B09_Amendment0005_Form_SF30.pdf

PDF 91 KB Posted

Attached to
Construction Services for Repair/Alteration of Office Building - Solicitation 140P2019R0068
Solicitation number
140P2019R0068
Issued by

About this file

SF30 - Amendment 0005

View the file

Other files

File Type Posted
B09_Amendment0010_SF30_140P2019R0068.pdf PDF
Door_Sched_NPS_A6.23.pdf PDF
B09_Solit_General_References_Form.pdf PDF
B09_Solit_Hazardous_Materials.pdf PDF
Door_Sched_NPS_A6.20.pdf PDF
NCRO_251176_-_Prebid_RFI_Summary_190626.1_Amend_0010_Responses.pdf PDF
Door_Sched_NPS_A6.22.pdf PDF
Door_Sched_NPS_A6.24.pdf PDF
Door_Sched_NPS_A6.21.pdf PDF
B08_Solit_PSP_Vol_II_Equals.pdf PDF
B08__Amendment_0009_140P2019R0068_FINAL.pdf PDF
B09_Amendment0008_Form_SF30_.pdf PDF
140P2019R0068_-_Interested_Parties_List.pdf PDF
B09_Amendment0004_Form_SF30_.pdf PDF
B09_Amendment0003_Form_SF30.pdf PDF
B09_Amendment0002_Form_SF30_.pdf PDF
B09_Amendment0001_Form_SF30.pdf PDF
B09_Amendment0006_Form_SF30.pdf PDF
B09_Amendment0007_Form_SF30_and_attachment_Released_6-21-19.pdf PDF
B08_Solicitation_Form_1442_-_140P2019R0068_Revised_6-20-2019_Amendment0004.pdf PDF
B11_Pre-Bid_Proposal_Conference_Site_Visit__Sign-in_Sheet.pdf PDF
B08_Solicitation_Form_1442_-_140P2019R0068_Revised_6-7-2019_Amendment0003.pdf PDF
B11_NCRO201409_PreBid_Agenda_Revised_Amendment0003.pdf PDF
B11_NCRO201409_PreBid_Agenda_Revised.pdf PDF
B11_NCRO201409_PreBid_Agenda.pdf PDF
B08_Solicitation_Form_1442_-_140P2019R0068.pdf PDF
B08_Solic_Sec_J_Attachm_3_-PSP_Vol_II_SubKPlanForm_NCRO201409.pdf PDF
Drawings_Volume_I_pgs_175-349.pdf PDF
B08_Solic_Sec_J_Attachm_4_-_DC190002_5-22-19_Wage_Determination.pdf PDF
B08_Solic_Sec_J_Attachm_6_-_PPQ_Form.pdf PDF
Drawings_Volume_II.pdf PDF
Drawings_Volume_I_pgs_1-174.pdf PDF
Drawings_-_Roof.pdf PDF
Specification_Package_Volume_I_and_Volume_II.pdf PDF
B08_Solic_Sec_J__Attach_1_-_NCRO_Specification_Package.pdf PDF
B08_Solic_Sec_J_Attachm_5_-_Project_Experience_Form.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2019R0068 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

NCRO-20140906/06/20190005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/06/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation No. 140P2019R0068 is amended by this Amendment 0005 as follows:

Amendment 0005 -FORM 1442 and Solicitation Clauses is amended as follows:

1. Page 1

BOX 13. ADDITIONAL REQUIREMENTS: The first sentence of Box 13.a of Form 1442 is changed

FROM:

13.a. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1600 (hour) local time 07/08/2019 (date).

TO:

13.a. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1600 (hour) (Mountain Time) local time 07/16/2019 (date).

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Anne Laporta

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 179

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2019R0068/0005

Legacy Doc #: NPS

Period of Performance: 09/30/2019 to 06/30/2021

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it.