This document is an Exhibit A Scope of Services attachment outlining Building Information Modeling (BIM) and electronic media submittal requirements for Broward County construction projects. The County requires BIM-based design, documentation, and construction deliverables for all major projects, including new construction, with deliverables to be provided in native BIM format and Industry Foundation Class (IFC) electronic standards. The scope establishes comprehensive standards for design authoring using parametric software, defines Level of Development (LOD) specifications ranging from LOD 100 through LOD 400, and requires consultants and contractors to collaborate through a BIM Project Execution Plan (BIM PxP) that documents project-specific BIM uses, team roles, responsibilities, and delivery methods. All BIM models must be positioned using Florida State Plane Coordinates, and the County requires extraction of two-dimensional (2D) deliverables directly from the Building Information Model. The document emphasizes the importance of data interoperability and the use of nationally defined standards including National BIM Standards, BIMForum LOD Specification, OmniClass, Uniformat, and MasterFormat to ensure building datasets facilitate ongoing facility operation and maintenance.
The deliverables must comply with specific software requirements including Autodesk Revit 2025 or higher for BIM models and AutoCAD 2025 or higher for CAD data, with all files submitted in native formats plus IFC2x4 or higher standards. Consultants must provide Construction Operations Building Information Exchange (COBie) data selected from OmniClass Table 23 categories and establish tolerances and quality assurance/quality control procedures detailed in a Model Progression Schedule/Agent Responsibility Matrix. The County retains ownership of all digital deliverables generated under consulting and construction agreements. Electronic media must be submitted on labeled ISO-9660 CD-ROM, DVD, or flash drives with specified documentation, and all files must be virus-scanned using current antivirus software. The document includes detailed requirements for federated BIM color coding by discipline, model structure, file naming conventions, workset organization, and compliance checklists. All submittals require transmittal letters documenting file contents, transfer instructions, virus-scan certifications, and plot file development documentation, with prime contractors responsible for ensuring subcontractor and subconsultant compliance with these BIM standards and policies.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 1 of 62
EXHIBIT A, SCOPE OF SERVICES
ATTACHMENT 1:
BIM and Electronic Media Submittal Requirements
Introduction The Contract Administrator will be utilizing electronic media as the principal way it develops, communicates and archives information concerning its various construction programs for the County. To that end, County's standard Professional Services Agreements for Consultant services and Construction Agreements for construction services require submittal of documents produced on electronic media. The County requires Building Information Modeling (BIM) based design, documentation and construction deliverables, scaled to the County’s needs, especially for all major projects, including all new construction.
These BIM processes are achieved through collaborative efforts of the Consultant and the Contractor and generally conclude with the completion of the Consultant’s Design Model and a Contractor’s As-Constructed Model as outlined in the Scope of Work and in the BIM Project Execution Plan (BIM PxP).
For projects utilizing BIM delivery, Consultant and Contractor will provide native BIM format and Industry Foundation Class (IFC) electronic BIM deliverables in addition to all other electronic copies of hardcopy submissions and other files that support the intent of the project at all project milestones. Data interoperability is important to the County. Design Authoring software shall be used throughout the project lifecycle and shall be parametric. It is also important that nationally defined standards and protocols be used when developing BIM’s so that data may be normalized for multiple uses, now and in the future. Most current versions of standards such as the National BIM Standards, BIMForum LOD Specification Part 1 and Commentary, OmniClass, Uniformat and MasterFormat, should be used whenever possible.
The Consultant will derive any two-dimensional (2D) deliverables from the Building Information Model. Further, it is the intent of the County to require open-standard facility management data as a project deliverable at all milestones. An important goal for the Construction Management Division is to not only enhance the value of all team efforts to efficiently design and construct lean, new and renovated construction projects using BIM, but also to assist in achieving a dependable use and development of BIM across multiple building types and for a wide range of County agencies.
Predictable, reliable, and uniform data will help to ensure a building dataset that will facilitate ongoing building operation and maintenance protocols. Project Consultant shall initiate and jointly develop BIM and Construction Operations Building Information Exchange (COBie) information to be completed by the Contractors throughout their corresponding phases of the project.
Definitions and Identifications for BIM terms used in this Attachment, requirements for electronic media, the BIM/CADD Standard of Care, LOD, COBie and other requirements are presented in Sections 1, 2 and 3 of this Attachment 1. The detailed BIM PxP Template is provided in Section 4
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 2 of 62 and is required to be developed at project initiation to provide a master information and data management plan and assignment of roles and responsibilities for model creation and data integration. Wherever possible, the BIM PxP will be developed through a collaborative approach involving all Project Consultants, Contractors and applicable County staff. A small sample of the Model Progression Schedule/Agent Responsible Matrix Template (MPS) is provided in Section 5 and will be made available in its native Excel format upon request. The County template includes minimum LODs but will be adapted if needed for the Project. An Introduction and directions for completion are described on the first page of the document.
Table of Contents - Attachment 1:
Introduction Section 1 - Definitions and Identifications Section 2 - Electronic Media Section 3 - BIM/ CADD Standard of Care, Level of Development (LOD), COBie Section 4 - BIM Execution Plan (BIM PxP) (Template to be completed) Section 5 - Model Progression Schedule/ Agent Responsible Matrix (MPS) (Template to be completed)
Section 1 Definitions and Identifications
The following BIM oriented definitions and identifications in this Section apply to this Attachment 1 unless the context, the Agreement in which the word or phrase is used, requires a different definition. In the event of a conflict, the Contract Administrator will determine its final resolution:
1.1 3D Coordination & Conflict Analysis: A process in which clash detection software is utilized during the coordination process to determine field conflicts by comparing 3D models of building systems. The goal of clash detection is to eliminate the major system conflicts prior to installation.
1.2 As-Constructed BIMs: Multiple Construction BIMs, delivered and validated by the Contractor before closing-up spaces and reviewed by the Consultants that represent the final As-Constructed building and components, including embedded data as required by the Contract Documents.
1.3 Asset Management: A process in which an organized management system will efficiently aid in the maintenance and operation of a facility and its assets. Asset Management utilizes the data contained in a record model to determine cost implications of changing or upgrading building assets, segregate costs of assets for financial tax purposes, and maintain a current comprehensive database that can produce the value of a company's assets.
1.4 Augmented Reality Simulation (AR): A Model Use where 3D models - combined with other technologies - allow users to experience virtual objects superimposed on top of physical objects or places, thus allowing images from the physical and virtual worlds to appear as one. AR is typically experienced through hand-held screens, wearables, holograms and projections.
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 3 of 62
1.5 BIM: Building Information Modeling as such term is defined by the US National Building Information Model Standard Project Committee. BIM is not a specific product or technology, instead it’s a collection of software applications and processes designed to facilitate coordination and project collaboration through a facilities lifecycle. BIM is a process for developing design, construction and operations and maintenance documentation by virtually constructing a building, bridge or other form of infrastructure
– before anything is built. As used herein, the BIM may also refer to a specific model derived from the BIM process (sometimes redundantly identified as a BIM model).
References to Building Information Model, BIM, or the Model, include the primary design model or models and all linked, related, affiliated or subsidiary models developed for design, analysis, estimating, detailing, fabrication, construction, operation or maintenance of the project, or any portion or element of the project.
1.6 BIM Project Execution Plan (BIM PxP or PxP): A document that defines the appropriate uses for Building Information Modeling on a project (e.g., design authoring, design review and 3D coordination), along with a detailed design and documentation process for executing BIM throughout a facility’s lifecycle, team contacts, team responsibilities, team roles, definitions, delivery methods / formats, LOD matrix, work flow and process maps are among other information outlined in the BIM PxP.
1.7 Building Maintenance Scheduling: A process in which the functionality of the building structure (walls, floors, roof, etc.) and equipment serving the building (mechanical, electrical, plumbing, etc.) are maintained over the operational life of a facility.
1.8 BIM2Field: See definition for Digital Layout.
1.9 CAD/CADD: Computer Aided Design/Computer Aided Design and Drafting.
Interchangeably used terms interpreted as 2D, (Two Dimensional) representations in electronic format. CAD represents all pre-BIM digital tools and their 2D/3D deliverables.
1.10 CAD/BIM Manager: The System Administrator and/or person responsible for leading the BIM implementation processes within an organization and supporting it in developing/delivering new BIM services and model-based efficiencies. Also responsible for the management of all CAD and BIM data and processes.
1.11 CAFM – Computer Aided Facility Management: A software platform that streamlines facilities management and maintenance. CAFM software spans space and workplace management, asset management, project management, building operations, preventive maintenance, and more. These systems leverage facilities data and drawings into performance metrics and planning tools to optimize the process of managing facilities.
1.12 CIM - Sub-Surface: Civil Information Modeling and subsurface utility mapping that relates and is coordinated with the building modeling.
1.13 Clash Detection - Clash Rendition: A process in which clash detection software is used during the coordination process to determine field conflicts by comparing 3D models of building systems prepared by different disciplines. Rendition or the visual representation of the native-format model file is be used specifically for spatial coordination processes.
The key benefit is to eliminate major system conflicts prior to installation, reducing errors, and hence costs, prior to commencement of construction.
1.14 CMMS: Computerized Maintenance Management System. A software system that provides maintenance managers a detailed look into the maintenance of a facility and
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 4 of 62 keeps track of work costs and orders, machine history, labor records and critical equipment and can generate preventive maintenance work orders.
1.15 COBie: Construction Operations Building Information Exchange specifications as administered through the buildingSMART alliance, National Institute of building Sciences, Washington, DC. http://www.nibs.org/?page=bsa_cobie.
1.16 Code Validation: A process in which code validation software is utilized to check model parameters against specific codes.
1.17 Commissioning: The process of verifying in new construction that agreed upon building systems achieve the County’s project requirements.
1.18 Compatible Data: Data that can be accessed directly by the target BIM or CADD system upon delivery to the County, without further translation or post-processing of the electronic digital data files. It is the responsibility of Consultant to ensure this minimum level of compatibility.
1.19 Constructability - PEER Review: Constructability can be defined as a review of the building model along with drawings, specifications to determine feasibility to assembly the project in the manner documented. The review includes, but does not limit, evaluating and identifying efficiencies, assemblies, systems and obstacles to construction.
1.20 Construction System Design: A process in which 3D System Design Software is utilized to design and analyze the construction of a complex building system (e.g. form work, glazing, tiebacks, etc.) in order to improve planning.
1.21 Cost Analysis: A process in which a BIM can offer a preliminary analysis of the costs of constructing a Project during the design process and provide cost benefit effects of additions and modifications with potential to save time and avoid budget overruns. The accumulation, examination, and manipulation of cost data for comparisons and projections.
1.22 Cost Estimation: A process in which a BIM is used to develop accurate quantity take-offs for the purpose of creating or validating cost estimates.
1.23 Design Authoring: A process in which 3D software is used to develop a BIM based on criteria that is important to the translation of the building’s design. Design authoring tools are a first step towards BIM, connecting the 3D model with a database of properties, quantities, means and methods and schedules.
1.24 Design for Maintenance: An evaluation process where each object selected during design for inclusion in a BIM are evaluated for maintenance issues, such as recommended, or code required clearances to perform routine maintenance activates to include complete replacement of the object or any of its components.
1.25 Design Model: is an object-based 3D model generated by the Design Team (individually or as a group) for the purposes of design analysis, Clash Detection and documentation.
1.26 Design Reviews: A process in which a 3D model is used to showcase the proposed design to the stakeholders and to help evaluate whether it has met deliverable requirements.
1.27 Digital Fabrication: A process that utilizes machine technology to prefabricate objects directly from a 3D Model. The Model is spooled into appropriate sections and input into fabrication equipment for production of system assemblies.
1.28 Digital Layout - BIM2Field: A process that allows information in a BIM to be transferred to digital layout tools for layout in conformance to the model. This information can be used to validate (QA/QC) the physical facility against the model.
https://www.nibs.org/?page=bsa_cobie
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 5 of 62
1.29 Disaster Planning - EM Preparation: A process in which emergency responders would have access to critical building information in the form of model and information system.
The BIM would provide critical building information to the responders, that would improve the efficiency of the response and, more importantly, minimize the safety risks.
The dynamic building information would be provided by a building automation system (BAS), while the static building information, such as floor plans and equipment schematics, would reside in a BIM model. These two systems would be integrated via a wireless connection and emergency responders would be linked to an overall system. The BIM coupled with the BAS would be able to clearly display where the emergency was located within the building, possible routes to the area, and any other harmful locations within the building.
1.30 Electrical Analysis: A process in which intelligent modeling software uses the BIM model to determine the most effective electrical system based on engineering and design specifications. These analysis tools and performance simulations can significantly improve the design of the facility and its energy consumption during its lifecycle in the future.
1.31 Energy Analysis: A process in which intelligent modeling software uses the BIM model to determine the most effective facility energy plan based on engineering and design specifications. These analysis tools and performance simulations can significantly improve the design of the facility and its energy consumption during its lifecycle in the future.
1.32 Existing Conditions Modeling: A process in which a project team develops a parametric 3D model of the existing conditions for a site, facilities on a site, or a specific area within a facility. This model can be developed in multiple ways depending on what is desired and what is most efficient. Once the model is constructed, it can be queried for information, whether it be for new construction or a modernization project.
1.33 Facility Data Exchange: A process where a facility data schema is developed to ensure information is supplied to the BIM in electronic form so that it can be easily exchanged between the BIM and the organizations selected tool. The capability should include textural as well as graphic entities.
1.34 Federated BIM: A BIM model which links (does not merge) several single-discipline models together. Federated Models do not merge the properties of individual models into a single database. A federated model is useful for design coordination, clash avoidance and clash detection, approvals processes, design development, estimating and so on, but the individual models do not interact, they have clear authorship and remain separate. This means that the liabilities of the originators of the separate models are not changed by their incorporation into the federated model.
1.35 IFC: Industry Foundation Classes, open sharable standards for building information as defined by the buildingSMART alliance, National Institute of building Sciences, Washington, DC. http://www.buildingSmart.org/compliance/certified-software
1.36 Information Manager: The BIM Protocol refers to and provides for the appointment of ‘Information Manager’ by the Consultants, Contractors or County. This is the project manager, or BIM Manager who is responsible for managing the processes of information exchange on projects, using BIM procedures and methods.
1.37 Integrated Project Delivery* (IPD): The owner’s goal who’s primary motive is to bring the teams together early on in the project. A full implementation of BIM also requires the project teams to collaborate from the inception stage and formulate model sharing and https://www.designingbuildings.co.uk/wiki/Federated_model https://www.designingbuildings.co.uk/wiki/Design_co-ordination https://www.designingbuildings.co.uk/wiki/Clash_avoidance https://www.designingbuildings.co.uk/wiki/Clash_avoidance https://www.designingbuildings.co.uk/wiki/Clash_detection https://www.designingbuildings.co.uk/wiki/Approvals https://www.designingbuildings.co.uk/wiki/Design_development https://www.designingbuildings.co.uk/wiki/Estimating https://www.designingbuildings.co.uk/wiki/Federated_model http://www.buildingsmart.org/compliance/certified-software https://en.wikipedia.org/wiki/Integrated_Project_Delivery
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 6 of 62 ownership contract documents. *NOTE: True IPD employs various constructs, many of which the County is precluded from using by state law. (such as the use of multi-party contracts, and profit sharing). The County’s integrated delivery approach leverages aspects of IPD that are allowed by law.
1.38 Laser Scanning and Point Cloud Integration: A process where the application is the controlled steering of laser beams followed by a distance measurement at every pointing direction. This is used to rapidly capture shapes of objects, buildings and landscapes. The point cloud generated is then interpreted by software to create a BIM of the existing conditions.
1.39 Life Cycle Assessment - Life-cycle assessment (LCA, also known as life-cycle analysis) is a cradle-to-grave environmental impact assessment for built assets, in terms of materials and energy. The energy and materials used, along with waste and pollutants produced as a consequence of a product or activity, are quantified over the whole life cycle; the result representing the environmental load of that asset. ISO 14040 defines LCA methodology.
1.40 Lighting Analysis: A process in which intelligent modeling software uses the BIM model to determine the most effective lighting method based on engineering and design specifications. These analysis tools and performance simulations can significantly improve the design of the facility and its energy consumption during its lifecycle in the future.
1.41 LOD: Level Of Development Specification for Building Information Models. See Section 3
– BIM/CADD Standards of Care and the current edition of the BIMForum LOD Specification for additional information. http://BIMForum.org/lod
1.42 Maintenance & Repair Information: A function to allow the collection and storage of maintenance and repair information about objects brought into a BIM.
1.43 Mechanical Analysis: A process in which intelligent modeling software uses the BIM model to determine the most effective mechanical system design based on engineering and design specifications. These analysis tools and performance simulations can significantly improve the design of the facility and its energy consumption during its lifecycle in the future.
1.44 Model Progression Schedule/Agent Responsible Matrix (MPS): A worksheet that is a guide for the project team to define model creation scope of work, minimum model level of development and responsible agent. The LOD will aid in determining the level of involvement of the project stakeholders from planning through facility turnover. This worksheet is intended to guide the project team in achieving project goals, accommodate required BIM uses, meet schedule requirements for the project and identify the responsible agents at differing phases of the project.
1.45 OmniClass: OmniClass Construction Classification System (OCCS), is a means of organizing and retrieving information specifically designed for the construction industry. This agreement incorporates Table 23 establishing National Standards for the classification of construction products. OmniClass uses MasterFormat and UniFormat as the basis of its Tables wherever possible. http://www.omniclass.org/about
1.46 Owner (County) Approval: A business process which takes advantage of information stored in a BIM to help validate progress as well as observing that the County’s intent for the facility is being honored both conceptually and contractually.
http://bimforum.org/lod http://www.omniclass.org/about
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 7 of 62
1.47 Phase Planning - 4D Modeling: A process in which a 4D model (3D models with the added dimension of time) is utilized to effectively plan the phased occupancy in a renovation, retrofit, addition, allow construction scheduling or to show the construction sequence and space requirements on a building site.
1.48 Programming: A process in which a spatial program is utilized to efficiently and accurately assess design performance in regard to spatial requirements. Use of the BIM model allows the project team to critically analyze space and understand the complexity of space standards and regulations for discussion with the County and other stakeholders.
1.49 PxP: Abbreviated form of (BIM PxP). See definition for BIM Project Execution Plan.
1.50 RAW Image Format: A camera raw image file contains minimally processed data from the image sensor of either a digital camera, a motion picture film scanner, or other image scanner. Raw files are named so because they are not yet processed and therefore are not ready to be printed or edited with a bitmap graphics editor.
1.51 Quality Assurance/Quality Control - QA/QC: QA/QC as a BIM Use refers to ensuring that the BIMs follow County requirements and all components of the approved BIM Execution Plan, and that the BIMs accurately represent the building geometry and data to meet the purposes for which they are developed.
1.52 Quantity Take Off (QTO): A model use representing how 3D models are used to calculate the quantity of Furniture, Fixtures and Equipment or building material to create a detailed measurement of materials and labor needed to complete a construction project.
Estimators review drawings, specifications and BIMs to find these quantities.
1.53 Record BIMs: The updated BIMs generated by the Architecture/Engineering Team of record that includes the Contractors’ As-Constructed BIMs.
1.54 Security - Key Management: A process to identify and evaluate the security zones in the facility using BIM. The process includes identifying the door keys required for openings through the security perimeters established to ensure that the level of security defined is maintained.
1.55 Site Analysis: A process in which BIM/GIS tools are used to evaluate properties in a given area to determine the most optimal site location for a future project. The site data collected is used to first select the site and then the position the building based on engineering criteria (e.g. solar path, utility availability, hazardous material).
1.56 Site Utilization Planning: A process in which a 4D model is used to graphically represent both permanent and temporary facilities on site, with the construction activity schedule.
Additional information incorporated into the model can include labor resources, materials and associated deliveries, and equipment location.
1.57 Space Management: A process in which BIM is utilized to effectively allocate, manage, and track space types, workspaces, occupancy and resources within physical spaces.
1.58 Specification Production: A data based three-part specification system linked to the objects selected in a BIM which responds to any changes or alternatives items added or subtracted from the model.
1.59 Structural Analysis: A process in which analytical modeling software utilizes the BIM design authoring model to determine the behavior of a given structural system. Based on this analysis further development and refinement of the structural design takes place to create effective, efficient, and constructible structural systems.
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 8 of 62
1.60 Sustainability & LEED Evaluation: A BIM process in which a project is evaluated based on LEED or other sustainability criteria. This can refer to materials, performance, or a process. Sustainability evaluations can be applied across all four phases of a construction project, Planning, Design, Construction, and Operation. Sustainability evaluation is most effective when it is done in planning and design stages and then applied in construction and operations phase.
1.61 Tolerance: Acceptable dimension or variation from precise material, fabrication, or assembled condition as a unit of measure to be specified allowable variations in strength, stability, dimension, the mix of a material, the performance of a system, temperature ranges and so on.
1.62 Total Cost of Ownership / Service Life: A financial estimate intended to help buyers and owners determine all direct and indirect costs of a product or system.
1.63 Virtual Design and Construction (VDC): The management of integrated multi-disciplinary performance models of design-construction projects, the work processes and organization of the teams to support business objectives.
1.64 Virtual Reality Simulation (VR): A Model Use where 3D models are part of an Immersive Environment where users experience simulated places, objects and processes. As opposed to Augmented Reality Simulation, VR may require full 'immersion' within multi-projection rooms and/or through stereoscopic goggles and other specialized gear.
1.65 Visualization: Any technique for creating images, diagrams, or animations to communicate information. BIM can be used as a tool to show visual clarity of simple and complex systems and data to help understand project scope, design options, constructability, coordination and for QA/ QC.
Section 2 Electronic Media
2.1 General Requirements:
2.1.1 All Work, including drawings, land surveying work, maps, details or other drawing information to be provided in electronic media by Consultant shall be accomplished and developed using Computer-Aided Design and Drafting (CADD), or Building Information Modeling (BIM), or a coordinated combination of both as determined by the Contract Administrator and may also include other software and procedures conforming to the following criteria.
2.2 BIM and CAD/CADD Graphic Formats:
2.2.1 Provide all CAD/CADD data in Autodesk, Inc.’s AutoCAD release 2025 or higher for Windows in native .dwg electronic digital format. CAD/CADD data required for Contract submittals shall be provided in native .dwg format. Provide copies of all drawing sheets or other CAD/CADD and/or PDF format produced documents intended for hardcopy plotting or printing in plot (.plt) and drawing web format (.dwf) versions of all sheets/documents.
https://www.designingbuildings.co.uk/wiki/Variations https://www.designingbuildings.co.uk/wiki/Temperature
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 9 of 62
2.2.2 Provide all BIM models and data in Autodesk Revit 2025 or higher. Provide all BIM and data in any of the following software formats:
a. Autodesk, Inc. Revit 2025 or higher.
b. Alternative compatible BIM software formats that conform to the requirements of Section 2.2 of this Attachment if accepted in writing by t h e County’s Contract Administrator.
2.2.3 BIM data required for Contract submittals shall be provided in their native (.rvt typical) format as well as .ifc format in conformance with IFC (Industry Foundation Classes) IFC2x4 or higher, as established by the buildingSMART International Alliance for Interoperability. Use of BIM vendor’s or systems that incorporate the International Alliance for Interoperability IFC standard above are acknowledged but their use must be approved in writing in advance by the County’s Contract Administrator and otherwise comply with this Attachment.
2.2.4 Building Positioning to be accomplished for the intended project site by using “Auto – by Shared Coordinates” process or similar. Obtain State Plane Coordinates from Project survey information and utilize this same positioning process for all BIM files.
2.2.5 CAD/CADD data required for Contract submittals shall be provided in native .dwg format or be contained within the structure of the BIM data required in Section 2.2.2.
a. Ensure that all digital files and data (e.g., constructs, elements, base files, prototype drawings, reference files and images, blocks, attribute links, pen settings and all other files external to the drawing itself) are Compatible Data with the Contract Administrator's target BIM and/or CADD system (i.e., BIM and CADD software, platform, database software), and adhere to the standards and requirements specified herein.
2.2.6 Target platform: A personal computer with Windows 10 operating system that meets or exceeds the minimum manufacturer’s requirements to operate the version of software utilized for the project.
2.2.7 Any non-graphical database delivered with prepared drawings must be provided in relational database format compatible with Microsoft Access 2016 or higher, or other compatible SQL format database. All database tables must conform to the structure and field-naming guidance provided upon request by the Contract Administrator.
a. Maintain all linkages of non-graphical data with graphic elements, relationships between database tables, and report formats.
2.2.8 CAD/CADD Standards:
a. Standard plotted drawing size: 24-inch x 36-inch sheets (Arch D-sized sheet)
b. Coordinate with the Contract Administrator concerning the standard file naming protocol to be utilized.
c. Drawing Set Organization and Sheet Identification per the United States National
CAD Standard - V5. Provide dots in lieu of dashes at all uses.
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 10 of 62
2.2.9 CAD/CADD Layering:
a. Conform to the guidelines defined by the American Institute of Architect's (AIA) standard document, U.S. National CAD standards version 5 (V5). “CAD Layer Guidelines”, 2nd edition or later.
b. Provide an explanatory list of which layers are used at which drawing and an explanatory list of all layers which do not conform to the standard AIA CAD Layer Guidelines including any user definable fields permitted by the guidelines.
c. Layering: The Contract Administrator may, from time to time, supplement the AIA
CAD Layer Guidelines with the Contract Administrator's specific requirements for Facilities or Construction Management and other related information. Obtain latest Contract Administrator specific layering from Contract Administrator prior to production of documents and incorporate into drawings.
2.2.10 Attribute Definitions:
a. Obtain latest guidance from the Contract Administrator concerning attribute definition, database linking and other information embedding requirements prior to production of documents.
2.2.11 Federated Models: The following colors shall be utilized for all federated models including Design, Construction, Coordination, As-Constructed, and Record Models:
a. Architectural Models
1. Architectural - White
2. Envelope (Curtainwall, Precast, Other) - Default
3. Masonry - Gray
b. Civil & Site Improvement Model
1. TBD
c. Structural Models
1. Steel – Maroon
2. Concrete - Gray
3. Masonry - Gray
d. MEP/FP Models
1. Mechanical Ductwork Supply - Blue
2. Mechanical Ductwork Return - Magenta
3. Mechanical Ductwork Exhaust – Medium Orchid
4. Mechanical Piping Supply – Gold
5. Mechanical Piping Return- Violet
6. Electrical Conduit – Light Yellow
7. Cable Tray- Dark Orange
8. Electrical Lighting – Light Golden Rod Yellow
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 11 of 62
9. Plumbing Domestic Water - Lime
10. Plumbing Storm / Roof Drain – Dark Green
11. Plumbing Waste / Vent - Olive
12. Medical Gas – Light Green
13. Fire Protection - Red
14. Fire Alarm – Golden Rod
15. Data/IT / Controls - Aqua
16. Pneumatic Tubing – Dark Slate Gray
e. Miscellaneous Models
1. Framing – Sandy Brown
2. Equipment Models (by Equip. Planners) – Burly Wood
3. Clearances - Dark Red
2.2.12 Deviations from Standards:
a. Submit a written request for approval of any deviations from the Contract Administrator's established electronic media standards. Pre-coordinate the development, use and submittal of 3-D modeling, Building Information Models (BIM), photo-realistic renderings, animations, presentations and other visualization/information tools utilized during the design and construction process to ensure compatibility of submittal with County's intended use and information systems.
b. No deviations from the County’s established BIM/CADD standards will be permitted unless prior written approval of such deviation has been received from the Contract Administrator.
c. Contract Administrator reserves the right to review, accept or reject AutoCAD files, BIMs and other Digital Deliverables. If the Digital Deliverables do not comply with the provisions of the agreement between County and the External Project Team member, the External Project Team member will be required to correct the work at no additional cost to County or delay to the Project Schedule.
d. Contract Administrator also reserves the right to review, accept or reject Facility Data deliverables when required by contractual agreements. To ensure successful integration into County’s CAFM software, milestone reviews may be conducted by County to export or link BIM data into these designated programs to ensure compatibility and capability. During the development of the BIM PxP, the required BIM outputs allowing for this integration will be determined. If the Facility Data integration with the computer aided facility management software fails because of the BIMs non-compliance with the provisions of the agreement between County and the External Project Team member, or the data imported does not accurately reflect the current state of the Project, the External Project Team member will be required to correct the work at no additional cost to the owner or delay to the Project Schedule.
2.3 Non-BIM/CADD Graphic Format:
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 12 of 62
2.3.1 Provide digital photography files and other miscellaneous graphics in High Resolution JPEG, PDF in 600 dots per inch (dpi) or higher resolution or PNG format.
Provide RAW files when available.
2.4 Non-Graphic Format:
2.4.1 Provide word processing files in Microsoft Word 2016 or higher compatible file formats including all fonts, typefaces, bitmap and vector graphics and other information necessary for remote printing.
2.4.2 Provide spreadsheet files in Microsoft Excel 2016 or higher for windows compatible file formats including all fonts, typefaces, bitmap and vector graphics and other information necessary for remote printing.
2.4.3 Provide database files in relational database format compatible with Microsoft Access 2016 or higher, PDF or other compatible SQL format database including all tables, form and report formats, fonts, typefaces, bitmap and vector graphics and other information necessary for remote printing. Ensure integrity of relational database structure.
2.5 Delivery Media and Format:
2.5.1 Submit copies of all BIM/CADD data and other electronic files developed under this contract on electronic digital media as required for project phase submittals to 400 dots per inch (dpi) resolution.
2.5.2 Provide electronic digital data and files on labeled ISO-9660 CD-ROM., DVD’s, Flash drives or other acceptable alternatives if approved by the Contract Administrator.
Each device or disc shall contain identifying County project information in their disk name.
2.5.3 The electronic digital media shall be in the format which can be read and processed by the Contract Administrator's target CADD or BIM system. See also Section 2.2.
2.5.4 The external label or archival case for each electronic digital media shall contain, as a minimum, the following information:
a. The Project Number, Project Title and date.
b. The Facility Name
c. The format and version of operating system software.
d. The name and version of utility software used for preparation (e.g., compression/decompression) and copying files to the media.
e. A list of the filenames, (a separate sheet will be accepted).
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 13 of 62
2.5.5 Before a CADD file is placed on the delivery electronic digital media, the following procedures shall be performed:
a. Ensure that drawing sheets, viewports, paper-space, line weights, fonts, and other drawing components are correctly configured for Contract Administrator's viewing and plotting.
b. Make sure all reference files are attached using a “relative” path setting and without device or directory specifications.
c. Transmit function should be used in AutoCAD to assemble files for submittal. For each 2D drawing, provide one bound file containing drawing sheet with associated XREFs and one un-bound file containing the associated XREFs.
d. Compress and reduce all design files using PKZIP, WINZIP or other compatible file compression/decompression software approved by the Contract Administrator. If the file compression/decompression software is different from that specified above, then an electronic digital media copy of the file compression/decompression software shall be purchased for the Contract Administrator and provided with the delivery media.
e. Include all files, both graphic and non-graphic, required for the project (i.e., color tables, pen tables, font libraries, block libraries, user command files, plot files, and other elements of drawing definition). All blocks not provided as Contract Administrator-furnished materials must be provided as a part of the electronic digital deliverables.
f. Make sure that all support files such as those listed above are in the same directory and that references to those files do not include device or directory specifications.
g. Document any fonts, tables, or other similar customized drawing element developed by Consultant or not provided among Contract Administrator-furnished materials. Contractor shall obtain Contract Administrator approval before using anything other than Contract Administrator's standard fonts, line types, tables, blocks, or other drawing elements available from Contract Administrator.
h. Include any standard sheets (i.e., abbreviation sheets, standard symbol sheets, or other listing) necessary for a complete project.
i. Check completed files are free of any known viruses or unrequired attachments.
2.6 Drawing Development Documentation:
2.6.1 Provide the following information for each finished drawing in the nonplot layer X
****-NPLT:
a. How the data were input (e.g., keyed in, downloaded from a survey total station instrument (include name and model), and other identification data).
b. Brief drawing development history (e.g., date started, modification date(s) with brief description of item(s) modified, author's name, and other identifying data.).
c. The names of the reference, blocks, symbols, details, tables, and schedule files required for the finished drawing.
d. Layer assignments and lock settings.
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 14 of 62
e. Text fonts, line styles/types used, and pen settings.
2.7 Submittals / Deliverables:
2.7.1 Submit as Project Record Documents specified above and as required for project phase submittals and project record documents.
2.7.2 Submit electronic media with a transmittal letter containing, as a minimum, the following information:
a. The information included on the external label of each media unit (e.g., CD, DVD, flash drive, etc.), along with the total number being delivered, and a list of the names and issue dates of all files on the media.
b. Brief instructions for transferring the files from the media.
c. Confirm that all delivery media is free of known computer viruses. A statement including the name(s) and release date(s) of the virus-scanning software used to analyze the delivery media, the date the virus-scan was performed, and the operator's name shall also be included with the certification. The release or version date of the virus-scanning software shall be the current version that has detected the latest known viruses at the time of delivery of the digital media.
d. The following “Plot File Development and Project Documentation Information” as an enclosure or attachment to the transmittal letter provided with each electronic digital media submittal:
1. List of all new figures, symbols, tables, schedules, details, and other blocks created for the project, which were not provided to Consultant with the Contract Administrator-furnished materials, and any associated properties.
2. List of all database files associated with each drawing, as well as a description and documentation of the database format and schema design.
3. Recommended modifications which will be necessary to make the data available for GIS use.
2.7.3 Prime Contractors are responsible for ensuring that the Digital Deliverables prepared by their Subcontractors or Subconsultants comply with the standards and policies outlined in this document.
2.8 Ownership:
2.8.1 County has ownership and all rights to all finished or unfinished digital deliverables developed for this Project. Any digital deliverables generated under any County Consulting or Construction Agreements or Contracts, including those generated by the External Project Team Members’ Subcontractors or Subconsultants, shall become the property of County. County will have unlimited use of the digital deliverables produced for the Project. County acknowledges that the digital deliverables are an instrument of service of the external project team member and that the author of the digital deliverable does not represent or guarantee that the digital deliverable will be useful to County for any purposes beyond those uses that they were authored.
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 15 of 62
2.8.2 County will have unlimited rights under the Agreement of which this document is a part to all information and materials developed under these and other contractual requirements and furnished to the Contract Administrator and documentation thereof, reports, and listings, and all other items pertaining to the work and services pursuant to this agreement including any copyright.
2.8.3 Unlimited rights under this contract are rights to use, duplicate, or disclose text, data, drawings, and information, in whole or in part in any manner and for any purpose whatsoever without compensation to or approval from author except where otherwise limited within the Contract.
2.8.4 The Contract Administrator will at all reasonable times have the right to inspect the work and will have access to and the right to make copies of the above-mentioned items.
2.8.5 All text, electronic digital files, data, and other products generated under this contract shall become the property of County except where otherwise limited within the Contract.
2.9 Contract Administrator-Furnished Materials to the Construction Contractor:
2.9.1 The Contract Administrator and Consultant may make various electronic information available to the Contractor during the Pre-Construction and Construction phases of the Project. To this end, Consultant shall make the following information available to the Contractor in electronic format:
a. Work-files: Selected work product files, copies of BIM and/or CAD files, reports, spreadsheets, databases, specifications, drawings and other documentation of Consultant's work in progress may be provided to the Contractor, Managing General Contractor, or other County consultant on an as required basis.
Consultant shall cooperate and facilitate the secure exchange of these electronic media documents.
b. Where electronic media submittals of final site surveys are required: Provide electronic copies of any existing site survey data already on electronic media conforming to Section 2.2 of this Attachment.
c. Where Electronic Project Record Documents are required, Consultant will provide the Contractor one set of contract drawings in an electronic file format conforming to Section 2.2 of this Attachment, to be used for as-constructed drawing markups at the Contractor's option. Make electronic file drawings available on media in conformance with Section 2.5 of this Attachment.
2.10 Other Digital Information:
2.10.1 A variety of digital information may be generated by participants in the design process including the Contract Administrator, Consultant, Subconsultants, Contractor, RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 16 of 62 subcontractors, the Contract Administrator's commissioning authority, local jurisdictional authorities and other project team members.
2.10.2 Consultant shall facilitate and participate in this digital exchange of information by conforming to the standards expressed above and as further described in Attachments.
Section 3 BIM/CADD Standards of Care
3.1 General Provisions:
3.1.1 The Model(s) shall be developed to include the systems described below as they would be built, the processes of installing them, and to reflect final As-Constructed construction conditions. The deliverable 3D Model at all phases shall be developed to include as many of the systems described below as are necessary and appropriate to the design/construction stage. The BIM shall be provided in an editable form and from its inception shall include automatic model positioning using a common reference point (Point of Origin), based on “Florida State Plane Coordinates” derived from the project survey.
3.1.2 The Model shall be developed using Building Information Modeling (“BIM”) supplemented with Computer Aided Drafting and Design (“CADD”) content as necessary to produce a complete set of Construction Documents.
3.1.3 Provide all Building Information Modeling (BIM) for Space Management and Program Validation in conformance to the General Service Administration’s (GSA) “Building Information Modeling Guide 02 -Spatial Program Validation,” dated May 21, 2015 or later. Provide space identification, charts and information in conformance with this Guide.
3.1.4 The parties shall utilize the appropriate Levels of Development (LOD) described below in completing the Model, which establishes the required LOD for each Model Element at each phase of the Project.
3.1.5 The following Level of Development (LOD) descriptions are summaries of Level Of Development Specification for Building Information Models as developed by BIMForum.
(http://bimforum.org/lod), current edition (2017 or later). Each subsequent LOD builds on the previous level and includes all the characteristics of previous levels. See also “Section 5 BIM Model Progression Schedule” for examples and graphic descriptions of Levels of Development. The following list is a simplified summary of the adopted Levels of Development:
• LOD 100 elements are not geometric presentations. They may be symbols or other generic representations of information that can be derived from other model elements. Any information derived from LOD 100 elements must be http://bimforum.org/lod
RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 17 of 62 considered approximate.
• LOD 200 elements are represented graphically but are generic placeholders, e.g., volume, quantity, location, or orientation. Any information derived from LOD 200 elements must be considered approximate.
• LOD 300 elements are graphically represented as specific systems, objects, or assemblies from which quantity, shape, size, location, and orientation can be measured directly, without having to refer to non-modeled information such as notes or dimension callouts.
• LOD 350 elements are enhanced beyond LOD 300 by the addition of information regarding interfaces with other building systems. For example, an LOD 350 masonry wall element would include jamb conditions, bond beams, grouted cells, dowel locations, and joints – information that enables the model user to coordinate the wall element with other systems in the structure.
• LOD 400 elements are modeled at sufficient detail and accuracy for fabrication of the represented component.
NOTE - County and the LOD Specification do not address LOD 500 since that LOD relates to field verification and is not an indication of progression to a higher level of geometry or information.
3.1.6 The parties shall utilize the appropriate Levels of Development (LOD) described below in completing the Model, which establishes the required LOD for each Model Element at each phase of the Project. LODs and Model Definition: There is no such thing as an “LOD ### model.” As previously noted, project models at any stage of delivery will invariably contain elements and assemblies at various levels of development. As an example, it is not logical to require an “LOD 200 model” at the completion of the schematic design phase. Instead, the “100% SD Model” will contain modeled elements at LOD 100 as well as various other levels of development. Consultants will be required to submit a LOD Model Progression as part of the Project Execution Plan.
3.2 Level of Development (LOD) – Expanded Descriptions
3.2.1 LOD 100: (Predesign preferred) and Schematic Design (Basic Services)
a. Model Content Requirements: Overall…