B08_140P1424R0004_Attachment_13_Request_for_Proposal_140P1424R0004_Questions_and_Answers_01022024_0001.pdf

PDF 1 MB Posted

Attached to
BICA - ADMINISTRATIVE BUILDING REMODEL
Solicitation number
140P1424R0004
Issued by

About this file

This document contains questions and answers related to Request for Proposal 140P1424R0004 for the rehabilitation of the Fort Smith Administrative Building at Bighorn Canyon National Recreation Area in Montana. The solicitation seeks a general contractor to remodel the administrative building, including replacing cabinets in the kitchen area, bathroom partitions and lockers, windows, and electrical switches and outlets throughout the building. Bidders asked about accepting bids just for specific scopes like the wheelchair lift or using key personnel in dual roles. The National Park Service confirmed it is seeking one prime contractor for the entire project and does not limit certain project roles being filled by the same individual. Clarification was also provided on past performance submission requirements and allowing the site superintendent to serve as the safety specialist.

View the file

Other files

File Type Posted
B08_140P1424R0004_Attachment_6_DOL_WD_20240056_01052024_0002.pdf PDF
B08_140P1424R0004_Attachment_15_Specifications_SECTION_113013_-_RESIDENTIAL_APPLIANCES_0002.pdf PDF
Sol_140P1424R0004_Amd_0002.pdf PDF
B08_140P1424R0004_Attachment_13_Request_for_Proposal_140P1424R0004_Question_and_Answers_01162024_0002.pdf PDF
B08_140P1424R0004_Attachment_14_Request_for_Proposal_140P1424R0004_Organized_Site_Visit_Sign_In_Sheet_0001.pdf PDF
Sol_140P1424R0004_Amd_0001.pdf PDF
B08_140P1424R0004_Attachment_8_Project_Experience_Form.docx DOCX document
B08_140P1424R0004_Attachment_11_Subcontracting_Percentage_Worksheet.xlsx XLSX spreadsheet
B08_140P1424R0004_Attachment_9_Contract_Admin.docx DOCX document
Sol_140P1424R0004.pdf PDF
B08_140P1424R0004_Attachment_6_DOL_WD_20230056_Rev_6_10062023.pdf PDF
B08_140P1424R0004_Attachment_10_General_References.pdf PDF
B08_140P1424R0004_Attachment_5_7112_24_Design_Calculations_Final_CD_3-14-23.pdf PDF
B08_140P1424R0004_Attachment_1_Specifications_Final_CD_3-23-23_Clean_with_Addendum.pdf PDF
B08_140P1424R0004_Attachment_4_Final_CD_Drawing_Full_Set_3-23-23_Revised.pdf PDF
B08_140P1424R0004_Attachment_2_100_Final_CD_s_Energy_Model_Compairson.pdf PDF
B08_140P1424R0004_Attachment_7_Past_Performance_Questionnaire.docx DOCX document
B08_140P1424R0004_Attachment_3_Fort_Smith_Admin_Building_Geotechnical_Report_Final.pdf PDF
B08_140P1424R0004_Attachment_12_Schedule_of_Values.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Question Received Question

Date Answer

Answered in Amendment 00XX

I am interested in quoting the cabinets for this project. Are there only cabinets in the kitchen area?

5-Dec

Hello I am the Lawler Rep for Montana, Idaho and Utah and I wanted to send you substitution paperwork for location ( TMV-1,2 ) on this project that has Lenord Valves on the project and I want to get this approved as equal for these valves please see attached attachment for these Lawler valve ( 86006 ) for location ( TMV-2 ) and ( 86506 ) for location ( TMV-1 ). Please submit these to the architect or engineer for approval thanks and if you have any questions please let me know thanks.

Additional Information provided via pdf titled Lawler Question and Answer Request

7-Dec

I am curious if you are accepting bids for just the Wheelchair lift alone for this project yet or if you are still bidding for a general contractor to take on the whole project?

7-Dec This Request for Proposal is for the entire specified project under one prime/general contractor.

4 Pella says they can meet the glazing spec. for this project. Pella Impervia series, fiberglass windows. Would this be an acceptable alternate?

7-Dec

We respectfully submit for your consideration a request to approve products as an accepted substitute on Administrative Building Rehabilitation (23- 427551); please find substitution request form attached.

With over 30 years of experience, Scranton Products is the industry leader in plastic (HDPE) bathroom partitions and lockers. Constructed from premium, American-made solid plastic, our products resist dents, scratches, corrosion, graffiti and mildew. More information regarding the benefits of our products as well as technical data sheets and MSDS forms for the appropriate product(s), confirming performance as specified, can be reviewed via the links below:

2019 Color Texture Brochure Privacy Health Barriers SP Ridge Series Vanities LEED Points Love the Look of Stainless Steel Warranty Engraving Brochure Health Product Declaration - Hiny Hiders Hiny Hiders Partitions Specifications Hiny Hiders Brochure HDPE vs Other Materials Comparison Healthier Restrooms - Hardware Additional information and hyperlinks provided via pdf titled Azekco Question and Answer Request

14-Dec

Regarding Attachment 8 – Project Experience Questionnaire. If all the same information is still provided (within 2 pages), can we use our writeup rather than that form?

19-Dec Please use the provided B08 140P1424R0004 Attachment 8 Project Experience Form

Regarding Key personnel. If a person is qualified, can any of those positions be filled by the same person?

a. If yes, which are allowed to be a dual hat position?

19-Dec

B08 140P1424R0004 Attachment 1 Specifications Final CD 3-23- 23_Clean with Addendum does not limit overlapping of the Project Manager, Job-Site Superintendnet, On-site Quality Control Manager, or On-site Safety Manager.

Given the size of the project, would the government consider having the Superintendent serve as the Quality and Safety Specialist, as well (“triple hat”)?

7-Dec Please refer to Answer #7. 0001

Will the government accept a previously received Past Performance Questionnaire for a project that does not have a CPARS?

7-Dec

The government will not accept a previous past performance questionnaire for a project that does not have CPARS. Contractors cannot submit their own past performance questionnaire(s). Those must be submitted to colton_nelson@nps.gov by the applicable customer.

I have it called out in the divisions there is fire suppression but there is no div.

21 in the specs and there is also no specs for the ADA appliances called out in the plans on A 7.2.

18-Dec

My last question is concerning the safety position and whether or not the on-site superintendent can also hold that position?

18-Dec Please refer to Answer #7. 0001

12 I cant find division 25- Integrated automation in the specs. 18-Dec

Plan sheet(s) E1.0 & E1.1 Power General Notes (C) Add Alternat #2: Replace All existing receptacles and switches in building with new. Statement also includes cover plates. The plan sheet(s) do not indicate where, how many, or rather they are single pole, double pole, 3-way (Switches), seems that receptacles are marked however, the switches are not. There is no information regarding the note for the switches.

Is there is a location where the switches are called out in the plans? and if they are not, how many are there and the type.

21-Dec

On the door schedule E13 has an existing HM Frame but then asks for a HM door. Do I need to supply a new HM Door? The spec does not talk about any doors. Should I replace this door with an 18 gauge 707 Polystyrene core flush door?

29-Dec