About this file

This is a mechanical plan drawing for a UPS (Uninterruptible Power Supply) replacement project at the Fairbanks Command and Data Acquisition Station (FCDAS) in Fairbanks, Alaska. The drawing, prepared by Coffman Engineers under U.S. Army Corps of Engineers contract W911KB-17-D-0009-0012, was completed on May 24, 2018, and is one of 27 sheets in the design documentation set.

The project scope includes installation of new CRAC (Computer Room Air Conditioning) units with evaporator and condensing components, routing of refrigerant lines with drip tray protection where necessary to avoid contact with electrical equipment, installation of hydrogen sensing stations with alarm beacons and audible alarms set to activate at levels above 1% by volume, relocation of existing ductwork and heating coils to maintain NEC clearances, and integration with the existing DDC (Direct Digital Control) system for monitoring and alarm reporting. Key operational requirements include automatic CRAC unit activation when room temperature exceeds 80°F, exhaust fan activation triggered by hydrogen sensors or the DDC system, and coordination with fire alarm systems to prevent interference with exhaust fan operation during normal hydrogen detection events. The design maintains all required National Electrical Code clearances and includes condensation line routing in copper piping with 1/8-inch slope directed to suitable drains.

View the file

Other files for this federal contract opportunity

Other files attached to NOAA/FCDAS Replacement of Two (2) Non-Operational Boilers, newest first.
File Type Posted
FCDAS Boilers Replacement QA_Amendment Ver 3.pdf PDF
FCDAS Boilers Replacement QA_Amendment Ver 2.docx.pdf PDF
FCDAS_Facilities Building_Amendment 0001.pdf PDF
DBA Wage Determination.pdf PDF
RFQ_1332KP26Q0033 Boilers Replacement.pdf PDF
QASP FCDAS Boilers Replacement.pdf PDF
PWS FCDAS Boilers Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY CORPS

OF ENGINEERS

Reference number:

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

ANCHORAGE, ALASKA

D r a w n b y

D e s i g n e d

S u b m i t t e d

R e v i e w e d b y

F i l e

D a t e

C O

N T

R A

C T

N

O

D r a w i n g

D w g s c a l e

C O

N T

R A

C T

O R

C I T

Y

S T

A T

E

R e c o m m e n d e d

A p p r o v e d

D a t e

P R

I M

E

C

O N

T R

A C

T O

R

R E

S I D

E N

T

E

N G

I N

E E

R

P l o t s c a l e x x

ALASKA DISTRICT

F A

I R

B A

N K

S

A

L A

S K

A

W

K B

D

N E

S

R

E P

L A

C E

U

P S

F A

I R

B A

N K

S

C

O M

M A

D

A

T

A

A C

Q U

I S

I T

I O

N

S

T A

T I O

N

F

C D

A S

S y m A c t i o n D e s c r i p t i o n D a t e

A p p v d

A

B C D E F G H

C O

F F

M A

N

E

N G

I N

E E

R S

A N

C H

O R

A G

E A

L A

S K

A

M

Y

D E

S I G

N

C

O M

P L E

T E

500 L STREET, SUITE 400, ANCHORAGE, AK 99501 Ph: 907.274.7443

AK CORPORATION #: 34752 D (KPB) & AECC249 (COFFMAN)

DESIGN

COMPLETE

REG IS T ER ED P R O F E S S IO NA L ENGINEERMay 18, 2018 No. ME12298

BRENT L. LITTLE

M E

C H

A N

I C

L

P

L A

N

P

O W

E R

H

O U

S E

M-100

E J G

S E

W

B L

L

S

S

H O

W N

M E

C H

A N

I C

A L

M

M

A1 MECHANICAL PLAN - POWER HOUSE

Sheet 5 of 27

GENERAL NOTES:

MECH

ROOM

TO (E)

AHU-2

TO E AHU-1

(E) DDC

PANEL2 3 4 5 6 7

c

CLIN002:

CRAC-CU CONDENS NG

UNIT, SUSPEND FROM WALL

DO NOT OBSTRUCT WINDOW

BATHROOM

r i

CLIN002:

CRAC-CU CONDENS NG

UNIT, SUSPEND FROM WALL

------ lOj

COMM

CLOSE

(E) DUCT WORK

TO REMAIN SWTCHGEAR

ROOM

HYDROGEN SENSING ,

TO DDC & ALARM —m

GENERATORSUPPORT REFRIGERANT

LINES ALONG WALL. SHOWN

OFFSET FOR CU\RITY.

ROOM

MAINTENANCE DOOR

DEDICATED SPACE

OLD YIECH HYDROGEN SENSING

STATION-TYPICAL OF (2)

REMOVE (E) DUCTWORK

AND DAMPER. SAVE

FOR RELOCATION AND

RECONNECTION.

RO DM

(E) TRANSFER

OPENING.

B 7^YLW /

CONTROL

ROOM

<DM E) FSD15 G) -4 n^Ti SI1st *

RELOCATE EXISTING FIRE/SMOKE

DAMPER AND HEATING COIL

CONNECT (E) 8

DUCTWORK HERE

16 EA UP

TO EF-1 — MUPS(D1100 ROOM NEW DIFEUSER AND

BALANCE DAMPER-

INSULATE VERTICAL

PORTION OF DUCT

(TYP.)------------------ NEW

UPSFUTURE WALL

□ ROOM BATHROOM

RE-USE (E) DUCTWORK, DIFFUSER,

BALANCE DAMPER, AND 3-WAY

HEATING COIL. RELOCATE AWAY

FROM ELECTRICAL EQUIPMENT PER

NEC. ROUTE ABOVE.

i

□CLIN002

C RAC-2

DO NOT ROUTE

REFRIGERANT LINES

ABOVE ELECTRICAL

EQUIPMENT, TYP.

A ROUTE REFRIGERANT LINES

AT CEILING LEVEL (TYP)

DO NOT ROUTE REFRIGERANT

LINES ABOVE ELECTRICAL

EQUIPMENT (TYP.)------------------

CLIN002:

CRAC-1 - 330

10” EA UP

TO EF-2

PLAN NORTH

SCALE: 3/16 = 1-0 1 2 16

3/16=1-0

3.

7.

8.

MAINTAIN NEC REQUIRED CLEARANCES ABOVE ALL NEW WORK.

COORDINATE WITH ELECTRICAL CONTRACTOR TO IDENTIFY FINAL

LOCATIONS OF EQUIPMENT. WHERE IT IS NOT PHYSICALLY

POSSIBLE TO AVOID ROUTING ABOVE EQUIPMENT, PROVIDE DRIP

TRAY TO PREVENT FOREIGN MATERIALS FROM ENTERING NEC

CLEARANCE AREAS. PROVIDE SHOP DRAWINGS PRIOR TO

INSTALLATION.

MOUNT CRAC EVAPORATOR UNITS ON THE WALL. ROUTE

REERIGERANT LINES EROM THE CRAC UNITS THROUGH THE

CONTROL ROOM TO THE CONDENSING UNITS. DO NOT ROUTE

REFRIGERANT LINES ABOVE ELECTRICAL EQUIPMENT. MAINTAIN ALL

REQUIRED NEC CLEARANCES.

ROUTE CONDENSATION LINES FROM THE EVAPORATOR UNITS TO

THE NEAREST SUITABLE DRAIN IN COPPER PIPING SLOPE

AT 1/8 . DO NOT ROUTE ABOVE ELECTRICAL EQUIPMENT. MAINTAIN

NEC REQUIRED CLEARANCES. DO NOT BLOCK WINDOWS.

PROVIDE SUPPORT AND PROTECTION PER STRUCTURAL

SPECIFICATIONS FOR CRAC AND CONDENSING UNITS.

INSTALL HYDROGEN SENSORS AT LOCATIONS INDICATED. SENSORS

SHALL INCLUDE ALARM BEACON AND AUDIBLE ALARM. ALARM AND

STROBE TO ACTIVATE AT LEVELS ABOVE 1% BY VOL. SENSOR TO

REPORT TO DDC CONTROL. ALARMS SHALL BE GENERATED AT THE

DDC MONITORING STATION EOR ALARMS AT THE SENSOR.

CRAC UNIT CONTROL:

a. MONITOR ROOM TEMPERATURE. IF ROOM TEMPERATURE RISES

ABOVE 80 F, ENABLE CRAC UNITS.

b. IF TEMPERATURE CONTINUES TO RISE ABOVE 80 F AFTER CRAC

UNITS HAVE BEEN ENABLED FOR 30 MIN (ADJUSTABLE),

ACTIVATE EF—1 AND EE-2, AND GENERATE ALARM AT DDC.

c. VIA THE (E) DDC SYSTEM, MONITOR CRAC UNITS AND REPORT

ALARMS FROM ON-BOARD BACNET CONTROLLER.

d. PROVIDE CHANGE OF VALUE TRENDS FOR CRAC UNIT

ENABLE/DISABLE AND LOG ALL ALARMS.

EXHAUST EAN CONTROL

a. IN NORMAL OPERATION, EXHAUST FANS SHALL REMAIN OFF.

b. EXHAUST FANS SHALL BE ACTIVATED BY THE DDC SYSTEM OR

THE HYDROGEN SENSORS. ISOLATION DAMPER SHALL REMAIN

CLOSED UNLESS FAN IS ENABLED.

c. IF THE ROOM HYDROGEN LEVEL IS SENSED BY THE HYDROGEN

SENSORS AT A LEVEL ABOVE 1% BY VOL, THEN THE EXHAUST

FANS SHALL ACTIVATE

d. FIRE ALARM AND CONTROLS CONTRACTORS SHALL COORDINATE

SO THAT EIRE ALARM DOES NOT PREVENT EXHAUST EAN EROM

ACTIVATING EXCEPT DURING A FIRE SUPPRESSION RELEASE

MODE.

e. PROVIDE TRENDING OF EXHAUST FAN ENABLE/DISABLE

RELOCATE (E) HEATING COIL THAT SERVES CONTROL ROOM.

RECONNECT COIL TO (E) PIPING LOCATED ABOVE CONTROL ROOM

CEILING. RESTORE CONTROLS TO EULL EUNCTION.

V'V\vvvo>~

T^N ~G I N E E R S

A R

C H

ITE

C

TS

JV

CRAC CU 1 &2

CRAC 2

CRAC 1

A S

-B U

ILT

F

O R

R E

C O

R D

O

LY

Sheets and Views
G-001 COVER SHEET
G-002 SHEET INDEX
G-101 LOCATION AND VICINITY MAP
M-001 LEGEND AND ABBREVIATIONS
M-100 MECHANICAL PLAN - POWER HOUSE
M-500 MECHANICAL DETAILS
M-600 MECHANICAL SCHEDULES
E-001 LEGEND AND ABBREVIATIONS
E-002 ELECTRICAL PROJECT NOTES
ED-100 DEMOLITION PLAN - POWER HOUSE
ED-400 ENLARGED DEMOLITION PLAN - POWER HOUSE
ED-600 DEMOLITION ONE-LINE DIAGRAM
ED-601 DEMOLITION ONE-LINE DIAGRAM
E-100 ELECTRICAL PLAN - POWER HOUSE
E-101 ELECTRICAL PLAN - UNDERGROUND DISTRIBUTION
E-400 ENLARGED ELECTRICAL PLAN - POWER HOUSE
E-401 ENLARGED ELECTRICAL PLAN - CONDUIT ROUTING
E-500 PHOTOS - UPS AND BATTERY SYSTEMS
E-501 PHOTOS - SECONDARY UNIT SUBSTATION
E-502 PHOTOS - UPS DISTRIBUTION SWITCHBOARD
E-503 PHOTOS - GENERATOR SWITCHGEAR GS
E-600 ONE-LINE DIAGRAM
E-601 ONE-LINE DIAGRAM
E-602 ELECTRICAL SCHEDULES
E-603 ELECTRICAL SCHEDULES
REF-1 BASEMENT FLOOR POWER DISTRIBUTION PLAN
REF-2 SITE ONE-LINE DIAGRAM