Statement_of_Work_-_ONA_Shoreline_Stabilization_(With_Map)_0002.pdf
PDF 2 MB Posted
- Attached to
- JILONA Shoreline Stabilization Federal contract opportunity
- Solicitation number
- 140L0624R0042
About this file
This document is a Statement of Work for a shoreline stabilization project within the Jupiter Inlet Lighthouse Outstanding Natural Area (ONA) in Palm Beach County, Florida. The primary objectives are to stabilize the shoreline, reduce erosion, protect the Intracoastal Waterway, enhance habitats, accommodate recreational use, and maintain the scenic integrity of the ONA.
The project includes constructing various shore protection features such as terraced walls, limestone breakwaters, and a timber boardwalk. Bid options cover additional elements like a new pavilion, ADA pathway, and floating dock. The work is to be completed in accordance with the Construction Drawings, Project Manual, and applicable permits. No government-furnished materials are available. The contractor must demonstrate experience in sustainable design, universal accessibility, and quality control. The project will be managed by the Department of the Interior's Bureau of Land Management.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10 19 9 SO UT HS I DE BLVD , S TE 31 0 | J ACKS ONV IL LE FL 3 22 5 6 | T EL 9 04 . 73 1 . 70 4 0
WWW .T AYLO RENG INE ER I NG.C OM
Jupiter Inlet Lighthouse Outstanding Natural Area Statement of Work
Shoreline Stabilization
STATEMENT OF WORK
INTRODUCTION
The Bureau of Land Management requires construction services for a shoreline stabilization project in Jupiter, Florida in northern Palm Beach County. The project site lies within the Jupiter Inlet Lighthouse Outstanding Natural Area (ONA), along the Indian River Lagoon and Loxahatchee River. The primary purpose of this undertaking is to stabilize the shoreline, reduce or eliminate erosion, provide for public use where it is compatible with that purpose and enhance aquatic and terrestrial habitats where possible.
BACKGROUND
Congress designated the ONA in 2008 for the protection and enhancement of seven key resources and values present on the site: Historic, Natural, and Cultural resources, and Scientific, Education & Interpretation, Recreation, and Scenic values. Within its designation Congress tasked the BLM with management of the ONA and made the area part of the National Conservation Lands. Congress recognized the area as unique and nationally significant, made more so by the fact that the site is one of only three congressionally designated ONAs in the country and the only complete unit of National Conservation Lands east of the Mississippi.
The ONA’s shoreline along both the Indian River Lagoon and Loxahatchee River – collectively part of the Intracoastal Waterway, is a scenically sensitive, highly visible, and intensively utilized landscape. Attracted by the Caribbean blue water associated with most incoming tides and the rich estuarine ecosystem, visitors, numbering over 25,000/year, use the ONA’s shoreline for boating (including motorized boats, paddle boarding and kayaking), snorkeling and SCUBA, water play and engaging with friends and family in a beach setting. Prevalent use of the area increased since the establishment of the local communities of Jupiter and Tequesta and further increased with trends in outdoor recreation growth, specifically recreational boating. The shoreline is also important for residents and visitors in part due to the iconic Jupiter Lighthouse and the surrounding 35ft sand dune (the highest natural point in Palm Beach County).
These conditions draw the attention to the scenic qualities of the ONA from several homes, businesses (restaurants, clubs, etc.) and traffic routes that offer direct views of the shoreline.
Aside from the scenic and recreational qualities of the shoreline, the shoreline also supports an abundance of biological diversity in the intertidal and transitional zones. Unfortunately, the shoreline is also subject to tidal conditions, storms, wind, surface runoff and incompatible public use that led to a significant loss of material and retreat of the shoreline through erosion. Shoreline erosion is one of the greatest risks to accomplishing the legislative direction for protection, preservation, and enhancement of the values of the ONA. A study completed in partnership with Palm Beach County and Florida Atlantic University documented erosion and shoreline retreat that average over 2ft annually, with the most intensively impacted areas retreating as much as 7ft per year. Based on aerial photographs dating back to the 1940’s, measurements show a loss of over 5 acres of shoreline with a fair market estimated land value in far excess of $60 million.
C2021-084 JILONA SHORELINE STABILIZATION – STATEMENT OF WORK
PROJECT AREA
The project area includes approximately 0.5 miles of shoreline extending from the northern property boundary along the Indian River Lagoon south to Loxahatchee River extending west to the dilapidated former USCG dock. The shoreline includes both the low elevation areas and the embankment of the sand dune surrounding the Jupiter Lighthouse. The legal description is T. 40 S., R. 43 E., Section 31, Lot 17 & Lot
22. Attached is a map of the project area. Elevations range from sea level to approximately 25 feet varying throughout the project area.
OBJECTIVES
The project will construct various shore protection features to provide the following benefits:
1) alleviate erosion along the shoreline and movement of material into the adjacent Intracoastal Waterway,
2) stabilize the shoreline bank to curtail the loss of land and eliminate safety concerns from collapsing sands and falling vegetation,
3) protect the navigability of the Intracoastal Waterway,
4) enhance aquatic and terrestrial habitats and establish native vegetation, as appropriate, to provide for a “living shoreline,”
5) accommodate recreational elements that allow for continued shoreline use for recreational boaters (motorized and nonmotorized) and ONA visitors that allows beach access and supports fishing and snorkeling/SCUBA activities, at appropriate locations,
6) maintain and enhance the scenic integrity of the ONA as viewed from within and from external key observation points.
PERFORMANCE REQUIREMENTS
This task includes completing all work to the satisfaction of the Contract Documents including Construction Drawings, Project Manual including technical specifications, and applicable federal, state, and local permitting agencies.
DELIVERABLES
The Contractor will provide all deliverables in accordance with Contract Documents.
GOVERNMENT FURNISHED MATERIALS
No government furnished equipment or materials are available for the preparation of proposals. Upon request, BLM will provide the Contractor with all information available relating to design efforts.
DESCRIPTION OF WORK
This task includes preparation of a letter report summarizing the various bid options included in this work.
Base Bid: Services in this scope may consist of, but are not limited to, upland site work including site clearing, excavation and fill placement, construction of a terraced wall with the upper wall being a large block gravity wall (Redi-Rock block wall or approved Engineer equivalent) and the lower wall being an anchored sheet pile wall. Further descriptions of the Base Bid work are provided below.
A. Terraced Walls
• Upper Retaining Wall o Temporary construction access along top of bluff to provide equipment access to site;
restore following construction o Approximately 800 linear feet of large block gravity wall (10 feet exposure) and associated features (gravel drains, etc.)
o Post and rope fencing for pedestrian traffic control o Three timber access stairways providing access from the top of bluff to the middle terrace (+/-10 ft vertical exposure)
• Lower Retaining Wall o Approximately 800 linear feet of anchored steel sheet pile (NZ26) wall with concrete cap (helical tie-backs) Sheets must be installed by silent press-in technology with an integral auger capability (no vibration due to slope stability issues) o Post and rope fencing for pedestrian traffic control o Four timber access stairways to provide access from the middle terrace to the lower shoreline (+/-10 ft vertical exposure)
• Mid-level terrace o Grading between upper and lower walls to provide level surface o Post and rope fencing for pedestrian traffic control
• Vegetation o Preserve owner-specified specimen trees at temporary on-site location; replant following wall construction o New native vegetation planting at specified areas
• Sediment management o Anticipated excavation for the wall(s) construction will produce excess sediment o Contractor shall manage all material on site o Portions of the excess sediment will be used in other project areas (e.g., stabilized path), as needed o All remaining excess sediment will be graded upland of the upper retaining wall
The Contractor shall adhere to the Contract Documents for the specific clearing locations to ensure preservation of native species. The Contractor shall additionally be responsible for the planting of native species in the disrupted areas after the completion of all construction work.
Bid Option 1: Services in this category may include, but are not limited to, construction of a new timber pavilion and ADA suitable pathway and along the Loxahatchee River.
A. Pavilion
• Demolition of existing timber pavilion and associated concrete foundation
• Construction of a new (25 ft by 30 ft) timber pavilion with a stand-n-seam gable roof with associated concrete footings
• Limited excavation allowed due to likely presence of historically significant artifacts in area
B. ADA Pathway
• Construction of a concrete pathway that leads to the pavilion from existing ADA pathway
Bid Option 2: Services in this category may include, but are not limited to, construction of limestone breakwaters above and below MHW north of SR 707 (Cato’s bridge) and selective placement of proprietary artificial shoreline stabilization structures (i.e., reef balls, SeaHive). Bid Option 4 may result in installation of experimental shoreline stabilization units. Installation will be water based and must preserve local seagrass beds. Installation in shallow water typically less than -4 ft-NAVD. Minor modifications to the design documents may occur as a result of permitting and pre-construction survey results. These changes will be discussed and negotiated prior to awarding the associated option.
Bid Option 3: Services in this category may include, but are not limited to, construction of limestone breakwaters above and below MHW along the Loxahatchee River and installation of Timber fender piles as aids to navigation. Minor modifications to the design documents may occur as a result of permitting and pre-construction survey results. These changes will be discussed and negotiated prior to awarding the associated option.
Bid Option 4: Services in this category may include, but are not limited to, construction of various limestone breakwaters and revetments south of S.R. 707 (locally known as Cato’s bridge), construction of a pocket beach, and pile driving of timber fender piles, with locations noted on the Contract Documents. Minor modifications to the design documents may occur as a result of permitting and pre-construction survey results. These changes will be discussed and negotiated prior to awarding the associated option.
A. Limestone breakwaters and revetments
• All stone must meet gradation specifications in the design plans
• Stone installation anticipated from waterside
• Select revetment cross sections provide planters along structure centerline
• Contractor shall maintain continuous navigation within the IWW throughout the project
B. Pocket beach
• Preserve existing mangroves
• Excavate to establish shallow open water areas
C. Timber fender piles
• 30 ft long timber piles to restrict boating access to select locations
Bid Option 5: Services in this category may include, but are not limited to, the construction of a timber boardwalk with a horizontal alignment that varies between onshore and offshore of the MHW line with wave screens incorporated in the structure in specific areas, upland stairway access, and rock placement above and below MHW within specified areas of the boardwalk’s footprint. Minor modifications to the design documents may occur as a result of permitting and pre-construction survey results. These changes will be discussed and negotiated prior to awarding the associated option.
Further descriptions of the Bid Option work are provided below.
A. Boardwalk
• Approximately 7,100 SF (725 linear feet) of timber boardwalk with composite grated deck
• Timber/composite wave screen at specified locations along the boardwalk
• Debris removal (above MHW) and vegetation clearing, as needed, to support pile installation
• Limestone rock revetment at specified locations along the boardwalk
• Two timber access stairways to provide pedestrian access from upland
Bid Option 6: Services in this category may include, but are not limited to, construction of a floating dock including the pile driving work and the installation of a gangway and boat lift.
Further descriptions of the Bid Option 3 work are provided below. Minor modifications to the design documents may occur as a result of permitting and pre-construction survey results. These changes will be discussed and negotiated prior to awarding the associated option.
A. Floating Dock
• Demolition and removal of existing debris within the floating dock footprint (remnant concrete piles and construction debris)
i. Submerged debris, typically between -1 ft-NAVD88 and -15 ft-NAVD88
• Installation of floating dock guide piles (18” PSC – 15 EA)
• Installation of concrete floating dock (1,250 SF)
• +/-54 ft aluminum gangway with access gate
• One boat lift supported by concrete piles
QUALITY CONTROL
The Contractor accepts ultimate responsibility, liability, and duty to control the quality of the services provided to the Government as stipulated in the FAR, Part 36.609-2. The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all elements of construction and other services furnished by the Contractor, their employees, agents, assignees, and sub-contractor(s) under the contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in his/her construction that do not comply with the Contract Documents.
The Contractor shall apply a documented internal quality control program to all services performed. The Contractor shall demonstrate existence of a quality control system that he/she will use for all work submitted to the Government.
The government requires documentation and submittal of all quality control work performed.
COORDINATION
The proposed work will extend over several years, requiring the Contractor to be capable of providing and managing a multidisciplinary team from within the firm or in conjunction with sub-contractor(s). The Contractor shall be responsible for direct contact with federal, state, or local regulatory agencies to ensure compliance with regulations, codes, policies, and permitting processes.
SUSTAINABLE DESIGN
The Government has adopted sustainable design as the guiding principle for its planning, design, and construction projects. By definition, this means meeting present needs without compromising the ability of future generations to meet their needs. In practice, sustainable design utilizes best available solutions within the design tradition and conserves global resources, utilizes energy efficiently, recycles materials and waste, and specifies ecologically responsible methods, practices, and materials in the construction and operations of Government facilities. Accordingly, the Contractor must exhibit current credentials and demonstrated competency in sustainable design and green building systems. The Contractor shall validate their sustainable abilities and practices through completed construction projects, green certifications, green building awards, and use of green technologies. The LEED program is an example of one such certification program.
UNIVERSAL DESIGN AND ACCESSIBILITY
The BLM is dedicated to making projects universally designed and seamlessly accessible to visitors and staff with disabilities. All planning, design and construction projects shall meet and exceed the requirements of the Architectural Barriers Act Accessibility Standards (ABAAS), Section 504 (program access) and Section 508 (electronic and information technology access) of the Rehabilitation Act. The BLM policies require that projects exceed these federal requirements and apply the tenets of universal design to provide usable and inclusive experiences for all. To meet the requirements of Executive Order 13548, Increasing Federal Employment of Individuals with Disabilities, BLM assures visitor use areas and employee areas are accessible and provide the connectivity to all amenities so that employees with disabilities can fully participate in all programs.
REGISTRATION/LICENSING
Where applicable, the listed disciplines shall be licensed/registered to practice in the state in which the project is located. At the time of contract award, the selected contractor shall be licensed to provide construction services in the state identified under project locations. In addition, where applicable, the listed disciplines shall meet the Secretary of the Interior's Professional Qualification Standards.
LOCAL MEETINGS
The Contractor shall be responsible for recording and distributing all meeting (phone, field, etc.) minutes within three business days, unless otherwise noted in each task order.
STANDARD SERVICES
1. Security: The safe and undamaged delivery to the Contracting Officer and Contracting Officer’s Representative (COR) of all drawings, specifications, reports, estimates, and related materials executed by or in behalf of the Contractor is the responsibility of the Contractor.
2. Other: The cost of transporting from the Contractor’s office all correspondence, drawings, specifications, reports, samples, and related matter shall be borne by the Contractor without additional reimbursement by the government.
3. Monthly Invoices/Status Reports: Furnish monthly invoices and status reports of all work completed to date and schedule of work to be done, revised as necessary, in the form of a flow diagram or bar chart with sufficient supporting narratives. Monthly invoices and reports are to be submitted at the end of each month subsequent to the execution of the task order.
4. The Contractor shall respond to government review comments by modifying the documents as appropriate and, in addition, by preparing typed memoranda which respond specifically to each question or comment. These memoranda shall be submitted to the government.
PROJECT
DRAWN BY
SHEET
DATE
CERTIFICATE OF AUTHORIZATION # 4815
C2021-084
KM
FEB 2024
TAYLOR ENGINEERING INC.
10199 SOUTHSIDE BOULEVARD
SUITE 310
JACKSONVILLE, FL 32256
FIGURE 1
BID OPTIONS
JILONA SHORELINE STABILIZATION
BUREAU OF LAND MANAGEMENT
PALM BEACH COUNTY, FLORIDA
PALM BEACH
COUNTY, FLORIDA
LOXAHATCHEE RIVER 0 400 800200
FEET
LEGEND
FEDERAL NAVIGATION CHANNEL
PROJECT COMPONENTS
BID OPTION
BASE BID
BID OPTION 1
BID OPTION 3
BID OPTION 4
BID OPTION 5
BID OPTION 6
BID OPTION 2
IN
DI
AN
R
IVE
R
(IN
TR
AC
OA
ST
AL
W
AT
ER
WA
Y)
S BEACH ROADUV707
File details come from the government source that posted it. Updated .