4_-_RFP1.pdf

PDF 136 KB Posted

Attached to
Utility Upgrades Phase II Federal contract opportunity
Solicitation number
140P2018R0018
Issued by
Department of the Interior National Park Service National Office

About this file

Proposal Submission Package - Technical

View the file

Other files for this federal contract opportunity

Other files attached to Utility Upgrades Phase II, newest first.
File Type Posted
SF30_Amendment__5.pdf PDF
2-FOVA_SF30_Amendment_4.pdf PDF
4-B08_Solit_PSP_Vol_I_PastPerf,_Amend__4.pdf PDF
3-Questions_and_Answers,_6-26-18.pdf PDF
1-Amend_No.4,_Narrative.pdf PDF
SF_30_FOVA_Amendment_3.pdf PDF
FOVA_AMENDMENT_NO_3.docx DOCX document
Revised_CD.pdf PDF
Amendment_No._2_SF30.pdf PDF
Summary_of_Items_Amendmt_2_dated_6-18-2018.xls XLS spreadsheet
5-Revised_SF1442.pdf PDF
4-Meeting_Minutes_dated_6-6-2018.pdf PDF
3-Questions_and_Answers.xlsx XLSX spreadsheet
1-SF30.pdf PDF
2-Attendance_Record_5-31-2018.pdf PDF
3-Wage_Determination.pdf PDF
2_-_Construction_Drawings_No._389134739.pdf PDF
5_-_RFP2.pdf PDF
FOVA_174966H,_Sol_140P2018R0018.pdf PDF
7_-_Phase_1_As-Builts.pdf PDF
1_-_FOVA_174966H_Final_Specs_dated_5-17-2018_.pdf PDF
8_-_Fillable_CPS_for_PSP2.xls XLS spreadsheet
6_-_COV_Right-of-Way_Permit_Requirements.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORT VANCOUVER NATIONAL HISTORIC SITE

SOLICITATION 140P2018R0018

FOVA-174966H

TECHNICAL VOLUME I

REQUEST FOR PROPOSAL

(RFP)

Proposal Submission Package

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

For Technical Volume I:

1. Experience Questionnaire

2. Subcontractor Reference

3. Key Personnel Qualifications

4. Past Performance Questionnaire

5. Proposed Equals

6. Hazardous Materials

Identification Listing

For Business & Price Volume II:

1. SF 24 Bid Bond

2. Contract Price Schedule

3. General References

4. Plan Report on Limitation on Subcontracting

Experience Questionnaire READ CAREFULLY: The purpose of this form is for the offeror to list projects performed during the past five (5) years that are similar to the work described in this solicitation. Provide a maximum of ten projects. Use this form to address your familiarity with the Statement of Work and with the evaluation criteria described in the solicitation.

Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly.

It is especially important that the offeror disclose instances in which their experience may be considered by others to be less than fully satisfactory. The offeror should disclose pertinent events and describe remedial corrective action that has or will be taken to correct deficiencies. Failure to do so may result in a determination that an offeror has been less than candid with the Government, and could be rated unfavorably.

NAME OF CONTRACTOR/OFFEROR:

# PROJECT NAME:

Project Location:

Name of Owner:

Address of Owner:

Telephone Number:

Project Value:

Dates of Construction:

DESCRIPTION OF THE PROJECT AND SCOPE OF OFFEROR’S WORK

PERFORMANCE REMARKS

Key Personnel Qualifications READ CAREFULLY: The purpose of this form is for the Offeror to list the qualifications of all key personnel as described in the Instructions, Conditions, and Notices to Offerors (Section L). Use additional sheets as needed.

Experience and qualifications include those job-related training courses; certificates and licenses; honors;

performance awards; and specialty skills that are relevant to the proposed project. Provide dates, but do not send documents.

Provide the state in which registration or license is held and the registration or license number. Fill in the information by typing or printing legibly.

NAME OF CONTRACTOR/OFFEROR:

PERSONNEL INFORMATION:

Name:

Job Title:

Years of Experience With This Firm: Years of Experience With Other Firms:

EDUCATION AND PROFESSIONAL REGISTRATION:

Top Educational Level Obtained: Year:

Area of Specialization:

Professional Registrations:

Area of Specialization:

EXPERIENCE AND QUALIFICATIONS

PAST PERFORMANCE QUESTIONNAIRE

INSTRUCTIONS: Offeror to complete Sections I and II and transmit questionnaire to reference listed in Section II Reference to complete Sections III and IV and transmit back to Contracting Officer (see contact information at bottom of form)

I. CONTRACT IDENTIFICATION

CONTRACTOR NAME: CONTRACT NO:

CONTRACTOR ADDRESS:

CONTRACT TYPE:

[ ] FIRM-FIXED-PRICE

[ ] COST REIMBURSEMENT

[ ] OTHER____________________________

[ ] ACTIVE [ ] COMPLETED

[ ] ROUTINE [ ] COMPLEX

DATES OF PERFORMANCE: AWARD AMOUNT $___________________

TOTAL WITH MODS $___________________

PROJECT DESCRIPTION:

II. AGENCY (CUSTOMER) IDENTIFICATION

AGENCY/CLIENT (CUSTOMER) NAME:

TITLE/PHONE:

III. PAST PERFORMANCE RATING

Rating Scale: E = Excellent. Considerably surpassed requirements/expectations.

G = Good. Surpassed requirements/expectations.

S = Satisfactory. Met requirements/expectations

M = Marginal. Met some requirements/expectations

U = Unsatisfactory. Did not meet requirements/expectations

1. QUALITY: (Circle applicable rating)

a. Conformance with contract requirements E G S M U

b. Quality of workmanship (including subcontractors) E G S M U

c. General oversight by project manager and superintendent E G S M U

d. Coordination with and control of subcontractors E G S M U

e. Compliance with Davis-Bacon wage rate and labor usage requirements

E G S M U

f. Avoidance of accidents/safety violations E G S M U

g. Ability to work in remote locations, if applicable E G S M U

2. TIMELINESS:

a. Adherence to project delivery schedules E G S M U

b. Submission of change proposals E G S M U

c. Response to technical direction and change orders E G S M U

d. Response to correction of identified problems E G S M U

e. Submission of timely/accurate/complete billings E G S M U

f. Ability to meet project schedule milestones E G S M U

g. Submission of materials/other submittals E G S M U

3. BUSINESS RELATIONS:

a. Flexibility and cooperativeness in resolving problems E G S M U

b. Tenacity and innovativeness in resolving problems E G S M U

c. Relationships with subcontractors, including prompt payment E G S M U

d. Relationships with owner’s representative E G S M U

e. End user was satisfied with services performed E G S M U

IV. COMMENTS

Provide any additional comments for items in Section III

Item No. Comment

POC SIGNATURE/DATE:

Please provide contact information where you may be reached during normal business hours:

Subcontractor Reference READ CAREFULLY: The purpose of this form is for the offeror to list certain subcontractors identified in the Instructions, Conditions, and Notices to Offerors (Section L) who are considered critical to the successful accomplishment of the project. Use as many sheets as necessary. These subcontractor references should include additional relevant projects similar to the work described in the plans and specifications. Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly.

SUB CONTRACTOR (PROPOSED):

ADDRESS:

TELEPHONE NUMBER: ( )

# PROJECT NAME:

Name of Owner:

Location:

Prime Contractor Telephone Number:

Subcontract $ Value:

Dates of Construction:

Reference Name and Telephone Number: ( ) .

Dates of Construction:

DESCRIPTION & SCOPE OF WORK

SPECIFIC AREAS OF EXPERIENCE (SEE INSTRUCTIONS FOR THE SUBMISSION OF OFFERS AND OTHER

INFORMATION – CAPABILITY CRITERIA):

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable.

Use additional sheets of paper as necessary.

Section No. Paragraph

No.

Product/Model No. Proposed Product/Model

No.

A. By submitting the proposed equal, the contractor certifies that it:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide, as a minimum, the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

B. The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

HAZARDOUS MATERIALS IDENTIFICATION

LISTING

In accordance with Clause 52.223-3, Hazardous Material Identification and Material Safety Data, of the Contract, contractor is required to identify any hazardous materials that will be delivered under this contract.

List below all known hazardous materials to be used in performance of the work and submit with the proposal/bid. If material components are unknown at the time of submission, respond with a statement to that effect.

RFP 1
B08_Solit_PSP_Cover
B08_Solit_PSP_Vol_I_Exp
B08_Solit_PSP_Vol_I_KeyPers
B08_Solit_PSP_Vol_I_PastPerf
B08_Solit_PSP_Vol_I_SubRef
B08_Solit_PSP_Vol_II_Equals
B08_Solit_PSP_Vol_II_HazMat

File details come from the government source that posted it.