CRIP Main Canal Checks with Lateral 73
Closed Solicitation Posted
- Solicitation number
- 140A1624R0015
- Agency
-
Central Office
Bureau of Indian Affairs and Indian Education, Department of the Interior
- Responses due
- Set-aside
- Indian Small Business Economic Enterprise
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KB Repair Or Alteration Of Canals
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior Bureau of Indian Affairs Central Office is seeking a construction contractor for the Colorado River Irrigation Project (CRIP) Main Canal Checks with Lateral 73 project. The solicitation requires rehabilitation and replacement of canal check structures at four primary sites: MC185, MC270, MC420, and Lateral 73-36 Check 1. The project involves complex engineering work including concrete rehabilitation, radial gate replacements, electrical transmission modifications, and canal realignment. The government will use a Lowest Price Technically Acceptable (LPTA) evaluation method to select the contractor, with a focus on technical compliance and cost-effectiveness. Key dates include a pre-proposal conference on January 22, 2025, with questions due by January 28, 2025, and the proposal submission deadline set for March 10, 2025 at 12:00 PM Eastern Time.
The solicitation is set aside exclusively for Indian Economic Enterprises (IEE), with a 3.5% Tribal Employment Rights Ordinance (TERO) fee requirement. The estimated contract value ranges between $10-20 million, with a total performance period of 900 calendar days after the notice to proceed. The project is located on the Colorado River Indian Reservation in La Paz County, Arizona, and requires extensive coordination around the canal's operational schedule, with limited two-week dry-up periods each January for major construction activities. Contractors must comply with Davis-Bacon Act wage rates, Buy American Act requirements, and provide performance and payment bonds within 14 days of award. The work includes complex technical requirements such as installing site surveillance cameras, managing environmental compliance, and coordinating with tribal authorities throughout the construction process.
Notice text
Colorado River Irrigation Project (CRIP) Main Canal Checks with Lateral 73
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Colorado River Irrigation Project (CRIP) Main Canal Checks with Lateral 73 | Special Notice | |
| CRIP Main Canal Checks and Lateral 73 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| East canal efficiency improvements | Bureau of Reclamation | Total Small Business | |
| Bgndrf piping upgrades | Bureau of Reclamation | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity