Document/Section Page Solicitation
Language
Question Response
E/Project
Proposal Our understanding is that Document E/Project Proposal would be the cost for the RSIL lab only. Please confirm.
Correct, the government is assessing your cost proposal for implementing in the RSIL as part of the price evaluation factors.
F/Labor
Category
Worksheet
Is this 10-year cost intended to be for all four laboratories? Or should four copies of Attachment F be completed for each of the four laboratories?
The 10-year cost of labor categories is for the IDIQ contract and represents all work to be done for the initial implementation of the 4 laboratories and any additional laboratories to be onboarded within the 10-year timeframe of the IDIQ contract.
G/Licensing
Worksheet Is USGS considering that there would be additional implementation fees for adding laboratories in the future? Should a row be added to the worksheet to account for implementation of additional laboratories?
The government is unclear what you mean by an implementation fee. The government anticipates additional labs for onboarding (Page 9, Table 1-2). The government anticipates additional task orders may be awarded for work related to onboarding additional labs pending available funding. Offerors are strongly encouraged to list any fees and descriptions in the licensing sheet.
G/Licensing
Worksheet Please add more detail around what is meant by Single
User License. Is USGS referring to field users?
Please confirm that you are wanting concurrent user pricing and not “named-user” pricing.
The government is trying to understand the offerors licensing model structure. If it is named-user, then the government needs to know if viewing sample information requires a license as this affects approximately 1500 field users. The government would prefer unlimited users based upon a good value for the price. The government does have approximately 100 lab users, but not all need to be in LIMS at the same time, so a concurrent user license model is reasonable depending upon the price. The government wants the offeror to propose the best value model based upon total number of users and expected concurrent usage.
G/Licensing
Worksheet Should vendors use 50 as the number of concurrent user licenses for all 10 years or does USGS anticipate the number of users to change?
The 50 number is the current concurrent usage for
NWQL which includes both lab and field users. Adding additional labs in future years may require looking at any issues surrounding ability to login to LIMS because of licensing restrictions.
RFP
140G0223R00
Pg 9 What are the monthly test volumes in the individual 4
Labs?
See below. Varies by month
Reston
Groundwater
Dating
Laboratory
What instruments are in the RGDL lab? The Groundwater Dating Lab (GwDL) equipment is listed below:
• 2x Shimadzu GC-8 GC-ECD with
Peaksimple
• 1x Shimadzu GC-2010 GC-ECD with
Peaksimple
• 2x Agilent 7890B GC TCD/FID System with OpenChrome CDS
Menlo Park
Tritium
Laboratory
What instruments are in the Menloe Park Tritium Lab? The Menlo Park Tritium Lab equipment is listed below:
• 1x Perkin Elmer Tricarbon Liquid
Scintillation Counter
• 2x Perkin Elmer Quantulus GCT Liquid
Scintillation Counter
A/Requiremen ts/ 5.17
Infrastructure, Implementatio n and Support
Requirements
25 Is it acceptable for vendors to insert a row underneath each question to provide the requested additional information?
Yes, that is acceptable or reference in another responding attachment.
Sol_140G0223
R0001/Factor
F Project
Management
Plan
Is one project plan for RSIL required for Factor F? Or is
USGS requiring two project plans, one for RSIL and another for the remaining three labs?
The one project plan evaluated in Factor F is for the implementation in the 4 labs identified in the SOW. As part of the project management plan, the Offeror’s overall system architecture will be evaluated on efficiency, scalability, and compatibility with existing systems in the USGS WMA which includes Reston
Stable Isotope Lab, Menlo Park Tritium Lab, Groundwater Dating, and the National Water Quality
Lab.
NWQL Monthly Samples (2022 representing “normal”)
Samples received in 2022:
In-House Contract Total
Jan 1703 726 2429
Feb 1961 119 2080
March 2409 863 3272
April 2736 521 3257
May 3217 398 3615
June 3689 544 4233
July 3380 686 4066
August 4269 807 5076
Sept 3627 1157 4784
Oct 2803 125 2928
Nov 2319 707 3026
Dec 2212 1076 3288
Total: 34325 7729 42054
RSIL, GwDL, MPTL Monthly samples
Month GwDL RSIL MPTL
Jan 13 260 26
Feb 36 513 40
Mar 22 428 57
Apr 27 460 70
May 162 301 102
Jun 17 519 48
Jul 54 848 79
Aug 151 577 141
Sep 121 625 21
Oct 10 551 46
Nov 25 381 20
Dec 51 680 62