This is a mechanical plan drawing for a UPS (Uninterruptible Power Supply) replacement project at the Fairbanks Command and Data Acquisition Station (FCDAS) in Fairbanks, Alaska. The drawing, prepared by Coffman Engineers under U.S. Army Corps of Engineers contract W911KB-17-D-0009-0012, was completed on May 24, 2018, and is one of 27 sheets in the design documentation set.
The project scope includes installation of new CRAC (Computer Room Air Conditioning) units with evaporator and condensing components, routing of refrigerant lines with drip tray protection where necessary to avoid contact with electrical equipment, installation of hydrogen sensing stations with alarm beacons and audible alarms set to activate at levels above 1% by volume, relocation of existing ductwork and heating coils to maintain NEC clearances, and integration with the existing DDC (Direct Digital Control) system for monitoring and alarm reporting. Key operational requirements include automatic CRAC unit activation when room temperature exceeds 80°F, exhaust fan activation triggered by hydrogen sensors or the DDC system, and coordination with fire alarm systems to prevent interference with exhaust fan operation during normal hydrogen detection events. The design maintains all required National Electrical Code clearances and includes condensation line routing in copper piping with 1/8-inch slope directed to suitable drains.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FCDAS Boilers Replacement QA_Amendment Ver 3.pdf | ||
| FCDAS Boilers Replacement QA_Amendment Ver 2.docx.pdf | ||
| FCDAS_Facilities Building_Amendment 0001.pdf | ||
| DBA Wage Determination.pdf | ||
| RFQ_1332KP26Q0033 Boilers Replacement.pdf | ||
| QASP FCDAS Boilers Replacement.pdf | ||
| PWS FCDAS Boilers Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY CORPS
OF ENGINEERS
Reference number:
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
ANCHORAGE, ALASKA
D r a w n b y
D e s i g n e d
S u b m i t t e d
R e v i e w e d b y
F i l e
D a t e
C O
N T
R A
C T
N
O
D r a w i n g
D w g s c a l e
C O
N T
R A
C T
O R
C I T
Y
S T
A T
E
R e c o m m e n d e d
A p p r o v e d
D a t e
P R
I M
E
C
O N
T R
A C
T O
R
R E
S I D
E N
T
E
N G
I N
E E
R
P l o t s c a l e x x
ALASKA DISTRICT
F A
I R
B A
N K
S
A
L A
S K
A
W
K B
D
N E
S
R
E P
L A
C E
U
P S
F A
I R
B A
N K
S
C
O M
M A
D
A
T
A
A C
Q U
I S
I T
I O
N
S
T A
T I O
N
F
C D
A S
S y m A c t i o n D e s c r i p t i o n D a t e
A p p v d
A
B C D E F G H
C O
F F
M A
N
E
N G
I N
E E
R S
A N
C H
O R
A G
E A
L A
S K
A
M
Y
D E
S I G
N
C
O M
P L E
T E
500 L STREET, SUITE 400, ANCHORAGE, AK 99501 Ph: 907.274.7443
AK CORPORATION #: 34752 D (KPB) & AECC249 (COFFMAN)
DESIGN
COMPLETE
REG IS T ER ED P R O F E S S IO NA L ENGINEERMay 18, 2018 No. ME12298
BRENT L. LITTLE
M E
C H
A N
I C
L
P
L A
N
P
O W
E R
H
O U
S E
M-100
E J G
S E
W
B L
L
S
S
H O
W N
M E
C H
A N
I C
A L
M
M
A1 MECHANICAL PLAN - POWER HOUSE
Sheet 5 of 27
GENERAL NOTES:
MECH
ROOM
TO (E)
AHU-2
TO E AHU-1
(E) DDC
PANEL2 3 4 5 6 7
c
CLIN002:
CRAC-CU CONDENS NG
UNIT, SUSPEND FROM WALL
DO NOT OBSTRUCT WINDOW
BATHROOM
r i
CLIN002:
CRAC-CU CONDENS NG
UNIT, SUSPEND FROM WALL
------ lOj
COMM
CLOSE
(E) DUCT WORK
TO REMAIN SWTCHGEAR
ROOM
HYDROGEN SENSING ,
TO DDC & ALARM —m
GENERATORSUPPORT REFRIGERANT
LINES ALONG WALL. SHOWN
OFFSET FOR CU\RITY.
ROOM
MAINTENANCE DOOR
DEDICATED SPACE
OLD YIECH HYDROGEN SENSING
STATION-TYPICAL OF (2)
REMOVE (E) DUCTWORK
AND DAMPER. SAVE
FOR RELOCATION AND
RECONNECTION.
RO DM
(E) TRANSFER
OPENING.
B 7^YLW /
CONTROL
ROOM
<DM E) FSD15 G) -4 n^Ti SI1st *
RELOCATE EXISTING FIRE/SMOKE
DAMPER AND HEATING COIL
CONNECT (E) 8
DUCTWORK HERE
16 EA UP
TO EF-1 — MUPS(D1100 ROOM NEW DIFEUSER AND
BALANCE DAMPER-
INSULATE VERTICAL
PORTION OF DUCT
(TYP.)------------------ NEW
UPSFUTURE WALL
□ ROOM BATHROOM
RE-USE (E) DUCTWORK, DIFFUSER,
BALANCE DAMPER, AND 3-WAY
HEATING COIL. RELOCATE AWAY
FROM ELECTRICAL EQUIPMENT PER
NEC. ROUTE ABOVE.
i
□CLIN002
C RAC-2
DO NOT ROUTE
REFRIGERANT LINES
ABOVE ELECTRICAL
EQUIPMENT, TYP.
A ROUTE REFRIGERANT LINES
AT CEILING LEVEL (TYP)
DO NOT ROUTE REFRIGERANT
LINES ABOVE ELECTRICAL
EQUIPMENT (TYP.)------------------
CLIN002:
CRAC-1 - 330
10” EA UP
TO EF-2
PLAN NORTH
SCALE: 3/16 = 1-0 1 2 16
3/16=1-0
3.
7.
8.
MAINTAIN NEC REQUIRED CLEARANCES ABOVE ALL NEW WORK.
COORDINATE WITH ELECTRICAL CONTRACTOR TO IDENTIFY FINAL
LOCATIONS OF EQUIPMENT. WHERE IT IS NOT PHYSICALLY
POSSIBLE TO AVOID ROUTING ABOVE EQUIPMENT, PROVIDE DRIP
TRAY TO PREVENT FOREIGN MATERIALS FROM ENTERING NEC
CLEARANCE AREAS. PROVIDE SHOP DRAWINGS PRIOR TO
INSTALLATION.
MOUNT CRAC EVAPORATOR UNITS ON THE WALL. ROUTE
REERIGERANT LINES EROM THE CRAC UNITS THROUGH THE
CONTROL ROOM TO THE CONDENSING UNITS. DO NOT ROUTE
REFRIGERANT LINES ABOVE ELECTRICAL EQUIPMENT. MAINTAIN ALL
REQUIRED NEC CLEARANCES.
ROUTE CONDENSATION LINES FROM THE EVAPORATOR UNITS TO
THE NEAREST SUITABLE DRAIN IN COPPER PIPING SLOPE
AT 1/8 . DO NOT ROUTE ABOVE ELECTRICAL EQUIPMENT. MAINTAIN
NEC REQUIRED CLEARANCES. DO NOT BLOCK WINDOWS.
PROVIDE SUPPORT AND PROTECTION PER STRUCTURAL
SPECIFICATIONS FOR CRAC AND CONDENSING UNITS.
INSTALL HYDROGEN SENSORS AT LOCATIONS INDICATED. SENSORS
SHALL INCLUDE ALARM BEACON AND AUDIBLE ALARM. ALARM AND
STROBE TO ACTIVATE AT LEVELS ABOVE 1% BY VOL. SENSOR TO
REPORT TO DDC CONTROL. ALARMS SHALL BE GENERATED AT THE
DDC MONITORING STATION EOR ALARMS AT THE SENSOR.
CRAC UNIT CONTROL:
a. MONITOR ROOM TEMPERATURE. IF ROOM TEMPERATURE RISES
ABOVE 80 F, ENABLE CRAC UNITS.
b. IF TEMPERATURE CONTINUES TO RISE ABOVE 80 F AFTER CRAC
UNITS HAVE BEEN ENABLED FOR 30 MIN (ADJUSTABLE),
ACTIVATE EF—1 AND EE-2, AND GENERATE ALARM AT DDC.
c. VIA THE (E) DDC SYSTEM, MONITOR CRAC UNITS AND REPORT
ALARMS FROM ON-BOARD BACNET CONTROLLER.
d. PROVIDE CHANGE OF VALUE TRENDS FOR CRAC UNIT
ENABLE/DISABLE AND LOG ALL ALARMS.
EXHAUST EAN CONTROL
a. IN NORMAL OPERATION, EXHAUST FANS SHALL REMAIN OFF.
b. EXHAUST FANS SHALL BE ACTIVATED BY THE DDC SYSTEM OR
THE HYDROGEN SENSORS. ISOLATION DAMPER SHALL REMAIN
CLOSED UNLESS FAN IS ENABLED.
c. IF THE ROOM HYDROGEN LEVEL IS SENSED BY THE HYDROGEN
SENSORS AT A LEVEL ABOVE 1% BY VOL, THEN THE EXHAUST
FANS SHALL ACTIVATE
d. FIRE ALARM AND CONTROLS CONTRACTORS SHALL COORDINATE
SO THAT EIRE ALARM DOES NOT PREVENT EXHAUST EAN EROM
ACTIVATING EXCEPT DURING A FIRE SUPPRESSION RELEASE
MODE.
e. PROVIDE TRENDING OF EXHAUST FAN ENABLE/DISABLE
RELOCATE (E) HEATING COIL THAT SERVES CONTROL ROOM.
RECONNECT COIL TO (E) PIPING LOCATED ABOVE CONTROL ROOM
CEILING. RESTORE CONTROLS TO EULL EUNCTION.
V'V\vvvo>~
T^N ~G I N E E R S
A R
C H
ITE
C
TS
JV
CRAC CU 1 &2
CRAC 2
CRAC 1
A S
-B U
ILT
F
O R
R E
C O
R D
O
LY
| Sheets and Views |
| G-001 COVER SHEET |
| G-002 SHEET INDEX |
| G-101 LOCATION AND VICINITY MAP |
| M-001 LEGEND AND ABBREVIATIONS |
| M-100 MECHANICAL PLAN - POWER HOUSE |
| M-500 MECHANICAL DETAILS |
| M-600 MECHANICAL SCHEDULES |
| E-001 LEGEND AND ABBREVIATIONS |
| E-002 ELECTRICAL PROJECT NOTES |
| ED-100 DEMOLITION PLAN - POWER HOUSE |
| ED-400 ENLARGED DEMOLITION PLAN - POWER HOUSE |
| ED-600 DEMOLITION ONE-LINE DIAGRAM |
| ED-601 DEMOLITION ONE-LINE DIAGRAM |
| E-100 ELECTRICAL PLAN - POWER HOUSE |
| E-101 ELECTRICAL PLAN - UNDERGROUND DISTRIBUTION |
| E-400 ENLARGED ELECTRICAL PLAN - POWER HOUSE |
| E-401 ENLARGED ELECTRICAL PLAN - CONDUIT ROUTING |
| E-500 PHOTOS - UPS AND BATTERY SYSTEMS |
| E-501 PHOTOS - SECONDARY UNIT SUBSTATION |
| E-502 PHOTOS - UPS DISTRIBUTION SWITCHBOARD |
| E-503 PHOTOS - GENERATOR SWITCHGEAR GS |
| E-600 ONE-LINE DIAGRAM |
| E-601 ONE-LINE DIAGRAM |
| E-602 ELECTRICAL SCHEDULES |
| E-603 ELECTRICAL SCHEDULES |
| REF-1 BASEMENT FLOOR POWER DISTRIBUTION PLAN |
| REF-2 SITE ONE-LINE DIAGRAM |