14-Attachment 3 - BLD2129865P1.pdf

PDF 81 KB Posted

Attached to
Container Crane Maintenance and Repair
Solicitation number
BLD2129865P1
Issued by
Broward County, Florida

About this file

Attachment 3 is a Post-Operational Check List form designed for use after crane service operations. The standardized document provides a comprehensive seven-point inspection protocol for technicians to systematically verify the condition and safety of equipment and work areas following crane operations. The checklist requires technicians to confirm the clearance of ships, docks, and work areas of debris, and to conduct detailed inspections of critical crane components including the panzer belt, gantry components, and spreader/lifting devices.

The form includes columns for recording "Yes", "No", or "N/A" responses to each inspection item, with a dedicated "Recommendations" column for noting any findings or required actions. The document is intended to ensure thorough post-operational documentation and maintenance of crane equipment, with a final instruction to "REPORT ALL POSTOP FINDINGS". Space is provided at the top of the form to record specific details such as date, manufacturer, technician name, location, serial number, and model number, allowing for precise tracking and documentation of each crane's service completion.

View the file

Other files

File Type Posted
16-Attachment 2 - BLD2129865P1.pdf PDF
2-RFP-RFQ-RLI Domestic Partnership Act Certification.docx DOCX document
12-Criminal History Screening Practices Certification.docx DOCX document
15-Attachment 1 - BLD2129865P1.pdf PDF
17-Bid Bonds, Performance and Payment Bonds, and Surety Qualification Requirements.pdf PDF
21-Attachment 4 - Equipment Preventative Maintenance Frequency - BLD2129865P1.pdf PDF
23-Living Wage Ordinance Requirements.docx DOCX document
24-Location Certification - RFP-RFQ-RLI.docx DOCX document
26-Insurance Requirements - BLD2129865P1.pdf PDF
3-Summary of Vendor Rights for Broward County Competitive Solicitations.docx DOCX document
6-OESBD Ownership Disclosure.docx DOCX document
11-Litigation History.docx DOCX document
18-Vendor Reference Verification - RFP-RFQ-RLI.docx DOCX document
5-OESBD Affiliated Entities of the Principals Certification.docx DOCX document
7-RFP-RFQ-RLI Agreement Exceptions.docx DOCX document
9-Subcontractors-Subconsultants-Suppliers Requirement.docx DOCX document
1-OESBD - Procurement Preferences SBE-CBE.docx DOCX document
10-Security Requirements.docx DOCX document
13-Workforce Investment Program Requirements.docx DOCX document
19-Vendor Questionnaire and Standard Certifications - RFP-RFQ-RLI.docx DOCX document
20-Evaluation Criteria - BLD2129865P1.pdf PDF
22-Scope of Services - BLD2129865P1.pdf PDF
25-Instructions to Vendors - RFP-RFQ-RLI.pdf PDF
4-Lobbyist Registration Requirement Certification.docx DOCX document
8-RFP-RFQ-RLI Volume of Previous Payments Attestation.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

Post-Operational Check List

DATE: MANUFACTURER:

TECHNICIAN: SERIAL NO.

LOCATION: MODEL NO.

The following is a check list to be completed after any crane has completed service:

Description Yes No N/A Recommendations

1. Confirm all ships equipment is clear of crane

2. Confirm dock is clear of debris etc.

3. All debris on dock in the path of the crane removed

4. All debris between WS rail and edge of dock removed

5. Inspect the panzer belt over the length of the operation

6. Inspect gantry components for damages or malfunction

7. Inspect spreader and/or lifting device for damages or malfunction

REPORT ALL POSTOP FINDINGS

File details come from the government source that posted it. Updated .