B09_A1_PWS_ROCR_Leaf_Removal_Serivces_Rev_7_15_16_0001.docx

DOCX document 55 KB Posted

Attached to
ROCR LEAF REMOVAL
Solicitation number
140P1326Q0029
Issued by

About this file

This is a Performance Work Statement (PWS) for leaf removal services at Rock Creek Park in Washington, District of Columbia, under the National Park Service. The contractor is responsible for collecting and removing leaves from designated park locations through two annual collection cycles: Cycle 1 (October 1 – December 31) and Cycle 2 (February 1 – April 30). The contract includes a base period from September 1, 2026 through August 31, 2027, with four one-year option periods and a six-month extension through March 1, 2032. The contractor must provide all labor, supervision, equipment (trucks, trailers, blowers, and related tools), vehicles, fuel, and materials necessary to complete leaf removal operations. Work shall be performed Monday through Friday between 6:30 AM and 3:00 PM, excluding federal holidays, with a supervisor present at all times during operations.

The contractor must comply with all OSHA, ANSI, and applicable safety regulations, including provision of traffic control devices, reflective safety vests, and proper personal protective equipment. All equipment must meet federal, state, and local safety standards and be properly licensed and inspected. The contractor is responsible for repairing any damage caused by operations at no additional cost to the government and must maintain daily work logs documenting work performed and locations serviced. Invoices shall be submitted monthly via the Invoice Processing Platform (IPP) at www.ipp.gov with a Net 30 payment term, and work must be inspected and approved by the Contracting Officer's Representative prior to payment. Failure to complete work as specified may result in delayed payment and other performance penalties.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Park Service U.S. Department of the Interior

NATIONAL CAPITAL REGION

Facilities, Design and Construction Facilities Management Branch WASHINGTON, DC

National Park Service Rock Creek Park (ROCR) Washington, District of Columbia PWS Leaf Removal Revised 7/15/2026

1. Summary of the Project The contractor is responsible for collecting leaves and ensuring their removal from the site. This contract is for removing leaves only.

2. Service Scope The Contractor shall:

Conduct two leaf removal collection cycles at each location. Leaves will be removed from each park location 2 times during leaf season.

1. Ensure total removal of leaves during each cycle.

2. Remove and dispose of all collected leaves off National Park Service property.

3. Provide all required:

A. Labor and supervision B. Equipment and vehicles C. Fuel and materials

4. Remove all incidental debris tree limbs, off site

3. Period of Performance

1. Base Period: 9/1/2026 – 8/31/2027

· Option Year 1:9/1/2027 – 8/31/2028
· Option Year 2:9/1/2028 – 8/31/2029
· Option Year 3:9/1/2029 – 8/31/2030
· Option Year 4:9/1/2030 – 8/31/2031
· 6 Month Ext:9/1/2031 – 3/1/2032

2. Active Work Season:

· Cycle 1 begins 10/1 and ends 12/31

· Cycle 2 begins 2/1 and ends 4/31 4/30

· Each leaf removal cycle must be completed within the Cycle.

4. Staffing Requirements

4.1 Supervision

1. Supervisor shall always be present during operations.

a) Ensure quality control

b) The supervisor must be an employee of the a prime contractor.

c) Be reachable by phone during operations

4.2 Workforce

1. All personnel shall:

a) Be trained in leaf removal and equipment safety

b) Use required Personal Protective Equipment (PPE)

c) Wear identifiable company uniforms

5. Equipment and Vehicles The Contractor shall:

1. Provide all necessary equipment, including:

A. Trucks, trailers, blowers and related tools

2. Ensure all equipment:

A. Meets OSHA, federal, state, and local safety standards B. Is properly licensed and inspected

3. Equip vehicles with:

A. Amber warning lights B. Slow-moving vehicle signage

6. Scheduling & Work Hours

1. Work shall occur:

A. Monday through Friday B. Between 6:30 AM and 3:00 PM C. Excluding federal holidays

2. Contractor shall:

A. Begin work once notified B. Start cycle 1 on 10/1 and cycle 2 on 2/1 of the base year and subsequent option years C. Work continuously (weather permitting) until completion

7. Safety Requirements The Contractor shall:

1. Comply with all OSHA, ANSI, and applicable safety regulations

2. Provide:

a) Traffic control devices (cones, signs, flaggers)

b) Reflective safety vests for all workers

c) PPE requirements

d) Training protocols

3. Immediately report any serious incident, Accident, life safety injury.

a) Dial 911

b) U.S. Park Police - 202-610-7500

c) Contracting Officer (CO) - TBD

d) Contracting Officer’s Representative (COR) - TBD

8. Environmental Protection

1. Protect all:

A. Trees, vegetation, utilities, and park infrastructure

2. Preventing damage caused by:

A. Equipment operation B. Material handling

3. Repair all damage resulting from leaf removal operations to the way it was prior to being damaged by the contractor at no additional cost to the government

9. Leaf Removal Operations The Contractor shall:

1. Verify work areas are clear of tree limbs prior to operations

2. Remove all leaves completely from designated areas

3. Ensure:

a) No leaves remain in piles overnight

b) Leaves are disposed of off-site

10. Reporting & Documentation

1. Maintain daily work logs documenting:

a) Work performed

b) Locations serviced

c) Dates of service

2. Submit logs to the COR for review and acceptance-when completed after each cycle

11. Inspection & Acceptance

1. All work shall be:

a) Inspected by the COR in accordance with the Quality Assurance Surveillance Plan

b) Approved prior to invoicing

12. Payment Terms

1. Net 30

2. Invoices shall be:

a) Submitted monthly after services have been performed

b) Based on contract line items

c) Accompanied by signed Acceptance Reports

3. Submission via:

a) Invoice Processing Platform (IPP) www.ipp.gov only

b) Vendors must attach or upload a copy of their invoice when submitting their application for payment in IPP. If the invoice is not included, the application will be rejected, resulting in payment delay until the contractor resubmits the application with the required invoice.

13. Performance Standards & Penalties

1. Failure to complete work as specified shall result in:

a) Delayed payment image3.png

File details come from the government source that posted it. Updated .