About this file

These are architectural drawings for a facilities building demolition project prepared by Above Group. The documents include foundation, first floor, second floor, mezzanine, and roof plans showing the layout and structural details of the building to be demolished. The building measures approximately 94'10" at the foundation, 100'0" for the first floor, 110'0" for the second floor, 108'3¾" for the mezzanine level, and 123'3⅛" for the roof plan.

The floor plans identify functional spaces including office areas (engineering, secretary, receptionist), a shop, carpentry area, mechanical equipment rooms, boiler room, kitchen, restrooms, janitor area, and multiple garage bays (six total). The elevation drawings show the north, east, south, and west facades of the structure. The documents are marked for demolition and include general removal notes and project specifications. The architectural firm is Above Group, located at 8401 Connecticut Avenue, Suite 350, Chevy Chase, MD 20815, with contact information provided for reference.

View the file

Other files for this federal contract opportunity

Other files attached to NOAA/FCDAS Replacement of Two (2) Non-Operational Boilers, newest first.
File Type Posted
FCDAS Boilers Replacement QA_Amendment Ver 3.pdf PDF
FCDAS Boilers Replacement QA_Amendment Ver 2.docx.pdf PDF
FCDAS_Power House_Amendment 0001.pdf PDF
DBA Wage Determination.pdf PDF
RFQ_1332KP26Q0033 Boilers Replacement.pdf PDF
QASP FCDAS Boilers Replacement.pdf PDF
PWS FCDAS Boilers Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

AD301.1

AD301.1

AD301.1

AD301.1

1A

B CB1 B2 B3A1

-1

-2

-3

4' - 0" 4' - 0"

0"

0"

107' - 4"

48' - 1" 56' - 2"

AD301.1

AD301.1

AD301.1

1A

B CB1 B2 B3A1

-1

-2

-3

8"

0"

108' - 8"

48' - 1" 56' - 10"

PLANT ENGINEER

SECRETARY

RECEPTIONIST

VESTIBULE

ENTRY

SITE SUPPLY OFFICE

CARPENTRY

WOMENS

MENS

CORRIDOR

JANITOR

CORRIDOR

BOILER ROOM

MECH. EQUIP.

MECH. EQUIP.

VESTIBULE

KITCHEN

SHOP

SHOP

STORAGE

RESTROOM

GARAGE BAY 1

GARAGE BAY 2

SHOP OFFICE

GARAGE5

23.1

GARAGE BAY 3

14.1

GARAGE BAY 6

23.2

GARAGE BAY 4

B

MEZZANINE

STORAGE

SEAL:

DRAWING NO.:

SCALE:

Revisions:

DRAWING TITLE:

APPROVED BY:

ISSUE DATE:

DRAWN BY:

NOT FOR C

ONSTRUCTIO

N

PROJECT NO.:

SUBMISSION:

Email: mail@delta-eas.com www.delta-eas.com

8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815

Tel: 301.718.0080 Fax: 301.718.9520

1/8" = 1'-0"

AD101.1

FACILITIES BUILDING -

FOUNDATION AND

GROUND FLOOR

DEMOLITION

LDM/LAA

EJL

04/03/2026

D E

M O

A S

S E

S S

M E

N T

E is el e

R d, F ai rb an ks , A

K

2025.234.001

65% SUBMISSION

SCALE: 1/8" = 1'-0"AD101.1

1 FOUNDATION PLAN - DEMOLITION

1. GENERAL CONTRACTOR TO COORDINATE WITH NOAA/NESDIS FOR SELECTIVE REMOVAL AND SALVAGE OF

BUILDING EQUIPMENT/ COMPONENTS PRIOR TO DEMOLITION.

2. INSTALL PERIMETER BARRIER AS REQUIRED TO SECURE DEMOLITION SITE.

3. ALL METAL BUILDING COMPONENTS SHALL BE SEPARATED AND SENT TO RECYCLING.

4. DEMO EXISTING ROOFING ASSEMBLY AND CEILINGS

5. DEMO INTERIOR PARTITIONS, DOORS, MILLWORK, AND PLUMBING FIXTURES. COORDINATE WITH M/E/P

AND CIVIL FOR UTILITY CAPS.

6. DEMO EXISTING EXTERIOR WALL ASSEMBLY, WINDOWS, OVERHEAD DOORS, AND STOREFRONT.

7. DEMO COMPLETELY EXISTING FLOOR SLABS AND FOUNDATION SYSTEM OF BUILDING, INCLUDING

FOOTERS. COORDINATE WITH M/E/P AND CIVIL FOR EXTENT OF REMOVAL WORK.

SCALE: 1/8" = 1'-0"AD101.1

2 FIRST FLOOR PLAN - DEMOLITION

PLAN NORTH PLAN NORTH

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

GENERAL REMOVAL NOTES

A. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING ELEMENTS TO BE

REMOVED. REFER TO OTHER TRADE DRAWINGS FOR OTHER REMOVALS, INCLUDING

MODIFICATIONS THAT MAY EXTEND BEYOND AREAS SHOWN.

C. PROVIDE TEMPORARY CONSTRUCTION BARRIERS WHERE REQUIRED TO SECURE SITE.

BARRIERS MUST BE CONSTRUCTED IN ACCORDANCE WITH FIRE PROTECTION AND

EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS ACCESS TO EXITS DURING

DEMOLITION,

E. COORDINATE WITH OWNER FOR EQUIPMENT TO BE SALVAGED AND RETURNED TO

OWNER. THE OWNER WILL RETAIN ALL SALVAGE THAT IS OF VALUE AS DESIGNATED BY

THE USER OR BUILDING ENGINEER. REMOVE FROM THE BUILDING AND DISPOSE OF IN

A LAWFUL MANNER ALL DEBRIS AND/OR ITEMS NOT RETAINED BY OWNER.

F. INSTALL ADHESIVE MATS INSIDE AND OUTSIDE EACH ACCESS DOOR TO

CONSTRUCTION AREA.

G. COORDINATE WITH OTHER TRADE DRAWINGS FOR REMOVAL WORK, AS REQUIRED.

SCALE: 1/8" = 1'-0"AD101.1

3 SECOND FLOOR PLAN - DEMOLITION

NO DATE DESCRIPTION

GENERAL PROJECT NOTES

A. NOTES LISTED BELOW ARE SUPPLEMENTAL AND SUPPORT DIVISION 0, 1 AND OTHER

PROJECT SPECIFICATIONS SECTIONS.

B. CONFORM WORK TO THE REQUIREMENTS OF THE APPLICABLE FEDERAL, AND STATE

BUILDING CODE, STATE & LOCAL FIRE DEPARTMENT REGULATIONS, LOCAL UTILITY

COMPANY REQUIREMENTS.

C. DIMENSIONS INDICATED ARE BASED ON ORIGINAL EXITING CONDITIONS DOCUMENTS.

VERIFY EXISTING DIMENSIONS AS NECESSARY.

D. EXAMINE THE EXISTING CONDITIONS & PRIOR STARTING WORK. VERIFY DIMENSIONS

AND COMPARE THE EXISTING CONDITIONS TO THE DESIGN INTENT OF THE CONTRACT

DOCUMENTS. NOTIFY THE ARCHITECT OF DISCREPANCIES.

E. COORDINATE OPERATIONS WITH THE OWNER SUCH AS BUT NOT LIMITED TO, WORK

AREAS USED FOR STORAGE, ACCESS TO AND FROM WORK AREAS, TIMING OF WORK,

SPECIAL CONSIDERATIONS OF NOISY OPERATIONS, INTERRUPTIONS FOR

MECHANICAL, PLUMBING, AND ELECTRICAL SERVICES. FLAMMABLE OR TOXIC

MATERIALS ARE NOT PERMITTED TO BE STORED INSIDE THE BUILDING.

F. FURNISH MATERIALS, LABOR, SERVICES, ETC., TO COMPLETE THE WORK AS

ESTABLISHED BY THE CONTRACT DOCUMENTS AND AS REASONABLY IMPLIED HEREIN.

G. STORE MATERIALS ACCORDING TO THE MATERIAL MANUFACTURER'S RECOMMENDED

PROCEDURES, REQUIREMENTS AND AS DIRECTED BY THE OWNER. PROTECT

MATERIALS FROM INCLEMENT WEATHER AND FROM POTENTIAL DAMAGE.

H. INFORMATION CONTAINED WITHIN THE CONTRACT DOCUMENTS ARE TO BE USED

TOGETHER AND IN CONCERT WITH ONE ANOTHER AS A WHOLE BODY OF INFORMATION

FOR THE PROJECT. PROVIDE ITEMS REQUIRED BY THE INFORMATION AND DESIGN

INTENT INDICATED AND IMPLIED BY THE DOCUMENTS, REGARDLESS OF THE LOCATION

OF THIS INFORMATION.

I. FOLLOW FIGURED DIMENSIONS AND DO NOT SCALE CONTRACT DOCUMENTS.

DIMENSIONS ARE NOT ADJUSTABLE WITHOUT THE APPROVAL OF THE ARCHITECT

UNLESS NOTED OTHERWISE.

J. WORK NOT INDICATED ON A PART OF THE DRAWING BUT REASONABLY IMPLIED TO BE

SIMILAR TO THAT SHOWN AT CORRESPONDING PLACES TO BE PROVIDED AT NO

ADDITIONAL COST.

K. MINOR DETAILS OR INCIDENTAL ITEMS NOT USUALLY SHOWN OR SPECIFIED, BUT

NECESSARY FOR A PROPER AND COMPLETE INSTALLATION OF ANY PART OF THE

WORK TO BE INCLUDED AS REQUIRED AS IF THEY WERE INDICATED IN THE DRAWINGS.

L. PROTECT CONSTRUCTION AND EQUIPMENT DURING THE PERFORMANCE OF THE

WORK. REPAIR/REPLACE AREAS DISTURBED OR DAMAGED BY THE WORK AT NO

ADDITIONAL COST TO THE OWNER.

M. LEGALLY DISPOSE OF UNUSED MATERIALS AND DEBRIS FROM THE PREMISES. NO

ON-SITE STORAGE OR BURIAL OF DEBRIS SHALL BE ALLOWED, UNLESS OTHERWISE

NOTED. SAFELY LOWER DEBRIS DOWN TO DUMPSTERS FOR PROPER DISPOSAL.

FREEFALL OF DEBRIS NOT PERMITTED.

N. COORDINATE OPERATIONS WITH ASSOCIATED PARTIES AS DIRECTED BY OWNER OR

OWNER'S REPRESENTATIVE.

FIRST FLOOR PLAN

100' - 0"

SECOND FLOOR PLAN

110' - 0"

MEZZANINE

108' - 3 3/4"

ABC B1B2B3 A1

FOUNDATION PLAN

94' - 10"

ROOF PLAN

123' - 3 1/8"

FIRST FLOOR PLAN

100' - 0"

SECOND FLOOR PLAN

110' - 0"

MEZZANINE

108' - 3 3/4"

111 9 6 312 10 8 5 4 2 -1-2-3

FOUNDATION PLAN

94' - 10"

ROOF PLAN

123' - 3 1/8"

FIRST FLOOR PLAN

100' - 0"

SECOND FLOOR PLAN

110' - 0"MEZZANINE

108' - 3 3/4"

A B CB1 B2 B3A1

9'

- 3

FOUNDATION PLAN

94' - 10"

ROOF PLAN

123' - 3 1/8"

FIRST FLOOR PLAN

100' - 0"

SECOND FLOOR PLAN

110' - 0"

1 11963 12108542-1 -2 -3

FOUNDATION PLAN

94' - 10"

ROOF PLAN

123' - 3 1/8"

SEAL:

DRAWING NO.:

SCALE:

Revisions:

DRAWING TITLE:

APPROVED BY:

ISSUE DATE:

DRAWN BY:

NOT FOR C

ONSTRUCTIO

N

PROJECT NO.:

SUBMISSION:

Email: mail@delta-eas.com www.delta-eas.com

8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815

Tel: 301.718.0080 Fax: 301.718.9520

1/8" = 1'-0"

AD301.1

EXTERIOR ELEVATIONS -

DEMOLITION

LDM/LAA

Approver

04/03/2026

D E

M O

A S

S E

S S

M E

N T

E is el e

R d, F ai rb an ks , A

K

2025.234.001

65% SUBMISSION

SCALE: 1/8" = 1'-0"AD301.1

1 NORTH ELEVATION

SCALE: 1/8" = 1'-0"AD301.1

2 EAST ELEVATION

SCALE: 1/8" = 1'-0"AD301.1

3 SOUTH ELEVATION

SCALE: 1/8" = 1'-0"AD301.1

4 WEST ELEVATION

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

NO DATE DESCRIPTION

Sheets
G-001 - VA COVER SHEET

File details come from the government source that posted it. Updated .