B09_AMEND_0005-QA_KOOSKIA_0005.pdf
PDF 44 KB Posted
- Attached to
- ID-KOOSKIA NATIONAL FISH- GUTTER RPLCMNT
- Solicitation number
- 140FF027Q0040
- Issued by
- Not on record
About this file
This is a Questions and Answers document for Amendment P0005 to federal contract solicitation 140FF027Q0040 for rain gutter replacement at ID-Kooskia National Fish Hatchery. The procurement is a Total Small Business Set-Aside; HUBZone certification is not required. The contract requires installation of a white, 0.027-inch aluminum, 6-inch K-style seamless gutter system with 3-by-4-inch downspouts as the new standard per Amendment 0004. Work spans four buildings with separate pricing line items required for each building, though a single project-wide labor and material breakdown may be submitted in support of quoted prices. Work must be completed by December 17, 2026, beginning upon award; if award occurs after November 17, the Government may adjust the performance period to provide reasonable completion time through contract modification.
The solicitation does not prescribe specific minimum insurance limits for general liability, automobile liability, or workers' compensation; contractors must comply with all applicable federal, state, and local requirements. Prime contractors may use established gutter installation subcontractors but must comply with applicable limitations on subcontracting as a Total Small Business Set-Aside and remain responsible for contract performance. Davis-Bacon certified payroll requirements apply as stated in the solicitation, with the prime contractor responsible for subcontractor compliance and payroll documentation submission; treatment of LLC owners performing work depends on business structure and Department of Labor requirements, which contractors must determine and document independently.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B09 AMEND P0005 QUESTIONS AND ANSWERS FOR ID-KOOSKIA NFH-RAIN GUTTER
REPLACEMENT-140FF027Q0040
1. Is this a general small-business set-aside, or is HUBZone certification required? Both provisions appear in the solicitation.
ANSWER: This requirement is being competed as a Total Small Business Set-Aside.
HUBZone certification is not required to submit a quotation. While the solicitation contains several socioeconomic program clauses, including HUBZone provisions, the RFQ is not restricted to HUBZone-certified firms. Any responsible small business that meets the solicitation requirements may submit a quote.
2. Are there specific general liability, automobile liability, or workers’ compensation insurance limits required for the prime contractor or subcontractor?
ANSWER: The solicitation does not prescribe specific minimum limits for general liability, automobile liability, or workers' compensation insurance for the prime contractor or subcontractors. Contractors are responsible for complying with all applicable federal, state, and local laws and regulations, including any insurance requirements imposed by those authorities. Please review the solicitation in its entirety regarding bonding and other contractor responsibilities.
3. If we intend to use an established gutter installation business as a subcontractor. Are there restrictions on the percentage of installation work that may be subcontracted, including applicable limitations on subcontracting?
ANSWER: Yes, an established gutter installation company may be used as a subcontractor.
However, this procurement is a Total Small Business Set-Aside, and the prime contractor must comply with the applicable limitations on subcontracting requirements. The prime contractor remains responsible for contract performance and compliance with all solicitation requirements.
4. If the subcontractor is an LLC owner personally performing installation, how should Davis-Bacon certified payroll requirements be handled?
ANSWER: Davis-Bacon requirements apply as stated in the solicitation. The prime contractor is responsible for ensuring compliance by all subcontractors and for submitting any required payroll documentation. The treatment of an LLC owner personally performing work may depend on the individual's business structure and applicable Department of Labor requirements. Contractors are responsible for determining and documenting their compliance with those requirements.
5. Amendment 0004 permits an equivalent industry-standard gutter system. Would a proposed white, .027-inch aluminum, 6-inch K-style seamless gutter system with 3-by-4-inch downspouts be acceptable as our primary quotation, subject to the stated standards and warranties?
ANSWER: Yes, this will be acceptable as the SOW has been revised to indicate this is the new requirement.
6. Section F says work begins upon award and must finish by December 17, 2026. If award occurs after November 17, will the December 17 completion date remain unchanged?
ANSWER: The Government recognizes that the actual award date may affect the contractor's available performance period. If award occurs later than anticipated, the Government may adjust the period of performance as appropriate to provide a reasonable time for contract completion. Any changes to the period of performance would be addressed at the time of award or through a subsequent contract modification, as applicable.
7. Section B uses building names that differ from the statement of work. Could you confirm how the four Section B pricing line items correspond to the four buildings in the SOW, and whether the detailed labor/material breakdown must be provided separately for each building or may accompany the four building totals as one project-wide breakdown?
ANSWER: See map from SOW above to identify building names. Offerors must provide pricing for each Section B line item (building) as identified in the Schedule. A single project-wide labor and material breakdown may be submitted in support of the quoted prices and is not required to be allocated separately to each building. However, pricing must be provided for each individual line item.
File details come from the government source that posted it. Updated .