This document contains an exhibit listing equipment, systems, and maintenance items for the World War II Memorial along with a related federal contract opportunity solicitation.
The exhibit lists over 150 pieces of equipment across various systems including HVAC, electrical, plumbing, lighting, security, and more. Required maintenance for each item is specified, ranging from daily to annual tasks such as cleaning, inspection, filter replacement, and repairs. The solicitation seeks operations and preventative maintenance services for these systems on an IDIQ basis. The seed task order is for the National Park Service National Capital Region's National Mall and Memorial Parks unit. Services include emergency and non-emergency repairs. The solicitation number is 140D0424Q0127 and was issued by the Interior Business Center within the Department of the Interior Departmental Offices.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Alarm
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
ALARM SYSTEM
| Equipment | Qty | Location | Description | Required Maintenance | |
| Fire System | |||||
| * | Fire Alarms | 5 | PEPCO Vault | Audio and Lighted Alarm | Annual - Test Each Smoke Alarm (Contact NPS and DCFD to Schedule test) Annual - Clean Each Fire Alarms As Needed - Replace/Repair Alarms |
| 8 | Main Vault | ||||
| 3 | Comfort Station Bathrooms | ||||
| 1 | Information Center | ||||
| Security and Fire Control | |||||
| Control Panels | 3 | Engineers Office | Notifier NSF640 Antronix Alarms Station Voice Evacuation Control Fire Watch | Annual - Test/Troubleshoot/Repair Alarm Malfunctions |
| Note: |
| * Fire Alarms in the Tunnel Vault will require scaffolding to reach and test. |
Alarm System
Granite Bronze
EXHIBIT 2
NPS WWII Memorial Equipment, Systems, and Maintenance Items
| GRANITE AND BRONZE MAINTENANCE | ||||
| Material | Qty | Area/Item | Required Maintenance |
| 1 | Pool Area Caulking | 5300 LF | Total Caulk (Grey) | Prior to Spring Startup - Repair/Caulk Pool Joints Approx. Recaulk 750 LF | |
| Bronze | 4500 | Gold Stars and Bronze Panels Behind Stars | Annual - Handwash with Warm Water Annual - Clean and wax Quarterly - Remove Cobwebs | ||
| 112 | Wreaths | On each column | Tri-Annual - Hot wax (every three years) |
Semi-annual - Cold wax (twice a year), handwash and remove old wax
Monthly - Remove Cobwebs to include in and around granite.
| 2 | Baldacchinos | Arches (4 eagles & Wreaths) | ||
| 2 | 56 | Bronze Ropes | Between Columns | |
| 2 | Flagpole Pedestal | Plaza | ||
| 2 | Medallions | Memorial Arches | ||
| 24 | BAS Relief Panels | |||
| 248 LF | Handrails | Quarterly - Clean with soft cotton rag and mild detergent |
As-needed - Touch up paint for chips and scratches
| 2 | Gates | |||
| Granite Gum Removal | Memorial | Plaza | Gum Removal | Active - Daily with steam cleaner Deactive - monthly with steam cleaner or as approved by the COR |
| Concrete | Bus Drop-off | Concrete Sidewalks | ||
| Comfort Station |
| Notes: |
| 1 Caulking and Grouting is weather dependent and should be performed on dry days with adequate temperature in order for the compounds to adequately set. |
| 2 An articulated lift or scaffolding will be required to polish the entire Baldacchinos, can be performed in conjunction with relamping of the arches. |
| 3 Pressure washing should not be directed at lettering on columns. Cleaning techniques will be as directed by the COR. |
Granite and Bronze
HVAC
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
HVAC
| Fixture | Qty | Structure | Room | Location | Description | Required Maintenance | |
| Groundwater Treatment System | |||||||
| ACU-1 | 1 | Tunnels and Vaults | Main Vault | Ceiling Unit | Trane GEVB24041AAA10 | Monthly - Inspect Unit and Replace Filters (6 -20x25x1) Monthly - Inspect and Replace Belt as Needed (B-55) Every 3 Months - Check/Add Refrigerant as Needed Annual - Inspect Contactors, Wiring and Relays, Exercise Shutoff Switch, Clean Condenser Coils | |
| ACU-2 | 1 | Tunnels and Vaults | Main Vault | Ceiling Unit | Trane GEVB24041AAA11 | ||
| ACU-3 | 1 | Tunnels and Vaults | Main Vault | Floor Unit | Trane GEVB24041AAA12 | ||
| SF-1 | 1 | Tunnels and Vaults | Main Vault | Supply Fan Greenheck BCF-110-4 (1500CFM) | Monthly - Replace Filter (2 - 20x20x1) Every 3 Months - Check Belt Tension Adjust/Replace When Needed (AX43) Annual - Lubricate Motor SAE 20 Electric Motor Oil Annual - Exercise Shutoff Switch | ||
| EDH-1 | 1 | Tunnels and Vaults | Main Vault | Electric Duct Heater INDEECO | Annual - Inspect unit and Clean Coils Annual - Exercise Shutoff Switch | ||
| ACC-1 | 1 | Tunnels and Vaults | PEPCO Vault | Ceiling Unit | Condenser Unit Stultz Air Tech. Sys. HES-048-CAA | Monthly - Inspect unit and Replace Filter (25x25x1) Monthly - Check Belt Tension and Replace as Needed (B45) Annual - Check Condensate Line Annual - Inspect/Tighten Wiring Annual - Clean Unit Annual - Check Refrigerant Level Annual - Exercise Shutoff Switch | |
| ACC-2 | 1 | Tunnels and Vaults | PEPCO Vault | Ceiling Unit | Condenser Unit Stultz Air Tech. Sys. HES-060-CAA | ||
| AHU-1 | 1 | Tunnels and Vaults | PEPCO Vault | Floor Unit | Evaporator Unit Stultz Air Tech. Sys. OHS-048-AR | Monthly - Inspect Unit and Replace Filter (20x16x1) Monthly - check Belt Tension Replace as Needed Every 6 Months - Clean Evaporator Coil Annual - Exercise Shutoff Switch | |
| AHU-2 | 1 | Tunnels and Vaults | PEPCO Vault | Ceiling Unit | Evaporator Unit Stultz Air Tech. Sys. COS-060-AR | Monthly - Inspect Unit and Replace Filter (24x24x1) Monthly - check Belt Tension Replace as Needed (B43/5L460) Every 6 Months - Clean Evaporator Coil Annual - Exercise Shutoff Switch | |
| 1 | EF-1 | 1 | Tunnels and Vaults | Main Vault | Ceiling Unit | Exhaust Fan (1500 CFM) Greenheck SP-A125 | Every 3 Months - Check Belt Tension (Adjust/Replace When Needed) Annual - Lubricate SAE 20 Electric Motor Oil Annual Exercise Shutoff Switch |
| EF-2 | 1 | Tunnels and Vaults | PEPCO Vault | Sidewall Direct Drive Exhaust Fan Greenheck SE1-8-440-G1 | Annual - Inspect Fan |
Annual - Lubricate SAE 20 Electric Motor Oil Annual - Exercise Shutoff Switch EF-3A 1 Tunnels and Vaults Storm Vault Sidewall Direct Drive Exhaust Fan Greenheck SE1-8-440-G2 Annual - Inspect Fan Annual - Lubricate SAE 20 Electric Motor Oil Annual - Exercise Shutoff Switch EF-4 1 Tunnels and Vaults Storm Vault Sidewall Direct Drive Exhaust Fan Greenheck SE1-8-440-G3 Annual - Inspect Fan Annual - Lubricate SAE 20 Electric Motor Oil Annual - Exercise Shutoff Switch SF-1 1 Comfort Station Sewage Pump Room Supply Fan Greenheck BCF-110-4 (1500CFM) Monthly - Replace Filter (2 - 20x20x1) Every 3 Months - check Belt Tension Adjust/Replace When Needed (3L410) Annual - Lubricate SAE 20 Electric Motor Oil Annual - Exercise Shutoff Switch SF-2 1 Comfort Station Men's Room Sidewall Direct Drive Supply Fan Greenheck SS-12-432-B6 Annual - Inspect Fan Annual - Lubricate SAE 20 Electric Motor Oil Annual - Exercise Shutoff Switch SF-3 1 Comfort Station Women's Room Sidewall Direct Drive Supply Fan Greenheck SS-12-432-B7 Annual - Inspect Fan Annual - Lubricate SAE 20 Electric Motor Oil Annual - Exercise Shutoff Switch HVAC System
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
| EF-1 | 1 | Comfort Station | Sewage Pump Room | Ceiling | Exhaust Fan (1500 CFM) Greenheck SP-A125 | Every 3 Months - check Belt Tension (Adjust/Replace When Needed) Annual - Lubricate SAE 20 Electric Motor Oil Annual Exercise Shutoff Switch |
| EF-2 | 1 | Comfort Station | Sewage Pump Room | Sidewall Direct Drive Exhaust Fan Greenheck SE1-8-440-G1 | Annual - Inspect Fan |
Annual - Lubricate SAE 20 Electric Motor Oil Annual - Exercise Shutoff Switch
| EDH-1 | 1 | Comfort Station | Bathroom | Electric Duct Heater INDEECO | Annual - Inspect unit and Clean Coils Annual - Exercise Shutoff Switch | |
| UH-1 | 1 | Comfort Station | Mechanical Closet | Wall | Electric Duct Heater INDEECO | Annual - Clean Unit Casing, Fan and Motor Annual - Exercise Shutoff Switch |
| 2 | Comfort Station | Maintenance Storage | Wall | Electric Duct Heater INDEECO | ||
| 2 | Comfort Station | Sewage Pump Room | Wall | Electric Duct Heater INDEECO | ||
| 1 | Comfort Station | Janitor Closet | Wall | Electric Duct Heater INDEECO | ||
| AC-01 | 1 | Comfort Station | Engineers Office | Evaporator Trane | Bi-Monthly - Clean/Replace Filter Annual - Exercise Shutoff Switch | |
| CU-01 | 1 | Comfort Station | Engineers Office | Roof | Condenser Unit Trane TWE036C140B0/2TTA2 | Annual - Replace Humidifier Cylinder Annual - Check Condensate Line Annual - Clean Unit; Check/Tighten Wiring Annual - Check Refrigerant Level |
| EWH-1 | 2 | Comfort Station | Engineers Office | Wall | Electric Wall Heater INDEECO | Annual - Remove Front Grill and Clean Dust from heater and Grill Annual - Lubricate Motor with SAE No. 10 Annual - Exercise Shutoff Switch |
| EF-1-01 | 1 | Info Center/Ranger Contact Station | Bathroom | Exhaust Fan | Annual - Inspect Unit and Clean |
Annual - Lubricate SAE 20 Annual - Exercise Shutoff Switch EF-1-02 1 Info Center/Ranger Contact Station Janitor Closet Exhaust Fan Annual - Inspect Unit and Clean Annual - Lubricate SAE 20 Annual - Exercise Shutoff Switch
| EWH-1 | 1 | Info Center/Ranger Contact Station | Bathroom | Wall | Electric Wall Heater INDEECO | Annual - Remove Front Grill and Clean Dust from heater and Grill Annual - Lubricate Motor with SAE No. 10 Annual - Exercise Shutoff Switch |
| AHU-1 | 1 | Info Center/Ranger Contact Station | Bathroom | Trane Air Handling Unit AC Heat | Monthly - Replace Filter (20x20x1) Annual - Exercise Shutoff Switch | |
| CU-01 | 1 | Info Center/Ranger Contact Station | Bathroom | Back | Condenser Unit Trane TWE036C140B0/2TTA2 | Annual - Check Condensate Line Annual - Clean Unit; Check/Tighten Wiring Annual - Check Refrigerant Level |
| COP-1 | 1 | Tunnels and Vaults | Main Vault | 7.5HP w/inline strainer | Every 3 Months - Grease Pump (5FG High Perf Grease NLGI #2) Annual - Clean In-Line Strainers | |
| COP-2 | 1 | Tunnels and Vaults | Main Vault | 7.5HP w/inline strainer | ||
| HEP-1 | 1 | Tunnels and Vaults | Main Vault | 7.5HP w/inline strainer | ||
| HEP-2 | 1 | Tunnels and Vaults | Main Vault | 7.5HP w/inline strainer | ||
| HE-1 | 1 | Tunnels and Vaults | Main Vault | Heat Exchanger Bell & Gossett P20-40-TLA | Annual - Backflush | |
| ET-1 | Tunnels and Vaults | Main Vault | Expansion Tank | Annual - Inspect for Corrosions and Leaks | ||
| AS-1 | 1 | Tunnels and Vaults | Main Vault | Air Separator for ACU Pipe Loop Bell & Gossett A85524 | Annual -Strainer Servicing |
| Notes: |
| 1 Servicing EF-1 in Main Vault require scaffolding or other system to reach (35ft). |
HVAC System
Fountain
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
FOUNTAIN SYSTEM
| Equipment id | Qty | Structure | Room | Description | Required Maintenance | |
| Pumps | ||||||
| FP-1 | 1 | Tunnels and Vaults | Main Vault | Baldor 75HP Motor/Pump | Per O&M - Grease pump (5FG High Perf Grease NLGI #2) Maintain Pressure Differential Switches | |
| FP-2 | 1 | Tunnels and Vaults | Main Vault | Baldor 15HP Motor/Pump | As Needed - Clean Inline Strainer (Daily) Per O&M - Grease pump (5FG High Perf Grease NLGI #2) Maintain Pressure Differential Switches Annual - Lubricate and/or Replace O-Rings on Strainers | |
| DP-1 | 1 | Tunnels and Vaults | Main Vault | Baldor 40HP Motor/Pump | Per O&M - Grease pump (5FG High Perf Grease NLGI #2) Maintain Pressure Differential Switches Maintain Auto Air Vent | |
| DP-2 | 1 | Tunnels and Vaults | Main Vault | GE 125HP Motor/Pump | Per O&M - Grease pump (5FG High Perf Grease NLGI #2) Maintain Pressure Differential Switches Maintain Auto Air Vent | |
| DP-3 | 1 | Tunnels and Vaults | Main Vault | GE 100HP Motor/Pump | Per O&M - Grease pump (5FG High Perf Grease NLGI #2) Maintain Pressure Differential Switches Maintain Auto Air Vent | |
| DP-4 | 1 | Tunnels and Vaults | Main Vault | GE 75HP Motor/Pump | Per O&M - Grease pump (5FG High Perf Grease NLGI #2) Maintain Pressure Differential Switches Maintain Auto Air Vent | |
| DP-5 | 1 | Tunnels and Vaults | Main Vault | Baldor 15HP Motor/Pump | As Needed - Clean Inline Strainer (Daily) Per O&M - Grease pump (5FG High Perf Grease NLGI #2) Maintain Auto Air Vent Annual - Lubricate and/or Replace O-Rings on Strainers | |
| DP-6 | 1 | Tunnels and Vaults | Main Vault | Baldor 15HP Motor/Pump | As Needed - Clean Inline Strainer (Daily) Per O&M - Grease pump (5FG High Perf Grease NLGI #2) Maintain Pressure Differential Switches Annual - Clean/Replace Auto Air Vent | |
| DP-7 | 1 | Tunnels and Vaults | Main Vault | Baldor 50HP Motor/Pump | Per O&M - Grease pump (5FG High Perf Grease NLGI #2) Maintain Pressure Differential Switches Maintain Auto Air Vent |
| Filtration Tanks | ||||||
| FA-1,2,3,4,5 | 5 | Tunnels and Vaults | Main Vault | Filter Tanks, Model BMF-60 Tower Water Automatic 316 SS | Annual - Visual Inspection of tank/media for condition assessment Backwash as needed Maintain guages, flow meters, and air vents | |
| Flowmeters | 5 | Tunnels and Vaults | Main Vault | Filter Tanks | As Needed - Unclog (Take Apart and Clean/Repair) | |
| Sand Filter Air Vents | 5 | Tunnels and Vaults | Main Vault | Filter Tanks | Annual - Unclog (Take Apart and Clean/Repair) |
| Water Treatment | ||||||
| Chlorine Feeder | 1 | Tunnels and Vaults | Main Vault | Accu Tab Model 3500 | Maintain Accu-Tab chlorine feeders and automated controllers in main vault. | |
| Chlorine Feeder | 1 | Tunnels and Vaults | Main Vault | Accu Tab Model 3150 | Maintain Accu-Tab chlorine feeders and automated controllers in main vault. | |
| Ascorbic Acid Feeder | 1 | Tunnels and Vaults | Storm Vault | Hach Cl-17 | Maintain chlorine analyzer, float system and pumps. |
Fountain System
Electrical
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
ELECTRICAL SYSTEM
| ID | Qty | Location | Room | Description | Required Maintenance | |
| System | ||||||
| Electrical System | 1 | Memorial, Tunnels and Vaults, Information Center, Comfort Station, Pools, Plaza, Walkways | Display and Control Panels, Fixtures, Electrical Panels Wiring, Sensors, VFD's | AS NEEDED - A licensed electrician should be available to troubleshoot and repair electrical malfunctions. |
| Panels | ||||||
| PP | 1 | Tunnels and Vaults | Main Vault | 100 Amp Panel / 33 breakers | Annual - Vacuum/Clean Dust from Panel Annual - Exercise Breakers Annual - Inspect for Loose Connections and Tighten Perform a comprehensive Inspection every year and perform an infrared inspection annually | |
| FLA | 1 | Tunnels and Vaults | Main Vault | 400 Amp Panel / 42 breakers | ||
| FLB | 1 | Tunnels and Vaults | Main Vault | 225 Amp Panel / 32 breakers | ||
| DPP | 1 | Tunnels and Vaults | Main Vault | 800 Amp Main Feeder Panel / 5 breakers | ||
| PPA | 1 | Tunnels and Vaults | Main Vault | 400 Amp Panel / 20 breakers | ||
| PPB | 1 | Tunnels and Vaults | Main Vault | 100 Amp Panel / 8 breakers | ||
| PST | 1 | Tunnels and Vaults | PEPCO Vault | 100 Amp / 34 breakers | ||
| DPS | 1 | Tunnels and Vaults | PEPCO Vault | 400 Amp / 10 breakers | ||
| DPS-A | 1 | Tunnels and Vaults | PEPCO Vault | 250 Amp / 26 breakers | ||
| PIC | 1 | Information Center | PEPCO Vault | 225 Amp / 28 breakers / 150 Main | ||
| PCS | 1 | Comfort Station | Panel Room | 400 Amp / 42 breakers | ||
| PCSA | 1 | Comfort Station | Panel Room | 225 Amp Panel / 35 breakers |
| Lighting Racks | ||||||
| Dimmer Rack #1 | 1 | Tunnels and Vaults | Main Vault | 48 Breaker -Strand lighting Rack | Every 3 Months - Remove and Clean Breaker Modules | |
| Dimmer Rack #2 | 1 | Tunnels and Vaults | Main Vault | 48 Breaker -Strand lighting Rack | Every 3 Months - Check Fans and Clean Ventilation Filters | |
| Dimmer Rack #3 | 1 | Tunnels and Vaults | PEPCO Vault | 48 Breaker -Strand lighting Rack | Every 3 Months - Vacuum Dust from Panel and Exercise Breakers |
| Motor Control Center | ||||||
| DP-1 | 1 | Tunnels and Vaults | Main Vault | Wall Mounted Control Panels w/ Digital Control | Semi-Annual - Open Control Panel and Clean | |
| DP-2 | 1 | Tunnels and Vaults | Main Vault | |||
| DP-3 | 1 | Tunnels and Vaults | Main Vault | |||
| DP-4 | 1 | Tunnels and Vaults | Main Vault | |||
| DP-5 | 1 | Tunnels and Vaults | Main Vault | |||
| DP-5 | 1 | Tunnels and Vaults | Main Vault | |||
| DP-6 | 1 | Tunnels and Vaults | Main Vault | |||
| DP-7 | 1 | Tunnels and Vaults | Main Vault | |||
| FP-1 | 1 | Tunnels and Vaults | Main Vault | |||
| FP-2 | 1 | Tunnels and Vaults | Main Vault | |||
| 350 Amp Breaker | 1 | Tunnels and Vaults | Main Vault | 350 Amp Break on Motor Control Center | Annual - Exercise Breaker Switch |
| Emergency Battery Power System | ||||||
| IBPA | 1 | Tunnels and Vaults | Main Vault | 4 Battery Power Bank | Monthly- Check Batteries Monthly and Replace if Needed As Needed - Clean Battery Terminal and Vacuum Panel Annual - Inspect Wiring and Tighten/Repair as Needed | |
| IBPB | 1 | Tunnels and Vaults | PEPCO Vault | 4 Battery Power Bank |
| GFCI | ||||||
| GFCI Rack | 57 | Tunnels and Vaults | Main Vault | Lighting GFCI Panel | Semi-Annual - Check and Exercise Breaker Switches Replace GFCI when needed | |
| GFCI | 4 | Tunnels and Vaults | PEPCO Vault | GFCI Switches (next to Dimmer Rack #3) | ||
| GFCI Receptacles | Tunnels and Vaults | Throughout | GFCI Outlets | Annual - Check and Exercise Replace GFCI when needed |
Electrical System
Computer
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
COMPUTER CONTROL SYSTEM
| Equipment | Description | Required Maintenance | |
| Lighting Computer System | |||
| Computer System | Lighting Control System (Lutron) | Maintain System |
Quarterly PM by authorized service representative
Computer Control System
BMS
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
BUILDING MANAGEMENT SYSTEM
| Equipment | Qty | Location | Description | Required Maintenance | |
| Computer Control | |||||
| All BMS Components | 1 | Engineers Office | Siemens Building Technology 215068 | Maintain System Quarterly PM by authorized service representative |
Building Management System
PoolTreatment
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
POOLWATER TREATMENT SYSTEM
| Fixture | Qty | Structure | Room | Description | Required Maintenance | |
| DeScalamatic | ||||||
| DeScalamatic | 2 | Tunnels and Vaults | Main Vault | 800GPM | Annual - Clean Units | |
| DeScalamatic | 1 | Tunnels and Vaults | Main Vault | 300 GPM |
| Pools | |||||
| 1 | Rainbow Pool | 1 | Exterior Pools | 2335 m² Area | Pools must be kept free of debris/algae at all times. |
Contractor will be required to:
-Skim debris and trash out daily, higher frequencies required during high wind and spring and fall Elm tree debris drop -Vacuum pool floor-Clean/Clear return grates -Chemical treatment of water -Pressure washing prior to spring startup and at winter shut down -Brush walls and floors to prevent mineral deposit build-up and algae growth
| 1 | Ceremonial Pool | 3 | Exterior Pools | Upper | 428 m² Area |
| Lower | |||||
| Star | |||||
| Falls | |||||
| 1 | Arch Pool North | 1 | Exterior Pools | 172 m² Area | |
| 1 | Arch Pool South | 1 | Exterior Pools | 172 m² Area |
| Notes: |
| 1 Pools may be required to be drawn down for maintenance or other event. During drawdown, additional maintenance/cleaning should be scheduled. Coins collected during poolwater |
| treatment must be collected and turned into the NPS. |
| A chemical Application Log detailing chemical treatment dates and amount should be maintained. |
| Chemical quantities should be within limits proposed in the applied EPA process permit for the fountains. |
Poolwater Treatment System
Plumbing
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
PLUMBING SYSTEM
| Equipment | Qty | Structure | Location | Description | Required Maintenance | |
| Sewer System | ||||||
| Sewage Pit | 1 | Grounds | Behind Comfort Station | Annual - Vacuum/Clean out Maintain Control Panel | ||
| Sewage Ejector Pumps | 2 | Comfort Station | Sewage Pump Room | 30MVpp300-4-Self Priming Non-Clog V-Belt | As Needed - Unclog Pumps (Frequent) Semi-Annual - Grease Pumps and check Belts (GE D6A2CS) Semi-Annual - Clean/Replace Auto Air vent Maintain Control panel | |
| Backflow Preventer | 1 | Comfort Station | Sewage Pump Room | Annual - Test, Calibrate, and Certify by Certified Backflow Technician and repair as needed | ||
| Sewer and Storm Forced Main | Grounds | As needed - Unclog Sewer Lines As Needed - Repair Main Breaks | ||||
| Lavatory Waste Arms | Comfort Station/Info Center | As needed - Unclog/Snake |
| Fixtures | ||||||
| Urinals | 2 | Comfort Station | Men's Room | Std. Commercial Fixtures | Maintain Fixture As needed - Unclog Fixtures and Repair Valves etc. Annual Rebuild Flushometers (Sloan) | |
| Water Closets | 2 | Comfort Station | Men's Room | Maintain Fixture Weekly -Tighten Seats As Needed - Unclog and Valves etc. Annual Rebuild Flushometers (Sloan) | ||
| 8 | Comfort Station | Women's Room | ||||
| 1 | Info Center/Ranger Contact Station | Restroom | ||||
| 1 | Comfort Station | Family Room | ||||
| Lavatories | 4 | Comfort Station | Men's Room | Maintain Fixture As Needed - Unclog and Repair Faucet Annual - rebuild Faucet | ||
| 4 | Comfort Station | Women's Room | ||||
| 1 | Info Center/Ranger Contact Station | Restroom | ||||
| 1 | Comfort Station | Family Room | ||||
| Slop Sink | 1 | Comfort Station | Men's Room | Maintain Fixture As Needed - Unclog and Repair and/or rebuild Faucet | ||
| 1 | Comfort Station | Women's Room | ||||
| Drinking Fountains | 4 | Various Locations | Haws 6518.2FR Frost-Proof Drinking Fountains | Maintain Fixture with no longer than a 24 hour down time during the active season As Needed - Unclog and Repair Valves faucets, etc. Every 6 Months - Rebuild Regulators | ||
| Insta-Hot | 1 | Info Center/Ranger Contact Station | Restroom | In-line Hot Water Heater | Maintain Fixture As Needed - Repair/Replace Annually - Replace Filter | |
| DWH-1 | 1 | Comfort Station | Mechanical Room | 55 gallon Electric Water Heater | Maintain Hot Water Heater Annual - Inspect Unit and Replace Anode Rod As Needed | |
| Area Drains | 3 | Comfort Station | Floor Area Drains | As Needed - Unclog/snake | ||
| 4 | Tunnels and Vaults | Floor Area Drains | ||||
| Sensors | Comfort Station/Info Center | As needed - Maintain Sensors |
| Memorial Drainage | ||||||
| Comfort Station Gutters | 246.1 | Comfort Station | Perimeter | Copper Roof Gutter | Bi-Monthly - Clean Gutters and Strainers Semi-Annual - Inspect/Repair Standing Sea, As Needed - Clear Debris | |
| Info Station Gutters | 147.6 | Info Station | ||||
| Roof Drains | Comfort Station | Roof Drain | Bi-Monthly - Clean Roof Drain As Needed - Clear Debris | |||
| Bronze Ground Drainage Grates | WWII Memorial | Throughout | Rainbow Pool Cast Bronze Trench Grating | Monthly - (Rotating around Memorial) - Unscrew, Lift, Clear and Clean Grates Monthly - Clean out Drainage trench of debris and trash |
Plumbing System
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
| Backflow Preventers | ||||||
| RP-4 | 1 | Tunnels and Vaults | Main Vault | Fountain System Backflow Preventer | Annual - Test, Calibrate, and Certify by Certified Backflow Technician Annual - Bleed Air Annual - Inspect and Clean | |
| Irrigation Backflow Preventer | 1 | Tunnels and Vaults | PEPCO Vault | Irrigation System backflow Preventer |
| Sump Pits | ||||
| Floor Drain Sump | 1 | Tunnels and Vaults | South Stairwell | |
| Floor Drain Sump | 1 | Tunnels and Vaults | Main Vault | |
| Floor Drain Sump | 1 | Tunnels and Vaults | North Stairwell | |
| Tidal Basin Discharge | Tunnels and Vaults | Storm Vault | ||
| Plumbing System |
Groundwater
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
GROUNDWATER SYSTEM
| Fixture | Qty | Structure | Room | Location | Required Maintenance | |
| Groundwater Treatment System | ||||||
| Chlorinator Pumps | 2 | Tunnels and Vaults | Storm Vault | Quarterly - Check Pumps as per O&M | ||
| Chlorine Sensors | 2 | Tunnels and Vaults | Storm Vault | Bi-Monthly - Clean/Unclog Sensors Annual - Calibrate Probes | ||
| Chlorinator Tank | 60 gal | Tunnels and Vaults | Storm Vault | Every 3 Months - Check Chlorine Level and Replenish Solution (12.5% Chlorine Solution) | ||
| 1 | Sedimentation Basins | 3 | Tunnels and Vaults | Storm Vault | Twice per year - Cleanout | |
| 2 | Oil Separator | 1 | Exterior | Storm Vault | Manhole | Twice per year - Check Level / Empty and Clean |
| Gauge Log | 1 | Comfort Station | Engineers Office | Weekly - Record Flow and Maintain Gauge Log | ||
| Filtration Vessel | 6 | Tunnels and Vaults | Storm Vault | Annual Inspection per the manufactures O&M |
| Notes: |
| 1 The sedimentation basin has limited direct outside access and is 50 ft below Grade (50 ft head draw). Basins are permit-required confined spaces. |
| 2 Disposal of oil separator discharge should be done in accordance with all necessary environmental regulations. |
Groundwater System
Lighting
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
LIGHTING
| Fixture | Qty | Structure | Room | Location | Description | Required Maintenance | |
| Interior Lights | |||||||
| wall/ceiling mounted 4 ft fluorescent fixtures (2 tubes per fixture) | |||||||
| FA | 10 | Tunnels and Vaults | PEPCO Vault | 2 x Fluorescent Tube | Maintain Fixture and Re-lamp when outage occurs. | ||
| FA | 3 | Tunnels and Vaults | Storm Vault | ||||
| FA | 26 | Tunnels and Vaults | Tunnels | ||||
| FA | 4 | Tunnels and Vaults | North Storage Room | ||||
| FA | 4 | Tunnels and Vaults | South Storage Room | ||||
| 1 | FA | 16 | Tunnels and Vaults | Main Vault | |||
| FA | 1 | Comfort Station | Men's Room | Janitors Closet | |||
| FA | 1 | Comfort Station | Women's Room | Janitors Closet | |||
| FA | 3 | Comfort Station | Engineers Room | ||||
| FA | 11 | Comfort Station | Sewage Pump Room | ||||
| FA | 3 | Comfort Station | Mechanical Closet | Ceiling | |||
| FA | 4 | Comfort Station | Maint. Storage Area | Ceiling | |||
| FA | 1 | Info Center/Ranger Contact Station | Electric Panel Room | ||||
| Total | 87 |
| wall/ceiling mounted 4 ft fluorescent fixtures (1 tubes per fixture) | |||||
| FC | 9 | Tunnels and Vaults | North Storage Room/North Stairs | Fluorescent Tube | Maintain Fixture and Re-lamp when outage occurs. |
| FC | 9 | Tunnels and Vaults | South Storage Room/South Stairs | ||
| Total | 18 |
| single 4ft tube fluorescent/staggered | ||||||
| FD | 10 | Comfort Station | Men's Room | Above Ceiling Grates | Single Fluorescent Staggered | Maintain Fixture and Re-lamp when outage occurs. |
| FD | 12 | Comfort Station | Women's Room | Above Ceiling Grates | Single Fluorescent Staggered | |
| FD | 8 | Comfort Station | Family Room | Above Ceiling Grates | Single Fluorescent Staggered | |
| Total | 30 |
| single 4ft tube fluorescent/staggered | ||||||
| FE | 7 | Comfort Station | Men's Room | Ceiling | Compact Fluorescent | Maintain Fixture and Re-lamp when outage occurs. |
| FE | 8 | Comfort Station | Women's Room | Ceiling | Compact Fluorescent | |
| FE | 2 | Comfort Station | Family Room | Ceiling | Compact Fluorescent | |
| FE | 10 | Comfort Station | Vestibule | Ceiling Outside of Bathrooms | Compact Fluorescent | |
| FE | 10 | Info Center/Ranger Contact Station | Ceiling/Overhang | Compact Fluorescent | ||
| Total | 37 |
| compact fluorescent ceiling lights | ||||||
| FF | 4 | Comfort Station | Vestibule | Ceiling outside of Engr. Office | 2 x Fluorescent Tube | Maintain Fixture and Re-lamp when outage occurs. |
| FF | 5 | Info Center/Ranger Contact Station | Ranger Area | Ceiling | ||
| FF | 2 | Info Center/Ranger Contact Station | Bathroom | Ceiling | ||
| Total | 11 |
Lighting System
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
| wall mounted incandescent | ||||||
| FJ | 1 | Info Center/Ranger Contact Station | Bathroom | Over Sink | Incandescent Bulb | Maintain Fixture and Re-lamp when outage occurs. |
| single sided exit lights | ||||||
| FX-1 | 8 | Tunnels and Vaults | Tunnel | Exit Lamp | Maintain Fixture and Re-lamp when outage occurs. | |
| FX-1 | 1 | Comfort Station | Men's Room | Over Entrance | ||
| FX-1 | 1 | Comfort Station | Women's Room | Over Entrance | ||
| Total | 10 |
| double sided exit light | ||||||
| FX-2 | 1 | Tunnels and Vaults | Tunnel | Exit Lamp | Maintain Fixture and Re-lamp when outage occurs. | |
| Exterior Lights | ||||||
| Submersible - Bronzelight (61-25-RGA-TCO) | ||||||
| F-1 | 20 | Outside/Memorial | Ceremonial Falls | 120V 120W PAR38/FL | Maintain Fixture with no more than 5% outage at any given time | |
| F-1 | 22 | Outside/Memorial | Ceremonial Pool of Stars | |||
| F-1 | 22 | Outside/Memorial | North and South Arch Pools | |||
| Total | 64 |
| In Ground -Exterieur - Vent (ICARE SPIC-90 Incandescent+LHIC-S) | |||||
| F3 | 8 | Outside/Memorial | Ceremonial Entrance/Arches | 120V 60W PAR38 Incandescent | Maintain Fixture with no more than 5% outage at any given time |
| F3-A | 108 | Outside/Memorial | Ceremonial Entrance/Ceremonial Pool/Outer Rampart Perimeter | ||
| Total | 116 |
| Submersible - Bronzelight (6050RG) | |||||
| F4 | 99 | Outside/Memorial | In Rainbow Pool | 120V 300W PAR56 | Maintain Fixture with no more than 5% outage at any given time |
| Antique Street Lamps (PI-C24 10.5 ANBK) - Lights on photo cells in conjunction with computer controlled clock - checked when dark | ||||||
| 2 | F7 | 38 | Outside/Memorial | North and South Along Sidewalks/Washington Globes | 120V MH-50W | Maintain Fixture with no more than 5% outage at any given time |
| Submersible - Hydrel (4427) | |||||
| F8 | 16 | Outside/Memorial | Rainbow Pool North and South Arch Cluster Jets | 120V 500W PAR64 | Maintain Fixture with no more than 5% outage at any given time |
| Sculpture Lighting - BK Lighting (LS Lite-Star Series) | ||||||
| 3 | F9 | 16 | Outside/Memorial | In Arches/Eagles Wings and Wreaths | 120/12V 50W MR-16 | Maintain Fixture with no more than 5% outage at any given time |
Lighting System
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
| Flagpole Perimeter Lights - Exterieur-Vert (ICAR-SPIT-70-10-.1-ICHRB) | |||||
| F10 | 8 | Outside/Memorial | At Flag Poles | 120V 70W/T6/830 | Maintain Fixture with no more than 5% outage at any given time |
| Wall Mounter - Bega (2012) | |||||
| F12 | 2 | Outside/Memorial | Bronze Door Entrance at north and South Vault Stairwell | 120V 100W A-19 | Maintain Fixture with no more than 5% outage at any given time |
| Rope Lights - Light Project | |||||
| F13 | 108 | Outside/Memorial | Plaza/Upper Bench Lights Under Trench Grates | Rope Lights, 360FT, 120V 2W/FT, 0.05A, 10 circuits | Maintain Fixture with no more than 5% outage at any given time |
| Recessed - Sterner (Custom Fixtures) | |||||
| F14 | 56 | Outside/Memorial | Inner Rampart | 2 x 120V 50W AR-11 PAR36 | Maintain Fixture with no more than 5% outage at any given time |
| Arch Lights - Exterieur Vert (PHENIX D4SC2R) | ||||||
| F16 | 32 | Outside/Memorial | Floor of Arches | 120V 50W MR-16 | Maintain Fixture with no more than 5% outage at any given time | |
| 3 | F16-A | 16 | Outside/Memorial | Ceiling of Arches | 120V 50W MR-16 | |
| Total | 48 |
| Bench Lights - Light Project(Louvre 3 IP54) | |||||
| F17 | 112 | Outside/Memorial | Under Lower benches in Plaza | 13 x 12V 5W Xenon | Maintain Fixture with no more than 5% outage at any given time |
| Flagpole Base - Cooper Lighting (Lumiere - BOCA 633-120 BK 2CTP) | |||||
| F18 | 6 | Outside/Memorial | Flag Pole Bases in Pedestals | 120V 50W MR-16 | Maintain Fixture with no more than 5% outage at any given time |
| Notes: | |
| BALLAST SHOULD BE REPLACED ON ALL APPLICABLE LAMPS AS NEEDED DURING RELAMPING | |
| 1 Some fluorescent fixture in the main vault will require a tall (35 ft) extension ladder or scaffolding in order to service. | |
| 2 Lights on photo cells in conjunction with computer controlled clock, must be checked when dark. | |
| 3 An Articulated man-lift is required to service lamps. Permission from NPS required to use onsite lift. | |
| Lighting System |
Misc.
EXHIBIT 2
NPS WWII Equipment, Systems, and Maintenance Items
EMERGENCY GENERATOR AND MAN LIFT SERVICE
| System | Description | Required Maintenance | |
| Emergency Generator | |||
| Emergency Generator | Cummins | Quarterly - Service and Diagnostic (refer to O&M) Quarterly - Testing of Emergency Power System Annual - Load Test |
Miscellaneous System