This is a meeting summary from a pre-proposal conference held on October 8, 2024 for the Bureau of Indian Affairs' CRIP Main Canal Checks with Lateral 73 project (Solicitation #140A1624R0015). The meeting included representatives from BIA, Colorado River Indian Tribes (CRIT) Tribal Employment Rights Office, and CRIT Water Resources Department, with DOWL serving as the design engineer.
The project involves rehabilitation and replacement work at four sites: MC185 and MC270 check rehabilitations (CLIN 1), MC420 radial gate design (CLIN 2), MC420 check replacement (CLIN 3 - bid additive), MC420 electrical transmission modifications (CLIN 4), and Lateral 73-36 Check 1 replacement (CLIN 5). Key schedule milestones include contractor field measurements during January 2025 dry-up, gates functional at MC185/270 by end of January 2026 dry-up, electrical transmission realignment completion by March 31, 2026, and Lateral 73-36 temporary bypass ready by April 25, 2025. Questions are due October 11, 2024 with BIA responses the following week, and the solicitation deadline is November 1, 2024. The project requires coordination around irrigation dry-up periods and includes specific work restrictions related to environmental concerns and construction limits.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEETING SUMMARY
406-442-0370 ■ 1300 Cedar Street ■ Helena, Montana 59601 ■ www.dowl.com
PROJECT: CRIP Main Canal Checks with Lateral 73
DATE: 10/8/2024
SOLICITATION
NUMBER:
140A1624R0015 TIME: 8:30 a.m.
ORGANIZER: Will McLaughlin SUBJECT: Pre-proposal Conference
On October 8, 2024, BIA held a pre-proposal meeting for the (Colorado River Irrigation Project) CRIP Main Canal Checks with Lateral 73 project. Personnel from the Bureau of Indian Affairs, Colorado River Indian Tribes Tribal Employment Rights Office (TERO), and CRIT Water Resources Department attended the meeting. The meeting sign-in sheet is included as Attachment 1. The design engineer (DOWL) presented a brief presentation (Attachment 2) outlining key project components, the expected work sequence, and anticipated schedules. The slides included in Attachment 2 were distributed to in-person meeting participants as handouts. The notes annotated with each slide in Attachment 2 provide a summary of discussion topics but are not intended to provide a complete transcription of meeting discussions. The first 17 slides in Attachment 2 were discussed in the BIA conference room and the remaining slides were available for reference during the field review of each site. DOWL led a site walkthrough for prospective Bidders to review each of the four sites included in the solicitation. The meeting concluded at approximately 12:00 p.m.
Attachment 1: Sign-in Sheet
Virtual Attendees:
Abri-Gayle Sterlacci BIA – Contract Specialist abri-gayle.sterlacci@bia.gov
Kevin Smith BIA – Contracting Officer’s Representative kevinb.smith@bia.gov
Connie Nevarez DOWL cnevarez@dowl.com
Gabriel Sitapati DOWL gsitapati@dowl.com
Attachment 2: Presentation and Meeting Notes
CRIP MAIN
CANAL CHECK
STRUCTURES
Solicitation: 140A1624R0015
Pre-Bid Meeting
10/8/2024
These slides summarize the pre-bid meeting discussions for the subject solicitation.
Attachment 2, Page 001of 058
Attachment 2
AGENDA
8:30 to 10:00 Project Overview by BIA/DOWL
Introductions
Administrative Procedures (by BIA CO)
Project Overview (by DOWL)
General Q&A
10:00 to 1:00 On-site Field Review
MC185 and MC270 sites (~60 min. total)
MC420 site (~75 min. total)
Lat. 73-36 site (~75 min. total)
1:00 to 2:00 End of Meeting and Additional Q&A
Jeff Olsson (DOWL) briefly outlined the agenda for the pre-proposal meeting. Slides 1 through 17 of this presentation were presented during the “project overview” portion of the meeting. Subsequent slides were briefly discussed on-site at each of the project sites. The field review portion of the meeting concluded early at 12:00 p.m., local time.
Introductions of key BIA and Tribal team meeting participants included: Dillon Esquerra, CRIT Water Resources Director; Theo De La Rosa, CRIT TERO Director; Jonathan Cody, BIA Irrigation Engineer; Gary Colvin, BIA Irrigation Project Manager; Kevin Smith, BIA Contracting Officer Representative (COR); Abri-Gayle Sterlacci standing in for William McLaughlin who is the BIA Contracting Officer (CO); and Jeff Olsson, DOWL (BIA’s design A/E consultant) Project Manager and Engineer of Record.
Attachment 2, Page 002of 058
TRIBAL EMPLOYMENT RIGHTS OFFICE (TERO)
TERO Director Theo De La Rosa Email: theo.delarosa@crit-nsn.gov Phone: (928) 669-1380 Alt.: (928) 669-1390
Address: 26600 Mohave Road Parker, AZ 85344 https://crit-nsn.gov/crittero/
The TERO Director was in attendance at the meeting and confirmed the contact information shown here-in. Interested parties are encouraged to contact the TERO Office for more information on requirements that apply to this project and to individual contractors/subcontractors.
Attachment 2, Page 003of 058
ADMINISTRATIVE PROCEDURES &
BIDDING PROCESS
Bid/Proposal submittal overview (refer to Sections L and M)
• Volume 1 – Price Proposal
• Volume 2 - Technical Proposal
• Technical Approach
• Key Project Management/Technical Support
• Proposed Summary Schedule
• Relevant Experience and Past Performance
• Example Projects
Bid addenda process
Procedures for Question
• Verbal Q&A is non-binding
• Use the Q&A form in the solicitation
• Questions due October 11, 2024
• BIA Responses the following week
Solicitation Deadline – November 1, 2024 (unless modified through addenda)
Abri-Gayle Sterlacci presented this brief overview of the administrative procedures specific to this solicitation.
• All questions MUST be submitted in writing and on the Q&A form. All verbal Q&A is non-binding.
• Prospective bidders should review Sections L and M in particular for more detailed information on project-specification proposal information and how BIA will review these proposals.
• Anyone can submit questions through the proper channels and on the proper form.
Attachment 2, Page 004of 058
PROJECT OVERVIEW
CLIN 1: MC 185 & MC 270 Check Rehabilitation
CLIN 2: MC 420 Radial Gate Design
CLIN 3: MC 420 Check Replacement
CLIN 4: MC 420 Electrical Transmission and Distribution Modifications
CLIN 5: Lat. 73-36 Check 1 Replacement
Main Canal Check 185
Main Canal Check 270
Lateral 73-36 Check 1
Main Canal Check 420
This slide shows the four projects that have been bundled together by BIA for bidding and construction purposes:
• MC185 and MC270 – These sites will be rehabilitated on their current footprint and as such no permanent ROW modifications are required. CRIT approved a resolution in
2023 granting a temporary construction easement (TCE) to facilitate construction of these features.
• MC420 – This site is in worse condition than the two upstream sites and has the least remaining service life; replacement (i.e., not rehabilitation) is required for this site.
Replacement is not feasible within the current footprint and ROW modifications are required to facilitate construction on a new alignment adjacent the existing. ROW approvals are being coordinated by BIA and CRIT.
• Lateral 73-36 Check 1 – This is a re-bid of an earlier solicitation by BIA. This had previously been considered an emergency repair. No permanent ROW needs at this site. A TCE was approved by CRIT through a Tribal resolution earlier in the year.
Attachment 2, Page 005of 058
PRICING SCHEDULE STRUCTURE
Base Bid CLIN 1: MC 185 & MC 270 Check
Rehabilitation
CLIN 2: MC 420 Radial Gate Design
CLIN 4: MC 420 Electrical Transmission and Distribution Modifications
CLIN 5: Lat. 73-36 Check 1 Replacement
Bid Additive 1 CLIN 3: MC 420 Check Replacement
Main Canal Check 185
Main Canal Check 270
Lateral 73-36 Check 1
Main Canal Check 420
• BIA would like to award the base bid and bid additive. The bid additive is included to allow BIA flexibility in awarding the contract. For example, ROW modifications are ongoing at the time of award, BIA can award the base bid while waiting for final ROW authorizations.
• A key driver in the bidding and award schedule is the need for award in advance of the January 2025 dry-up schedule, as on-site activities by the successful proposer are required in January 2025.
• CLIN 2 includes the design of the MC420 radial gate. The fabrication and installation of this gate is included under CLIN 3.
Attachment 2, Page 006of 058
BASE BID – CLIN1
MC185
KEY WORK ELEMENTS
Radial Gate Replacement
Owner-Furnished Lateral Gates
Selective Demolition
Concrete and Steel Repairs
Walkways and Handrails
Instrumentation and Control Building
Safety Features, Fencing, Signage
Access Road Improvements
Stop Logs
• CRIP has a two-week (generally 14 calendar days) dry-up period in January of each year for routine O&M. Various activities (e.g., final gate measurements) will need to be performed by the successful proposer during this dry-up period. For the 2025 season, irrigation will be shut off Jan 12th and resume Jan 25th. The canal will likely take a few days for the water level to draw down.
• DOWL has identified activities in the plans that could take place prior to the dry-up period. However, the called-out activities may not be inclusive and may be adjusted based on Contractor preference. It will be important to the successful performance of the contract to do as much as possible outside of the very limited dry-up window.
• Unless indicated otherwise through addendum, bidders should assume a two-week dry-up period for bidding purposes; however, BIA and CRIT are reviewing the potential for an extended dry-up in January 2023 to better accommodate this project. Bidders are encouraged to submit a question if they feel completion within the two-week dry-up is infeasible.
• The lateral gates at MC185 are owner-furnished and the actuators require modification (e.g., a motor swap); however, the successful bidder is not obligated to use the owner-furnished equipment.
• The structure will need to be pressure washed during the dry-up period to facilitate crack mapping. This could be done during the January 2025 dry-up, if desired. Another consideration is to perform the crack repairs in January 2025 immediately after the crack mapping to reduce the work required in the January 2026 dry-up period.
• Field measurements of the radial gate and associated anchorage (which will be reused) will need to be taken by the successful proposer during the January 2025 dry-up period.
• Additional photos of the structures can be provided if requested via the Q&A process.
• The successful bidder would need to coordinate with the CRIT building inspector prior to bringing the control building on-line.
• The radial gates are electrically actuated and automated. The lateral slide gates are electrically actuated.
• A set of guides/rails will be installed at each MC site with one set of stop logs that can be used at all the sites. The bulkhead elements could be installed via crane if/when they are needed; these are not part of the
BIA’s typical/annual O&M.
Attachment 2, Page 007of 058
MC270
KEY WORK ELEMENTS
Radial Gate Replacement
Contractor-Furnished Lateral Gates
Selective Demolition
Concrete and Steel Repairs
Walkways and Handrails
Instrumentation and Control Building
Safety Features, Fencing, Signage
Access Road Improvements
Stop Logs Shared With MC 185
Expected Work Sequence Shared with MC 185
• The elements of the MC270 site are very similar to the MC185 site. The main difference between the sites is that the lateral gates for MC270 are CONTRACTOR-furnished.
• Field measurements of the structure will need to be taken during the 2025 dry-up period for the gate design.
• The existing anchorage will be re-used.
• There is flexibility if the successful bidder wants to re-use the existing anchorage or cut it flush and extend the rods – refer to the drawings.
• Although Contractor’s detailed measurements are to be used for shop drawing development and final design, sufficient information is provided in the drawings for bidding purposes. The drawings document the overall gate bay width and require post-installed side rubbing plates and sill plate, providing suitable construction tolerance for fit-up.
• MC185 and MC270 will be completed during the same two-week dry-up period.
Attachment 2, Page 008of 058
MC185/270 KEY CONSIDERATIONS
Annual January Main Canal dry-up (typically 2 weeks)
Contractor required to collect field measurements during January 2025 dry-up
Radial gate: assemble and test hoist as a single assembly in shop, deliver to site prior to dry-up
Contractor should do as much as possible prior to irrigation dry-up
• Radial gate field measurements must be taken and submitted.
• The specs outline the requirements for substantial completion and commissioning at the close of the dry-up period. The gates need to be able to be operated manually and ready for programming.
• The Owner will be providing programming, which is expected to occur immediately after the dry-up period.
• A question was asked about the concrete cure time prior to being under water/pressure. Jeff indicated that an official question should be submitted.
Attachment 2, Page 009of 058
B A
S E
B
ID
C
L
IN
L
A T.
-3
C H
E C
K R
E P
L A
C E
M E
N T
Existing Conditions Proposed Conditions
New Headworks
New Long-Crested Weir Check
Bank Improvements
Existing Check Structure with Integral Headworks
Cast-in-place Check
Precast Headgate
• This structure has been undermined several times and is not in very good condition.
• A new structure will be built slightly downstream of the current structure and a new headworks.
• A temporary check and bypass will be utilized to facilitate construction.
• The bypass will be constructed early in 2025 and will remain deactivated until the 2026 dry-up period.
• If the existing structure fails, the bypass can be activated early to allow irrigation to continue.
• Otherwise, the bypass will be activated during the 2026 dry-up period.
• The Lat. 73-36 check has a primary two-week dry-up period in Jan. (Jan. 12th – 25th in 2025).
• A secondary one-week dry-up period occurs in Feb. (Feb. 16th – 22nd in 2025).
• The headgate structure will be pre-cast and installed during the Jan. dry-up.
• The successful bidder will design and utilize their preferred cofferdam system.
• The plans include a design for the temporary check portion.
Attachment 2, Page 010of 058
EXISTING FACILITY – CHECK 1
A S
E B
ID
C L
IN
L A
T.
-3
A
N T
IC
IP
A
T E
D W
O R
K S
E Q
U E
N C
E
Construct Temp. Check & Bypass Channel
Construct Permanent Check Structure
Construct Headworks & Resume Irrigation
1 2 3
The work sequence depicted on this slide is the design intent that the plans are based on. The Engineer believes this expected work sequence is a reasonable approach with a high likelihood of success. The Contractor may propose an alternate work sequence. Certain aspects of the work (e.g., cofferdam type, method, and timing) are the responsibility of the Contractor. Some aspects of the illustration were based on an alternate construction sequence, but the overall workflow is similar. The general expected workflow is:
• Phase 1: Construct the temporary bypass and check. Sheet pile walls isolates the construction of a bypass channel parallel to the 73-36 lateral. A bank raise upstream of the new check will be required. Some of the sheets are temporary and are intended to be removed when activating the bypass channel. The bypass is expected to be left in this (inactivated) condition from completion in 2025 until the January 2026 dry-up.
• Phase 2: The bypass would be activated during the January 2026 dry-up. The existing check and headworks demolition would also be completed at this time. Water would then flow in the bypass while the new check is being constructed.
• Phase 3: After the permanent check is constructed the bypass would be removed, initiating flow over the new structure for water level control.
Attachment 2, Page 011of 058
BASE BID – CLIN5
LAT. 73-36 KEY TAKEAWAYS
Activating bypass (Cofferdamming and CRIP Coordination)
Foundation dewatering (Isolate Seepage and Active Dewatering)
Demolish existing structure and install headworks (During 2-wk Period)
Bidders are encouraged to give significant attention to these items.
Attachment 2, Page 012of 058
MC420 WORK RESTRICTIONS SUMMARY
Irrigation Restrictions and Dry-Up Schedule
Environmental Restrictions
Electrical Outage Window
Construction Limits
Construction Limits
Earthwork Borrow Area
Protect Culturally Significant Rock Outcrop
Protect Concrete Wasteway
• This site requires ROW modifications. BIA is working with CRIT to finalize the ROW authorizations for the project.
• Due to this, there might be a staggered award of bid additive 1.
• Work restrictions are included in the specs.
• Clearing and grubbing has to be completed during a specific time-frame to avoid the bird breeding season – refer to the environmental specifications.
• There is an electrical outage window.
• The new electrical transmission lines can be activated during this window with a brief outage or activated “hot”.
• Preliminary pole foundations have been designed. Final foundation designs will be based on the Contractor’s shop drawings and pole reactions provided through submittals. This may necessitate the need for a foundation size adjustment. Refer to the pricing schedule which shows how size adjustments will be handled.
Attachment 2, Page 013of 058
M C
S
IT
E
O V
E R
V
IE
W Proposed Transmission Line Existing
Transmission Line
New Check Structure
Existing Check Structure Drain
Realignment
Canal Realignment
• The final cut/fill for the project is expected to be a net balance; however, not every construction phase will balance. For example, we expect there will be a shortage during Phase 1 construction; to accommodate this, the drawings identify a temporary borrow area. Final excavations during Phase 3 would then be needed to restore this borrow area to pre-disturbance conditions; however, note that the Phase 3 available fill is on the opposite side of the canal from the temporary borrow area.
Attachment 2, Page 014of 058
ID
A D
D
IT
IV
E
M
C
A N
T
IC
IP
A
T E
D W
O R
K S
E Q
U E
N C
E
Construct New Canal Alignment and Check Structure
Tie Into New Alignment During Dry-Up
Resume Irrigation and Remove Existing Canal1 2 3
• The transmission line will need to be realigned prior to canal work.
• Canal realignment will include the three phases detailed above.
Attachment 2, Page 015of 058
EXPECTED PROJECT SCHEDULE SUMMARY
2027202620252024
Q2Q1Q4Q3Q2Q1Q4Q3Q2Q1Q4Q3Event
Awards and Contracting
Lat. 73-36 Bypass and Check Construction
Lat 73-36 Headgate Replacement
MC 185/270 Site Prep Work
MC 185/270 Radial Gate Replacement
MC 185/270
Final Site Work
MC 420 Electrical Transmission and Distribution
MC 420 Canal Realignment and New Check
MC 420 Gate Commissioning and Final Site Work
Jan. 2026 MC Dry-up
Jan. 2027 MC Dry-up
Jan. 2025 Gate Measurements
Temp Check & Bypass Perm. Check
Gate Shop Dwgs. & Fab.
Pole Shop Dwgs. & Fab.
C
LI
N
C
LI
N
C
LI
N
, 3
This schedule illustrated the general relationships between key activities, showing how we expect the work would be completed. The successful proposer may have alternate ideas; however, to be appropriate, any alternate work sequences or schedules need to consider the work restrictions (e.g., vegetation clearing windows, electrical outage periods, irrigation operations, and scheduled annual dry-up periods).
Attachment 2, Page 016of 058
RECOMMENDED CONSTRUCTION
SCHEDULE MILESTONES
Base Bid o CLIN 1 - MC185 and MC270 Check Rehabilitation o Perform Contractor’s on-site measurements during the January 2025 dry-up period o Gates Functional at the end of the January 2026 MC dry-up period o February 13, 2026: MC185 and MC270 Check Rehabilitation Substantial Completion o CLIN 4 - MC420 Electrical Transmission and Distribution Modifications o Perform clearing and grubbing activities and any electrical outages within the defined work restrictions o March 31, 2026: Elec. Transmission Realignment Substantial Completion o CLIN 5 - Lateral 73-36 o April 25, 2025: Temporary Bypass/Check Ready to Activate o Headgate Substantial Completion by the end of the January 2026 MC dry-up period o June 12, 2026: Lat. 73-36 Check 1 Substantial Completion
Bid Additive 1 o CLIN 3 - MC420 Check Replacement o Complete Phase 1 before the January 2027 MC dry-up o Construct Phase 2 during the January 2027 MC dry-up o Gate functional at the end of the January 2027 MC dry-up period
• These recommended construction schedule milestones are included in Addendum 1.
Attachment 2, Page 017of 058
REMINDERS
Review Solicitation Sections L and M
Schedules shown in these slides are for illustration purposes only – refer to the “Recommended Construction Schedule Milestones”
Verbal Q&A is non-binding
All questions must be submitted in writing to the COR
Leaving from the parking lot to MC 185 Check site
• If you get separated from the group call:
Jeff Olsson
406-202-8436 (mobile)
Field logistics & Safety Reminder
Attachment 2, Page 018of 058
C
H E
C K
R E
H A
B
IL
IT
A
T
IO
N
Beginning of slides covered on-site at the MC185 site. Not all of these slides were reviewed in detail during the field review.
Attachment 2, Page 019of 058
Radial Gate
Weir Wall
Lateral 19R Gate
Lateral 19L Gate
Overflow Wasteway
MC 185
SITE OVERVIEW
LATERAL 19L
Attachment 2, Page 020of 058
MC 185 WORK RESTRICTIONS
Dry-Up Schedule
Construction Limits
Environmental Restrictions
Construction Limits
Protect Pedestrian Bridge
Protect Concrete Wasteway
• The construction limits show the extent of the TCE approved by CRIT for the project. Work outside of these areas is not allowed.
Attachment 2, Page 021of 058
MC 185 STRUCTURE MODIFICATIONS
Selective demolition
Structural platforms, walkways, railings
Concrete restoration
Concrete weir wall
Stainless steel stoplogs and bulkhead slots
Brief overview of key structure modifications.
Attachment 2, Page 022of 058
MC 185 RADIAL GATE REPLACEMENT
Gate Hoist Assembly
1. Hoist base
2. Motor and gearing
3. Control panel
4. Cross shaft and wire rope drums
5. Grating and railings
Owner Witness Testing at fabrication shop
Erecting Engineer
Trunnion pins to fit existing anchor rods
Attachment 2, Page 023of 058
MC 185 LATERAL GATE REPLACEMENTS
Owner-furnished stainless steel slide gates
Lateral 19L Headgate Lateral 19R Headgate
Attachment 2, Page 024of 058
S
IT
E
I M
P R
O V
E M
E N
T S
Safety Cable & Ladders
Bollards
Fencing, Signage, & Gates
Road Resurfacing and Widening
All existing fences will be removed and replaced in their entirety.
Attachment 2, Page 025of 058
I
N S
T R
U M
E N
TA
T
IO
N
N
D C
O N
T R
O L S
Staff Gages
Water Level Sensors
Stilling Wells
New Control Building
Gate Instrumentation
Attachment 2, Page 026of 058
MC 185 ANTICIPATED WORK SEQUENCE
Phase 1: Prior to Main Canal Drawdown
Field Measurements (Jan. ‘25)
Selective Demolition
Radial Gate Procurement
Sensor Mounting and Installation
Control Building Installation
Staging and Preparation for Phase 2
All other work that can plausibly be completed before irrigation drawdown
Phase 2: During Main Canal Drawdown
Dewatering
Crack Mapping
Selective Demolition
Radial Gate and Lateral Gate Installation and Testing
Electrical Infrastructure
Structural Upgrades and Repairs
Safety Feature Installation
Concrete Weir Wall
Phase 3: After Main Canal Drawdown
Final Testing and Commissioning
Access Road Rehabilitation
Programming (by Owner) and Systems Integration
All Remaining Tasks
Site Rehabilitation and Demobilization
1 2 3
Attachment 2, Page 027of 058
MC 185 ANTICIPATED TIMELINE
20262025
Q2Q1Q4Q3Q2Q1Event
Field Measurements
Radial Gate Procurement and Fabrication
Site Preparatory Work
Gate Installation and Structure Modifications
Gate Commissioning
Final Site Work and Cleanup
Planned two-week irrigation shutoff in the CRIP Main Canal January 2025 and January 2026
Jan. 2025 Dry-up
Jan. 2026 Dry-up
Phase 1: Prior to Main Canal Drawdown
Phase 2: During Main Canal Drawdown
Phase 3: After Main Canal Drawdown
Attachment 2, Page 028of 058
RADIAL GATE PROCUREMENT FLOWCHART
Contractor Field Measurements (35 22 46-9)
Radial Gate Fabrication
Radial Gate Designer and Manufacturer Qualifications (35 22 46-1)
Radial Gate Approval Drawings and Data (35 22 46-2)
Wire Rope Prestressing Test Results (35 22 46-3)
Radial Gate Factory Acceptance Test Results (35 22 46-4)
Owner-witnessed Factory Acceptance Test Results (35 22 46-5)
Gate Handling and Installation Plan (35 22 46-6)
O&M Manuals and Post-Installation Documents (35 22 46-7 and 35 22 46-8)
Gate Hoist Assembly Fabrication
Ship Components to Site Gate Installation
Gate Commissioning and Testing
Training
Hoist Control Panel Product Data and Wiring Diagrams (40 63 13-1)
Hoist Control Panel Unwitnessed Factory Acceptance Test Results (40 63 13-2)
Hoist Control Panel Fabrication
Ship Panel to Hoist Assembly Shop
Owner’s Inspection of Materials
Notice of Award
Key Milestones
Radial Gate Submittals
Hoist Control Panel Submittals
LEGEND
FABRICATION SHOP(S)
PROJECT SITE
PANEL FACTORY
This flowchart illustrates project requirements. Emphasis on Contractor’s field measurements and Owner’s approval (e.g., gate hoist testing and gate inspection) of equipment. Programming will be by Owner after installation.
Attachment 2, Page 029of 058
MC 185 KEY TAKEAWAYS
Radial gate fabrication and testing requirements
Identify elements of work that can be completed prior to irrigation dry-up
Incorporating owner- and contractor-furnished equipment
Attachment 2, Page 030of 058
C
H E
C K
R E
H A
B
IL
IT
A
T
IO
N
Beginning of slides covered on-site at the MC270 site. Not all of these slides were reviewed in detail during the on-site meeting.
Attachment 2, Page 031of 058
Radial Gate
Spillway
Lateral 27R Gate
Lateral 27L Gate
Overflow Wasteway
MC 270
SITE OVERVIEW
LATERAL 27R LATERAL 27L
3 4
Attachment 2, Page 032of 058
MC 270 KEY
WORK ELEMENTS
Radial Gate Replacement
Selective Demolition
Concrete and Steel Repairs
Walkways and Handrails
Contractor-Furnished Lateral Gates
Instrumentation, and Control Building
Safety Features, Fencing, Signage
Access Road Improvements
Stop Logs Shared With MC 185
Expected Work Sequence Shared with MC 185
Attachment 2, Page 033of 058
C
H E
C K
R E
P L A
C E
M E
N T
Beginning of slides covered on-site at the MC420 site. Not all of these slides were reviewed in detail during the on-site meeting.
Attachment 2, Page 034of 058
Existing MC420 Check Structure
Existing Transmission Line
New Canal Alignment
MC420 Replacement Structure
Temporary Borrow Area
MC 420 SITE OVERVIEW
Attachment 2, Page 035of 058
MC 420 WORK RESTRICTIONS
Dry-Up Schedule
Construction Limits
Environmental Restrictions
Construction Limits
Earthwork Borrow Area
Protect Concrete Wasteway
Protect Culturally Significant Rock Outcrop
Attachment 2, Page 036of 058
E
X P
E C
T E
D W
O R
K S
E Q
U E
N C
E
Construct New Canal Alignment and Check Structure (2026)
Tie Into New Alignment During 2027 Dry-Up
Resume Irrigation and Remove Existing Canal1 2 3
Attachment 2, Page 037of 058
MC 420 EXPECTED TIMELINE
2027202620252024
Q2Q1Q4Q3Q2Q1Q4Q3Q2Q1Q4Event
Work Restrictions: Allowed Vegetative Clearing Window(s)
Work Restrictions: Allowed Transmission Outage Window
Electrical Pole Procurement and Fabrication
Construct Transmission and Distribution Revisions
Radial Gate Procurement and Fabrication
Construct Canal Realignment and New Check
Tie in Connection and Gate Commissioning
Final Site Work and Cleanup
Jan. 2027 Dry-up
Design Fabrication & Installation
CLIN 4 (Base Bid)
CLIN 2 (Base Bid)
CLIN 3 (Bid Additive 1)
Attachment 2, Page 038of 058
F
IN
IS
H E
D S
IT
E
P L A
N Realigned Access Road
Concrete Canal Lining
Relocated Drain Ditch
New MC 420 Check Structure and Security Fencing
Canal Safety Features
Buried Drain Pipe
Attachment 2, Page 039of 058
MC 420: DRAIN REALIGNMENT
Attachment 2, Page 040of 058
R
E P
L A
C E
M E
N T
C H
E C
K S
T R
U C
T U
R E
Attachment 2, Page 041of 058
MC 420 RADIAL GATE
Individual Contract Line Item
Gate Hoist Assembly
Owner-Witness Hoist Assembly Testing at Fabrication Shop
Owner’s Inspection of Radial Gate Before Shipping
Erecting Engineer and Commissioning
Attachment 2, Page 042of 058
Sensors and electrical system for gate controls and flow measurement
Additional instrumentation and controls at Lateral 42L
Electrical system for gate controls not associated with transmission realignment
PLC Programming By Owner
MC 420 CONTROLS AND
INSTRUMENTATION
Control Building
Hoist Control Panel
Existing Electrical Distribution Pole
Stilling Wells
Attachment 2, Page 043of 058
MC 420 ELECTRICAL TRANSMISSION REALIGNMENT
Alignment
Work Sequencing
Foundation Payment Procedures
Attachment 2, Page 044of 058
MC 420 KEY TAKEAWAYS
New Canal Alignment Construction
Radial Gate Commissioning Before Phase 3
Electrical Transmission Realignment
Attachment 2, Page 045of 058
L
T E
R A
L
-3
C
H E
C K
R
P L A
C E
M E
N T
Beginning of slides covered on-site at the Lat. 73-36 site. Not all of these slides were reviewed in detail during the on-site meeting.
• Project Purpose: replacing infrastructure while minimizing interruptions in irrigation service.
• The new check will be an updated version of the existing long-crested weir, which maintains a relatively consistent upstream water level over a wide range of flow rates.
Attachment 2, Page 046of 058
73-36 Check 1
73-36-7 Headworks
Temporary Bypass
Check 1 Replacement
LAT. 73-36 SITE
OVERVIEW
3 4
LA
TE
R A
L
-3
Attachment 2, Page 047of 058
LAT. 73-36 BACKGROUND INFORMATION
Attachment 2, Page 048of 058
LAT. 73-36 WORK RESTRICTIONS
Dry-Up Schedule
Construction Limits
Environmental Restrictions
Construction Limits
Attachment 2, Page 049of 058
EXISTING FACILITY – CHECK 1
L A
T E
R A
L
-3
E
X P
E C
T E
D W
O R
K S
E Q
U E
N C
E
Construct Temp. Check & Bypass Channel
Construct Permanent Check Structure
Construct Headworks & Resume Irrigation
1 2 3
Attachment 2, Page 050of 058
LAT. 73-36 EXPECTED TIMELINE
202620252024
Q2Q1Q4Q3Q2Q1Q4Event
Construct Temporary Check and Bypass
Install Cofferdams
Construct Permanent Check Structure
Fabricate Headgate and Precast Elements
Demolish Existing Check and Install Headgate
Final Site Grading and Cleanup
Annual two-week irrigation shutoff in Main Canal and Sublateral 73-36 January of each year
Additional one-week Lateral 73 shutdown in February of each year
Exact shutdown dates vary by year
Jan. 2026 Dry-up
Optional Permanent Check Construction Window
Attachment 2, Page 051of 058
T
M P
O R
A R
Y C
H E
C K
C O
N S
T R
U C
T
IO
N
A Typical Section Bypass Channel
A
The borrow source for the temporary bypass fill is the adjacent farm field.
Attachment 2, Page 052of 058
TEMPORARY CHECK CONSTRUCTION
Sheet Pile 1
Sheet Pile 2
Sheet Pile 3
A brief discussion on the design intent of the temporary check and bypass. Sheet Pile 1 and Sheet Pile 3 will be removed to activate the bypass channel. Sheet pile 2 is the temporary weir wall check that will stay in place for the duration that the bypass is active. The Contractor could propose an alternate sheet pile or bypass channel configuration.
Attachment 2, Page 053of 058
TEMPORARY CHECK CONSTRUCTION
Sheet Pile 1 Sheet Pile 2
Sheet Pile 2
Sheet Pile 2 manages the upstream water level after the bypass channel is activated. The Contractor can decide how to achieve the specified elevation and length (e.g., overdriving or cutting the sheet pile).
Attachment 2, Page 054of 058
73-36 CHECK 1 CONSTRUCTION
The replacement check is a relatively simple concrete structure, primarily consisting of flatwork and vertical walls with a downstream riprap apron. The Contractor will blend in the canal side slopes with the existing canal.
Attachment 2, Page 055of 058
D
M O
E X
IS
T
IN
G
C H
E C
K
A N
D C
O N
S T
R U
C T
N E
W H
E A
D W
O R
K S
An expected excavation plan is shown on the left and the final grading plan is shown on the right. During the 2-week dry-up, the Contractor will demolish the existing structure and install the pipe, precast headwall, and precast outlet wall. The actual excavation approach will be the Contractor’s decision. Implicit to the design is the idea that the structure can be demolished and the new facility installed during the 2-week drawdown. Bidders are encouraged to review this sequence carefully when preparing their bids.
Attachment 2, Page 056of 058
73-36-7 HEADWORKS CONSTRUCTION
Precast Headworks Fabricated in Three Pieces
B C
A
Embedded Wall Thimble
To improve constructability and allow for installation during the 2-week drawdown, Owner and Engineer selected a precast arrangement for the headwall. The headwall consists of three main precast elements and a concrete cutoff wall. Bidders attention was called to the wall thimble required for the headgate – this will take some coordination. Early development of gate shop drawings and precast design by Contractor and their suppliers is encouraged. The wall thimble is an embedded element requiring coordinated shop drawings and delivery of the wall thimble to the precast manufacturer. The outlet wall (not pictured in this presentation) is a similar precast element without a wall thimble.
Attachment 2, Page 057of 058
LAT. 73-36 CHECK 1 KEY TAKEAWAYS
Activating bypass (Cofferdamming and CRIP Coordination)
Foundation dewatering (Isolate Seepage and Active Dewatering)
Demolish existing structure and install headworks (During 2-wk Period)
Attachment 2, Page 058of 058