Statement of Work Summary
This is a Statement of Work (SOW) for the Kooskia National Fish Hatchery Rain Gutter Replacement Project. The U.S. Fish and Wildlife Service seeks contractors to remove existing rain gutters and downspouts and install new 6-inch gutter systems with four 3-inch by 4-inch or 4-inch round downspouts (approximately 20 feet each) on four buildings: Incubation Building (~190 linear feet), Reuse Building (~160 linear feet), Maintenance Shop/Vehicle Storage Building (~260 linear feet), and Chiller Building (~160 linear feet). The contractor must provide all labor, materials, equipment, and supervision. All listed measurements are approximate, and contractors are required to conduct an on-site inspection before bidding. No additional compensation will be granted for discrepancies discovered after contract award. The project period of performance runs from October 1, 2026 through May 1, 2027.
Contractors must comply with OSHA 29 CFR 1910 and 1926, implement fall protection and proper debris handling, and maintain worksite safety controls. Materials and installation must follow federal, state, and local codes and industry standards. Warranty requirements include manufacturer warranties for all materials (minimum 10 years) and a 2-year workmanship warranty covering installation defects and leakage. Contractors must disclose any conditions affecting warranty coverage during site inspection. Bid submission requirements include a verification statement acknowledging the measurement disclaimer, proposed materials and specifications, warranty documentation, detailed cost breakdown, and estimated schedule. Technical points of contact are Kurt McCorkle (COTR, kurt_mccorkle@fws.gov, 208-400-0002) and Kayla Warden (KNFH Manager, kaylaw@nezperce.org, 208-935-8798) at Kooskia National Fish Hatchery, 318 Toll Road, Kooskia, Idaho 83539.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Kooskia National Fish Hatchery – Rain Gutter Replacement Project
1. Project Overview
Kooskia National Fish Hatchery is looking for contractors to replace existing rain gutters and downspouts. This project includes installing new 6" gutters and four 3” x 4”, or 4” round 20-foot downspouts (approx.) on each building listed below. The contractor shall provide all labor, materials, equipment, and supervision necessary to complete this project.
• Incubation Building – ~190 linear feet, four 20’ downspouts (approximately)
• Reuse Building – ~160 linear feet, four 20’ downspouts (approximately)
• Maintenance Shop/Vehicle Storage Building – ~260 linear feet, four 20’ downspouts (approximately)
• Chiller Building – ~160 linear feet, four 20’ downspouts (approximately)
All listed measurements are approximate. Contractors must conduct an on-site inspection to verify all measurements and conditions before submitting a bid.
The attached visual reference KNFH RAIN GUTTER IMAGE shall be used for general context only and does not represent final measurements or structural details
2. Scope of Work
• Remove and properly dispose of existing gutters and downspouts.
• Provide and install new 6” gutter systems sized appropriately for each building’s roofline.
• Install four 3” x 4”, or 4” round downspouts per building (approx. 20 feet each).
• Ensure gutter systems meet all applicable federal, state, and local codes.
• Ensure all materials and installation methods follow industry standards.
• Restore work areas to original condition after installation.
3. Site Visit Requirement
Contractors are required to visit the site prior to bidding.
No additional compensation will be granted for discrepancies discovered after contract award.
https://doimspp-my.sharepoint.com/personal/kurt_mccorkle_fws_gov/Documents/Microsoft%20Copilot%20Chat%20Files/KNFH%20RAIN%20GUTTER%20IMAGE.pdf
4. Warranty Requirements
Contractors shall provide the following warranties:
4.1 Material Warranty
• All gutter materials, downspouts, hangers, and hardware shall be warranted by the manufacturer for defects in material for a minimum of 10 years.
• Warranty documentation must be provided to the Government upon project completion.
4.2 Workmanship Warranty
• Contractor shall provide a minimum 2-year workmanship warranty covering installation defects, improper fastening, inadequate slope, leakage due to installation error, and any failure resulting from contractor workmanship.
• The contractor should correct, at no additional cost to the Government, any deficiencies discovered during the warranty period.
4.3 Warranty Coordination
Given that warranty conflicts can arise when installing new systems onto older structures the contractor must:
• Disclose any conditions discovered during site inspection that could affect warranty coverage.
• Identify any warranty limitations resulting from the condition of existing building components and provide written notice before proceeding with installation.
5. Safety Requirements
Contractors shall adhere to all applicable federal, state, and local safety regulations, including but not limited to:
5.1 OSHA Compliance
Based on established requirements referenced in prior construction specifications used by the Service contractors must be in,
• Compliance with OSHA 29 CFR 1910 – General Industry Safety and Health Standards.
• Compliance with OSHA 29 CFR 1926 – Safety and Health Regulations for Construction.
5.2 Worksite Safety Controls
• Use of fall protection when working at height.
• Proper handling and disposal of debris.
• Use of PPE including gloves, safety glasses, hard hats, and hearing protection were required.
• Maintain a clean, organized worksite free of hazards.
6. Technical Point of Contact and Project location
• Kurt McCorkle, Contracting Officers Technical Representative (COTR) Facility Operations Specialist – kurt_mccorkle@fws.gov; 208-400-0002
• Kayla Warden, KNFH Manager, kaylaw@nezperce.org; 208-935-8798
• Kooskia National Fish Hatchery; 318 Toll Road, Kooskia Idaho 83539
7. Bid Submission Requirements
• Verification statement acknowledging approximate measurement disclaimer.
• Proposed materials and specifications.
• Warranty documentation for included products.
• Detailed cost breakdown.
• Estimated schedule and performance plan.
8. Period of Performance
• October 1, 2026 through May 1, 2027 mailto:kurt_mccorkle@fws.gov mailto:kaylaw@nezperce.org