This is a bid form for the Old Town Pool Replacement Invitation to Bid (ITB) 2038 in Virginia, requiring bidders to propose labor, equipment, materials, and all work necessary for construction according to plans and specifications dated October 12, 2026, prepared by RRMM Architects. The project is structured in five bid components: Part A covers the base bid for primary construction work; Part B addresses excavation of unsuitable material at an estimated quantity of 200 cubic yards; Part C encompasses contaminated soil removal at an estimated quantity of 200 cubic yards; Part D includes excavation of rock material at an estimated quantity of 100 cubic yards; and Part E involves delivery and placement of VDOT 21A aggregate at an estimated quantity of 200 cubic yards. Final quantities and amounts for Parts B through E are subject to adjustment based on actual authorized quantities.

Pricing for the additive bid items is structured as unit prices per cubic yard, with Part B estimated at $13,000 (200 cy at $65 per cy), Part C estimated at $13,000 (200 cy at $65 per cy), Part D estimated at $12,500 (100 cy at $125 per cy), and Part E estimated at $12,000 (200 cy at $60 per cy). Bidders must complete all five parts to calculate the total bid amount. The bid form does not specify set-asides, incumbent information, funding sources, or contract term details within the provided document.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Old Town Pool Replacement ITB 2038 Bid Form

In compliance with the ITB and the documents therein specified, all of which are incorporated herein by reference, the bidder proposes to furnish all labor, equipment, and materials and perform all work necessary for construction of this project, in accordance with the Plans and Specifications dated 10/12/2026, as prepared by RRMM Architects for the consideration of the following amount:

BASE BID (excluding work in Part B-E and Additive Bid Items):

PART A = ________________________________________ Dollars ($ ___ ).

Parts B through E shall be priced as shown for each part.

PART B. - EXCAVATION OF ADDITIONAL UNSUITABLE MATERIAL

Excavation of unsuitable material, where authorized or directed, below or in addition to the levels required for the Work in Parts A and B and backfill with compacted material per specifications. (Price per cubic yard) Final amount shall be adjusted upward or downward based on actual quantity authorized.

Estimated quantity of 200 cy @ $ __65_______ per cy = _$13,000________

PART B = _______________________________________ Dollars ($13,000 )

PART C= CONTAMINATED SOIL REMOVAL per Part 1.4.B of specification 12200 where authorized or directed, and proper disposal off-site of excess material, complete per specifications. (Price per cubic yard) Final amount shall be adjusted upward or downward based on actual quantity authorized.

Estimated quantity of 200 CY @ $ __65_______ per cy = _$13,000________

PART C= ______________________________________Dollars ($13,000)

PART D. - EXCAVATION OF ROCK MATERIAL

Excavation of ROCK material, where authorized or directed, and proper disposal off-site of excess material, complete per specifications. (Price per cubic yard) Final amount shall be adjusted upward or downward based on actual quantity authorized.

Estimated quantity of (100) cy @ $ __125.00_____ per cy = _$12,500_________

PART D = _________________________________________Dollars ($12,500 )

PART E. – PROVISION OF VDOT 21A AGGREGATE

Deliver and place VDOT 21A aggregate where authorized or directed per specifications. (price per cubic yard) (Final amount shall be adjusted upward or downward based on actual quantity authorized.)

Estimated quantity of (200) cy @ $ _60________ per cy = $12,000_______

PART E = _________________________________________ Dollars ($12,000 )

TOTAL BID AMOUNT (Sum of PARTS A, B, C, D and E) IS:

____________________________________________________ DOLLARS ($ _________)

File details come from the government source that posted it. Updated .