3-Questions_and_Answers.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Utility Upgrades Phase II Federal contract opportunity
- Solicitation number
- 140P2018R0018
About this file
Pre-bid Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_Amendment__5.pdf | ||
| 2-FOVA_SF30_Amendment_4.pdf | ||
| 4-B08_Solit_PSP_Vol_I_PastPerf,_Amend__4.pdf | ||
| 3-Questions_and_Answers,_6-26-18.pdf | ||
| 1-Amend_No.4,_Narrative.pdf | ||
| FOVA_AMENDMENT_NO_3.docx | DOCX document | |
| SF_30_FOVA_Amendment_3.pdf | ||
| Revised_CD.pdf | ||
| Amendment_No._2_SF30.pdf | ||
| Summary_of_Items_Amendmt_2_dated_6-18-2018.xls | XLS spreadsheet | |
| 5-Revised_SF1442.pdf | ||
| 4-Meeting_Minutes_dated_6-6-2018.pdf | ||
| 1-SF30.pdf | ||
| 2-Attendance_Record_5-31-2018.pdf | ||
| FOVA_174966H,_Sol_140P2018R0018.pdf | ||
| 7_-_Phase_1_As-Builts.pdf | ||
| 1_-_FOVA_174966H_Final_Specs_dated_5-17-2018_.pdf | ||
| 8_-_Fillable_CPS_for_PSP2.xls | XLS spreadsheet | |
| 6_-_COV_Right-of-Way_Permit_Requirements.pdf | ||
| 3-Wage_Determination.pdf | ||
| 2_-_Construction_Drawings_No._389134739.pdf | ||
| 5_-_RFP2.pdf | ||
| 4_-_RFP1.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| # | Date of Question | Question | Response | Response Issued |
| 1 | May 31, 2018 | Q: Do we have to pay sales tax on materials? | A: Yes for State of Washington | June 6, 2018 |
| 2 | May 31, 2018 | Q: Which Davis Bacon Wage Rates apply? | A: Wage determination was attached to the solicitation. Contractor must pay at least those amounts which are considered the minimum. | June 6, 2018 |
| 3 | May 31, 2018 | Q: Since permits are required, how long do you anticipate before the NPS issues the Notice to Proceed (NTP) with construction? | A: Reference spec section 013100. Contractor must obtain the following permits prior to NPS issuing the NTP: 1) WA Department of Ecology stormwater permit; and 2) City of Vancouver of Right of Way permit for contractor work within COV right of ways. It is anticipated that these permits could both be obtained in approximately 2 months. It should also be noted that the contractor shall also prepare and submit all Div. 1 submittals during this time. | June 6, 2018 |
| 4 | May 31, 2018 | Q: CLIN #4 – How does the unit pricing work for the Archeology Monitor? | A: Reference spec section 012700. To clarify, payment will be made for the number of hours worked on the jobsite: therefore, contractor’s unit rate must factor in all other associated costs that may be incurred by providing a contract archeological monitor (mobilizations, etc.). | June 6, 2018 |
| 5 | May 31, 2018 | Q: CLIN #4 – 320 hour allotment for Archeology doesn’t seem like enough, that is just 8 weeks? | A: The majority of Archeological Monitoring will be performed by NPS Archeologists. This CLIN is to provide possible supplemental archeological monitoring, upon request of the CO, in case NPS capacity to monitor construction is exceeded (i.e. multiple excavations occurring at the same time). | June 6, 2018 |
| 6 | May 31, 2018 | Q: Can you provide a list of preferred archeologists and qualifications? | A: NPS cannot provide such a list. Reference spec section 013513.22rev for information on the qualifications required of the contract archeologist. | June 6, 2018 |
| 7 | May 31, 2018 | Q: How does payment work for CLIN #5 “ALLOTMENT FOR PAYING FOR SYSTEM DEVELOPMENT CHARGES (SDC’s) FROM THE COV” and CLIN #6 “ALLOTMENT FOR PAYING FOR ELECTRICAL ENERGIZING COSTS FROM CLARK PUBLIC UTILITY DISTRICT (CPUD)? How will we be reimbursed for our other costs associated with making these payments to COV and to CPUD, such as bonding, checkwriting, postage, etc. | A: Reference spec section 012700. States that “payment will be made at the actual lump sum amount charged” by the COV (and/or CPUD). IF the contractor anticipates additional costs associated with making these payments on behalf of the NPS (i.e. bonding fees IF applicable), then the contractor should include those additional costs in a related CLIN. NPS will only pay the exact amount billed by the utilities and paid by the contractor. No overhead and profit are allowed. | June 6, 2018 |
| 8 | May 31, 2018 | Q: Is the work of this Phase 2 outside the burial grounds? | A: This Phase 2 project is assumed to be outside the burial grounds; however it is possible that there may be unknown discoveries. Archeological monitoring is required during all excavations – see spec section– 01 35 13.22rev. | June 6, 2018 |
| 9 | May 31, 2018 | Q: Who will be inspecting during the project? | A: NPS intends to hire a 3rd party (private) Construction Management Representative who will be on site at all times during the contract performance period. Please note that this project has been designed in cooperation with COV, CPUD, Comcast and Century Link, with the intent of the NPS having agreements with utility providersfor long term operations and maintenance. It is anticipated that utility company reps will routinely inspect the installation of the systems to ensure compliance with their construction standards. | June 6, 2018 |
| 10 | May 31, 2018 | Q: Who did Phase 1 utility project and excavating? | A: Pacific Tech Construction was the prime contractor. Abris performed the civil/excavation work. As-builts for Phase 1 are attached as Attachment 7 in the solicitation notice. | June 6, 2018 |
| 11 | May 31, 2018 | Q: Is it busy around here in the summer as far as people/activities/visitors? | A: Reference spec 013523. The park gets approximately 1 million visitors a year with passive recreation; the contractor is required to perform work and protect the public from its construction operations. | June 6, 2018 |
| 12 | May 31, 2018 | Q: How do we work around trees? | A: Refer to spec section 011100 “Summary of Work” paragraph 1.5 D. It is imperative that the successful contractor protect heritage trees for damage. This spec section outlines some means and methods on how to do so. It is anticipated that some adjustments will be needed in the field to ensure the protection of critical tree roots. | June 6, 2018 |
| 13 | May 31, 2018 | Q: Are there stop-work durations defined for archeological findings? | A: Reference 01 35 13.22rev, part 3. It is anticipated that excavation work will need to stop at times for the archeologists to investigate their findings. No specific durations for these stoppages are defined. It is assumed that investigations will proceed expeditiously so as to minimize impacts to the contractor. All excavations will be monitored by an archeologist. | June 6, 2018 |
| 14 | May 31, 2018 | Q: Does the contract require removal of the primary existing water meter? | A: Yes – this job will replace the “system” meter with individual meters at each building. See demo drawings. | June 6, 2018 |
| 15 | May 31, 2018 | Q: Are there any irrigation lines involved in this project? | A: All work along Evergreen Rd. to Fort Vancouver Way goes through city property which is irrigated. Contractor is responsible for repairing and restoring irrigation lines and turf to pre-existing conditions. NPS does not have irrigations system on its property. | June 6, 2018 |
| 16 | May 31, 2018 | Q: Will there be concurrent construction going on? | A: Yes it is anticipated that other contractors will also be working within the east and south barracks areas during the contract performance period. Contractor will be responsible for cooperating with these other contractors. No major complications of site use are anticipated. | June 6, 2018 |
| 17 | May 31, 2018 | Q: Are there a lot of active buildings or mostly mothballed? | A: There are several buildings with active tenants or NPS staff – these must remain operating during the projects. See Building connection sheets 28 through 33. | June 6, 2018 |
| 18 | May 31, 2018 | Q: How do we handle utility locates? | A: Refer to drawings sheet G01, General Note 4, “CONTRACTOR SHALL CALL CLARK COUNTY UTILITIES COORDINATING COUNCIL 2 BUSINESS DAYS BEFORE DIGGING. 1-800-424-5555 AND NOTIFY/ALLOW NPS 5 BUSINESS DAYS TO MARK UTILITIES.” NPS intends to formally amend the solicitation by replacing this General Note 4 with the following replacement contract language: “CONTRACTOR SHALL CALL CLARK COUNTY UTILITIES COORDINATING COUNCIL 2 BUSINESS DAYS BEFORE DIGGING. 1-800-424-5555. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL NPS OWNED UTILITIES ON NPS OWNED PROPERTY. THIS INCLUDES POTHOLING AND/OR HIRING A PROFESSIONAL UNDERGROUND UTILITY LOCATION SERVICE. NPS CANNOT PROVIDE THIS LOCATING SERVICE. ASSUME ALL EXISTING UTILITIES ON NPS PROPERTY ARE NPS OWNED.” | June 6, 2018 |
| 19 | May 31, 2018 | Q: What about potholing? | A: See various notes on the drawings. Potholing to verify existing utility location is anticipated and required. | June 6, 2018 |
| 20 | May 31, 2018 | Q: Do you have flow diagram and valve locations? | A: NPS can provide information previously received from the Department of Defense. This information would be provided to the successful contractor. | June 6, 2018 |
| 21 | May 31, 2018 | Q: Can you please identify the capacity of the power supply at the proposed revised staging area? | A: The power supply at the new staging area is located near building P748. The service is labeled as 300 Amp, 208Y/120, 3 phase, 4 wire. Regarding the "revised staging" area discussed during the site walk: NPS intends to formally amend the soliciation as follows: "Reference sheet G02 of the drawings. Eliminate the 2 staging areas located to the south of East 5th Street. (One of these is labeled “construction staging area” and the other is labeled “optional construction staging area”.) Add a new staging area to the northeast of the intersection of E. 5th Street and Fort Vancouver Way. A marked up drawing will accompany the formal amendment. | June 6, 2018 |
| 22 | May 31, 2018 | Q: Can NPS provide the list of attendees to the Pre-proposal meeting? | A: Yes, the list of people who attended the Pre-proposal meeting are attached to the pre-proposal meeting minutes. | June 6, 2018 |
Project #: FOVA 174966H Solicitation No. 140P2018R0018 Questions and Answers page &P of &N