B09_Amendment0007_Form_SF30_and_attachment_Released_6-21-19.pdf
PDF 755 KB Posted
- Attached to
- Construction Services for Repair/Alteration of Office Building - Solicitation 140P2019R0068
- Solicitation number
- 140P2019R0068
About this file
Amendment 0007 SF30 and Attachments
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2019R0068 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
NCRO-20140906/06/20190007
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/06/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1. The attachments reference in the following Amendments are mislabeled; however, the
Attachments reflect the correct information for that Amendment, respectively. No changes are made to the Attachments by this Amendment 0007. This information is provided for clarification purposes.
a) Amendment 4 Attachment should be titled:
B08-Solicitation_Form_1442-140P2019R0068_Revised 6-7-19-Amendment 0004 (not 0003)
b) Amendment 5 Attachment should be titled:
B08-Solicitation_Form_1442-140P2019R0068_Revised 6-7-19-Amendment 0005 (not 0004).
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Anne Laporta
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
2. The due date and time for proposals specified in Box 13 is local time for the location in Box 8 of FORM 1442; not the location of the site of the project. For further
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2019R0068/0007 to clarification:
FORM 1442 Page 1 is amended as follows:
BOX 13. ADDITIONAL REQUIREMENTS: The first sentence of Box 13.a of Form 1442 is changed FROM:
13.a. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1600 (hour) (Mountain Time) local time 07/16/2019 (date).
TO:
13.a. Sealed offers in original and 1 copies perform the work required are due at the place specified in Item 8 by 1600 (hour) (Mountain Daylight Time (MDT)) local time 07/16/2019 (date).
3. Proposal Questions Due Date: Proposal questions are due at the place specified in FORM 1442, Item 8 by 1600 (hour) (Mountain Daylight Time (MDT)) local time 06/25/2019 (date). The points of contact for proposal questions is provided in the NPS SOLICITATION 140P2019R0068
NCRO 201409 CONSTRUCTION SERVICES FOR
REPAIR/ALTERATION OF OFFICE BUILDING PRE-PROPOSAL
CONFERENCE AGENDA JUNE 18, 2019, as amended by Amendment 0001 to this Solicitation. The Government will try to answer all the questions and post the questions and answers as an amendment by the end of the day July 1, 2019.
Please do not wait until then to submit your questions, submit them as soon as you can so that the Government has the time to research and answer in order to help you prepare your proposals. Any questions received after that date/time there is no guarantee an answer will be provided.
4. Site Visit Attendees: A typed site visit attendee list, in addition to the previously provided hand-written list, is provided as an attachment hereto.
Legacy Doc #: NPS
Period of Performance: 09/30/2019 to 06/30/2021
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Mohammed Kammzzamen Montage, Inc. Prime pm42@montageinc.com Ralph Boldyga Progress Environmental sub rboldyga@progress401.com environmental Nimesh Patel Benaka Inc. Prime npatel@benakainc.com Jeffery C. Kitts Ocean Construction Services Inc. Prime bids@ocsinc.us Chris Bonomi PCS (Power Component Systems) sub cbonomi@powercomponentsystems.com Demo/environmental Chris Fagone JC Grimberg Prime Jmeckley@grimberg.com David Alexander Fidelity Powersystems sub davida@fidelityengineering.com HVAC, mechanical, building systems Steven Goodrich City Construction Prime citycorp@yahoo.com David Stone TMG Construction Prime dstone@tmgworld.net Mehmet Cetinbas Mac Corporation of VA sub maccorpva@macofva.com cetinbasm@yahoo.com abatement, flooring Jason Karlin WM Schlosser Prime jkarlin@wmschlosser.com Kari Katsouros City Construction Prime kari@citycorp.us Hayes Merkert ACEO Prime amerkert@oceaworld.com Demo/environmental Sean Tucker RSC sub seantucker@rsccompany.com Mechanical/Electrical
Mike Finken NPS DSC PM Jason Riharb NPS DSC PS Anne LaPorta NPS DSC anne_laporta@nps.gov CO John Babcock NPS DSC john_babcock@nps.gov CS Nathan Epling NPS NCR Acting Regional Chief of Facility Management Kimberly Benson NPS NCR Lead ‐ Design & Construction
6/18/19 Pre-Bid Site Visit Attendees SOLICIATION NO. 140P2019R0068
| B09_Amendment0007 Form SF30 |
| 19.06.18 Site Visit List of Attendees |