Revised_Spec_Sheet_-_FLAMINGO_S-11.pdf

PDF 123 KB Posted

Attached to
REHABILITATE FLAMINGO VISITOR CENTER AND REPLACE ROOF
Solicitation number
140P2019R0067
Issued by

About this file

Revised Specification sheet S-11

View the file

Other files

File Type Posted
S401_&_S501.pdf PDF
Parc-Vue-Bench-Materials.pdf PDF
ParcVue_-Brochure.pdf PDF
Flamingo_cottage_wetland_map.pdf PDF
Revised_Spec_Sheet_-_FLAMINGO_S-12.pdf PDF
B09_Amendment0004_140P2019R0067.pdf PDF
RFIRegister_190722.pdf PDF
B08_Amendment0003_140P2019R0067.pdf PDF
Sign-In_190711.pdf PDF
B11_EVER_235866_Pre-ProposalAGENDA_HANDOUT.pdf PDF
B08_ATTCH_16_Exp.docx DOCX document
B08_ATTCH_17_PastPerf_Q.docx DOCX document
B08_Amendment0002_140P2019R0067.pdf PDF
B08_Amendment0001__140P2019R0067.pdf PDF
Revised_Site_Plan_-_Flamingo_Visitors_Center_June_30_.pdf PDF
B08_Solicit_Geo_Report-Proposed_Elevator_ATTCH_4.pdf PDF
B08_Solicit_Closeout_and_OM_ATTCH_1.1.pdf PDF
EVER_235866_Final_Drawings_pp_1-94_2019-06-25_2.pdf PDF
B08_Solicit_IAQA_Report_ATTCH_9.pdf PDF
B08_Solicit_Asbestos_Survey_ATTCH_10.pdf PDF
B08_Solit_PSP_Vol_II_HazMat_ATTCH_14.pdf PDF
B08_Solit_-_Attch_J_Govt_Furnished_Property_ATTACH_13.pdf PDF
B08_Solicit_Submittal_Log_ATTCH_1.2.pdf PDF
B03_DOL_Wage_Decision_ATTCH_12.pdf PDF
B08_ATTCH_17_Past_Perf_Q.pdf PDF
B08_Solit_PSP_Vol_II_Equals__ATTCH_15.pdf PDF
B08_Solicit_Water_Improvements_ATTCH_11.pdf PDF
B08_ATTCH_16.pdf PDF
B08_Solicit_Specifications_ATTCH_1.pdf PDF
B08_Solicit_Asbestos_Survey_ATTCH_6.1.pdf PDF
B08_Solicit_Asbestos_Roof_ATTCH_6.2.pdf PDF
B08_Solicit_Mold_Report_ATTCH_8.pdf PDF
B08_Solicit-Structural_ATTCH_1.3.pdf PDF
B08_140P2019R0067_190627.pdf PDF
B08_Solicit_Mold__Testing_Analysis_ATTCH_7.pdf PDF
EVER_235866_Final_Drawings_pp_95-194_2019-06-25_2.pdf PDF
B08_Solicit_Geo_Report-Other_ATTCH_5.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Flamingo Visitor Center Law Enforcement Project‐ SPECIFICATION PACKAGE

FLAMINGO

S-11

Product Description:

Manufacturer:

Name:

Model: backed

Size: (overall)

Qty: 6

FINISHES

COLOR

PRODUCT DESCRIPTION/ FINISH IMAGES

CONTRACT INFORMATION

Contract Name:

Contract Number:

Contract Period:

MANUFACTURERS DATA

Warranty:

Lead Time:

Freight Terms:

ENVIRONMENTAL ATTRIBUTES

BIFMA Level 2 Indoor Advantage - Gold

• Metal is finished with Landscape Forms’ proprietary Pangard II® polyester powdercoat, a hard yet flexible finish that resists rusting, chipping, peeling and fading.

The manufacturer certifies that options selected are compliant with ADA

All furniture manufacturers must meet ABASS standards

Fixed to the ground

• Horizontal strap seat style is standard for backed or backless benches.

• Bench is available in 72" length.

• End arms are available for backed bench and are welded to the end frame.

• Support end frames are of 3/4" steel.

• Seating surface is made of horizontal steel straps (1-1/2" x 3/16"), which are welded to the end frames.

• Parc Vue bench may be specified freestanding with glides or surface mount with anchor tabs.

Landscape Forms

Parc Vue

25"D x 72"W x 36"H

Silver

GENERAL PRODUCT INFORMATION PRODUCT IMAGE

Civic Bench

File details come from the government source that posted it.