About this file
Proposal Submission Package - Business & Price
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_Amendment__5.pdf | ||
| 2-FOVA_SF30_Amendment_4.pdf | ||
| 4-B08_Solit_PSP_Vol_I_PastPerf,_Amend__4.pdf | ||
| 3-Questions_and_Answers,_6-26-18.pdf | ||
| 1-Amend_No.4,_Narrative.pdf | ||
| FOVA_AMENDMENT_NO_3.docx | DOCX document | |
| SF_30_FOVA_Amendment_3.pdf | ||
| Revised_CD.pdf | ||
| Amendment_No._2_SF30.pdf | ||
| Summary_of_Items_Amendmt_2_dated_6-18-2018.xls | XLS spreadsheet | |
| 5-Revised_SF1442.pdf | ||
| 4-Meeting_Minutes_dated_6-6-2018.pdf | ||
| 3-Questions_and_Answers.xlsx | XLSX spreadsheet | |
| 1-SF30.pdf | ||
| 2-Attendance_Record_5-31-2018.pdf | ||
| FOVA_174966H,_Sol_140P2018R0018.pdf | ||
| 7_-_Phase_1_As-Builts.pdf | ||
| 1_-_FOVA_174966H_Final_Specs_dated_5-17-2018_.pdf | ||
| 8_-_Fillable_CPS_for_PSP2.xls | XLS spreadsheet | |
| 6_-_COV_Right-of-Way_Permit_Requirements.pdf | ||
| 3-Wage_Determination.pdf | ||
| 2_-_Construction_Drawings_No._389134739.pdf | ||
| 4_-_RFP1.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Vancouver National Historic Site
Solicitation No. 140P2018R0018
UPGRADE SITE UTILITIES PHASE 2
FOVA-174966H
VOLUME II – BUSINESS & PRICE
REQUEST FOR PROPOSAL
(RFP)
Proposal Submission Package
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
INSTRUCTIONS:
In accordance with Sections L and M of the solicitation, the following forms, as applicable, are provided for the preparation of proposals for the subject solicitation.
For Technical Volume I:
1. Experience Questionnaire
2. Subcontractor Reference
3. Key Personnel
4. Proposed Equals
5. Hazardous Materials
6. Past Performance Questionnaire
For Business & Price Volume II:
1. SF 24 Bid Bond
2. Contract Price Schedule
3. General References
4. Small Business Participation Plan Subcontractor
Calculations
5. Subcontracting Plan Form
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P2018R0018
PARK - PMIS: 174966H
DEVELOPED AREA: Fort Vancouver National Historic Site, Washington PROJECT TITLE: Upgrade Utilities - Phase 2
Notice: Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
CONTRACT
LINE ITEM
NUMBER
(CLIN)
CONTRACT LINE ITEM (CLI)
TITLE
QUANTITY UNIT OF
MEASURE
UNIT
PRICE
TOTAL
PRICE
1 Sanitary Sewer System Improvements
1 LS $0.00
2 Water System Improvements 1 LS $0.00 3 Electrical and Communication
System Improvements
1 LS $0.00
4 Contract Archeological Monitor 320 HRS $0.00 5 Allotment for Paying for System
Development Charges from the City of Vancouver (COV)
1 LS
$310,325.00
$310,325.00
6 Allotment for Paying for Electrical Energizing Costs from Clark Public Utilities (CPU)
1 LS
$20,000.00
$20,000.00
TOTAL BASE PRICE (CLIN's 1-6) ------------------------------------>> $330,325.00
All measurement and payment information is included in the project specifications, Section 012700.
General References READ CAREFULLY: The purpose of this form is for the offeror to provide the Government with general references in the spaces provided as described in the Instructions, Conditions, and Notices to Offerors (Section L). Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly.
It is especially important that the offeror disclose instances in which their relationships with the references may be considered less than fully satisfactory. The offeror should tell their side of the story and describe remedial corrective action that has been taken or will be taken to correct the deficiency. Failure to do so may result in a determination that an offeror has been less than candid with the Government, which could result in an unfavorable assessment of the offeror’s past performance record. Provide explanations on separate sheets as necessary.
NAME OF CONTRACTOR/OFFEROR:
SURETY
Name of Surety:
Address of Surety:
Name of Agent:
Telephone Number:
CORPORATE BANK
Name of Bank:
Address of Bank:
Name of Agent:
Telephone Number:
Types and Numbers of Accounts:
CORPORATE BANK
Name of Bank:
Address of Bank:
Name of Agent:
Telephone Number:
Types and Numbers of Accounts:
INSURANCE COMPANY
Name:
Address:
Name of Agent:
Types of Policies:
SUBCONTRACTOR
Address:
Name of Contact:
Area of Specialized Work:
Address:
Name of Contact:
Address:
Name of Contact:
MATERIAL SUPPLIER
Address:
Name of Contact:
Telephone Number:
Types of Material:
MATERIAL SUPPLIER
Name:
Address:
Name of Contact:
Telephone Number:
Types of Material:
MATERIAL SUPPLIER
Name:
Address:
Name of Contact:
Types of Material:
| Binder2 |
| RFP 2 |
| B08_Solit_PSP_Cover VII |
| B08_SF24.pd |
| CONTRACT PRICE SCHEDULE |
| RFP 2 |
| B08_Solit_PSP_Vol_II_GenRefs |