ATTACHMENT_7_ACM-LBP_Survey_Report_-_Netherlands_Carillon.pdf

PDF 7 MB Posted

Attached to
GWMP 214371 Netherlands Carillon Federal contract opportunity
Solicitation number
140P2018R0067
Issued by
Department of the Interior National Park Service National Office

About this file

Attachment 7

View the file

Other files for this federal contract opportunity

Other files attached to GWMP 214371 Netherlands Carillon, newest first.
File Type Posted
ATTACHMENT_9_REV_1_WD_HEAVY_VA190043_FEB_22_2019_VA_43.pdf PDF
ATTACHMENT_14_WD_BUILDING_VA190178_April_05_2019_VA178.pdf PDF
140P2018R0067_amendment_0006.pdf PDF
ATTACHMENT_9_REV_1_WD_HEAVY_VA190043_FEB_08_2018_VA_43.pdf PDF
ATTACHMENT_13_ANSWERS_TO_PHASE_TWO_QUESTIONS.pdf PDF
140P2018R0067_Ammendment_0005.pdf PDF
ATTACHMENT_14_WD_BUILDING_VA190178_01042019_VA178.pdf PDF
140P2018R0067_Ammendment_0004.pdf PDF
140P2018R0067_Amendment_0003_FBO.pdf PDF
140P2018R0067_GWMP_214371_AMENDMENT_0002.pdf PDF
GWMP_214371_PHASE_1_Q&A_AM_0002.pdf PDF
GWMP_214371_PHASE_1_Q&A.pdf PDF
140P2018R0067_GWMP_214371_AMENDMENT_0001.pdf PDF
PreProposal_Conference_Attendance_Record.pdf PDF
GWMP_214371_Netherland_Carillon-Nov_prebid.pdf PDF
ATTACHMENT_5_GWMP_214371-BellReanalysisReport-Final-030818.PDF PDF
ATTACHMENT_2_GWMP_214371-Volume_2-_Final_RFP-Binder.pdf PDF
ATTACHMENT_1_GWMP_214371_Volume_1_Final_RFP.pdf PDF
ATTACHMENT_9_Wage_Decision_No_VA180043_Heavy_092818.pdf PDF
ATTACHMENT_3_GWMP_214371_Volume_3_Final_Presdesign_binder_102017.pdf PDF
ATTACHMENT_10_PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
ATTACHMENT_11_PROPOSAL_SUBMISSION_PACKAGE.rtf RTF text file
ATTACHMENT_6_GWMP_214371-BellReanalysisCalcs-Final-030818.pdf PDF
ATTACHMENT_8_Carillon_Geotechnical_Report.pdf PDF
ATTACHMENT_4_GWMP_214371_Full_Scanned_Drawings_Set.pdf PDF
ATTACHMENT_12__LIMITATIONS_ON_SUBCONTRACTING_REPORT.xlsx XLSX spreadsheet
140P2018R0067_GWMP_214371_FINAL_SOLICITATION.pdf PDF
B01_Amended_PreSolicitation_Notice_GWMP_214371_10_24_18.pdf PDF
B01_Amended_PreSolicitation_Notice_GWMP_214371_Draft.pdf PDF
B01_PreSolicitation_Notice_GWMP_214371.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 31, 2017

Ms. Anne Weber

Mills + Schnoering Architects, LLC

200 Forrestal Road, Suite 3A

Princeton, NJ 08540

Re:

Limited Hazmat Survey Report

The Netherlands Carillon

Arlington, Virginia

Langan Project No.: 270059001

Dear Ms. Weber:

Langan Engineering and Environmental Services, Inc. (Langan) completed a limited hazardous materials (hazmat) survey at the Netherlands Carillon in Arlington Ridge Park, Virginia. The purpose of the survey was to identify the presence/absence of asbestos containing materials

(ACM), and lead concentrations in painted surfaces that would have potential impact in connection with the planned rehabilitation of the Carillon.

SITE DESCRIPTION

The Netherlands Carillon adjacent to Arlington National Cemetery was a gift from the people of the Netherlands to the people of the United States in 1954. The Carillon is located in Arlington

Ridge Park which is part of the George Washington Memorial Parkway. The Carillon is situated on a ridge overlooking the Potomac River and Washington, D.C. and provides expansive views of the

National Mall, West Potomac Park, and Arlington Cemetery. The 127-foot steel structure was constructed in 1954 and was renovated in 1983 and 1994.

SURVEY METHODOLOGY

Asbestos-Containing Materials

Asbestos survey of the structure was conducted in accordance with the United States

Environmental Protection Agency (USEPA) protocol outlined in the USEPA publication “Asbestos in Buildings”. Suspect ACM was categorized into various homogeneous materials, and tested for asbestos content. Sampling and analysis was conducted in accordance with USEPA protocol

600/M4-82-020 per 40 CFR 763. During the survey, suspect materials observed in the structure were documented, assessed, and quantified, and sampled as necessary. Samples collected were properly packaged in individual containers, sealed; catalogued and chain-of-custody documentation was completed.

Lead-Based Paint

As per 40 CFR Part 745, Toxic Substances Control Act (TSCA), Title IV (Lead Exposure

Reduction), the term ‘‘lead-based paint’’ means paint or other surface coatings that contain lead in excess of 1.0 milligrams per centimeter squared (mg/cm2) or 0.5 percent by weight.

Arlington, Virginia

Langan Project No.: 270059001

A Heuresis Pb200i X-Ray Fluorescence (XRF) Spectrum Analyzer was used to inspect the subject structure to identify lead concentrations in painted surfaces. The Heuresis Pb200i analyzer uses a cobalt 57 radioactive source and an advanced solid-state radiation detector to generate an x-ray fluorescence spectrum of a painted surface. During the analysis, the intensity of the x-rays is converted by the instrument’s internal software into an estimate of the concentration of lead in the substance being analyzed. This device is a field-screening tool, used to collect multiple readings in a short period of time. The method of measurement is based on spectrometric analysis of lead x-ray fluorescence within a controlled depth of interrogation. The reading is an estimate of lead content in all layers of paint.

FILES REVIEW

No relevant files were available for our review.

OBSERVATIONS AND FINDINGS

Asbestos-Containing Materials

The field survey of the subject structure was conducted on July 26, 2017 by Langan’s Darshan

Desai, a State of Virginia accredited asbestos inspector. Suspect materials observed during the survey were documented, assessed, quantified, and sampled as necessary.

Twenty four (24) bulk samples of accessible suspect materials were collected and twenty two

(22) asbestos analyses were completed as part of the survey. As required by the USEPA, samples were analyzed by individual layer (i.e., floor tile & the associated mastic were analyzed as two (2) separate samples). Bulk samples of suspect ACM were analyzed using the Polarized

Light Microscopy (PLM) analytical methodology in accordance with 40CFR 763 and NESHAP regulations. Analysis of samples for each homogeneous group was stopped at first positive.

Samples were analyzed by AmeriSci Richmond, a laboratory certified by the National Voluntary

Laboratory Accreditation Program (NVLAP).

Refer to Table 1 for the detail summary of asbestos survey findings. A copy of laboratory test results, chain-of–custody documentation, Langan’s certifications and laboratory accreditations, and sampling locations are provided in the Attachments.

Lead Based Paint

The objective of the paint screening was to identify lead concentrations in painted components so that the Contractor is aware of the lead hazards while performing work activities. The screening of painted surfaces was conducted on July 26, 2017 by Langan’s Sanjay Patel, USEPA-accredited lead inspector. The locations screened primarily consisted of paint on metal walls and ceilings, structural components, handrails, floor, mesh enclosure, stair components, ladder, register, gate and door. A total of one hundred thirty (130) painted locations were screened for

LBP during the survey.

Based on the XRF screening data, the grey paint on wall panels, ceiling, structural components, landings, and door was identified to contain lead in excess of 1.0 mg/cm2. Overall, the paint on structural components was observed to be in fair to poor condition. A summary of XRF screening data is provided in Table 2 and included in the Attachments.

Arlington, Virginia

Langan Project No.: 270059001

CONCLUSIONS

Asbestos-Containing Materials

The caulk associated with the carillon structure windows and floor expansion joints was identified to be ACM. Due to live electricity, the braided electrical wires were inaccessible for sampling and are assumed to be ACM. Refer to Table 1 for a summary of asbestos survey findings.

All identified ACM/assumed ACM which would be impacted by planned project activities must be properly removed prior to initiating such activities. ACM which would be impacted by planned project activities must be properly removed in accordance with applicable Federal, State and local regulations by a licensed asbestos abatement contractor. Proper notifications must be filed with the Federal, State and local regulatory agencies prior to performing such activities.

Although not mandated by the current state regulation, the abatement activities should be monitored by a third party project monitor. The project monitor oversees the contractor’s work practices to ensure regulatory compliance and performs final clearance visual surveys and clearance air testing.

Lead Based Paint

Based on the XRF screening data, the grey paint on various structural components was identified to contain lead in excess of 1.0 mg/cm2. Refer to Table 2 for the XRF screening data.

Although the USEPA defines lead based paint as paint having lead concentrations equal or greater than 1.0 mg/cm2, the Occupational Safety and Health Administration (OSHA) considers any concentration of lead in paint to be lead containing paint. Regardless of the lead concentrations in paint, the contractor shall comply with 29 CFR 1926.62, OSHA regulations, and take precautionary measures for dust control and limit employee exposure to lead dust during the renovations.

Painted surfaces that would be impacted by planned activities such as drilling, cutting, scrapping, etc. and create dust should be properly addressed by following safe work practices, good housekeeping procedures and/or following proper abatement procedures. Grinding and sanding of paint without HEPA filter exhaust, open flame gas fired torch, unconfined abrasive blasting, and chemical strippers containing methylene chloride or other human carcinogenic chemicals are not recommended.

The Federal Resource Conservation and Recovery Act (RCRA) regulation governs the handling, transportation, and disposal of hazardous materials. Every demolition/renovation debris generator has the responsibility to determine whether the debris exhibits one or more of the characteristic wastes listed in subpart C of 40 CFR Part 261. In the case of demolition debris, lead in paint is a characteristic waste, and therefore, it is the responsibility of the renovation/demolition debris generator to characterize the waste prior to its disposal and, if found to be hazardous waste as defined by Federal Statutes, to be properly handled and disposed.

LIMITATIONS, EXCEPTIONS AND ASSUMPTIONS

Opinions and recommendations presented in this report apply to site conditions and features as they existed at the time of Langan’s site visit, and those reasonably foreseeable. They cannot

Arlington, Virginia

Langan Project No.: 270059001 necessarily apply to conditions and features of which Langan is unaware and has not had the opportunity to evaluate.

Any suspect material that is not listed in this report must be assumed to be ACM and treated as such unless otherwise confirmed by laboratory testing.

The conclusions presented in this report are professional opinions based solely upon Langan’s visual observations of accessible areas, laboratory test data and current regulatory requirements.

These conclusions are intended exclusively for the purpose stated herein, at the site indicated, and for the project indicated.

It is important to recognize that even the most comprehensive scope of services may fail to detect all asbestos containing materials that may be associated with the property. Langan cannot, therefore, act as insurers and cannot “certify” that all asbestos containing materials associated with the property have been identified, and no expressed or implied representation or warranty is included or intended in our report, except that our services were performed, within the limits prescribed by our client, with the customary thoroughness and competence of our profession. If you have any questions or need any additional information, please let us know.

Sincerely, Langan Engineering and Environmental Services, Inc.

Darshan Desai

Senior Project Engineer

Vijay Patel

Senior Associate/VP

Attachments: Table 1- Summary of Asbestos Survey Findings

Table 2- LBP XRF Screening Results

Laboratory Test Results and Chain of custody Documentation – Asbestos

Sample Location Drawings

Langan Certifications and Laboratory Accreditations

\\langan.com\data\ARL\data0\270059001\Project Data\_Discipline\HAZMAT\1 - Report Files\2017-08-31 - ACM-LBP Survey Report - Netherlands Carillon.docx

Arlington, Virginia

Langan Project No.: 270059001

ATTACHMENTS

TABLES

Material Sample

ID

Location Notes/Comments

ACM

Window caulk (tan/gray) WC-1 Exterior - Clavier Room ACM CHRY 2.0% 125 LF ---

Floor joint caulk (tan/gray) FJC-2 4th Landing below Terrace

ACM CHRY 2.0% 10 LF ---

Braided electrical wires -- Scattered Locations Assumed

ACM

-- 500 LF

Live electricity prohibited sampling.

Non-ACM

Textured paint (gray) TP-1 Throughout Non-ACM -- -- ---

Metal wall/ceiling -- Throughout Non-

Suspect

Bare metal column/beam -- Throughout Non-

Suspect

No suspect materials were observed associated with metal columns/beams.

Floor joint caulk (clear) FJC-1 Throughout Non-ACM -- -- ---

12"X12" light beige floor tiles FT-1 Clavier Room Non-ACM -- -- ---

Glue associated with 12"X12" light beige floor tiles FT-1 Clavier Room Non-ACM -- -- ---

Caulk around HVAC unit CAH-1 Exterior - Clavier Room Non-ACM -- -- ---

Rubber/plastic electrical wires -- Throughout Non-

Suspect

Terra cotta caulking TCC-1 Perimeter Wall / Sitting

Area Non-ACM -- -- ---

Structure base caulk SBC-1 Ground Floor Non-ACM -- -- ---

Stone tile mortar FTM-1 Ground Floor Non-ACM -- -- ---

Bedding associated with stone tile BD-1 Ground Floor Non-ACM -- -- ---

Waterproofing coat WP-1 Roof Non-ACM -- -- ---

2 ND = “None Detected” – Asbestos not detected in sampled material.

3 CHRY = Chrysotile Asbestos

A material with asbestos content greater than one percent (>1.0%) is considered as an asbestos-

Table -1 - SUMMARY OF ASBESTOS SURVEY FINDINGS

Netherlands Carillon - GWMP 214371

Arlington, VA 22211

Survey Results

Estimated

Quantity

Affected by

Scope of

Work

Project Name: Action Level: 1.0 mg/cm

Survey Dates: 7/26/2017 Total Assays Reported: 130

N/A 1.00

N/A 1.00

1 Wall Metal Grey Clavier Room 0.10 NEGATIVE ---

2 Door Metal Grey Clavier Room 2.10 POSITIVE ---

3 Wall Metal Grey Clavier Room 0.10 NEGATIVE ---

4 Wall Metal Grey Clavier Room 0.10 NEGATIVE ---

5 Wall Metal Grey Clavier Room 0.50 NEGATIVE ---

6 Wall Metal Grey Clavier Room 0.30 NEGATIVE ---

7 Ceiling Metal Grey Clavier Room 0.10 NEGATIVE ---

8 Ceiling Metal Grey Clavier Room 0.30 NEGATIVE ---

9 Panel Metal Grey Clavier Room 0.00 NEGATIVE ---

10 Conduit Metal Grey Clavier Room 0.40 NEGATIVE ---

11 Door Metal Grey Terrace 2 Level 1.80 POSITIVE ---

12 Door Metal Grey Terrace 2 Level 1.50 POSITIVE ---

13 Ladder Metal Grey Terrace 2 Level 0.30 NEGATIVE ---

14 Column Metal Grey Terrace 2 Level 1.10 POSITIVE ---

15 Floor Metal Grey Terrace 2 Level 0.30 NEGATIVE ---

16 Column Metal Grey Terrace 2 Level 2.80 POSITIVE ---

17 Handrail Metal Grey Terrace 2 Level 0.40 NEGATIVE ---

18 Ceiling Metal Grey Terrace 2 Level 1.60 POSITIVE ---

19 Ceiling Metal Grey Terrace 2 Level 1.30 POSITIVE ---

20 Wall Panel Metal Grey Terrace 2 Level 1.70 POSITIVE ---

21 Wall Panel Metal Grey Terrace 2 Level 2.10 POSITIVE ---

22 Floor Metal Grey Terrace 2 Level 0.20 NEGATIVE ---

23 Floor Metal Grey Terrace 2 Level 0.10 NEGATIVE ---

24 Floor Metal Grey Terrace 2 Level 0.00 NEGATIVE ---

25 Ladder Metal Grey Terrace 2 Level 0.20 NEGATIVE ---

26 Handrail Metal Grey Terrace 2 Level 0.40 NEGATIVE ---

27 Handrail Metal Grey Terrace 2 Level 0.10 NEGATIVE ---

28 Mesh Enclosure Metal Grey Between Terrace 1 & 2 0.20 NEGATIVE ---

29 Mesh Enclosure Metal Grey Between Terrace 1 & 2 0.00 NEGATIVE ---

30 Column Metal Grey Between Terrace 1 & 2 1.00 POSITIVE ---

31 Stair Component Metal Grey Between Terrace 1 & 2 0.00 NEGATIVE ---

32 Beam Metal Grey Between Terrace 1 & 2 1.10 POSITIVE ---

33 Column Metal Grey Between Terrace 1 & 2 0.10 NEGATIVE ---

34 Wall Metal Grey Between Terrace 1 & 2 -0.40 NEGATIVE ---

35 Stair Component Metal Grey Between Terrace 1 & 2 0.20 NEGATIVE ---

36 Beam Metal Grey Between Terrace 1 & 2 0.20 NEGATIVE ---

37 Structural Component Metal Grey Between Terrace 1 & 2 0.20 NEGATIVE ---

38 Wall Panel Metal Grey Between Terrace 1 & 2 0.10 NEGATIVE ---

39 Column Metal Grey Between Terrace 1 & 2 1.30 POSITIVE ---

40 Column Metal Grey Between Terrace 1 & 2 1.80 POSITIVE ---

41 Wall Panel Metal Grey Between Terrace 1 & 2 1.70 POSITIVE ---

42 Stair Component Metal Grey Between Terrace 1 & 2 0.10 NEGATIVE ---

43 Handrail Metal Grey Between Terrace 1 & 2 0.00 NEGATIVE ---

44 Stair Component Metal Grey Between Terrace 1 & 2 0.10 NEGATIVE ---

45 Handrail Metal Grey Between Terrace 1 & 2 0.00 NEGATIVE ---

46 Wall Panel Metal Grey Between Terrace 1 & 2 0.10 NEGATIVE ---

47 Wall Panel Metal Grey Between Terrace 1 & 2 0.10 NEGATIVE ---

48 Wall Panel Metal Grey Between Terrace 1 & 2 -0.40 NEGATIVE ---

49 Wall Panel Metal Grey Between Terrace 1 & 2 2.10 POSITIVE ---

50 Wall Panel Metal Grey Between Terrace 1 & 2 0.30 NEGATIVE ---

51 Wall Panel Metal Grey Terrace 1 Level 0.00 NEGATIVE ---

52 Wall Panel Metal Grey Terrace 1 Level 0.00 NEGATIVE ---

Table -2 - XRF SCREENING RESULTS

Netherlands Carillon - GWMP 214371

Arlington, VA 22211

Site

Address:

Arlington, VA 22211

Netherlands Carillon - GWMP 214371

Calibration

Calibration

Survey

ID #

Results CommentsComponent Substrate Color Test Location

Total Lead mg/cm

Survey Dates: 7/26/2017 Total Assays Reported: 130

Table -2 - XRF SCREENING RESULTS

Netherlands Carillon - GWMP 214371

Arlington, VA 22211

Site

Address:

Arlington, VA 22211

Netherlands Carillon - GWMP 214371

Survey

ID #

Results CommentsComponent Substrate Color Test Location

Total Lead mg/cm

53 Wall Panel Metal Grey Terrace 1 Level 0.20 NEGATIVE ---

54 Wall Panel Metal Grey Terrace 1 Level 1.90 POSITIVE ---

55 Handrail Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

56 Handrail Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

57 Mesh Enclosure Metal Grey Terrace 1 Level 0.30 NEGATIVE ---

58 Mesh Enclosure Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

59 Mesh Enclosure Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

60 Handrail Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

61 Wall Panel Metal Grey Terrace 1 Level 3.80 POSITIVE ---

62 Wall Panel Metal Grey Terrace 1 Level 2.80 POSITIVE ---

63 Floor Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

64 Wall Panel Metal Grey Terrace 1 Level 5.80 POSITIVE ---

65 Floor Metal Grey Terrace 1 Level 0.30 NEGATIVE ---

66 Wall Panel Metal Grey Terrace 1 Level 3.40 POSITIVE ---

67 Wall Panel Metal Grey Terrace 1 Level 1.70 POSITIVE ---

68 Wall Panel Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

69 Wall Panel Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

70 Wall Panel Metal Grey Terrace 1 Level 0.00 NEGATIVE ---

71 Wall Panel Metal Grey Terrace 1 Level 0.90 NEGATIVE ---

72 Conduit Metal Grey Terrace 1 Level 0.60 NEGATIVE ---

73 Conduit Metal Grey Terrace 1 Level 0.20 NEGATIVE ---

74 Column Metal Grey Terrace 1 Level 1.70 POSITIVE ---

75 Column Metal Grey Terrace 1 Level 3.10 POSITIVE ---

76 Beam Metal Grey Terrace 1 Level 1.10 POSITIVE ---

77 Beam Metal Grey Terrace 1 Level 1.40 POSITIVE ---

78 Ceiling Metal Grey Terrace 1 Level 0.40 NEGATIVE ---

79 Ceiling Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

80 Ceiling Metal Grey Terrace 1 Level 2.50 POSITIVE ---

81 Ceiling Metal Grey Terrace 1 Level 2.70 POSITIVE ---

82 Ceiling Metal Grey Terrace 1 Level 3.10 POSITIVE ---

83 Floor Metal Grey Terrace 1 Level 0.00 NEGATIVE ---

84 Floor Metal Grey Terrace 1 Level 0.30 NEGATIVE ---

85 Floor Metal Grey Terrace 1 Level 0.10 NEGATIVE ---

86 Wall Panel Metal Grey Terrace 1 Level 1.60 POSITIVE ---

87 Stair Component Metal Grey Between Terrace 1 & Level 1 0.00 NEGATIVE ---

88 Stair Component Metal Grey Between Terrace 1 & Level 1 0.00 NEGATIVE ---

89 Stair Component Metal Grey Between Terrace 1 & Level 1 0.20 NEGATIVE ---

90 Stair Component Metal Grey Between Terrace 1 & Level 1 0.10 NEGATIVE ---

91 Stair Component Metal Grey Between Terrace 1 & Level 1 0.20 NEGATIVE ---

92 Stair Component Metal Grey Between Terrace 1 & Level 1 0.10 NEGATIVE ---

93 Structural ComponentMetal Grey Between Terrace 1 & Level 1 1.50 POSITIVE ---

94 Structural ComponentMetal Grey Between Terrace 1 & Level 1 1.90 POSITIVE ---

95 Landing Ceiling Metal Grey Between Terrace 1 & Level 1 1.10 POSITIVE ---

96 Landing Floor Metal Grey Between Terrace 1 & Level 1 0.20 NEGATIVE ---

97 Landing Ceiling Metal Grey Between Terrace 1 & Level 1 1.20 POSITIVE ---

98 Landing Floor Metal Grey Between Terrace 1 & Level 1 0.20 NEGATIVE ---

99 Landing Ceiling Metal Grey Between Terrace 1 & Level 1 0.60 NEGATIVE ---

100 Landing Floor Metal Grey Between Terrace 1 & Level 1 -0.10 NEGATIVE ---

101 Wall Panel Metal Grey Between Terrace 1 & Level 1 0.10 NEGATIVE ---

102 Wall Panel Metal Grey Between Terrace 1 & Level 1 1.30 POSITIVE ---

103 Wall Panel Metal Grey Between Terrace 1 & Level 1 1.80 POSITIVE ---

104 Wall Panel Metal Grey Between Terrace 1 & Level 1 0.20 NEGATIVE ---

105 Handrail Metal Grey Between Terrace 1 & Level 1 0.10 NEGATIVE ---

106 Handrail Metal Grey Between Terrace 1 & Level 1 0.10 NEGATIVE ---

107 Handrail Metal Grey Between Terrace 1 & Level 1 0.00 NEGATIVE ---

108 Handrail Metal Grey Between Terrace 1 & Level 1 0.00 NEGATIVE ---

109 Wall Panel Metal Grey Ground Floor - Level 1 0.00 NEGATIVE ---

110 Wall Panel Metal Grey Ground Floor - Level 1 0.10 NEGATIVE ---

111 Wall Panel Metal Grey Ground Floor - Level 1 3.30 POSITIVE ---

112 Wall Panel Metal Grey Ground Floor - Level 1 3.10 POSITIVE ---

113 Wall Panel Metal Grey Ground Floor - Level 1 0.00 NEGATIVE ---

Survey Dates: 7/26/2017 Total Assays Reported: 130

Table -2 - XRF SCREENING RESULTS

Netherlands Carillon - GWMP 214371

Arlington, VA 22211

Site

Address:

Arlington, VA 22211

Netherlands Carillon - GWMP 214371

Survey

ID #

Results CommentsComponent Substrate Color Test Location

Total Lead mg/cm

114 Wall Panel Metal Grey Ground Floor - Level 1 0.00 NEGATIVE ---

115 Wall Panel Metal Grey Ground Floor - Level 1 0.00 NEGATIVE ---

116 Wall Panel Metal Grey Ground Floor - Level 1 11.10 POSITIVE ---

117 Wall Panel Metal Grey Ground Floor - Level 1 2.80 POSITIVE ---

118 Wall Panel Metal Grey Ground Floor - Level 1 7.20 POSITIVE ---

119 Wall Panel Metal Grey Ground Floor - Level 1 0.30 NEGATIVE ---

120 Gate Metal Grey Ground Floor - Level 1 0.10 NEGATIVE ---

121 Handrail Metal Grey Ground Floor - Level 1 0.20 NEGATIVE ---

122 Gate Metal Grey Ground Floor - Level 1 0.10 NEGATIVE ---

123 Stair Component Metal Grey Ground Floor - Level 1 0.20 NEGATIVE ---

124 Stair Component Metal Grey Ground Floor - Level 1 0.10 NEGATIVE ---

125 Wall Panel Metal Grey Ground Floor - Level 1 0.20 NEGATIVE ---

126 Wall Panel Metal Grey Ground Floor - Level 1 1.20 POSITIVE ---

127 Conduit Metal Grey Ground Floor - Level 1 0.20 NEGATIVE ---

128 Conduit Metal Grey Ground Floor - Level 1 0.20 NEGATIVE ---

129 Register Metal Grey Ground Floor - Level 1 0.08 NEGATIVE ---

130 Wall Panel Metal Grey Ground Floor - Level 1 1.70 POSITIVE ---

N/A 1.00

N/A 1.00

NEGATIVE = Negative Lead Result <LOD = Less than level of detection

POSITIVE = Positive Lead Result

DAILY CALIBRATIONS

Date: 7/26/2017

Calibration Check

Good

Calibration

Calibration

LABORATORY TEST RESULTS AND CHAIN OF

CUSTODY DOCUMENTATION

SAMPLE LOCATION DRAWINGS

© 2016 Langan

/2

6/

D D

N E

T H

E R

LA

N

D S

C A

R

IL

LO

N

AS

L

V irg in ia

A rli ng to n

A S

B E

S T

O S

S A

M P

LI

N

G

LO

C A

T

IO

N S

U P

A B

C D

A

A -3

.0

B

A -3

.0

A B

C D

1 42 3

U P

L E

V E

L

T E

R R

A C

E

T P

-1 -A

/2

6/

D D

N E

T H

E R

LA

N

D S

C A

R

IL

LO

N

AS

L

V irg in ia

A rli ng to n

A S

B E

S T

O S

S A

M P

LI

N

G

LO

C A

T

IO

N S

T E

R R

A C

E

E L

E V

A T

IO

N

A B

C D

1 42 3

LE

V

EL

TO

P O F C A R

IL

LO

N

TE

R R A C E

TE

R R A C E

R O O F

T P

-1 -B

F T

-1 -B

F T

-1 -A

W C

-1 -A

W C

-1 -B

C A

H -1

-A ,B

F

JC

-1 -B

F

JC

-1 -A

F

JC

-2 -A

,B

W P

-1 -B

W P

-1 -A

S B

C

-A

/2

6/

D D

N E

T H

E R

LA

N

D S

C A

R

IL

LO

N

AS

L

V irg in ia

A rli ng to n

A S

B E

S T

O S

S A

M P

LI

N

G

LO

C A

T

IO

N

ST

C C

-1 -B

T C

C -1

-A

S B

C -1

-B

F T

M -1

-A B

D -1

-A

F T

M -1

-B B

D

-B

LANGAN CERTIFICATIONS AND LABORATORY