B08_Solicit_Closeout_and_OM_ATTCH_1.1.pdf

PDF 97 KB Posted

Attached to
REHABILITATE FLAMINGO VISITOR CENTER AND REPLACE ROOF
Solicitation number
140P2019R0067
Issued by

About this file

Closeout and O&M Requirements

View the file

Other files

File Type Posted
S401_&_S501.pdf PDF
Parc-Vue-Bench-Materials.pdf PDF
ParcVue_-Brochure.pdf PDF
Flamingo_cottage_wetland_map.pdf PDF
Revised_Spec_Sheet_-_FLAMINGO_S-11.pdf PDF
Revised_Spec_Sheet_-_FLAMINGO_S-12.pdf PDF
B09_Amendment0004_140P2019R0067.pdf PDF
RFIRegister_190722.pdf PDF
B08_Amendment0003_140P2019R0067.pdf PDF
Sign-In_190711.pdf PDF
B11_EVER_235866_Pre-ProposalAGENDA_HANDOUT.pdf PDF
B08_ATTCH_16_Exp.docx DOCX document
B08_ATTCH_17_PastPerf_Q.docx DOCX document
B08_Amendment0002_140P2019R0067.pdf PDF
B08_Amendment0001__140P2019R0067.pdf PDF
Revised_Site_Plan_-_Flamingo_Visitors_Center_June_30_.pdf PDF
B08_Solicit_Geo_Report-Proposed_Elevator_ATTCH_4.pdf PDF
EVER_235866_Final_Drawings_pp_1-94_2019-06-25_2.pdf PDF
B08_Solicit_IAQA_Report_ATTCH_9.pdf PDF
B08_Solicit_Asbestos_Survey_ATTCH_10.pdf PDF
B08_Solit_PSP_Vol_II_HazMat_ATTCH_14.pdf PDF
B08_Solit_-_Attch_J_Govt_Furnished_Property_ATTACH_13.pdf PDF
B08_Solicit_Submittal_Log_ATTCH_1.2.pdf PDF
B03_DOL_Wage_Decision_ATTCH_12.pdf PDF
B08_ATTCH_17_Past_Perf_Q.pdf PDF
B08_Solit_PSP_Vol_II_Equals__ATTCH_15.pdf PDF
B08_Solicit_Water_Improvements_ATTCH_11.pdf PDF
B08_ATTCH_16.pdf PDF
B08_Solicit_Specifications_ATTCH_1.pdf PDF
B08_Solicit_Asbestos_Survey_ATTCH_6.1.pdf PDF
B08_Solicit_Asbestos_Roof_ATTCH_6.2.pdf PDF
B08_Solicit_Mold_Report_ATTCH_8.pdf PDF
B08_Solicit-Structural_ATTCH_1.3.pdf PDF
B08_140P2019R0067_190627.pdf PDF
B08_Solicit_Mold__Testing_Analysis_ATTCH_7.pdf PDF
EVER_235866_Final_Drawings_pp_95-194_2019-06-25_2.pdf PDF
B08_Solicit_Geo_Report-Other_ATTCH_5.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Topic Specification

Section Requirement

Submittal Date

Completed Received by Park

01 31 00 - 1.3.A Coordination Drawings 10 22 39.13 -

1.6.A Operable Glass-Panel Partition Coordination Drawings

09 51 13 - 1.5.A Acoustical Panel Ceilings - Coordination Drawings

09 84 36 - 1.6.A Sound-Absorbing Ceiling Units - Coordination Drawings

21 13 13 - 1.4.A.6 Wet Pipe Sprinkler System - As-Built Drawings

22 42 16.13 - 1.4.A

Commercial Lavatories - Coordination Drawings

22 42 16.16 - 1.4.A

Commercial Sinks - Coordination Drawings

23 31 13 - 1.4.A Metal Ducts - Coordination Drawings

23 33 00 - 1.4.A Air Duct Accessories - Coordination Drawings

23 33 46 - 1.4.A Flexible Ducts - Coordination Drawings

23 34 16 - 1.4.A HVAC Fans - Coordination Drawings

23 37 13.13 - 1.4.A

Air Diffusers - Coordination Drawings

23 37 13.23 - 1.4.A

Registers and Grilles - Coordination Drawings

26 05 29 - 1.4.A Hangars and Supports for Electrical Systems - Coordination Drawings

26 05 33 - 1.5.A Raceways and Boxes for Electrical Systems - Coordination Drawings

26 05 36 - 1.4.A Cable Trays for Electrical Systems - Coordination Drawings

26 09 43.23 - 1.5.A

Relay-Based Lighting Controls - Coordination Drawings

26 24 16 - 1.3.C Panelboards - Record Drawings

26 41 13 - 1.4.A Lightning Protection for Structures - Coordination Drawings

27 40 00 - 1.6 Audio Visual Systems - Record Drawings

28 31 76 - 1.4.A.7 Fire Alarm Voice Evacuation System - As-Built Drawings

28 31 00 - 1.8 Intrusion Detection Systems - Record Documents 31 10 00 - 1.6.B Site Clearing - Record Drawings

WL 22 11 23 -

1.4.A Domestic Water Pumps - Coordination Drawings

01 31 00 - 1.7.C Project Management & Coordination - Contractor's Environmental Training Program

01 32 33 - 1.1.C Photo Documentation for Historic Preservation Projects - Videotape Demonstration & Training

01 35 23 - 3.6.A Safety Requirements - First Aid Training

01 35 23 - 3.6.B Safety Requirements - Hazardous Material Training

01 74 19 - 3.1.D Construction Waste Management and Disposal - Waste Management Procedures Training

01 91 14-10 - 3.8.A

Total Building Commissioning - Training Plan

08 42 29.33 - 3.6.A

Swinging Automatic Entrances - Factory-Authorized Representative Training for Maintenance Personnel

10 22 39.13 - 3.4.A

Folding Glass-Panel Partitions - Factory-Authorized Representative Training for Maintenance Personnel

14 21 23.16 - 3.4.A

MRL Electric Traction Passenger Elevators - Factory- Authorized Representative Training for Maintenance Personnel

21 13 13 - 3.8 Wet Pipe Sprinkler System - On-Site training and training manual

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

Project Record Drawings

System Demonstration and Training

Section Requirement

Submittal Date

Completed Received by Park

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

23 81 30 - 3.1.6 Variable Refrigerant Volume Air Conditioning System - Factory Authorized Representative Training for Maintenance Personnel

26 05 73.19 - 3.6.A

Arc-Flash Hazard Analysis - Power Systems Analyst Arc- Flash Hazard training for Maintenance Personnel

26 09 23 - 3.8.B Lighting Control Devices - Factory-Authorized Representative Training for Maintenance Personnel

26 09 43.23 - 2.3.H, 3.9.A

Relay-Based Lighting Controls - Factory-Authorized Representative Training for Maintenance Personnel

26 27 13 - 3.5.A Electricity Metering - Factory-Authorized Representative Training for Maintenance Personnel

26 36 00 - 3.4.A Transfer Switches - Factory-Authorized Representative Training for Maintenance Personnel

28 20 00 - 3.6.A Video Surveillance - Factory-Authorized Representative Training for Maintenance Personnel

28 31 00 - 3.3 Intrusion Detection Systems - Factory-Authorized Representative Training for Maintenance Personnel

28 31 76 - 1.4.A.8 Fire Alarm and Voice Evacuation System - Training

08 41 13 - 3.5.A Alum-Framed Entrances and Storefronts - Entrance Door Hardware

Drawing M-601 Spare VRF Unit Filters

28 31 76 - 1.7 Fire Alarm Voice Evacuation System - Tools, Etc.

07 42 33 - 1.6.A Phenolic Wall Panels - Maintenance Material Submittals

09 30 13 - 1.7 Ceramic Tiling - Maintenance Material Submittals

09 30 23 - 1.7 Glass Mosaic Tiling - Maintenance Material Submittals

09 91 13 - 1.5.A Exterior Painting - Maintenance Material Submittals

09 91 23 - 1.5.A Interior Painting - Maintenance Material Submittals

09 93 00 - 1.5.A Staining and Transparent Finishing - Maintenance Material Submittals

09 96 00 - 1.5.A High-Performance Coatings - Maintenance Material Submittals

22 42 13.13 - 1.6.A.1

Commercial Water Closets: Maintenance Material Submittals

22 42 13.16 - 1.5.A.1

Commercial Urinals - Maintenance Material Submittals

22 42 16.13 - 1.6.A

Commercial Lavatories - Maintenance Material Submittals

22 42 16.16 - 1.6.A

Commercial Sinks - Maintenance Material Submittals

22 42 23 - 1.5.A Commercial Showers - Maintenance Material Submittals

23 09 23 - 1.6.A Direct Digital Control System for HVAC - Maintenance Material Submittals

23 33 00 - 1.6.A Air Duct Accessories - Maintenance Material Submittals

23 34 33.13 - 1.6.A.1

Commercial Air Curtains - Maintenance Material Submittals

26 09 43.23 Relay-Based Lighting Controls - Maintenance Material Submittals

26 56 19 - 1.8.A LED Exterior Lighting - Maintenance Material Submittals

Extra Stock

Tools Spare Parts Equipment

Section Requirement

Submittal Date

Completed Received by Park

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

27 13 13 - 1.6.A Communications Copper Cabling - Maintenance Material Submittals

27 31 76 - 1.7 Fire Alam and Voice Evacuation System - Extra Materials

01 32 16 - 1.3.D Construction Schedule - CPM Reports

01 40 00 - 1.4.C Quality Requirements - Contractor's Quality Control Daily Reports

01 40 00 - 1.4.D Quality Requirements - Test Reports

01 40 00 - 1.4.E Quality Requirements - Accessibility Inspection Report

01 40 00 - 1.4.F Quality Requirements - Off-Site Inspection Reports 01 57 19.11 -

1.4.C Indoor Air Quality Management - Inspection & Test Reports

01 91 14 - 1.6.I Total Building Commissioning - Deficiency Report and Resolution Record

03 01 00 - 1.4.D Rehabilitation of Concrete - SD-06 Test Reports - Mixture Proportioning

03 01 00 - 1.4.D Rehabilitation of Concrete - SD-06 Test Reports -Quality Control

03 01 00 - 1.4.D Rehabilitation of Concrete - SD-06 Test Reports - Tolerance Report

03 01 00 - 1.4.D Rehabilitation of Concrete - SD-06 Test Reports - Reinforcement and Reinforcement Supports

03 01 00 - 1.4.D Rehabilitation of Concrete - SD-06 Test Reports - Conventional Concrete

03 01 00 - 1.4.D Rehabilitation of Concrete - SD-06 Test Reports - Polymers

03 01 00 - 1.4.D Rehabilitation of Concrete - SD-06 Test Reports - Miscellaneous Materials and Equipment

03 30 00 - 1.4.G Cast-in-Place Concrete - Material Test Reports

05 12 00 - 1.4.E Structural Steel - Material Test Reports

05 12 00 - 1.4.F Structural Steel - Product Test Reports

05 12 00 - 1.4.G Structural Steel - Source Quality-Control Reports

05 52 13 - 1.6D Pipe & Tube Railings - Product Test Reports

05 52 13 - 1.6E Pipe & Tube Railings - Evaluation Reports

05 73 00 - 1.5F.1 Ornamental Handrails & Railings - Test Reports

06 40 23 - 1.6.B Interior Architectural Woodwork - Wood Material Evaluation Reports

07 26 00 - 1.4.A Vapor Retarders - Product Test Reports

07 52 16 - 1.4.G.1 SBS-Modified Bitumen Roofing - Roofing System Manufacturer's Inspection Report

07 71 29 - 1.5.B Manufactured Roof Expansion Joints - Product Test Reports

07 84 13 - 1.5.A Penetration Firestopping - Product Test Reports

07 91 00 - 1.4.A Preformed Joint Seals - Product Test Reports

07 92 00 - 1.5.B Joint Sealants - Product Test Reports

07 92 00 - 1.6.B Joint Sealant Test Report from Testing Agency

07 92 19 - 1.4.A Acoustical Joint Sealants - Product Test Reports

08 11 13 - 1.7.A Hollow Metal Doors and Frames - Product Test Reports

08 14 16 - 1.4.B.6 Flush Wood Doors - Adhesive Laboratory Test Reports

08 14 16 - 1.4.B.7 Flush Wood Doors - Composite Wood Product Laboratory Test Reports

Reports

Section Requirement

Submittal Date

Completed Received by Park

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

08 41 13 - 1.5.C Aluminum-Framed Entrances and Storefronts - Product Test Reports

08 51 13 - 1.5.B Aluminum Windows - Product Test Reports

08 51 13 - 1.5.C Aluminum Windows - Field Quality-Control Reports

08 80 00 - 1.7.C Glazing - Product Test Reports

09 22 16 - 1.4.B Non-Structural Metal Framing - ICC-ES-Qualified Testing Agency Evaluation Reports: Firestop tracks post-installed anchors and power-actuated fasteners

09 29 00 - 1.3.B.6 Gypsum Board - Laboratory Test Reports: Adhesives and Sealants

09 29 00 - 1.3.B.7 Gypsum Board - Laboratory Test Reports: Ceiling and Wall Materials

09 30 13 - 1.6.C Ceramic Tiling - Product Test Reports: Tile-Setting and -grouting products, and certified porcelain tile

09 30 23 - 1.6.C Glass Mosaic Tiling - Product Test Reports: Tile-Setting and -grouting products, and certified porcelain tile

09 51 13 - 1.5.B Acoustical Panel Ceilings - Product Test Reports 09 51 13 - 1.5.C Acoustical Panel Ceilings - Evaluation Reports

09 65 13 - 1.3.B.2 Resilient Base and Accessories - Laboratory Test Reports: Adhesives

09 65 13 - 1.3.B.4 Resilient Base and Accessories - Laboratory Test Reports: Sealants

09 65 13 - 1.3.B.5 Resilient Base and Accessories - Laboratory Test Reports: For Resiliant Base and Stair Products and Accessories

09 65 16 - 1.3.B.1 Resilient Sheet Flooring - Laboratory Test Reports: Floor Covering Products

09 65 16 - 1.3.B.3 Resilient Sheet Flooring - Laboratory Test Reports:

Adhesives

09 65 16 - 1.3.B.5 Resilient Sheet Flooring - Laboratory Test Reports:

Chemical Bonding Compounds and VOC Content

09 65 16 - 1.3.B.7 Resilient Sheet Flooring - Laboratory Test Reports:

Sealants and VOC Content

09 65 19 - 1.3.B.2 Resilient Tile Flooring - Laboratory Test Reports:

Adhesives

09 65 19 - 1.3.B.4 Resilient Tile Flooring - Laboratory Test Reports:

Chemical Bonding Compounds and VOC Content

09 65 19 - 1.3.B.6 Resilient Tile Flooring - Laboratory Test Reports:

Sealants and VOC Content

09 65 19 - 1.3.B.7 Resilient Tile Flooring - Laboratory Test Reports:

Flooring Products and VOC Content

09 66 23 - 1.5.B Resinous Matrix Terrazzo Flooring - Pre-Installation Moisture Testing Reports

09 68 13 - 1.4.B.2, 1.4.B.3 &

1.5.A Tile Carpeting - Product Test Reports

10 22 39.13 - 1.6.D

Folding Glass-Panel Partitions - Product Test Reports

12 36 23.13 - 1.3.B.6

Plastic Laminate-Clad Countertops - Laboratory Test Reports: Adhesives

12 36 23.13 - 1.3.B.8

Plastic Laminate-Clad Countertops - Laboratory Test Reports: Installation Adhesives

12 36 23.13 - 1.3.B.9

Plastic Laminate-Clad Countertops - Laboratory Test Reports: Composite Wood Products

12 36 23.13 - 1.4.D

Plastic Laminate-Clad Countertops - Evaluation Reports:

ICC-ES Certified Fire Retardant-Treated Materials

Section Requirement

Submittal Date

Completed Received by Park

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

12 36 61.16 - 1.3.B.3

Solid-Surfacing Countertops - Laboratory Test Reports:

Installation Adhesives

12 36 61.16 - 1.3.B.4

Solid-Surfacing Countertops - Laboratory Test Reports:

Composite Wood Products

12 36 61.16 - 1.7.A

Solid-Surfacing Countertops - Field Measurement Report

12 36 61.19 - 1.6A

Quartz Agglomerate Countertops - Field Measurement Report

12 36 61.19 - 1.3.B.3

Quartz Agglomerate Countertops - Laboratory Test Reports: Installation Adhesives

12 36 61.19 - 1.3.B.4

Quartz Agglomerate Countertops - Laboratory Test Reports: Composite Wood Products

22 00 00 - 3.5.A Plumbing General - Plumbing Systems Test Report

22 00 00 - 3.5.B Plumbing General - Domestic Water Piping Hydrostatic Pressure Test Report

22 00 00 - 3.5.C Plumbing General - Drainage and Vent Water Leakage Test Report

22 00 00 - 3.5.D Plumbing General - Natural Gas Piping Pressure Test Report

22 05 17 - 1.3.A Sleeves and Sleeve Seals for Plumbing Piping - Field Quality-Control Reports

22 11 16 - 1.3.A Domestic Water Piping - System Purging and Disinfecting Activities Report

22 11 16 - 1.3.B Domestic Water Piping - Field Quality-Control Reports

22 11 19 - 1.4.A Domestic Water Piping Specialties - Field Quality- Control Reports

22 13 16 - 1.3.A Sanitary Waste and Vent Piping - Field Quality-Control Reports

22 13 19 - 1.3.A Sanitary Waste Piping Specialties - Field Quality-Control Reports

23 05 17 - 1.4.A Sleeves and Sleeve Seals for HVAC Piping - Field Quality-Control Reports

22 33 00 - 1.3.B Electric, Domestic-Water Heaters - Source Quality- Control Reports

22 33 00 - 1.3.C Electric, Domestic-Water Heaters - Field Quality-Control Reports

23 05 17 - 1.4.A Sleeves and Sleeve Seals for HVAC Piping - Field Quality-Control Reports

23 05 93 - 1.5.B Testing, Adjusting, and Balancing for HVAC - Contract Documents Examination Report

23 05 93 - 1.5.E Testing, Adjusting, and Balancing for HVAC - Examination Report

23 05 93 - 1.5.F Testing, Adjusting, and Balancing for HVAC - Certified TAB Reports

23 05 93 - 1.5.H Testing, Adjusting, and Balancing for HVAC - Instrument Calibration Reports

23 07 13 - 1.3.B Duct Installation - Material Test Reports 23 07 13 - 1.3.C Duct Installation - Field Quality-Control Reports 23 07 19 - 1.4.B HVAC Piping Insulation - Material Test Reports 23 31 13 - 1.4.B Metal Ducts - Field Quality-Control Reports

23 33 00 - 1.4.B Air Duct Accessories - Source Quality-Control Reports

23 34 16 - 1.4.B HVAC Fans - Field Quality-Control Reports 23 37 13 .13 -

1.4.B Air Diffusers - Source Quality-Control Reports

23 37 13.23 - 1.4.B

Registers and Grilles - Source Quality-Control Reports

26 05 19 - 3.2.A Low Voltage Power Conductors and Cables - Field Quality-Control Reports

Section Requirement

Submittal Date

Completed Received by Park

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

26 05 26 - 3.2.A Grounding and Bonding for Electrical Systems - Field Quality-Control Reports

26 05 33 - 1.5.C Raceways and Boxes for Electrical Systems - Source Quality-Control Reports

26 05 73.19 - 1.4.B

Arc-Flash Hazard Analysis - Arc-Flash Study Report

26 41 13 - 1.4.D Lightning Protection for Structures - Field Quality-Control Reports

26 56 19 - 1.5.D LED Exterior Lighting - Source Quality-Control Reports

28 31 00 - 1.6.D Intrusion Detection Systems - 100% Device-by-Device Test Report

28 31 00 - 1.6.D Intrusion Detection Systems - Completed Punch List Report

28 31 76 - 1.4.A.5 Fire Alarm Voice Evacuation System - Device Identifier Field Report

31 10 00 - 1.6.A Site Clearing - Existing Conditions Report

08 71 00 - 1.04.B Door Hardware - Keying Schedule

09 51 33 - 2.5.C.1 Acoustic Metal Pan Ceilings - Manufacturer's Key/Tool for ceiling panel access

05 73 00 - 1.5G.1 Ornamental Handrails & Railings - Warranty

05 73 00 - 1.5G.2 Ornamental Handrails & Railings - Maintenance Data

07 42 33 - 1.5F Phenolic Wall Panels - Operation and Maintenance Data

07 52 16 - 1.04F SBS-Modified Bitumen Membrane Roofing - Sample Warranty

07 52 16 - 1.04.G.1

SBS-Modified Bitumen Membrane Roofing - Roofing-system Mfgr's Inspection Report of Completed Installation

07 52 16 - 1.04.G.2

SBS-Modified Bitumen Membrane Roofing - Completed warranty from roofing-system Mfgr.

07 52 16 - 1.04.G.3

SBS-Modified Bitumen Membrane Roofing - Completed warranty from installer (See end of section 07-52-16)

07 52 16 - 1.04.G.4

SBS-Modified Bitumen Membrane Roofing - Maintenance program recommended for roofing system.

07 71 29 - 1.5.C Manufactured Roof Expansion Joints - Sample Warranties

07 71 29 - 1.7.A Manufactured Roof Expansion Joints - Special Warranty:

Roof Expansion Joints and Components

07 71 29 - 1.7.B Manufactured Roof Expansion Joints - Special Warranty:

Painted Finishes

07 72 00 - 1.6.A Roof Accessories - Warranty

07 91 00 - 1.6.A Preformed Joint Seals - Special Warranty: Preformed Joint Seals - 1 Year

07 91 00 - 1.6.B Preformed Joint Seals - Special Manufacturer's Warranty: Preformed Joint Seals - 5 Year

07 92 00 - 1.5.C Joint Sealants - Sample Warranties

07 92 00 - 1.9.A Joint Sealants - Special Installer's Warranty: Joint Sealants - 1 Year

07 92 00 - 1.9.B Joint Sealants - Special Manufacturer's Warranty: Joint Sealants - 5 Year

08 14 16 - 1.5.A Flush Wood Doors - Sample Warranties 08 14 16 - 1.6.A &

1.10A Flush Wood Doors - Special Warranties

Keys and keying schedule

O&M Data Warranties Guarantees

Section Requirement

Submittal Date

Completed Received by Park

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

08 16 13 - 1.4.F Fiberglass Doors and Frames - Operation and Maintenance Data

08 16 13 - 1.7.A Fiberglass Doors and Frames - Warranty

08 41 13 - 1.5.E Aluminum-Framed Entrances and Storefronts - Sample Warranties

08 41 13 - 1.6.A Aluminum-Framed entrance and storefront Maintenance Data

08 41 13 - 1.6.B Aluminum-Framed entrance and storefront - ASTM C 1401-Compliant Structural Sealant Maintenance Data

08 41 13 - 1.8.A Aluminum-Framed Entrances and Storefronts - Special Warranty: Aluminum Framed Entrances and Storefronts - 10 Year

08 41 13 - 1.8.B Aluminum-Framed Entrances and Storefronts - Special Finish Warranty: Aluminum Framed Entrances and Storefronts - 20 Year

08 42 29.33 Swinging Automatic Entrances - O&M Data 08 42 29.33 -

1.7.B Swinging Automatic Entrances - Sample Warranties

08 42 29.33 - 1.10.A

Swinging Automatic Entrances - Special Warranty:

Automatic Entrance Components - 2 Year

08 42 29.33 - 1.10.B

Swinging Automatic Entrances - Special Finish Warranty: Automatic Entrance Components - 20 Year

08 51 13 - 1.5.D Aluminum Windows - Sample Warranties 08 51 13 - 1.7.A Aluminum Windows - Manufacturer's Warranties

08 71 00 - 1.04.F Door Hardware - O&M Data

08 71 00 - 1.06.A Door Hardware - Warranties

08 71 00 - 1.06.B Door Hardware - Special Warranty: Door Closers - 10 Year

08 80 00 - 1.11.A Glazing - Special Warranty: Coated Glass Products - 10 Year

08 80 00 - 1.11.B Glazing - Special Warranty: Laminated Glass - 10 Year

08 80 00 - 1.11.C Glazing - Special Warranty: Insulating Glass - 10 Year

08 88 13 - 1.6.C Fire-Rated Glazing - Sample Warranty

08 88 13 - 1.10.A Fire-Rated Glazing - Special Warranty: Fire-Rated Laminated Glass - 10 Year

08 88 13 - 1.10.B Fire-Rated Glazing - Special Warranty: Fire-Rated Double Glazing Units with Clear Gel Fill - 10 Year

09 51 13 - 1.6A Acoustical Panel Ceilings - Maintenance Data 09 51 33 - 1.5.A Acoustical Metal Pan Ceilings - Maintenance Data

09 65 16 - 1.5.A Resilient Sheet Flooring - Maintenance Data

09 65 19 - 1.5.A Resilient Tile Flooring - Maintenance Data

09 66 23 - 1.6.A Resinous Matrix Terrazzo Flooring - Maintenance Data

09 67 23 - 1.3.E Resinous Flooring - Maintenance Data

09 67 23 - 1.7.A Resinous Flooring - Warranty

09 68 13 - 1.5.B Tile Carpeting - Sample Warranty

09 68 13 - 1.6.A Tile Carpeting - Maintenance Data

09 68 13 - 1.9.A Tile Carpeting - Special Warranty: Carpet Tiles - 10 Year

09 84 36 - 1.6.C Sound-Absorbing Ceiling Units - Sample Warranty 09 84 36 - 1.7.A Sound-Absorbing Ceiling Units - Maintenance Data

09 84 36 - 1.11.A Sound-Absorbing Ceiling Units - Special Warranty:

Sound-Absorbing Ceiling Units and Components - 2 Year

Section Requirement

Submittal Date

Completed Received by Park

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

09 96 53 - 1.3.E Elastomeric Coatings - Maintenance Data

09 96 53 - 1.7.A Elastomeric Coatings - Warranty

10 14 19 - 1.6.B Dimensional Letter Signage - Sample Warranty

10 14 19 - 1.7.A Dimensional Letter Signage - Maintenance Data

10 14 19 - 1.10.A Dimensional Letter Signage - Special Warranty: Signs and Components - 5 Year

10 14 23.16 - 1.6.B

Room-Identification Panel Signage - Sample Warranty

10 14 23.16 - 1.7.A

Room-Identification Panel Signage - Maintenance Data

10 14 23.16 - 1.10.A

Room-Identification Panel Signage - Special Warranty:

Room Identification Signs and Components - 5 Year

10 21 13.17 - 1.5.A

Phenolic-Core Toilet Compartments - Maintenance Data

10 22 39.13 - 1.6.E

Folding Glass-Panel Partitions - Sample Warranty

10 22 39.13 - 1.7.A

Folding Glass-Panel Partitions - O&M Data

10 22 39.13 - 1.10.A

Folding Glass-Panel Partitions - Special Warranty:

Operable Glass-Panel Partitions - 2 Year

10 28 00 - 1.5.A Sample Warranty 10 28 00 - 1.6.A Toilet and Bath Accessories - Maintenance Data

10 28 00 - 1.7.A Special Warranty: Mirrors - 15 Year

10 44 13 - 1.5.A Fire Protection Cabinets - Maintenance Data

10 44 16 - 1.5.A Fire Extinguishers - Sample Warranty

10 44 16 - 1.6.A Fire Extinguishers - O&M Data

10 44 16 - 1.8.A Fire Extinguishers - Special Warranty: Fire Extinguishers

- 6 Year

12 24 13 - 1.5.A Roller Window Shades - O&M Data 12 36 61.16 -

1.5.A Solid-Surfacing Countertops - Maintenance Data

12 36 61.19 - 1.4A

Quartz Agglomerate Countertops - Maintenance Data

12 48 13 - 1.4.A Entrance Floor Mats and Frames - Maintenance Data

14 21 23.16 - 1.6.A

Machine-Room-Less Electric Traction Passenger Elevators - O&M Data

14 21 23.16 - 1.9.A

Machine-Room-Less Electric Traction Passenger Elevators - Manufacturer's Special Warranty: Elevator Equipment and Work

21 13 13 - 1.4.A.7 Wet Pipe Sprinkler Systems - O&M Data

22 00 00 - 3.4.A Plumbing General - Warranty: Plumbing Equipment and Components - 1 Year

22 11 19 - 1.5.A Domestic Water Piping Specialties - O&M Data 22 13 16 - 1.4.A Sanitary Waste and Vent Piping - Warranty 22 13 19 - 1.4.A Sanitary Waste Piping Specialties - O&M Data 22 13 29 0 1.4.A Sanitary Sewerage Pumps - O&M Data

22 33 00 - 1.3.D Electric, Domestic-Water Heaters - Sample Warranty

22 33 00 - 1.4.A Electric, Domestic-Water Heaters - O&M Data

22 33 00 - 1.6.A Electric, Domestic-Water Heaters - Special Warranty:

Electric, Domestic-Water Heaters; Storage Tank, Controls, and Other Components - 5 Years

Section Requirement

Submittal Date

Completed Received by Park

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

22 33 00 - 1.6.A Electric, Domestic-Water Heaters - Special Warranty:

Electric, Domestic-Water Heaters; Expansion Tanks - 5 Years

22 42 13.13 - 1.5.A

Commercial Water Closets: O&M Data

22 42 13.16 - 1.4.A

Commercial Urinals - O&M Data

22 42 16.13 - 1.5.A

Commercial Lavatories - O&M Data

22 42 16.16 - 1.5.A

Commercial Sinks - Maintenance Data

22 42 23 - 1.4.A Commercial Showers - Maintenance Data 22 47 13 - 1.4.A Drinking Fountains - Maintenance Data

23 00 00 - 3.4.A Mechanical General - Special Warranty: Mechanical Equipment, Components, and Workmanship - 1 Year

23 00 00 - 3.4.B Mechanical General - Special Warranty: Air Conditioning Compressors - 5 Years

23 09 23 - 1.5.A Direct Digital Control System for HVAC - O&M Data

23 09 23 - 1.8.A Direct Digital Control System for HVAC - 2 Year Warranty

23 23 00 - 1.4.A Refrigerant Piping - O&M Data 23 33 00 - 1.5.A Air Duct Accessories - O&M Data 23 34 16 - 1.5.A HVAC Fans - O&M Data

23 34 33.13 - 1.4.A

Commercial Air Curtains - Sample Warranty

23 34 33.13 - 1.5.A

Commercial Air Curtains - O&M Data

23 34 33.13 - 1.7.A

Commercial Air Curtains - Special Warranty- 60 Months

23 74 33 - 1.4.A Dedicated Outdoor Air Unit - Energy Recovery - O&M Data

23 81 25 - 1.3.B Variable Refrigerant Volume Air Conditioning System - O&M Data

23 81 25 - 1.5.A Variable Refrigerant Volume Air Conditioning System - Special Warranty: Compressors - 5 Year

23 81 25 - 1.5.B Variable Refrigerant Volume Air Conditioning System - Special Warranty: Refrigerant Piping - 5 Year

26 05 73.19 - 1.5.A

Arc-Flash Hazard Analysis - O&M Data

26 09 23 - 1.4.A Lighting Control Devices - O&M Data

26 09 23 - 1.5.A Lighting Control Devices - Manufacturer's Special Warranty: Lighting Control Devices - 2 Year

26 09 43.23 - 1.5.C

Relay-Based Lighting Controls - O&M Data

26 09 43.23 - 1.9.A

Relay-Based Lighting Controls - Special Warranty:

Standalone Multipreset Modular Dimming Controls - 8 Year

26 27 13 - 1.5.A Electricity Metering - O&M Data

26 27 13 - 1.8.A Electricity Metering - Special Warranty: Metering Equipment - 8 Year

26 36 00 - 1.4.A Transfer Switches - O&M Data

26 36 00 - 1.6.A Transfer Switches - Special Manufacturer's Warranty:

Transfer Switches and Components - 12 Month

26 41 13 - 1.5.A Lightning Protection for Structures - Maintenance Data

26 43 13 - 1.3.A Surge Protection Devices - Maintenance Data

26 43 13 - 1.4.A Surge Protection Devices - Special Warranty: Surge Protection Devices and Components - 5 Year

26 51 19 - 1.6.D LED Interior Lighting - Sample Warranty

Section Requirement

Submittal Date

Completed Received by Park

CLOSEOUT AND OPERATION & MAINTENANCE REQUIREMENTS

26 51 19 - 1.7.A LED Interior Lighting - O&M Data 26 51 19 - 1.10.A

& 1.10.B LED Interior Lighting - Special Warranty: Luminaires - 5 Year

26 52 13 - 1.5.A Emergency and Exit Lighting - O&M Data

26 52 13 - 1.7.A Emergency and Exit Lighting - Special Warranty:

Emergency Exit Luminaires - 2 Year

26 52 13 - 1.7.B Emergency and Exit Lighting - Special Warranty:

Emergency Power Unit Batteries - 5 Year Prorated

26 56 19 - 1.5.E LED Exterior Lighting - Sample Warranty 26 56 19 - 1.7.A LED Exterior Lighting - O&M Data

26 56 19 - 1.12.A LED Exterior Lighting - Special Warranty: Exterior Luminaires and Components - 5 Year

27 40 00 - 1.4 Aduio Visual Systems - Warranty 28 20 00 - 1.5.A Video Surveillance - O&M Data

28 20 00 - 1.7.A Video Surveillance - Special Warranty: Video Surveillance Systems, Components, Controls, and Equipment - 3 Year

28 31 00 - 1.9.A Intrusion Detection Systems - Special Warranty:

Electronic Security System - 1 Year

28 31 76 - 1.4.A.6 Fire Alarm Voice Evacuation System - O&M Data

32 17 26 - 1.4.A Tactile Warning Surfacing - O&M Data

32 17 26 - 1.8.A Tactile Warning Surfacing - Special Warranty: Tactile Warning Surfaces and Components - 5 Year

32 92 00 - 1.6.A Turfs and Grasses - Maintenance Data

WL 22 11 23 -

1.5.A Domestic Water Pumps - O&M Data

WL 46 01 00 -

1.02

Operation and Maintenance of Water Equipment - O&M Data