BOXES, AND

SUPPORT CONDUIT ALONG WITH SUPPORT PATHWAYS SUCH

AS CEILING MOUNTED J-HOOKs, TO TR-342A. TO INCLUDE

RELATED SUPPORT HARDWARE INSIDE TR SUCH AS CROSS

CONNECT WIRES, PATCH CORDS, PATCH PANELS, AND 66

AND/OR 110 CONNECTING BLOCKS. REMOVE ALL ABANDONED

25-PAIR COPPER UTP CABLES THAT ARE CUT NEAR THE TR's

CEILING.

TYP

EXISTING CATV DISH ANTENNA. OWNED AND MAINTAINED BY

OTHERS SHALL REMAIN IN PLACE.

REMOVE OLD CABLE TV CABLE THAT IS RESTING ON THE ROOF.

REMOVE OLD CONNECTORS AND ASSOCIATED SUPPORT

HARDWARE.

1. REFERENCE TD0.0 FOR SYMBOLS AND ABBREVIATIONS.

2. REMOVE ALL HORIZONTAL WORK AREA OUTLET CABLING AND

PATHWAYS TO TR 342A. TO INCLUDE RELATED CROSS

CONNECT WIRES, J-HOOK PATHWAYS, PATCH CORDS, PATCH

PANELS AND CONNECTING BLOCKS.

T C

H L I N

E M

A T

C H

L I N

E

M A

T C

H L I N

E M

A T

C H

L I N

E

1. REFERENCE TD0.0 FOR SYMBOLS AND ABBREVIATIONS.

TYP

REMOVE ALL HORIZONTAL WORK AREA OUTLET CABLING (i.e. 4-PAIR

UTP CAT-3 CABLE, JACKS, BACK BOXES, AND

" SUPPORT CONDUIT

ALONG WITH SUPPORT PATHWAYS SUCH AS CEILING MOUNTED

J-HOOKs, TO WALL MOUNT PATCH PANELS IN CLASS ROOM 182. TO

INCLUDE RELATED SUPPORT HARDWARE INSIDE TR SUCH AS CROSS

CONNECT WIRES, PATCH CORDS, PATCH PANELS, AND 66 AND/OR

110 CONNECTING BLOCKS. REMOVE ALL ABANDONED 25-PAIR

COPPER UTP CABLES THAT ARE CUT NEAR THE TR's CEILING.

WALL MOUNTED COPPER PATCH PANEL AND WALL MOUNTED FIBER

BOX. REMOVE ALL COPPER AND FIBER CABLING AND HARDWARE.

EXISTING CATV DISH ANTENNA OWNED AND MAINTAINED BY OTHERS

SHALL REMAIN IN PLACE.

T C

H L I N

E M

A T

C H

L I N

E

MATCHLINE MATCHLINE

TYP

REMOVE ALL HORIZONTAL WORK AREA OUTLET CABLING (i.e.

4-PAIR UTP CAT-3 CABLE, JACKS, BACK BOXES, AND

SUPPORT CONDUIT ALONG WITH SUPPORT PATHWAYS SUCH

AS CEILING MOUNTED J-HOOKs, TO TR-119. TO INCLUDE

RELATED SUPPORT HARDWARE INSIDE TR SUCH AS CROSS

CONNECT WIRES, PATCH CORDS, PATCH PANELS, AND 66

AND/OR 110 CONNECTING BLOCKS. REMOVE ALL ABANDONED

25-PAIR COPPER UTP CABLES THAT ARE CUT NEAR THE TR's

CEILING.

EXISTING MODULAR FURNITURE IS NOT SHOWN. REMOVE ALL

CABLING INFRASTRUCTURE FROM MODULAR FURNITURE

SYSTEM.

1. REFERENCE TD0.0 FOR SYMBOLS AND ABBREVIATIONS.

TYP

TYP

TYP

A

T C

H L I N

E M

A T

C H

L I N

E

1. REFERENCE TD0.0 FOR SYMBOLS AND ABBREVIATIONS.

TYP

REMOVE ALL HORIZONTAL WORK AREA OUTLET CABLING (i.e.

4-PAIR UTP CAT-3 CABLE,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.