Solicitation Amendment No. 0003 Q&A's

View the file

Other files

File Type Posted
S401_&_S501.pdf PDF
Parc-Vue-Bench-Materials.pdf PDF
ParcVue_-Brochure.pdf PDF
Flamingo_cottage_wetland_map.pdf PDF
Revised_Spec_Sheet_-_FLAMINGO_S-11.pdf PDF
Revised_Spec_Sheet_-_FLAMINGO_S-12.pdf PDF
B09_Amendment0004_140P2019R0067.pdf PDF
RFIRegister_190722.pdf PDF
Sign-In_190711.pdf PDF
B11_EVER_235866_Pre-ProposalAGENDA_HANDOUT.pdf PDF
B08_ATTCH_16_Exp.docx DOCX document
B08_ATTCH_17_PastPerf_Q.docx DOCX document
B08_Amendment0002_140P2019R0067.pdf PDF
B08_Amendment0001__140P2019R0067.pdf PDF
Revised_Site_Plan_-_Flamingo_Visitors_Center_June_30_.pdf PDF
B08_Solicit_Geo_Report-Proposed_Elevator_ATTCH_4.pdf PDF
B08_Solicit_Closeout_and_OM_ATTCH_1.1.pdf PDF
EVER_235866_Final_Drawings_pp_1-94_2019-06-25_2.pdf PDF
B08_Solicit_IAQA_Report_ATTCH_9.pdf PDF
B08_Solicit_Asbestos_Survey_ATTCH_10.pdf PDF
B08_Solit_PSP_Vol_II_HazMat_ATTCH_14.pdf PDF
B08_Solit_-_Attch_J_Govt_Furnished_Property_ATTACH_13.pdf PDF
B08_Solicit_Submittal_Log_ATTCH_1.2.pdf PDF
B03_DOL_Wage_Decision_ATTCH_12.pdf PDF
B08_ATTCH_17_Past_Perf_Q.pdf PDF
B08_Solit_PSP_Vol_II_Equals__ATTCH_15.pdf PDF
B08_Solicit_Water_Improvements_ATTCH_11.pdf PDF
B08_ATTCH_16.pdf PDF
B08_Solicit_Specifications_ATTCH_1.pdf PDF
B08_Solicit_Asbestos_Survey_ATTCH_6.1.pdf PDF
B08_Solicit_Asbestos_Roof_ATTCH_6.2.pdf PDF
B08_Solicit_Mold_Report_ATTCH_8.pdf PDF
B08_Solicit-Structural_ATTCH_1.3.pdf PDF
B08_140P2019R0067_190627.pdf PDF
B08_Solicit_Mold__Testing_Analysis_ATTCH_7.pdf PDF
EVER_235866_Final_Drawings_pp_95-194_2019-06-25_2.pdf PDF
B08_Solicit_Geo_Report-Other_ATTCH_5.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2019R0067 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

EVER 23586607/17/20190003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/28/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AMENDMENT 0002 - EVER 235866 and EVER 244520, Rehabilitate Flamingo Visitor Center and

Replace Roof, Everglades National Park, Florida

See the Attached Continuation Sheet put on the SF 30 Continuation Sheet.

Attachments:

1. Continuation Sheet (1 page).

2. CROFT Pre-Proposal Meeting Handout (1 page).

3. Contract Price Schedule to include Optional Line Items 0080 and 0090 (1 page)

4. Button Wood Canal drawings (16 pages).

5. RFI Register Log (Questions and Answers - 3 pages)

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Anne Laporta

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 25CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2019R0067/0003

The Proposal Due Date is hereby extended one week

(7 calendar days) from July 30, 2019 to August 6, 2019 at 16:00 (4:00 PM) MDT.

Solicitation SECTION H is hereby amended by the addition of the following special clause:

SPECIAL CLAUSE VI - OPTION FOR ADDITIONAL

SERVICES-SEPARATLY PRICED LINE ITEMS

All other terms and conditions remain unchanged.

Delivery: 02/11/2021

Delivery Location Code: 0009060749

NPS,DSC-Design & Construction

(Via Courier) 12795 W. ALAMEDA PARK

LAKEWOOD CO 80228 US

Period of Performance: 09/20/2019 to 02/11/2021

00080 Water Line Upgrades - Additional Length 1 LS

(Option Line Item)

00090 Water Line Upgrades - Visitor Center to Hotel 1 LS

Stub Out

(Option Line Item)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation No. 140P2019R0067

EVER 235866

Amendment 0003

CONTINUATION SHEET

1. The Solicitation is Amended as follows:

a. In Box 13 of Form 1442, the proposal due date is extended by seven (7) calendar days FROM July 30, 2019, TO August 6, 2019. The time for proposals to be submitted remains unchanged at 16:00 hours local (Mountain Daylight Time) time.

b. The Solicitation is amended by the addition of Special Clause VI in Section H – SPECIAL CONTRACT REQUIREMENTS as follows:

SPECIAL CLAUSE VI: OPTION FOR ADDITIONAL SERVICES—SEPARATELY PRICED LINE

ITEMS

The Government may require the delivery of the numbered line items identified in the Schedule as option items at the price stated in the Schedule. The Contracting Officer may unilaterally exercise the option by written notice to the Contractor within 120 days after contract award. Performance of added line item tasks shall be at the price negotiated in the contract Schedule.

2. Administrative Note on FBO & Amendments:

a. There was one Site Visit held on July 11, 2019. There will be No other Site Visits.

b. Q # FBO Amendment 1 was issued on Jul 02, 2019 – but no SF 30 Amendment was posted on FBO. Is the government going to post the SF 30 for inclusion into FBO?

A # FBO Amendment 1 does not have a SF 30. AMENDMENT No. 0001 on SF 30 was issued to incorporate the drawing that is showing as FBO Amendment 2.

c. Q# The "General References" form was not included as part of the provided information on FBO. Can we get a copy of the form the government wants used in the proposal?

A# The "General References Form” was added as an AMENDMENT No. 0002 on SF 30 and is shown on FBO as Amendment 3. This AMENDMENT No. 0002 also furnished Section J Attachment 16 Project Experience and Attachment 17 – Past Performance Questionnaire in a WORD format.

d. The Pre-Proposal Agenda was posted July 11 as a new attachment on FBO. The Pre- Proposal Sign-In and Attendance Roster was posted July 15 as a new attachment on

FBO.

REVISION

RFI

DIVISION

or

REC'D

1 General 7/1/2019

2 General 7/1/2019

3 General 7/1/2019

4 Spec 122413 7/1/2019

5 Arch Dwgs 7/1/2019

6 General 7/2/2019

7 AV 7/2/2019

8 General 7/3/2019

9 General 7/3/2019

10 General 7/3/2019

11 General 7/3/2019

12 7/3/2019

13 General 7/5/2019

14 General 7/5/2019

15 General 7/9/2019

16 General 7/10/2019

17 General 7/10/2019

18 Arch Specs 7/11/2019

19 Specs 7/11/2019

The drawings are missing a finish plan/schedule, so we are unable to determine which windows are expected to be covered with window treatments.

Can we give you price for the roofing only or is the proposal for the entire project?

See sheets: A-700 and A-701 for shedule and materials, A-711 thru A-715 for floor finishes, as well as several additional A-7XX series sheets showing interior elevation sheets defining finishes on the walls

No. Proposals must be for the entire project broken out per the contract line item guidelines in specification 01 27 00. Interested roofing subcontractors may coordinate with prime contractors to submit subcontractor proposals. See the site visit sign-in sheet from the prior amendment and the Interested Party list on FBO.

AMENDMENT 0003 will incorporate the NEW Contract Price Schedule which includes the two new line items for the water line.

Clause 52.219-4 of the solicitation gives 2 instances for a 10% pricing preference, the first to receive a preference is HUBZONE Small Business Concerns and the second is Small

Business Concerns. We are a construction company that has done less than $35,000,000 yearly revenue average for the last 3 years and therefore will self-certify as a Small Business

Concern in SAM. My question is, do we qualify as a Small Business Concern and will we receive the same pricing preference as a HUBZONE Small Business Concern.

Offers will be evaluated in accordance with FAR Clause 52.219-4. The Contrator is responsible for understanding and meeting small business requirements in order to submit the required Representations and Certifications and meet all proposal requirements. .

Volume II contents require us to submit general references form and subcontracting plan form. It states both are attached, however they were not included as part of the attachments nor is it included within the solicitation form. Could you please advise if there are, in fact, preprinted forms for these items and if so, can you please provide?

National Park Service

Denver Service Center

12795 West Alameda Parkway

Lakewood, CO 80228

RFI REGISTER

I will prepare a SF 30 amendment for the new FBO posted amendment (e-mail response sent with attachment 7/3/19 by Kurt Ulmer).

No, the contractor will manage this scope and they will not be selected until contract award.

Two volumes in 3 inch binders is acceptable.

CONTRACT No.

Solicitation 140P2019R0067

PMIS

EVER 235866

PROJECT TITLE

EVERGLADES - Rehabilitate Flamngo Visitor Center and Replace Roof

DATE

7/17/2019

FBO Amendment 1 does not have a SF 30. AMENDMENT No. 0001 on SF 30 was issued to incorporate the drawing that is showing as FBO Amendment 2.

Refer to FAR 52.236-1. The clause requires that the work performed to satisfy the percentage shall be performed on the site and with the contractor's own organization.

Work not meeting these requirements, under any Division, would not be applied against the percentage.

Please confirm if 15% of work to be self-performed includes the cost of general conditions.

The solicitation states volumes are to be bound – can we submit the two volumes in 3-inch binders versus binding?

REQUEST / QUESTION RESPONSE

This is John with Clark Wire and Cable. We are on the specs as supplier for the

Audio/Visual scope of above/attached project. Could you advise who is managing the AV scope of the project?

What is the required roller shade fabric material? The specs call for light-filtering fabric under section 2.2. F. 1. and light-blocking/opaque fabric under section 2.3. B. If light-filtering is the appropriate fabric type, please indicate the percentage openness (i.e. 1%, 3%, 5%, or 10%).

See sheets: A-104, note is shown pointing to windows for space 135 and A-700, Finish Material Specifications Legend, heading Window Shades and Blinds, WIN-1

FBO Amendment 1 was issued on Jul 02, 2019 – but no SF 30 Amendment was posted on

FBO. Is the govt going to post the SF 30 for inclusion into FBO?

The "General References" form was not included as part of the provided information on

FBO. Can we get a copy of the form the govt wants used in the proposal?

The solicitation states volumes are to be bound – can we submit the two volumes in 3-inch binders versus binding?

Amendment 01 was issued on Jul 02, 2019 – but no SF 30 Amendment was posted on FBO.

Is the govt going to post the SF 30 for inclusion into FBO?

Only as indicated in drawings where repair, replacement, or touchup is necessary.

The exterior stucco/paint beyond those areas is not in scope.

The "General References Form” and "Subcontractng Plan Form" were added as an

AMENDMENT No. 0002 on SF 30 and is shown on FBO as Amendment 3.

The "General References Form” was added as an AMENDMENT No. 0002 on SF

30 and is shown on FBO as Amendment 3. This AMENDMENT No. 0002 also furnished Section J Attachment 16 Project Experience and Attachment 17 – Past

Performance Questionnaire in a WORD format.

Volumes can be submitted in binders (e-mail response sent with attachment 7/3/19 by Kurt Ulmer).

Will the forms containing the CLIN’s be revised to include the additional CLIN’s created by

Addendum # 1?

What special inspections are required what testing is required of the contractor? (Croft to list out the specification section(s) containing special inspections, and a brief description of those test and inspections that require a contractor to provide an inspection/test for). A comprehensive list should be in section 014000 of the specifications. Currently I do not see that included in the specs. There is a note in the specs saying the testing requirements are described in certain spec sections.

...answer is pending

Please advise if a price for stucco at the existing building areas to remain should be included as part of this proposal.

The forms attached to this email are to be completed and returned by the offeror, however these forms will be difficult to fill out and complete in their current format. Thy currently have text in the fields that are to be filled in by the offeror and that text cannot be overwritten using Adobe Acrobat without creating a new text box for each and every field which would be extremely time consuming and not good quality. Can these forms be provided in a fillable format or at least with the fields being left blank so we can use the fill and sign tool in Adobe

Acrobat to fill in the blanks and complete the form?

The Forms were added as AMENDMENT No. 0002 on SF 30 and is shown on FBO as Amendment 3. This AMENDMENT No. 0002 furnished Section J Attachment 16

Project Experience and Attachment 17 – Past Performance Questionnaire in a

WORD format.

DEC Contracting is requesting additional time to complete the PPQ and have our references complete them and return to you by email. Currently the deadline for returning these to you is July 15th, 2019 and we are concerned that is not enough time to coordinate the completion of these forms by multiple clients of DEC Contracting Group, Inc.

The Past Performance Questionnaires may be submitted up until the Proposal due date of Juluy 30, 2019 at 4:00 PM MDT.

Hope this email finds you well, this project came across my desk and my firm is already submitting a proposal for materials testing to a contractor bidding on the project but wondering if you will also need an Asbestos Survey for the Demo permit as well as a proposal for Private Provider Inspections for the re-roof?

There is no asbestos in the building and NPS has the testing reports verifying this.

The roof was also tested, and no asbestos was found. The contractor should provide the 3rd party inspections as described in the specifications.

Tennant Coatings, Inc. (the third largest manufacturer and supplier of epoxy/resinous floor coatings) through one of our preferred contractor/installers would like to provide a bid for the Seamless Resinous/Epoxy Flooring for the Rehabilitate Flamingo Visitor Center using our line of products. I have prepared a Request for Substitution of an equivalent system using Tennant Company Products and have attached it along with product information for

...answer is pending

DIVISION

or

REC'D

National Park Service

Denver Service Center

12795 West Alameda Parkway

Lakewood, CO 80228

RFI REGISTER

CONTRACT No.

Solicitation 140P2019R0067

PMIS

EVER 235866

PROJECT TITLE

EVERGLADES - Rehabilitate Flamngo Visitor Center and Replace Roof

DATE

7/17/2019

REQUEST / QUESTION RESPONSE

20 General 7/11/2019

21 General 7/11/2019

22 Arch Dwgs 7/11/2019

23 General 7/11/2019

24 General 7/11/2019

25 General 7/11/2019

26 General 7/11/2019

27 Arch 7/11/2019

28 General 7/11/2019

29 Arch 7/11/2019

30 Arch 7/11/2019

31 Struct 7/11/2019

32 General 7/11/2019

33 General 7/11/2019

34 Elec Dwgs 7/11/2019

35 Struct Dwgs 7/11/2019

36 General 7/11/2019

37 General 7/11/2019

38 Struct Dwgs 7/11/2019

39 General 7/11/2019

40 Struct Dwgs 7/11/2019

41 Arch Dwgs 7/11/2019

42 General 7/11/2019

43 General 7/12/2019

44 General 7/12/2019

45 Arch Dwgs 7/15/2019

46 Civil Dwgs 7/16/2019

47 General 7/11/2019

How are the cracks at the upper walkway to be treated/repaired. ...answer is pending.

What are the DEP requirements for permitting and other approvals for the water line upgrade work.

...the Park is confirming requirments...answer is pending.

What type of compliance or precaution is needed for water line excavation work which will encompass area approximately 8 ft distance from the road leading to the lock/bridge.

The Park is awaiting the answer.

Who is responsible for cutting back the vegetation prior to construction?

The Park. The Park will also be responsible for the removal of the ivy growing on the exterior walls such as at the stair tower.

How are the existing railings to be cleaned and refurbished?

Clean up railing where there is previous patching residue and rust. There will be no new coatings applied. The architect will review and elaborate if further comment is required.

Explain procedure for Cleaning of existing historic walkways. ...answer is pending.

Confirm what type of mitigation is acceptable to Fish and Wildlife to keep alligators from nesting in the disturbed soil from the trenching to be done for water line work. The contractors will need to add this cost as an option. I prefer to be proactive and put up whatever barriers necessary so that work doesn’t have to stop if an alligator nests in our excavated work areas.

...answer is pending.

Currently per the specifications the contractor does not have to pay for the utility usage fees.

They will provide the temporary power components but do they have to pay the Park for usage fees?

Contractor does not need to pay for utility usage fees.

What is the cellular service out at the site. AT&T

When is the painting of the exterior building walls to occur?

That part of the building work is under a separate contract and will occur after this construction contract ends.

What contract line item (CLIN) does the exterior breezeway and railing work need to be included in?

For consistency, all exterior railing refurbishment, breezeway slab repairs, and infill mesh needs to be included in CLIN 0001 - Interior Renovation of Visitor Center

Wing. Additionally, all new roof joists and the breezway soffit replacement needs to be included in CLIN 0005 - Roof Replacement.

...answer is pending.

This specification section is for Post Award Modifications and the form will be issued to the contract awardee.

*Solicitations are "Amended" rather than changed with a modification.

Modifications are strictly used for Post Award contract actions. A Solicitation is not a contract, therefore any information changes are just Amended.

Please provide the Contractor Estimate Form referenced on page 19 of the Spec Book under section 01 26 01 - 3 "Modification Proposal Pricing Requirements"

Yes. Contractor to coordinate with Park during construction for relocation of salvaged items.

Are the exterior sliding shutters at the Law Enforcement wing to be salvaged? No. They should be removed and disposed of.

What areas of the walk way are to cleaned: upper and ground level breezeway walkway and walkways around the building.

The architect will confirm the level of cleaning, or add some description on the process and/or level of cleaning expected.

Should the soffit of the upper level breezeway be primed only or painted and painted in this contract?

The painting of the soffit should be included in this bid. The paint color should match existing (which is a light aqua bluish color). Color samples can be confirmed during the submittal process.

To what extent should concrete spalling be repaired.

Reference repairs identified in drawings for pricing purposes. The interior slabs and surfaces have to be repaired and prepped as necessary to support finishes. Given the timing and duration of the design, there could be additional spall repairs to be made, but the drawings should be priced as represented for the bidding exercise.

One of the endangered species identified by NPS EVER during the pre-bid walkthrough is a certain bat species. Special care and attention is needed if they are identified on-site. A bat inspection of the facility will be performed 15-30 days prior to construciton start. Who will perform this inspection.

NPS EVER will perform the inspection.

The water line upgrade drawings include a generator sizing calculation. Is there a requirement for a new Generator?

No, this was done to prove that the existing generator was sufficient for the new pumps. The generator will remain as existing.

There is a typical window installation detail on the structural drawings. Does this apply to every opening in the building?

No, this detail is not representative of every window. The application of the detail will be reflected on an Addendum for clarity.

There is ivy growing on the outside of existing stair tower of the Visitors Center wing. Is it in scope to remove this from the tower?

Yes. The Contractor shall remove this ivy and clean/touch up area where ivy was growing. This should be included in CLIN 0005 - Roof Replacement.

In review of the drawing, more clarification is required for the beam L20 on sheet S-115 regarding the anchorage between beam and joist.

...answer is pending.

Is the NPS arrowhead sign at the exterior of the building to be salvaged?

My vendors are telling me that the attached bench from Janus is no longer available. Please advise on a replacement.

For reference of existing construction at the plug/bridge for the water line replacement, see attached drawing.

What special inspections are to be performed by contractor's 3rd party inspector

All tests and inspections listed in the specifications, drawings, and the solicitation attachement call "Statement of strucural tests and special inspections" is to be performed by the contractor's 3rd party inspector and is to be paid by the Contractor.

This service should be included in the contractor's bid.

For the Law Enforcement wing, there are 1-2 places where stair nosings are missing. The drawings call to replace them. Shoudl these be replaced with nosings to match the existing or should all be replaced.

Replace missing nosings with new nosings to match existing.

For the Water Line upgrade project, can drawings be provided of the existing water plant and Plug canal structure?

Yes, please see attached drawings titled, "Button Canal Drawings" (16 pages)

We will be including temporary power for construction in our proposal. Please confirm if utility usage fees will be paid by the government or if we are to include this cost as part of our proposal as well.

See question #24.

DIVISION

or

REC'D

National Park Service

Denver Service Center

12795 West Alameda Parkway

Lakewood, CO 80228

RFI REGISTER

CONTRACT No.

Solicitation 140P2019R0067

PMIS

EVER 235866

PROJECT TITLE

EVERGLADES - Rehabilitate Flamngo Visitor Center and Replace Roof

DATE

7/17/2019

REQUEST / QUESTION RESPONSE

Utility availability 7/11/2019

49 Roof 7/11/2019

50 Windows 7/11/2019

51 Windows 7/11/2019

52 Roof 7/11/2019

53 Roof 7/11/2019

54 Site 7/11/2019

55 Water Utility 7/11/2019

56 Water Utility 7/11/2019

57 Water Utility 7/11/2019

58 Elevator 7/11/2019

Addendum item

60 Site Visit 7/11/2019

63 Windows 7/17/2019

65 General 7/11/2019

Will temporary water need to be provided while new water line in being installed? ...answer is pending.

There are 2 white pipes above-grade along the gravel road. One is the water line. What is the other pipe for?

...answer is pending.

RESERVED

Were site visit attendees able to inspect the roof from on the surface of the roof?

No. The roof has significant damage and it was not safe to walk on the surface. Site visit attendees were not permitted to go on the surface of the roof for field measurements. The roof structure could only be inspected from below.

Are the window opening dimensions on the drawings? Window openings will need to be field-verified.

Pre-Proposal Agenda , Technical Item

Weather days are to be included in the baseline schedule which are part of the DIV 1 submittals (ref. sect. 013216-5), which occurs after award. For the baseline schedule the contractor is to submit a weather calendar with regional data from a reliable weather source to show anticipated normal down time based on typical weather patterns. This down time shall be incorporated into their proposed baseline schedule.

Is there concrete around all the windows? Yes.

How many roofing material layers are on the roof? At least three.

Does the roof on the breezeway get replaced? Is this a different material than the rest of the roof?

Yes that portion of the roof must be replaced. The architect is reviewing the answer is pending.

See Croft handout titled, "NPS Solicitation 140P2019R0067 EVER 235866 Rehabilitate

Flamingo Vistor Center and Replace Roof - Pre-Proposal Meeting - 2019-07-11".

(Attachment to Solicitation Amendment 003).

RESERVED

The drawings are missing a finish plan/schedule identifying the windows expected to receive window treatments. Please provide at your earliest convenience.

...answer is pending.

Are there any Underground Storage Tanks (USTs) on the site? The Government is not aware of any USTs on the site.

Please explain who is responsible for applications and who is responsible to test the pumps and other water utility improvements?

...answer is pending.

On the gravel road adjacent to the above-grade water line, is there any need to protect the vegetation (e.e., protected plants)?

...answer is pending.

Where will the new elevator be located?

The location for the new elevator is not the same as the old frieght elevator; the new location is specified in the Drawings.

Epoxy Coating at inside face of exterior concrete walls is eliminated from scope

Amend 0003 Continuation Sheet REV 7-17-19
B08_Amendment0003_140P2019R0067
B08_Amendment0003_140P2019R0067
CROFT_Pre-Proposal_handout
Contract_Price_Schedule_CLIN's 001-009
EVER 235866- Prebid RFI Summary Form
Buttonwood Plug dwg_EVER_160_60933A_[id290390]