B08__A62_PreBid_Site_Visit_Agenda_0005.pdf

PDF 158 KB Posted

Attached to
CRIP Main Canal Checks with Lateral 73
Solicitation number
140A1624R0015
Issued by

About this file

This is a pre-proposal meeting agenda for the CRIP MC Check Structures with Lateral 73 project (Solicitation No. 140A1624R0015) scheduled for January 22, 2025, at the Bureau of Indian Affairs Colorado River Agency in Parker, Arizona. The meeting consists of two main segments: a project overview session from 8:30 AM to 10:00 AM in Building 4, featuring introductions, administrative procedures, and a general Q&A, followed by on-site field reviews from 10:00 AM to 1:00 PM.

The field review portion includes visits to four specific project sites: MC Check 185, MC Check 270, MC Check 420, and Lateral 73-36 Check 1, with precise latitude and longitude coordinates provided for each location. The agenda allocates approximately 60 minutes per site including travel time. Additional time until 2:00 PM is available for follow-up discussions or site revisits if requested. Attendees may make subsequent visits to the sites independently but must stay within defined construction limits and cannot enter controlled access areas. No safety equipment or special passes are required for the site visits.

View the file

Other files

File Type Posted
B08__A70_Solicitation_Questions_and_Answers_Log_Final_0010.pdf PDF
Sol_140A1624R0015_Amd_0010.pdf PDF
B08__A69_First_PreBid_Site_Visit_Minutes_0009.pdf PDF
Sol_140A1624R0015_Amd_0009.pdf PDF
Sol_140A1624R0015_Amd_0008.pdf PDF
Sol_140A1624R0015_Amd_0007.pdf PDF
B08__A68_Second_PreBid_Site_Visit_Minutes_0007.pdf PDF
Sol_140A1624R0015_Amd_0006.pdf PDF
B08__A47_Specifications_Lateral_73_0005.pdf PDF
B08__A65_SF-24_Bid_Bond_Form_0005.pdf PDF
B08__A40_Revised_Solicitation_140A1624R0015_0005.pdf PDF
B08__A57_Geotechnical_Data_Report_Lateral_73_0005.pdf PDF
B08__A42_Statement_of_Work_Main_Canal_Checks_0005.pdf PDF
B08__A55_Historic_Drawings_Owner_Furnished_Gates_0005.pdf PDF
B08__A58_Asbestos_Assessment_Survey_MC185_MC270_MC420_0005.pdf PDF
B08__A54_Historic_Drawings_MC420_0005.pdf PDF
B08__A51_Drawings_MC420_Electrical_Transmission_0005.pdf PDF
B08__A66_SF-25_Performance_Bond_Form_0005.pdf PDF
B08__A52_Drawings_Lateral_73_0005.pdf PDF
B08__A59_Asbestos_Assessment_Survey_Lateral_73_0005.pdf PDF
B08__A44_Specifications_MC185_270_0005.pdf PDF
B08__A43_Statement_of_Work_Lateral_73_0005.pdf PDF
B08__A60_Groundwater_Monitoring_Report_MC185_MC270_MC420_0005.pdf PDF
B08__A63_Solicitation_Questions_and_Answers_Log_0005.xlsx XLSX spreadsheet
B08__A61_DOL_Wage_Rates_AZ20230007___AZ20230037_0005.pdf PDF
B08__A45_Specifications_MC420_0005.pdf PDF
B08__A56_Geotechnical_Data_Report_MC185_MC270_MC420_0005.pdf PDF
Sol_140A1624R0015_Amd_0005.pdf PDF
B08__A49_Drawings_MC270_0005.pdf PDF
B08__A41_Pricing_Schedule_0005.pdf PDF
B08__A67_SF-25A_Payment_Bond_Form_0005.pdf PDF
B08__A46_Specifications_M420_Electrical_Transmission_0005.pdf PDF
B08__A50_Drawings_MC420_0005.pdf PDF
B08__A48_Drawings_MC185_0005.pdf PDF
B08__A53_Historic_Drawings_MC270_0005.pdf PDF
B08__A64_IA_-_IEE_Representation_Form_0005.pdf PDF
Sol_140A1624R0015_Amd_0004.pdf PDF
B08__A31_Solicitation_Questions_and_Answers_Log_Round_Two_Final_0003.pdf PDF
Sol_140A1624R0015_Amd_0003.pdf PDF
B08__A30_Specification_35_22_46_-_Radial_Gates_Rev20241029_0003.pdf PDF
Sol_140A1624R0015_Amd_0002.pdf PDF
Meeting_SignInSheet_20241008_0002.pdf PDF
B08__A23_Solicitation_Questions_and_Answers_Log_Round_One_0002.pdf PDF
Sol_140A1624R0015_Amd_0001.pdf PDF
B08__A1_Pricing_Schedule.pdf PDF
B08__A21_DOL_Wage_Rates_AZ20230007___AZ20230037.pdf PDF
B08__A14_Historic_Drawings_MC420.pdf PDF
B08__A24_IA_-_IEE_Representation_Form.pdf PDF
B08__A22_PreBid_Site_Visit_Agenda.pdf PDF
B08__A5_Specifications_MC420.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Proposal Meeting Agenda CRIP MC Check Structures with Lat. 73

(Solicitation No. 140A1624R0015) Bureau of Indian Affairs Colorado River Agency

January 22, 2025 – all times are local time

8:30 a.m. to 10:00 a.m. Project overview by BIA/DOWL (Parker, AZ)

Introductions

Administrative Procedures (by the BIA Contracting Officer)

Project Overview (By DOWL)

General Q&A

10:00 a.m. to 1:00 p.m. On-site Field Review to Controlled Access Project Sites (south of Parker, AZ)

MC185 and MC270 Sites (~60 min. total including drive time)

Check Structure MC420 (~60 min. total including drive time)

Lateral 73-36 Site (~60 min. total including drive time)

1:00 p.m. End of Meeting

Immediately following the visit to the Lat. 73-36 site, BIA and

DOWL personnel will be available until 2:00 p.m. on an as-needed/if-requested basis to discuss the projects and/or make return visits to any of the project sites, including access (if requested) to controlled-access areas (i.e., fenced areas at the Main

Canal check structure sites).

Following the meeting, attendees may make return visits at their discretion to any or all of the project sites, subject to the following limitations: (1) attendees will not be able to enter any controlled access areas, (2) attendees must stay within the “construction limits” defined on the construction drawings for each site.

ADDITIONAL INFORMATION REGARDING THE MEETING:

The meeting will begin at 8:30 am local time (MST), 1/22/2025, in Building 4 of the BIA Colorado River

Agency, which is located at 12124 1st Ave., Parker, AZ and will go until around 10:00 am. Around

10:00 we will visit each of the four project sites. The site visits should conclude around 1:00 pm.

The four sites have the following locations:

MC Check 185 - Latitude and Longitude Coordinates 34°07'59.85"N, 114°18'54.08"W

MC Check 270 - Latitude and Longitude Coordinates 34°06'41.37"N, 114°19'28.88"W

MC Check 420 - Latitude and Longitude Coordinates 34°04'12.34"N, 114°19'31.37"W

Lateral 73-36 Check 1 - Latitude and Longitude Coordinates 33°54'43.10"N, 114°23'25.73"W

No passes are required and safety equipment is not necessary.

January 22, 2025 – all times are local time
10:00 a.m. to 1:00 p.m. On-site Field Review to Controlled Access Project Sites (south of Parker, AZ)
1:00 p.m. End of Meeting
ADDITIONAL INFORMATION REGARDING THE MEETING:
Word Bookmarks
October_8th,_2024_–_all_times_are_local_
10:00_a.m._to__1:00_p.m._On-site_Field_R
1:00_p.m._End_of_Meeting

File details come from the government source that posted it. Updated .