B09_-_Attachment_34_-_HMI_20_0001.jpeg
JPEG file 817 KB Posted
- Solicitation number
- 140P1426Q0071
About this file
This image is a process overview diagram for a wastewater treatment facility operations display captured on May 20, 2026 at 5:20 PM. The diagram illustrates two parallel filter train systems (Filter Train 1 and Filter Train 2) that process incoming flow from lagoons through rapid mixer units, influent valves, and mixer operations before entering the primary filtration stages.
Filter Train 1 shows an operational status with 077 GPM influent flow, 20% influent valve opening, mixer running at 345.2 minutes runtime, 5.0 feet level sensor reading, 00.00 head loss, and an NTU (Nephelometric Turbidity Unit) reading of 0.0 for Filter 2. The system routes sludge waste to storage pond with 45.0 minutes remaining before the sludge waste pump 1 stops running, and maintains 120.0 minutes of interval time remaining. Filter Train 2 displays 091 GPM influent flow, 40% influent valve opening, mixer running at 326.2 minutes, with similar operational parameters including 5.0 feet level sensor, 00.00 head loss, and 3.2 NTU reading for Filter 2. Both trains feed into backwash supply and surface wash systems with associated inlet and effluent valves. The left sidebar provides quick access to operational graphs (Influent Flow, Filter Differential Pressure readings, and NTU levels) and system menu options including headworks info, aerator overview, and plant control interfaces.
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .