B02_Liquidated_Damages_Data_0006.pdf
PDF 587 KB Posted
- Attached to
- NEW LECTURE HALL PARKER BUILDING 112
- Solicitation number
- 140A2323R0106
About this file
This document includes conceptual drawings and specifications for renovating an existing lecture hall located in Building 112 of the Haskell Indian Nations University. Key details include designing and constructing a new tiered floor plan to accommodate 60 students in a radial seating configuration with moveable desks and manufacturer-installed data and power outlets. Additional requirements involve upgrading mechanical, electrical, data, lighting, ceiling, wall finishes, flooring and HVAC systems. The related federal contract opportunity is a solicitation to renovate the lecture hall, with a site visit scheduled for December 12, 2023. Questions are due by December 19, 2023 and proposals are due January 4, 2024. This opportunity is set aside for Indian Economic Enterprise firms only and is being issued by the Department of the Interior Bureau of Indian Affairs Bureau of Indian Education.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_Log_A_140A2323R0106_0006.xlsx | XLSX spreadsheet | |
| 2_14_24_SOW_Parker_-_Room_118_Lecture_Hall_-_ADDENDUM__2_0006.docx | DOCX document | |
| 2_7_24_-_Addendum__1_-_Rm__110_Equipment_Example_0006.docx | DOCX document | |
| Question_Log_B_140A2323R0106_0006.xlsx | XLSX spreadsheet | |
| Sol_140A2323R0106_Amd_0006.pdf | ||
| SECTION_B_REVISED_0006.docx | DOCX document | |
| Sol_140A2323R0106_Amd_0005.pdf | ||
| Sol_140A2323R0106_Amd_0004.pdf | ||
| Sol_140A2323R0106_Amd_0003.pdf | ||
| Sol_140A2323R0106_Amd_0002.pdf | ||
| Sol_140A2323R0106_Amd_0001.pdf | ||
| A_-_Wage_Rates_0001.pdf | ||
| G_-__B112_Architect_Lect-room_-CONECEPT_DRAWINGS_0001.pdf | ||
| F_-_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting)_0001.pdf | ||
| C_-_SF-24_Bid_Bond_Form_0001.pdf | ||
| B_-_Question_Log_0001.xlsx | XLSX spreadsheet | |
| D_-_SF-25_Performance_Bond_Form_0001.pdf | ||
| E_-_SF-25A_Payment_Bond_Form_0001.pdf | ||
| Sol_140A2323R0106.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
Room
Room
Room
Storage
Room 114a
Room
Room 115b
Room
Room
0' - 1" 0' - 7 3/4" 1' - 2 1/2"
A-501
A-501
A-501
A-501
Scale
Date
Drawn By
Checked By
Project Number
Consultant Address Address Address Phone
Consultant Address Address Address Phone
Consultant Address Address Address Phone
Consultant Address Address Address Phone
Consultant Address Address Address Phone
Bureau Of Indian Education
1/4" = 1'-0"
6/
/2
3:
:5
AM
A-101
NEW FLOOR PLAN
BIE
Blg.112 - Room 118 Lecture Hall
Gary B.
DURAID Y
06/19/2023
Project Number
No. Description Date 1 Revision 1 06/19/23
1/4" = 1'-0"1 GROUND FLOOR NEW PLAN
5 6
8 8 8
13 1412
15 16 17 18
New Plan Keynotes
Note Number Note Text
1 Design and construct a new tiered floor to accomodate the required lecture hall seating. levels of flooring shall take in consideration all lecturer hall instances required in accordance with the applicable codes.
2 Infill the wall after removing the door with same materials of the existing wall. The exterior finish for the entrance to be designed to reflect the Indian nations cultural art.
3 Install a new storefront system including double aluminum door meeting the ADA requirements.
4 Design and construct new entrance slab with stairs and ADA ramp.
Design and construct a canopy for the porch with consideration for including Indian Nations cultural art.
5 Proposed new door location. door location is a concept only. contractor to design the best configuration and access location to maintain the required function of the rooms.
6 Infill wall for the removed door. patch and prepair for finish.
7 Proposed new wall to provide access for rooms 115 and 115b. Contractor to verify and design the best configuration for the optimum code compliant configuration.
8 Proposed seating arrangements only to demonstrate the radial seating configuration. Contractor to design the required seating and tables to meet the lecturer hall requirement in accordance with BIA design guides and referenced Codes. The estimated capacity is 60 students and the contractor needs to verify the capacity in accordance with the applicables codes and the hall size. Desired desks and seating are moveable with manufacturer installed data and power outlets with consealed tray.
9 Proposed new partition walls to create the new mechanical room no.114a and enlrage room 114 to be a sotrage room. contractor to design the optimum configuration to chief the intended code compliance and HINU requirements.
10 Proposed new double door for the new mechanical room.
11 Potential room to be converted to a Restroom. Contractor to make the required analysis based on the new occupancy and to verify if anyadditional restrooms required. If required, the contractor may convert room 117 first then if more needed room 116 can be accomodated as well. This shall be part of the contractor;s design verification.
12 Design and install new carpet flooring for the entire hall including the required resilient baseboard and all other accessories required.
13 Design and install new wall finish system for the entire hall suitable for the lecture hall functionality. a consideration shall be given for the accoustical requirements in a lecture hall in accordance with the BIA referenced codes.
14 Design and install new ceiling system for the hall. the required system is accoustical 2'x2' or 2'x4' with flexibility to add boudary sofit system. The ceiling shall meet the accoustical properties requirements for a lecture hall.
15 Design and install new lighting system recessed in the ceiling suitable for a lecture hall function.
16 Design and install new sound system for the lecture hall. sound speakers to be recessed in the ceiling.
17 Design and install HVAC system for the hall. Size and re-oute ducts above the ceiling to accomodate the new occupancy requirements in accordance with the applicable codes. This is including all required instruments, grilles, return air, supply air and all other requirements.
18 Design and construct the required electrical modification to include the required power and data outlets required for the smart lecturer room and all over equipments included. reuse the existing junction boxes, conduits, trays to the maximum extent possible.
19 The mechanical room relocation was made as an assumption that the new hall capacity would need a larger a HVAC unit and may need a larger space to fit in the indoor unit. Contractor to calculate the Air conditioning requirements and make the optimum configuration to accomodate the inside unit as part of the contractor's design. The new outdoor unit location shall be at the nearest location to the new mechanical room location.
20 The DOR to specify and design the visual presentation system. coordinate power and data outlets locations as required as part of the contractor's design.
21 Proposed location for the new electrical DP. design and install all required conduits and cables from the panel to the loads, feeder from the blg. MDP to the new new DP in accordance with the Contractor's approved design.
22 Proposed new ceiling mounted drop projectior screen. coordinate installation with the projector location.
23 Proposed new smart Podium. Coordinate power and data outlets with the Podium location in accordance with the contractor's approved design.
24 White board proposed location. install Government furnished white board at location approved in accordance with the contractor's approved design.
DISCLAIMER: These drawings are for conceptual use only, not for construction.
Contractor to field verify all information and dimensions. The drawings may not demonstrate all items under the project SOW.
if any discrapency between the SOW and the drawings, the most stringent requirement to prevail.
File details come from the government source that posted it. Updated .