This document appears to be a bid schedule for a federal contract opportunity related to a shoreline stabilization project. The contract opportunity is solicitation number 140L0624R0042, titled "JILONA Shoreline Stabilization", issued by the Department of the Interior Bureau of Land Management National Office.
The bid schedule includes several bid options for different aspects of the project, such as mobilization and demobilization, environmental protection, construction surveys, demolition, concrete work, timber structures, pathways, drainage, and stone/fencing work. The bid options provide detailed item descriptions, quantities, unit costs, and total costs. The total base bid amount and total bid amounts for each option are specified. The document states that all bid items shall include costs for furnishing materials, equipment, labor, and supplies to complete the work outlined in the contract documents.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST
01 Mobilization and Demobilization LS 1
02 Bonds and Insurance LS 1
03 Environmental Protection and Erosion Control LS 1
04 Construction, Payment, and As-Built Surveys LS 1
05 Construction Materials Testing LS 1
06 Clearing and Grubbing LS 1
07 Excavation, Stockpiling, and Placement CY 5,120
Large Block Gravity Retaining Wall (including drainage, foundation, etc.)
LF 831
09 Sheet Pile SF 27,000
10 Helical Anchors EA 90
11 Concrete Pile Cap (including reinforcement) CY 178
12 Timber Access Stairs EA 7
13 Post and Rope Fencing LF 1,028
14 Specimen Tree Removal, Care, and Reinstallation EA 10
15 Grassing (upland of terraced walls) LS 1
16 Grassing (stockpile area) LS 1
TOTAL BASE BID $
BASE BID SCHEDULE
ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT
DOCUMENTS. ALL COSTS BELOW ARE INSTALLED COSTS.
Dollars
TOTAL BASE BID (WRITTEN)
JBrumfield Line
02 Bonds and Insurance LS 1
03 Environmental Protection and Erosion Control LS 1
04 Construction, Payment, and As-Built Surveys LS 1
05 Construction Materials Testing LS 1
06 Clearing and Grubbing LS 1
07 Topsoil Excavation, Stockpiling, Placement, Grading, Compaction CY 35
08 Existing Pavilion Demolition LS 1
09 Concrete Footings and Slab (including reinforcement) CY 27
10 Timber Pavilion LS 1
11 Concrete Sidewalk SF 1287
12 Gravel Pathway SF 617
13 Yard Drain LS 1
14 Foot Washing Station (including water conduit) LS 1
15 Sod LS 1
TOTAL BID OPTION 1 $
Dollars
BID OPTION 1 SCHEDULE
ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT
DOCUMENTS. ALL COSTS BELOW ARE INSTALLED COSTS.
TOTAL BID OPTION 1 (WRITTEN)
JBrumfield Line
02 Bonds and Insurance LS 1
03 Environmental Protection and Erosion Control LS 1
04 Construction, Payment, and As-Built Surveys LS 1
05 Construction Materials Testing LS 1
06 Armor Stone TN 113
07 Bedding Stone (including filter fabric) CY 134
08 Timber Fender Piles (including signage) EA 6
TOTAL BID OPTION 2 $
Dollars
BID OPTION 2 SCHEDULE
ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT
DOCUMENTS. ALL COSTS BELOW ARE INSTALLED COSTS.
TOTAL BID OPTION 2 (WRITTEN)
02 Bonds and Insurance LS 1
03 Environmental Protection and Erosion Control LS 1
04 Construction, Payment, and As-Built Surveys LS 1
05 Construction Materials Testing LS 1
06 Clearing and Grubbing LS 1
07 Pocket Beach Excavation and Grading LS 1
08 Armor Stone TN 5,145
09 Bedding Stone (including filter fabric) CY 1,378
10 Timber Fender Piles EA 32
TOTAL BID OPTION 3 $
Dollars
BID OPTION 3 SCHEDULE
ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT
TOTAL BID OPTION 3 (WRITTEN)
02 Bonds and Insurance LS 1
03 Environmental Protection and Erosion Control LS 1
04 Construction, Payment, and As-Built Surveys LS 1
05 Construction Materials Testing LS 1
06 Timber Boardwalk with FRP Mesh Decking (including stairs) SF 7,592
07 Concrete Footers (including reinforcement) EA 3
08 Debris Removal for Boardwalk Construction LS 1
09 Security Gate at Gangway Access EA 1
10 Armor Stone TN 1,005
11 Bedding Stone (including filter fabric) CY 283
TOTAL BID OPTION 4 $
Dollars
BID OPTION 4 SCHEDULE
ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT
TOTAL BID OPTION 4 (WRITTEN)
02 Bonds and Insurance LS 1
03 Environmental Protection and Erosion Control LS 1
04 Construction, Payment, and As-Built Surveys LS 1
05 Construction Materials Testing LS 1
06 Debris Removal LS 1
07 18" Prestressed Square Concrete Piles EA 11
08 Concrete Floating Dock SF 1,228
09 60' Aluminum Gangway (4-ft wide) LS 1
TOTAL BID OPTION 5 $
Dollars
BID OPTION 5 SCHEDULE
ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT
TOTAL BID OPTION 5 (WRITTEN)
02 Bonds and Insurance LS 1
02 Environmental Protection and Erosion Control LS 1
03 Construction, Payment, and As-Built Surveys LS 1
04 Construction Materials Testing LS 1
05 Armor Stone TN 1,470
06 Bedding Stone (including filter fabric) CY 495
TOTAL BID OPTION 6 $
Dollars
BID OPTION 6 SCHEDULE
ALL BID ITEMS SHALL INCLUDE ALL COSTS FOR FURNISHING TO THE OWNER ALL MATERIALS, EQUIPMENT, LABOR AND SUPPLIES, AND FOR ALL COSTS INCURRED IN PROVIDING ALL WORK SHOWN ON THE PROJECT DRAWINGS AND OUTLINED IN THE CONTRACT
TOTAL BID OPTION 6 (WRITTEN)