BLM_JILONA_Bid_Schedule_Amd_0003_0003.pdf

PDF 932 KB Posted

Attached to
JILONA Shoreline Stabilization Federal contract opportunity
Solicitation number
140L0624R0042
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document appears to be a bid schedule for a federal contract opportunity related to a shoreline stabilization project. The contract opportunity is solicitation number 140L0624R0042, titled "JILONA Shoreline Stabilization", issued by the Department of the Interior Bureau of Land Management National Office.

The bid schedule includes several bid options for different aspects of the project, such as mobilization and demobilization, environmental protection, construction surveys, demolition, concrete work, timber structures, pathways, drainage, and stone/fencing work. The bid options provide detailed item descriptions, quantities, unit costs, and total costs. The total base bid amount and total bid amounts for each option are specified. The document states that all bid items shall include costs for furnishing materials, equipment, labor, and supplies to complete the work outlined in the contract documents.

View the file

Other files for this federal contract opportunity

Other files attached to JILONA Shoreline Stabilization, newest first.
File Type Posted
Q_As_0005.docx DOCX document
Sol_140L0624R0042_Amd_0005.pdf PDF
Corrected_SF_30_for_Sol_140L0624R0042_Amd_0004_0005.pdf PDF
RFP_JILONA_Stabilization__Amd_0005_0005.docx DOCX document
Sol_140L0624R0042_Amd_0004.pdf PDF
Rnd_2_QAs_Amendment_00004_0004.docx DOCX document
RFP_JILONA_Stabilization__Amd_0004_0004.docx DOCX document
Sol_140L0624R0042_Amd_0003.pdf PDF
Specifications__Amd_3_0003.pdf PDF
RFP_JILONA_Stabilization__Amd_0003_0003.docx DOCX document
Q___As__Amd_0003_0003.docx DOCX document
BLM_JILONA_Shoreline_Stabilzation_Construction_Drawings_Amd_3_0003.pdf PDF
20240723-DA_Permit_0003.pdf PDF
Statement_of_Work_-_ONA_Shoreline_Stabilization_(With_Map)_0002.pdf PDF
Q_As_-_Amendment_0002_0002.docx DOCX document
Sol_140L0624R0042_Amd_0002.pdf PDF
RFP_JILONA_Stabilization_0002.docx DOCX document
Sol_140L0624R0042_Amd_0001.pdf PDF
Site_Visit_Attendees_0001.docx DOCX document
ATT_6__Limitations_on_Subcontracting_Breakout.xlsx XLSX spreadsheet
ATT_1__Drawings.pdf PDF
ATT_7__Section_K_Representations_and_Certifications.docx DOCX document
Sol_140L0624R0042.pdf PDF
ATT_5__SF_1442_Completion_Instructions.pdf PDF
ATT_4__Past_Perf_Questionnaire.docx DOCX document
ATT_3__Wage_Determination.pdf PDF
ATT_2__Specifications.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST

01 Mobilization and Demobilization LS 1

02 Bonds and Insurance LS 1

03 Environmental Protection and Erosion Control LS 1

04 Construction, Payment, and As-Built Surveys LS 1

05 Construction Materials Testing LS 1

06 Clearing and Grubbing LS 1

07 Excavation, Stockpiling, and Placement CY 5,120

Large Block Gravity Retaining Wall (including drainage, foundation, etc.)

LF 831

09 Sheet Pile SF 27,000

10 Helical Anchors EA 90

11 Concrete Pile Cap (including reinforcement) CY 178

12 Timber Access Stairs EA 7

13 Post and Rope Fencing LF 1,028

14 Specimen Tree Removal, Care, and Reinstallation EA 10

15 Grassing (upland of terraced walls) LS 1

16 Grassing (stockpile area) LS 1

TOTAL BASE BID $

BASE BID SCHEDULE

ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT

DOCUMENTS. ALL COSTS BELOW ARE INSTALLED COSTS.

Dollars

TOTAL BASE BID (WRITTEN)

JBrumfield Line

02 Bonds and Insurance LS 1

03 Environmental Protection and Erosion Control LS 1

04 Construction, Payment, and As-Built Surveys LS 1

05 Construction Materials Testing LS 1

06 Clearing and Grubbing LS 1

07 Topsoil Excavation, Stockpiling, Placement, Grading, Compaction CY 35

08 Existing Pavilion Demolition LS 1

09 Concrete Footings and Slab (including reinforcement) CY 27

10 Timber Pavilion LS 1

11 Concrete Sidewalk SF 1287

12 Gravel Pathway SF 617

13 Yard Drain LS 1

14 Foot Washing Station (including water conduit) LS 1

15 Sod LS 1

TOTAL BID OPTION 1 $

Dollars

BID OPTION 1 SCHEDULE

ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT

DOCUMENTS. ALL COSTS BELOW ARE INSTALLED COSTS.

TOTAL BID OPTION 1 (WRITTEN)

JBrumfield Line

02 Bonds and Insurance LS 1

03 Environmental Protection and Erosion Control LS 1

04 Construction, Payment, and As-Built Surveys LS 1

05 Construction Materials Testing LS 1

06 Armor Stone TN 113

07 Bedding Stone (including filter fabric) CY 134

08 Timber Fender Piles (including signage) EA 6

TOTAL BID OPTION 2 $

Dollars

BID OPTION 2 SCHEDULE

ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT

DOCUMENTS. ALL COSTS BELOW ARE INSTALLED COSTS.

TOTAL BID OPTION 2 (WRITTEN)

02 Bonds and Insurance LS 1

03 Environmental Protection and Erosion Control LS 1

04 Construction, Payment, and As-Built Surveys LS 1

05 Construction Materials Testing LS 1

06 Clearing and Grubbing LS 1

07 Pocket Beach Excavation and Grading LS 1

08 Armor Stone TN 5,145

09 Bedding Stone (including filter fabric) CY 1,378

10 Timber Fender Piles EA 32

TOTAL BID OPTION 3 $

Dollars

BID OPTION 3 SCHEDULE

ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT

TOTAL BID OPTION 3 (WRITTEN)

02 Bonds and Insurance LS 1

03 Environmental Protection and Erosion Control LS 1

04 Construction, Payment, and As-Built Surveys LS 1

05 Construction Materials Testing LS 1

06 Timber Boardwalk with FRP Mesh Decking (including stairs) SF 7,592

07 Concrete Footers (including reinforcement) EA 3

08 Debris Removal for Boardwalk Construction LS 1

09 Security Gate at Gangway Access EA 1

10 Armor Stone TN 1,005

11 Bedding Stone (including filter fabric) CY 283

TOTAL BID OPTION 4 $

Dollars

BID OPTION 4 SCHEDULE

ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT

TOTAL BID OPTION 4 (WRITTEN)

02 Bonds and Insurance LS 1

03 Environmental Protection and Erosion Control LS 1

04 Construction, Payment, and As-Built Surveys LS 1

05 Construction Materials Testing LS 1

06 Debris Removal LS 1

07 18" Prestressed Square Concrete Piles EA 11

08 Concrete Floating Dock SF 1,228

09 60' Aluminum Gangway (4-ft wide) LS 1

TOTAL BID OPTION 5 $

Dollars

BID OPTION 5 SCHEDULE

ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT

TOTAL BID OPTION 5 (WRITTEN)

02 Bonds and Insurance LS 1

02 Environmental Protection and Erosion Control LS 1

03 Construction, Payment, and As-Built Surveys LS 1

04 Construction Materials Testing LS 1

05 Armor Stone TN 1,470

06 Bedding Stone (including filter fabric) CY 495

TOTAL BID OPTION 6 $

Dollars

BID OPTION 6 SCHEDULE

ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT

TOTAL BID OPTION 6 (WRITTEN)