14-6A - COD ENVIRONMENTAL BEST MGMT PRACTICES - CONSTRUCTION.pdf
PDF 924 KB Posted
- Attached to
- Dallas Love Field Garages A & B Repairs Re-bid
- Solicitation number
- CIZ25-AVI-3197
- Issued by
- Dallas County, Texas
About this file
This document is the City of Dallas Environmental Best Management Practices (BMP) guide for construction projects, developed by the Office of Environmental Quality and Sustainability (OEQS) and aligned with ISO 14001:2015 standards. The comprehensive manual provides detailed environmental guidelines and requirements for contractors working on City of Dallas construction projects, which include exterior work involving ground disturbance, infrastructure construction, improvements, and site upgrades. The document outlines specific environmental responsibilities, best practices, and compliance expectations across multiple areas such as erosion control, waste management, spill prevention, chemical storage, tree protection, and emission reduction strategies.
The guide requires contractors to complete a "Contractor Environmental Responsibilities Acknowledgement Form" before commencing work, demonstrating their understanding and commitment to environmental stewardship. Contractors must adhere to federal, state, and local environmental regulations, implement pollution prevention measures, and minimize environmental impacts during construction activities. Key focus areas include maintaining erosion and sediment controls, properly managing waste and recyclables, protecting trees and natural areas, preventing spills and releases, conducting environmentally sound fueling operations, and reducing emissions. The document also provides contact information for the City's environmental departments and references various regulatory frameworks, including TPDES Municipal Separate Storm Sewer System permit requirements and the City's Comprehensive Environmental & Climate Action Plan (CECAP).
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e | 1
COD-BMP-001 Revision 1 Effective Date: 6/1/2022
City of Dallas Environmental Best Management Practices for Construction Projects
P a g e | 2
In this document:
• City of Dallas Environmental Policy
• Environmental Best Management Practices for contractors working with the City of
Dallas
• Contractor Environmental Responsibilities Acknowledgement Form. Contractors involved in construction and hired by the City of Dallas must sign this form before work commences. Construction includes exterior work involving ground disturbance, construction of new infrastructure, improvement of existing infrastructure and upgrades to a site
Index
Purpose Pg. 3 Instructions Pg. 3 City of Dallas Environmental Policy Pg. 4 Compliance Pg. 5 Awareness and Competence Pg. 5 Environmental Best Management Practices Pg. 6 Erosion and Sediment Control Pg. 6 Soil Conservation and Stockpiles Pg. 7 Saw Cutting and Coring Pg. 8 Tree Protection Pg. 9 Waste Management & Recycling Pg.10 Offsite Disposal of Excavated Soil or Material Pg.11 Working Next to/in Creeks, Drainage Channels, & Other Surface Water Pg.12
Spills and Releases Pg. 13 Reporting to a Regulatory Agency Pg. 13 Cleaning Up a Spill or Release Pg. 14 Fueling Vehicles and Equipment Pg. 15 Contamination Discover Pg. 15 Chemical/Oil Storage Pg. 16 Imported Fill Material Pg. 16 Vehicle Idling Pg. 17 Emission Reduction Strategies for Construction Sector Pg. 17
BMP for Construction Sites Pg. 18 Useful City of Dallas Sources of Information Pg. 19 Useful Acronyms Pg. 20 References Pg. 21 Disclaimer Responsibilities Acknowledgement Form Pg. 22
P a g e | 3
Purpose
The City of Dallas (City) is committed to environmental compliance, environmental stewardship, and environmental sustainability. The City achieves this commitment by systematically reducing environmental impacts through pollution prevention, regulatory compliance, and continuous improvement. To manage this commitment, the City has developed an Environmental Management System (EMS) per the ISO 14001:2015 standard. Contractors shall be knowledgeable and aware of the specific environmental impacts and environmental regulatory requirements of your work conducted on behalf of the City.
Instructions
• Contractors for the City shall review and sign the City of Dallas Contractor
Environmental Responsibilities Acknowledgement Form prior to beginning work.
• Contractors shall communicate this information to onsite personnel that are engaged in carrying out the work or providing material to the job site. This includes informing subcontractors. The City reserves the right to review the information in this document with you and your personnel.
P a g e | 4
City of Dallas Environmental Policy
The City of Dallas is committed to a clean, safe, and healthy environment. As such, we will exercise environmental stewardship in our dealing with employees, other governments, citizens, City contractors, businesses, and others in the community for our world today and for future generations. Caring for the environment is one of our core values, and this is demonstrated by ensuring our activities are in harmony with the natural world around us.
This commitment is embodied by the following actions:
• Implementation of programs and procedures with an intent to meet or exceed all applicable environmental laws and regulations.
• Continual improvement of our environmental performance through proactive environmental management and self-assessments and/ or third-party assessments.
• Prevention of pollution at its source through implementation of best management practices and resource conservation measures to reuse, reclaim, and recycle materials we generate.
• Utilization of Environmental Management Systems (EMS), as appropriate for our operations, to provide a framework for systematically reviewing and reducing our environmental footprint.
Focal points of the City’s Environmental Policy
• Compliance
• Continual Improvement
• Pollution Prevention
P a g e | 5
• Employees abiding by all environmental regulations and demonstrate environmental compliance in their daily work practices.
• Educating City employees on Dallas’ environmental policies motivating and encouraging employees to practice environmental stewardship by raising awareness and sensitivity to environmental issues through City policies, regulations, training, and interactive dialogue.
• Outreach to the citizens and businesses of our community through communication of this policy and education on the importance of environmental stewardship for clean air, clean water, and sustainable development for the City of Dallas
P a g e | 6
Compliance
The United States has enacted environmental laws and regulations to protect the environment and minimize pollution. Contractors are required to know which of these federal, state, and local regulations apply to your operations in and for the City.
Contractors shall be responsible for obtaining all approvals and permits related to site activities and maintaining documented compliance with all applicable regulations. Failure to comply with regulations can result in civil and/or criminal penalties.
Awareness and Competence
Contractors/Vendors/Consultants working on behalf of the City shall be competent to perform the work and shall be aware of applicable environmental requirements. Achieve awareness and competence through proper education, training, and experience. Subcontractors shall also be aware of their environmental responsibilities and competency to perform their work.
The City hosts education and training sessions on environmental requirements and responsibilities. For training specific to construction projects, contact the Stormwater Management Division of the Office of Environmental Quality & Sustainability at 214-948-4022 or StormWater@dallascityhall.com or visit www.WhereDoesItGo.com. The Office of Environmental Quality & Sustainability Stormwater Management Division provides Construction General Permit workshop training and on-site training upon request. Please contact the Office of Environmental Quality & Sustainability for education and training schedules and to request training at 214-670-1200.
P a g e | 7
Environmental Best Management Practices
When working on City projects, the guidelines outlined below must be followed for activities involving:
• Erosion and sediment control
• Erosion and sediment control practices required by your contract
• Soil conservation and stockpiles
• Saw cutting and coring
• Tree protection
• Waste management and Recycling
• Offsite Disposal of Excavated Soil or Material
• Properly Responding to Spills and Chemical Releases
• Fueling Vehicles and Equipment
• Contamination Discovery
• Chemical/ Oil Storage
• Imported Fill Material
• Vehicle(s) idling
• Comprehensive Environmental & Climate Action Plan (CECAP)
• Emission Reduction Strategies for Construction Sector
• Best Management Practices for Construction Sites
Erosion and Sediment Control
Construction activities can result in soil erosion and sedimentation, which if left uncontrolled, can harm the environment. This may include the loss of valuable topsoil and sediment to rivers and other water bodies. To reduce environmental impacts from construction activities, the following precautionary measures are required to control soil erosion, waterway sediment, and airborne dust generation:
• Create and implement a Stormwater Pollution Prevention Plan (SWP3) that conforms to the erosion and sediment control requirements of the Texas Pollutant Discharge Elimination System (TPDES) Construction General Permit (CGP) TXR150000
• Create and implement local erosion and sedimentation control standards and codes
The SWP3 plan shall describe the measures implemented to accomplish the following objectives:
• Prevent loss of soil during construction due to stormwater runoff and or wind erosion, including protecting topsoil by stockpiling for reuse
• Prevent sediment discharges to the storm sewer system or receiving streams
• Prevent polluting the air with dust and particulate matter
The CGP applies only to construction sites 1 acre or greater in size, or within ¼ mile of another construction site (common plan of development). Dallas City Code prohibits discharges of polluted stormwater regardless of the source. Information on the Texas Pollutant Discharge Elimination System (TPDES) Construction General Permit TXR150000 can be found at https://www.tceq.texas.gov/permitting/stormwater/construction/TXR15_AIR.html.
P a g e | 8
Erosion and Sediment Control Practices Required by Your Contract
Contractors employed by the City must comply with the latest approved edition of the North Central Texas Council of Government’s Public Works Construction Standards including the provisions contained in the City’s annex.
Erosion and sediment control practices during construction can be found in Division 200 “Site Protection and Preservation” and Division 1000 “Erosion and Sediment Control”. At https://www.nctcog.org/envir/public-works/construction-standards and https://www.nctcog.org/nctcg/media/Environment-and- Development/Documents/Public%20Works/Standards/Dallas_NCTCOG_2011addendum.p df.
In addition, your project must comply with the latest approved City of Dallas Drainage Design Manual. See https://dallascityhall.com/departments/public-works/DCH%20Documents/Public%20Works/pdf/Drainage%20Design%20Manual_091019.
pdf.
Soil Conservation and Stockpiles
Soil conservation and stockpiling is common to City operations and construction. There are several potential environmental issues related to stockpiling of soil including: dust generation, increased erosion, and mobilizing sediment that will block watercourses and the storm sewer system.
Appropriate soil conservation and stockpiling practices that prevent or eliminate erosion and the loss of topsoil may include, but are not limited to, the following:
• Disturb only the area necessary to accomplish the current phase of construction
• Minimize the amount of soil exposed during construction activity
• Preserve existing vegetation whenever possible by following a planned, organized sequence of construction activities
• Locate stockpiles away from catch basins, inlets, watercourses, and water bodies
• Store soil on flat grades
• Minimize storage time
• Employ protective measures, such as tarps (above and below) to protect the soil erosion.
• Contain stockpiles with a perimeter control such as silt fence or organic filter tube fence
P a g e | 9
Saw Cutting and Coring
Slurry generated from saw cutting and coring activities may contain several contaminants including sediment, hydrocarbons, and elevated pH levels in the runoff. If operations include saw cutting or coring, the resulting slurry must not enter the stormwater system or water bodies. Federal, state, and City code prohibits the discharge of substances to the stormwater system and water bodies that can result in adverse effects on the environment or the City infrastructure.
Some recommended methods for controlling releases can include, but are not limited to, the following:
• Minimize the amount of water being used to cool the saw
• Avoid performing saw cutting or coring operations during wet or windy weather
• Contain the slurry in the work area using sediment controls
• Cover/block sewer inlets or gutters to prevent slurry from entering
• Collect slurry using appropriate vacuum equipment
• Use saws with built-in slurry containment system
P a g e | 10
Tree Protection
Trees are an important part of an urban environment.
Trees can:
• Reduce the urban heat-island affect
• Reduce water run-off
• Prevent soil erosion
• Muffle noise
• Absorb dust and other pollutants
• Improve air quality
• Sequester carbon to reduce potential for climate change
• Provide wildlife habitat
• Help conserve energy
Trees may become stressed due to drought, shifts in temperature, and shorter cold seasons that encourage parasites. Recently, due to redevelopment and construction activities, trees are facing new stressors which put them in jeopardy and can result in a loss of resources for the City. Construction damage often occurs to the root system because of compaction, trenching, soil contaminants, and erosion. Follow the tree protection guidelines below:
• Establish a root protection zone equal to 1.25 feet in width for each inch in tree diameter (measured at
4.5 feet above the ground)
• The root protection zone shall be fenced, mulched, watered, and monitored during construction activities.
• Prohibit construction activities, personnel, and equipment in this area
• Avoid filling and grading (adding or taking away) 2 inches or more of the soil prevalent around the tree protection zone. Consider a no fill or grade zone for the entire root protection zone for trees that are to be retained on site
• Excavate the edge closest to the root protection zone using an air spade followed by severing roots cleanly with a saw. Avoid tearing or crushing roots with a bulldozer, backhoe, or similar equipment
Tree Protection Requirements per City of Dallas Park and Recreation Department (http://www.dallasparks.org/documentcenter/view/3178)
• Existing trees shown to remain are to be protected during construction
• Chain-link fencing (min. 4'-0"height) shall be installed at the drip line of all trees or tree groups to remain
• Vehicle parking and performing work in these areas other than shown on the plan, will not be allowed
• The tree protection shall remain during construction
• Other tree protection measures shall be in accordance with the city's standards and ordinances
• Waste material disposal such as, but not limited to, paint, asphalt, oil solvents, concrete, mortar, etc. within the canopy area of the existing trees shall not be allowed
• No attachments or wires of any kind, other than those of a protective nature, shall be attached to any tree
• No fill or excavation of any nature shall occur within the drip line of a tree to be preserved, unless there is a specified well or retaining wall shown on the grading plan
P a g e | 11
Waste Management and Recycling
The City undertakes many activities that generate waste and recyclables. If improperly managed, waste can negatively impact the environment.
Waste storage shall be stored on site, in a manner that limits waste exposure to stormwater, wind, and weather. Sealed waste drums must be kept closed when not in use. Bins and containers should be stored under cover. Secondary containment shall be provided for all containers of hydrocarbons and hazardous materials.
There are several federal, state, and municipal laws or ordinances that require proper handling, storage, transportation, and disposal of non-hazardous and hazardous wastes. The contractor is responsible for adhering to the regulatory requirements that apply to the work being performed. Contractors are also responsible for ensuring that waste material is disposed of at an approved registered facility in accordance with these laws.
The City operates one landfill and three transfer stations.
McCommas Bluff Landfill accepts commercial waste, household waste, municipal waste, grass clippings/brush, and appliances. The landfill has an acceptance policy.
Soils shall be tested to ensure compliance with soil acceptance policy prior to disposal.
See policy and form here
The transfer stations accept recyclables, grass clippings, and municipal waste.
City transfer stations are:
• Northeast (Fair Oaks) Transfer Station
• Northwest (Bachman) Transfer Station
• Southwest (Oak Cliff) Transfer Station
McCommas Bluff Landfill (MBLF) is a Type I landfill (30 TAC §335.5) Municipal Solid Waste (MSW) facility. The facility is therefore strictly prohibited from accepting any hazardous waste, Class 1 waste, Liquid Waste, and some Special Waste.
MBLF may only accept Class 2, Class 3, Municipal Solid Waste, and some Special Waste (on a case-by-case basis).
Some Special Waste is accepted with an Approved McCommas Bluff Landfill Special Waste Application, which shall be submitted with analytical laboratory analysis and results from an accredited lab. Environmental Site Assessments (ESA) may be necessary.
Environmental Laboratory (NELAP) Accreditation information can be found on National
Environmental Laboratory Accreditation Program (NELAP) website at https://www.tceq.texas.gov/agency/qa/env_lab_accreditation.html https://www.tceq.texas.gov/@@site-logo/TCEQ-1072x1072.png.
For more information on disposal options and services, please contact Department of Sanitation Services customer service and visit their website at
P a g e | 12
(214) 670-5111 https://dallascityhall.com/departments/sanitation/pages/mccommas_bluff.aspx For additional information on municipal solid wastes Chapter 18 Municipal Solid Wastes
Contractors are required to determine whether the waste generated is either hazardous or of some other category of regulated solid waste. Generated hazardous waste must have the following:
• a hazardous waste management program to include an emergency response plan
• staff appropriately trained and competent in hazardous waste management
• appropriate containers, container management practices
• employ a properly qualified company to transport the waste.
• proper manifesting of your waste
• file an annual waste summary with TCEQ
• and ensure waste is properly disposed of at a hazardous waste facility.
Contractors are responsible for waste from “cradle to grave” (from the point of generation to its final disposal).
The City also encourages contractors to reduce and divert waste from landfills through recycling. Contractors shall consider recycling cardboard, wood, concrete, and metal that is generated onsite. Construction materials with recycled content should be used where reasonably practical.
Offsite Disposal of Excavated Soil or Material Move to before section on McCommas
Any material that is excavated from a site that is suitable for fill may be used onsite or transported to an appropriate offsite location. Contractors are responsible for ensuring that all disposition of material removed from the site is done in compliance with local, state, and federal regulations and approved by the City projector manager.
Filling in a floodplain is only allowed with current permit from DWU- Floodplain Management.
In most cases, grading and excavation requires permits from the City’s Department of Development Services.
The City has a comprehensive approach to floodplain and drainage management that dates to the early 1970s. Through various initiatives, the City has worked with private, public, and non-profit sectors to determine the most feasible approach to managing development in and around floodplains.
This approach is outlined in the – City of Dallas, Floodplain Regulations (Article V of the Dallas Development Code) at https://dallascityhall.com/departments/waterutilities/stormwater-operations/PublishingImages/COD_FloodPlainRegulations.pdf.
P a g e | 13
Residential and commercial development, including earthwork, existing or new structures within the regulatory 1% Annual Exceedance Probability (100-year) floodplain are reviewed and evaluated by the City to ensure that the floodplain criteria are met before permitting construction.
Property owners may need to obtain fill permits and/or floodplain alteration permits prior to construction activities in a floodplain, as well as all applicable state and federal permits.
Interior improvements valued up to 50% of the appraised value of the structure can be made every 10 years with floodplain management approval. Demolition of a structure (such as a home) within the 100-year floodplain is permitted without a separate floodplain permit but may require additional building permits. The construction of new structures will require a floodplain fill permit and final approval by the Dallas City Council. Improvements that do not remove a floodplain designation such as a tennis court, a playground, a swimming pool, a fence, a deck, an erosion control wall, or the installation of significant landscaping can be made through a floodplain alteration permit.
To review the requirements of the fill permit application and associated documents, view it here at https://dallascityhall.com/departments/trinitywatershedmanagement/DCH%20Documents /Fill-PermitApplication.pdf , (note that Article V permit fees apply), or please contact Floodplain Management at 214-948-4666.
Working Next to or in Creeks, Drainage Channels, and Other Surface Water
• Operating equipment in surface water is prohibited
• Active flows in creeks must be diverted around the work area
• Channel crossing must be designed and installed to minimize erosion and sediment and must allow fish and other wildlife to pass through the crossing
• Operating in a creek may require additional authorization from the US Army Corps of Engineers and City of Dallas Floodplain Management.
• Channel and creek work should be scheduled for the seasonal dry times
• Sediment control should be deployed downstream of any channel or creek work
• Equipment must be closely monitored for leaks and spills
P a g e | 14
Spills and Releases
Spills can cause environmental damage. If a substance leaks into a drain, it can pollute the local water supply. If exposed to a hazardous substance, serious health effects can occur. If a substance is flammable, explosive, corrosive or reactive, it can also create other hazards.
Contractors must take measures to prevent pollution of land and waterways including the stormwater system. If a spill or release occurs, contractors are legally responsible to report the incident to the appropriate regulatory agency and to the City.
Examples of commonly used substances that may cause an adverse effect on the environment:
Gasoline /diesel fuel Paint Oil containing PCB’s
Antifreeze/glycol Solvents Acids or caustics
Lubricating oil Chemicals Fertilizers
Hydraulic fluid Sewage Excessive smoke, fumes, odors
Other petroleum products and synthetic oils
Erosion and sedimentation materials
Chlorine
Freon/CFCs Ammonia Pesticides and herbicides
Industrial wastes Hot asphalt Propane
This list is not all-inclusive and other substances may cause an adverse effect on the environment.
Reporting to a Regulatory Agency
There are specific legal requirements related to reporting spills and releases. Contractors must ensure that spills and releases are immediately reported to both the City projector manager or authorized designee and the appropriate regulatory agencies as required by law.
Failure to report could result in enforcement action.
Release reporting is also a requirement of federal and state legislative bodies such as the Environmental Protection Agency (EPA) and the Texas Commission on Environmental Quality (TCEQ).
Notify the City project manager or authorized designee of a spill or release immediately.
To notify the City of a spill, call 311.
P a g e | 15
TCEQ Spill Reporting Guidelines
Report an environmental emergency, discharge, spill, or air release. Links to rules, laws, technical assistance, waste management, State Emergency Response Commission.
https://www.tceq.texas.gov/response/spills
Cleaning Up a Spill or Release
Prior to beginning work, Contractors must have established spill cleanup.
procedures. Staff must be trained appropriately on spill prevention, response, and reporting.
After ensuring the health and safety of the public and workers and reporting the spill, the next step to managing a non-hazardous or hazardous material spill or release is to control the source and extent of the release. The type of material spilled, the quantity spilled, and the spill location are factors to consider when deciding what appropriate actions to take.
The person or entity that causes a spill or release of non-hazardous or hazardous material into the environment is responsible for satisfactorily cleaning and, if necessary, remediating the affected area.
The City will oversee the contractor’s response to ensure that the spill is cleaned to the City’s satisfaction and to the level required by law.
Spills, releases, and the response activities that follow must be properly documented.
Adequate quantities of absorbent material or berm material must be readily available to clean up spills. Provide adequate spill kits for onsite vehicles and operating equipment as applicable.
Waste material generated during spill clean-up activities must be properly disposed in accordance with federal and state requirements. Waste from spills is not accepted at McCommas Bluff Landfill.
P a g e | 16
Fueling Vehicles and Equipment
Fuel spills can occur during fueling operations at construction sites. Measures to ensure that fueling operations do not cause an environmental impact include, but are not limited to the following:
• Place berms or other containment around fuel storage tanks
• Labeling all fuel storage tanks
• Conduct fuel operations away from catch basins and water bodies
• Ensure contractor personnel are present during fueling operations for the duration of the fueling process
• Communicate operating procedures to onsite personnel
• Keep adequate quantities of absorbent materials readily available
Fueling or maintenance of equipment must not take place within 30 ft of waterways including the stormwater system or environmentally sensitive areas.
SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) REGULATION
40 CFR part 112
A Facility Owner/Operator's Guide to Oil Pollution Prevention A brief guide on Oil Spill Prevention, Control and Countermeasure (SPCC) Rule requirements for facility owners and operators.
SPCC Requirements can be found at the link below:
https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/facility-owneroperators-guide-oil-pollution
Contamination Discovery
Contractors must establish protocol for evaluating and addressing potential environmental contamination issues associated with construction projects. Evaluation of the potential for contamination should be conducted early in the project planning phase through an environmental screening/review by a certified environmental consultant. Soil testing may be needed based on the review recommendations by the consultant.
P a g e | 17
During construction, indications of possible contamination include but are not limited to the following:
• Rusted barrels, drums, abandoned underground storage, and other containers
• Stained or discolored earth in contrast with adjoining soil
• Fill material containing debris
• Household trash covered by earth or industrial waste debris
• Non-earthy odors, or other strange smells
• Oily residue intermixed with earth
• Sheen on groundwater; and
• Structures such as asbestos cement pipe, abandoned pipes, and/or vaults
Contractors must report any suspected contamination discovery to the City project manager or designee immediately.
Chemical/Oil Storage
Contractors shall follow city, state and federal regulations on chemical handling, transportation, and storage, including but not limited to Dallas City Code, Texas Hazardous Communication Act, DOT regulations, FIFRA, SARA, EPCRA and OSHA requirements.
Proper storage is required to minimize the hazards associated with chemical and oil storage. Further, contingency plans and Spill Prevention, Control, and Countermeasure Plans (SPCC) must be implemented when total materials stored on site exceeds 1,320 gallons. Spill Prevention, Control, and Countermeasure (SPCC) for the Upstream (Oil Exploration and Production) Sector | US EPA
Some elements of chemical and oil storage requiring consideration shall include separation of incompatible chemicals, solvents, flammables versus combustibles, acids versus bases, oxidizers, poisons, explosives, and unstable reactive materials. Some chemicals may require storage in flammable or acid proof containers while others may have distance requirements.
Imported Fill Material
When imported fill material is proposed for use at a construction site, contractors are responsible for reporting the source location of the material to the City project manager. All fill material shall be comprised solely of soil and free of deleterious material, trash, rebar, vegetation, and other construction debris.
For any fill material brought to the site, contractors shall provide representative environmental laboratory testing results for TPH, VOCs, PAHs, and RCRA 8 metals for review and approval by the City project manager prior to use onsite. Test results shall demonstrate no environmental concerns based on
P a g e | 18 current and past land use and regulatory history. The following table explains thresholds for materials stored on site.
29 CFR 1926 Excavation spoil piles 2 ft from trench edge
29 CFR 1926 No material / no equipment
Within 4 ft from roof edge (masonry & mortar only)
29 CFR 1926 No material Within 6 ft of hoist way, inside floor openings, or within 10 ft of exterior wall
29 CFR 1926 Stacked bagged materials
Cross-keying bags every 10 bags high
29 CFR 1926 Stacked brick Less than 7 ft high.
Taper from 4 ft high
29 CFR 1926 Stacked masonry blocks / stone
Tapered stacks after 6 ft high
29 CFR 1926 Lumber (nails and screws must be removed)
Piles cannot exceed 16 ft high. Must be self-supporting on solid level sills
Alternatively, contractors may provide an environmental site assessment or environmental desktop review document for the borrow source site for review by the project manager prior to approval. Documents shall demonstrate no environmental concerns based on current and past land use and regulatory history.
The source location of any imported or recycled fill material must be reported to the City project manager prior to material being brought onsite. The contractor may be asked to verify the suitability of the material for its intended use.
Vehicle Idling
Vehicle idling contributes to several environmental problems such as the deterioration of air quality and the production of unnecessary emissions of greenhouse gases such as carbon dioxide (CO2) and nitrogen oxides (NOx).
In addition to these environmental concerns, idling of vehicles also wastes fuel and may damage vehicle engines.
According to City Ordinance 26766, vehicles with a gross vehicle weight rating equal to or greater than 14,000 pounds must not idle for more than 5 minutes. See link for details.
http://greendallas.net/air-quality/city-air-quality/reduce-idling/anti-idling-ordinance/ Contractors are encouraged to minimize idling of vehicles and follow City Ordinance 26766.
P a g e | 19
City of Dallas Comprehensive Environmental & Climate Action Plan (CECAP) Vision
“Dallas is a leader in reducing emissions and addressing climate and environmental.
risk with effective, equitable, and common-sense solutions.”
Emission reduction strategies for construction sector
Construction industry can:
• Replace engines in construction fleet with low emitting/alternative fueled engines.
• Retrofit engines in construction fleet to reduce NOx emissions by 25%
• Diesel engines should be retrofit to a minimum of Tier 3 or Tier 4
• Portable diesel generators should be Tier 2 or higher
• Commit to using cleaner fuels for construction fleet
• Select subcontractors with cleaner/efficient engines
• Apply for TERP funds every cycle to offset cost of new engines/retrofits/rebuilds
• When renting, rent the newest engines, lowest emitting engines possible
• Arrange construction hours past morning commute hours during ozone season
• Consider changes in work practices on ozone action days to reduce emissions
• Reduce idling on job sites; implement ride sharing programs to job sites
• Procure environmentally friendly products and chemicals
• Commit to designing and building to meet the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) standards
• Incorporate more energy efficient standards into residential and commercial construction
• Incorporate sustainability practices into future construction projects such as cool or green roofs
• Consider environmental concerns when selecting products for use on projects
Best Management Practices
Preferred Practices & Practices to Avoid for Construction Sites
Preferred Practices
• Stabilize the exposed areas on your site as soon as possible. In areas where construction has ceased either permanently or temporarily, you must take action to stabilize disturbed areas by the end of the next workday after the cessation of earth-disturbing activities.
• Maintain erosion and sediment controls in good working order.
• When dewatering your site after a rain episode, use sediment filter bags and other BMPs to remove suspended soil and ensure that only clean stormwater is discharged.
• Use the iSWM guide available from the NCTCOG when planning your environmental construction best management practices. See http://iswm.nctcog.org/ and http://iswm.nctcog.org/technical-manual.html.
• Protect stockpiles and materials from wind and rain by storing them under secured plastic sheeting or temporary roofs.
• Whenever possible schedule grading and excavation projects for dry weather.
• Avoid contaminating clean runoff from areas adjacent to your site by using berms and
P a g e | 20 temporary check dams to divert water flow around the site.
• Always cover and maintain dumpsters. Check thoroughly and frequently for leaks.
• Clean up leaks, drips, and other spills immediately. This will prevent contaminated soil or residue on paved surfaces from blowing or washing into the storm drains.
• Identify all storm drains, drainage swales and creeks located near the construction site and make sure all subcontractors are aware of their locations to prevent pollutants from entering them.
• Use terracing, rip rap, sandbags, rocks, straw bales, and/or temporary vegetation on slopes to reduce runoff velocity and trap sediments.
• Dispose of all waste properly. Many construction materials, including solvents, water-based paints, vehicle fluids, broken asphalt and concrete, wood, and cleared vegetation can be recycled.
• Train employees and subcontractors in spill response, erosion, and runoff control procedures.
Practices to Avoid
• Avoid beginning construction until you have fully implemented erosion and sediment control practices, including your SWP3.
• Regularly inspect, maintain, and fix erosion and sediment controls such as silt fences, sedimentation basins, inlet protection, etc.
• Avoid clearing all the vegetation off your construction site. You are required to minimize the amount of exposed soil and the disturbance of steep slopes.
• Do not wash out concrete chutes into the street or storm drains.
• Do not dump concrete blocks on site. Unload one block at a time.
• Do not throw food wrappers on the ground. Use a trash can to dispose of food waste and wrappers.
• Do not clean brushes or rinse paint containers into a storm drain, gutter, or street.
• Avoid cleaning a dumpster by hosing it down on-site.
• Avoid rinsing dirty pavement or surfaces where materials have spilled. Instead, use dry cleanup methods (e.g., absorbent materials such as kitty litter, sawdust, or cornmeal) whenever possible.
• Do not throw debris and waste or wash sweepings into the storm drain.
• Do not use asphalt rubble or other demolition debris on slopes to trap sediments.
• Avoid using the street to stockpile dirt, sand, and other construction materials that can
P a g e | 21 contribute to stormwater pollution. Add appropriate BMPs to prevent tracking and/or discharge of these materials to the drain.
• Avoid allowing vehicles exiting construction sites to track dirt and mud to the street. Install appropriate drive pad to prevent off-site tracking.
Figure 1 Stockpile exposed to weather Figure 2 Drums not stored with containment.
Useful City Sources of Information
Should you have any questions or need further information including contractor environmental requirements, please contact your City project manager, appropriate City staff, the Office of Environmental Quality and Sustainability (OEQS) at 214-670-1200, or visit our website at https://dallascityhall.com/departments/OEQ/Pages/contractors.aspx
For information on City Codes: https://dallascityhall.com/government/Pages/city-codes.aspx
For questions regarding soil/special waste disposal and import, Municipal Setting Designation (MSD), Due Diligence, suspected asbestos containing materials, please contact:
City of Dallas OEQS-Environmental Due Diligence (EDD)/Municipal Setting Designation (MSD) Division at -https://dallascityhall.com/departments/OEQ/Pages/msd.aspx
1500 Marilla Street, 7AN
Phone: 214-671-8967 or 214-670-1200
Email: environmentalduediligence@dallascityhall.com
For Stormwater Permits and Stormwater related questions please contact:
City of Dallas OEQS- SWM (Stormwater Management) Oak Cliff Municipal Center 320 E. Jefferson Blvd., Rm. 108 Dallas, Texas 75203 Phone: 214-948-4022
The City offers these free educational opportunities in compliance with its TPDES Municipal Separate Storm Sewer System permit requirements. For additional information, please visit us at www.WhereDoesItGo.com.
P a g e | 22
Construction General Permit-TXR150000 >
Industrial General Permit TXR050000 >
Useful Acronyms
ACRONYMS
ACRONYMS
AD – Administrative Directives NOC – Notice of Change
AE – Area Engineer NCTCOG – North Central Texas Council of Governments
AOTS – Advanced Outfall Tracking System NOI – Notice of Intent
NOT – Notice of Termination
BMP – Best Management Practice NEPA – National Environmental Policy Act
CGP – Construction General Permit PAHs - polycyclic (or polynuclear) aromatic hydrocarbons
CSN – Construction Site Notice
CWA - Clean Water Act PS&E – Plans, Specifications and Estimates
EA – Environmental Assessment RCRA - Resource Conservation and Recovery Act
EMS – Environmental Management System ROW – Right-of-Way
IDDE – Illicit Discharge Detection and Elimination RP – Responsible Party iSWM - Integrated Stormwater Management SPCC – Spill Prevention Control and Countermeasure
IWB – Impaired Water Body
LPST – Leaking Petroleum Storage Tanks SWMP – Stormwater Management Program
MS4 – Municipal Separate Storm Sewer System SWP3 – Stormwater Pollution Prevention Plan
MSW - Municipal Solid Waste TAC - Texas Administrative Code
TMDL – Total Maximum Daily Load TCEQ – Texas Commission of Environmental Quality
TPDES – Texas Pollutant Discharge Elimination System
TPH- Total Petroleum Hydrocarbon
TSS – Total Suspended Solids TxDOT – Texas Department of Transportation
P a g e | 23
References:
• City of Dallas Environmental Policy
• AD 3-73 Environmental Management Program
• AD 3-74 Spill Response Procedures
• City of Dallas Office of Environmental Quality & Sustainability (OEQS)
• TPDES Permit WQ004396000
• Dallas City Code Chapter 18 Municipal Solid Wastes
• Dallas City Code Chapter 19, Article IX, “Stormwater Drainage System”
• City of Dallas TWM-PRO-037, “Trinity Watershed Management” – Flood Control Environmental Best Management Practices Standard Operating Guide (SOG)
• NCTCOG iSWM Technical Manual “Construction Controls”
• NCTCOG Public Works Construction Standards, 5th edition VERIFY MOST CURRENT
• TXDOT Stormwater Management Program
• City of Dallas Drainage Design Manual
• City of Rancho Santa Margarita Stormwater Program Best Management Practices & Other Resources VERIFY
• Dallas Park and Recreation
• Dallas Water Utilities Floodplain & Drainage Management Section 51A-5.101
• Dallas Water Utilities Standard Protocol for Soil and Groundwater Management on Construction Sites (Version 1) 2011 DWU-SGW_Manual.pdf (dallascityhall.com)
• U.S. EPA
• TCEQ
Disclaimer
This document is only informational. No part of this document is intended to replace, supersede, or contradict any information outlined in the City ordinance or any Federal, State of Texas, City of Dallas or any local document, code, or law.
Contractors, consultants, and citizens are encouraged to contact the Stormwater Management section of the Office of Environmental Quality & Sustainability of the City of Dallas (stormwater@dallascityhall.com, 214-948-4022).
Guidance on technical requirements can be found in the NCTCOG (North Central Texas Council of Governments) iSWM (Integrated Stormwater Management) Manual (https://www.nctcog.org/envir/public-works/iswm).
Requirements can also be found in the City of Dallas Drainage Design Manual DrainageDesignManual-searchable.pdf (dallascityhall.com) and the NCTCOG Public Works Construction Standards, 5th Edition, including the City of Dallas Addendum to the Public Works Construction Standard – North Central Texas 5th Edition 2021 COD NCTCOG Addendum.pdf (dallascityhall.com).
Contractors are always required to abide by the plans, specifications and provisions included in the project contract.
Below is a form that you (the contractor) are required to submit to the City with your bid, the “City of Dallas Contractor Environmental Responsibilities Acknowledgement Form”. We are including a blank form here for familiarity. To access the form, click on the following link.
P a g e | 24 https://dallastxgov.sharepoint.com/:b:/r/sites/EnvironmentalQualitySustainability/Shared %20Documents/CONTRACTOR%20FORMS/Contractor%20Environmental%20Resposibilit ies%20Acknowledgement%20Form.pdf?csf=1&web=1&e=l7DhyM.
Finally, initial, sign, and submit the form with your bid to the City.
The following form is only for reference. The actual form to be signed is found at link above.
P a g e | 25
City of Dallas
Contractor Environmental
Responsibilities Acknowledgement Form
PART 1: COMPANY INFORMATION
Name: __________________________________________________________________________
Address: __________________________________________________________________________
Phone: _____________________________________ Fax: ____________________________________
E-mail Address: _______________________________________________________________________
Emergency Contact: ___________________________________________________________________
PART 2: DESCRIPTION OF WORK
Nature of Work: ________________________________________________________________________
Contract / PO #: ________________________________________________________________________
TCEQ Contractor Registration #: __________________________________________________________
Work Performed for (Name Department): ___________________________________________________
PART 3: CHECKLIST OF CONTRACTOR’S ENVIRONMENTAL RESPONSIBILITIES
As a contractor for the City of Dallas, your review and signature of this document is necessary prior to commencement of the work. The items in this checklist are in addition to any specific environmental requirements that are identified in the contract. Please complete this form by initialing each applicable item in the checklist and then by signing the acknowledgement at the bottom of the document. If a checklist item does not apply to the project, indicate by marking not applicable (N/A). Please forward a copy of the completed form to the Authorized Department Representative for verification.
Authorized Company Representative
CONTRACTOR’S
ENVIRONMENTAL
RESPONSIBILITIES
Authorized Department Representative
Initial The City of Dallas Environmental Policy and Environmental Commitments I acknowledge that I have been made aware of the City of Dallas Environmental Policy and its environmental commitments.
Initial
Initial Compliance I am aware of all federal, state, and local compliance requirements that relate to the contracted work. I agree to maintain compliance with these rules and regulations, as well as any additional environmental requirements included in the contract.
Initial
Initial Awareness and Competence I acknowledge that I am responsible to ensure that all personnel under my control are aware of applicable environmental requirements and responsibilities, and that all personnel under my control are competent to perform their work.
P a g e | 26
Initial Environmental Best Management Practices I am aware that I must identify and employ best management practices on this contract. I am aware that best management practices are required on all City projects, regardless of the size of the project.
Initial
Initial Waste Management and Recycling It is my responsibility to know and adhere to the regulatory requirements for nonhazardous waste generated on the project site.
Waste shall be minimized, and applicable waste shall be diverted from landfills through re-use and recycling as required.
Initial Spills and Releases I am aware of my legal and contractual responsibilities that are associated with the reporting of spills or releases that I may discover.
Contractors are encouraged to follow best management practices for spill prevention.
Initial
Initial Cleaning Up Spills or Release I am aware of my legal and contractual responsibilities for the cleanup of spills and releases that may occur due to the project.
Additionally, I agree to keep enough absorbents and spill cleanup supplies readily available.
Initial
Initial Contamination Discovery I understand that any contamination that may be discovered must be reported to the City of Dallas project representative in accordance with regulations.
Initial
Initial Chemical/Oil Storage I understand that the City of Dallas expects contractors to be fully compliant with City, State, and Federal regulations on chemical handling, transportation, and storage, including but not limited to Dallas City Code, Texas Hazardous Communication Act, DOT regulations, FIFRA, SARA, EPCRA and OSHA requirements.
P a g e | 27
Initial Environmental Considerations/Impacts I am aware that I must identify and understand the potential environmental impact(s) of my work prior to commencement of the work.
Initial
Initial Water Conservation and Efficiency I will consider water conservation, improve water use efficiency, and explore opportunities for re-use of water as required.
Initial Energy Conservation and Efficiency I will consider energy conservation, energy efficiency of buildings and equipment, and explore opportunities for use of renewable energy sources as required.
Initial
Initial Material and Resource Conservation I will consider opportunities for material and resource conservation as required.
Initial
Initial Erosion and Sediment Control Measures for erosion and sediment control shall be implemented to comply with federal, state, and municipal laws or bylaws as required and specified in the contract.
Initial
Initial Soil Conservation and Stockpiles I agree to take appropriate action to conserve soil and manage stockpiles to prevent erosion, fugitive dust, and introduction of sediment to the stormwater system.
Initial
Initial Saw Cutting and Coring The slurry generated from saw cutting and the coring of asphalt or concrete shall not be allowed to enter the stormwater system or any waterbody.
P a g e | 28
Initial Offsite Disposal of Excavated Soil or Material I understand I am responsible for ensuring that excavated soil and other materials not used onsite are disposed of at an approved facility and in accordance with all federal, state, and local requirements.
Initial
Initial Fueling Vehicles and Equipment I agree to conduct fueling operations in an environmentally sound manner, including no fueling or maintenance operations within 30 ft of a waterway including any part of the stormwater system.
Initial
Initial Imported Fill Material I understand that the source locations of any imported or recycled fill material must be reported to the City of Dallas Project Designate prior to material being brought onsite.
Initial Vehicle Idling I shall minimize idling of vehicles that are not essential for the performance of work. Contractors must also comply with City of Dallas Ordinance 26766 which limits idling of certain vehicles to under five minutes.
Initial
Initial Emission Reduction Strategies for Construction Sector I will consider emission reduction strategies and will implement measures to reduce emissions, environmental risks, and improve quality of life for all residents.
Initial Tree Protection I will implement measures to protect public trees in accordance with municipal policies and bylaws as required.
Initial Natural Area Protection I will implement measures to protect natural areas in accordance with municipal policies as required.
P a g e | 29
City of Dallas Contractor Environmental Responsibilities Acknowledgement Form
This Environmental BMP Guide was originally written in November 2007. It was revised and updated in 2022 by Office of Environmental Quality & Sustainability (OEQS) BMP Review Team members and management.
Should you have any questions or need further information, please contact your City project manager, appropriate City staff, the Office of Environmental Quality and Sustainability (OEQS) at 214-670-1200, or visit our website at https://dallascityhall.com/departments/OEQ/Pages/contractors.aspx
Initial Additional Supplemental Information See attachment(s). I acknowledge that I have reviewed any supplemental information attached to this checklist.
I have been provided with a copy of the City of Dallas Environmental Policy, and I understand that it is my responsibility to comply with these requirements and communicate this information to all personnel that are engaged in completing the services as defined in the contract.
Authorized Company Representative (Signature): ____________________________________________
Name of Company Representative (Please Print): ____________________________________________
Authorized Department Representative (Signature): __________________________________
Name of Department Representative (Please Print): ____________________________________
Date of Acknowledgement: _______________________________________________________________
PART 4: DISTRIBUTION OF FORM
(MATERIALS MANAGEMENT)