This document is an amendment to a solicitation for drydock repairs to the NOAA ship Oscar Elton Sette. The amendment includes answers to questions, revisions to the specification, and updates to pricing calculations for the growth CLINs. The key changes are:
- Provided references for the docking plan, transducer pod redesign, and other technical documents.
- Revised the specification to address issues with cable pulls/repairs, ABS inspections, and coatings for the hawse pipes.
- Updated the pricing and quantity for the AIRs/Growth labor and material CLINs.
- Clarified the intent of certain repair items, such as the galley and crew's mess deck work.
- Addressed questions related to the 10,000-hour engine overhaul, chiller plant overhaul, fan overhauls, and other repair tasks.
- Provided additional details on the bridge weather door replacements and trawl winch repairs.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1305M224Q0182 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
EAD-OMAO
NORFOLK VA 23510
FED BLDG 200 GRANBY ST SUITE 815
EAD-OMAO
07/22/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/22/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See below.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ANDREW HILDEBRANDT
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 7
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1305M224Q0182/0001
Change Item 3000 to read as follows(amount shown is the obligated amount):
3000 Additional Item Requirements - ORF Growth, Class
5.0
Product/Service Code: 1910
See Attachment IV - Price Schedule
*Provide breakdown, as follows:
AIRs/Growth Labor Rate
Unit Price: $__________;
Quantity: 2,000;
Unit of Issue: Hour;
Extended Price: $__________
AIRs/Growth Material Markup/Handling Fee
Unit Price: $200,000.00;
Quantity: 1;
Unit of Issue: Percent __________%;
Extended Price: [$200,000.00 x percentage quoted]: $__________
Change Item 4000 to read as follows(amount shown is the obligated amount):
4000 Additional Item Requirements - PAC Growth, Class
6.0
Product/Service Code: 1910
See Attachment IV - Price Schedule
*Provide breakdown, as follows:
AIRs/Growth Labor Rate
Unit Price: $__________;
Quantity: 500;
Unit of Issue: Hour;
Extended Price: $__________
AIRs/Growth Material Markup/Handling Fee
Unit Price: $50,000.00;
Unit of Issue: __________%;
Extended Price: [$50,000.00 x percentage quoted]: $__________
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1305M224Q0182 0001
The purpose of Amendment 0001 includes the following:
1. To answer questions set forth below.
2. Provide a revised specification to reflect answered questions and clarifications with edits marked in red.
3. Include references as requested.
4. Additional responses to questions are forthcoming.
Question (Q): Can you provide the docking plan for the Sette?
Answer (A): Reference SE_085_OS-085-002_RevA_Sht1 OF 1_NONE_DOCKING DRAWING, attached.
Q: Item 3.27.2.3 Transducer Pod Redesign - Please provide reference SE-461-003 Rev A STBD Transducer Fairing.
A: Reference SE-461-003_Rev A_STBD Transducer Fairing Modifications, attached.
Q: Item 3.12.2.1 Main Motor Thrust Bearing, Inspect, Clean & Oil Change & Item 3.30.2.1 MG Set #1 and #2 Clean/Inspect Bearings & Item 4.1.2.1 #2 and #3 SSDG Generator Overhaul & Item 4.5.2.1 Overhaul ASW Pump - “Appendix B Specific Contract Work Definitions and Requirements” and “Technical Manual HI-311-01, Alternating Current Generator 600KW Kato” are listed as contract references but were not included in the technical package delivered via Kiteworks. Please provide.
A: Appendix B is an administrative error and should be removed as a reference. Reference at
4.1.2.1 added and attached. References 4.1.2.4 and 4.1.2.5 are available only as hardcopy aboard the vessel. See revised specification and attached reference SE_NONE_350-05002-00_INSTRUCTION
MANUAL KATO PILOT EXCITERS (PERMANENT MAGNET GENERATORS).
Q: Please correct pricing on the growth CLINs.
A: Please see revised pricing calculation for growth CLINs.
Q: Item 3.25 Cable Pulls and Transit Repairs - Provides no information to price repair work. Does USG intend for KTR to conduct inspection, propose cable removals via Condition Report (para 3.25.4.3) and then propose pricing for those removals via Change Request (para 3.25.4.4)?
A: Yes, this is the intent.
Q: Are you able to send over information on the ship's arrival condition for the Period of Performance as well as information/drawings on the stability/VCG of the vessel?
A: The arrival condition and ship’s fueling and burn depend on the location the ship will need to sail for dry dock. Without this, and potential for weather if the ship needs to cross the Pacific, it'd be reasonable to expect the ship will have more than 40k diesel on board for the ship's stability (this was noted in the Specifications). They can deballast and pump fuel off prior to going up on blocks and then tugs to move the ship into the drydock to offer the lightest condition possible. Latest trim and stability booklet is attached as reference OS-079-002 Rev D SETTE Trim and Stability Book (ABS Stamped).
Q: Item 3.25 Cable Pulls and Transit Repairs - Can the Government make this item a level of effort item "Provide 400 man hours of labor"?
A: No, as the contract award will be firm-fixed-price, not labor hour. It is up to the vendor to configure this information and price their quote accordingly.
Q: Item 3.27.4.1.1 Transducer Pod Redesign - It appears the contact information in the Sette drydock proposal is incorrect for Kongsberg.
A: Please see the revised specification.
Q: Item 3.7.4.1 ABS Special Survey Inspection - If a delay is solely attributable to ABS, and the Government is contracting directly with ABS, and the delay causes the contractor additional expense, how is the Government not responsible to compensate the Contractor for the additional expense? The FAR supports the Contractors right to compensation for additional expenses caused by the Government or subcontractors working directly for the Government.
A: Please see revised specification.
Q: Item 3.7.4.15.3 ABS Special Survey Inspection - The specified application of thermal spray to the interior surfaces of the hawse pipes and spill pipes cannot be successfully performed in place. Of the suggested sources for this service, one is out of business and the other is only willing to perform the work if the hawse pipes and spill pipes are delivered to their facility (Ohio) in short sections. Will the Government consider revising the specification to apply abrasion resistant epoxy coatings ("Ice Breaker Coating'')?
A: This is an acceptable replacement.
Q: Item 3.10.4.5.2 Miscellaneous Steel Repairs - Can the Government provide a PDF copy of drawings for the existing V1 Tank?
A: The dimensions are provided but there are no drawings for this.
Q: Item 3.10.4.7.7 Miscellaneous Steel Repairs - As the location of the leak is currently unknown, as such above and below deck interferences are unknown. Can the Government make removal and restoration of interferences the subject of a change order?
A: Yes, this is acceptable, however it is known that the backside interferences will be paint, lagging, and protection of the engineering control room. See revised specification.
Q: Item 3.11.4.9 Miscellaneous Pipe Repairs - Is reference "3.10.2.6" actually intended to be "3.11.2.6?”
A: Yes. See revised specification.
Q: Item 3.18.4.1 Galley and Crews Mess Decking Top Coat Removal - Is deck top covering replacement limited to the crew's mess?
A: It is to also include the galley and the crew’s mess.
Q: Item 3.34.4.2.5 Fabrication of Gasoline Tank - Paint adhesion to 316 SS is problematic, can the Government specify surface preparation and approved coatings for the exterior of the tank?.
A: SSPC-SP-16: Brush-Off Blast Cleaning of Non-Ferrous Metals
Q: Item 3.37.4.3 Small Boat Tall Cradle Stand Preservation - How many UT shots are to be taken?
A: Approximately 50 UT shots.
Q: Item 3.18 Galley and Crew’s Mess Deck Renewal - Please confirm intent of item is to reseal crew’s mess and galley decks not renewal as shown at 3.18.1.1.
A: The intent is to remove or cover the existing top coat which has too much texture. The textured floor was to provide an anti-slip surface, however this makes it very difficult to mop/clean.
Q: Item 3.25 Cable Pulls and Transit Repairs - Are cable removals/disposals at 3.25.4.4 and cable penetration/MCT repairs at 3.25.4.7 to be covered by change order process or included in bid?
A: Cable Penetrations/MCT Repairs can be covered via change order. Disposal is to be covered under the basic work item. See revised specification.
Q: Item 4.2 10,000 Hour CAT D398 Engine Overhaul - Please confirm or clarify 10-day performance period shown at 4.2.4.1.1.
A: The 10-day performance period has been removed. See revised specification.
Q: Item 4.4 No. 3 Chiller Plant Overhaul - Is this the #1 Auxiliary Seawater Pump?
A: No, these are separate items.
Q: Item 4.6 Fan Overhauls - Are we correct that only two (2) Generator Intake Fans and one (1) Forepeak Exhaust Fan are being serviced?
A: Yes, that is correct.
Q: Item 4.8 Profinet Upgrade Support - Does the Government understand that bidders will not be able to initiate an estimating process until receipt of information related to the specific communications system selected by the Government?
A: This Profinet upgrade is from Nate Waller and Associates with contact information is found at Item 4.8.6.1. Please contact him to get an estimate for this work. This has nothing to do with the communication systems/telephone/PA/GA system upgrade.
Q: Item 4.7 Dial Telephone & PA / GA Systems Upgrade - Please provide missing GFE list and installation and removal plans described at 4.7.2.4 and 4.7.6.1 for estimating.
A: This is still in the development phase.
Q: Item 7.1 Bridge Weather Doors - Could the government provide a list of the specific doors to be replaced?
A: The three doors on the bridge, and the two doors directly below the bridge. (One outside the chief engineer’s stateroom and the other outside the CO’s stateroom) They are all the same dimensions.
Q: Item 7.1 Bridge Weather Doors - Could the government provide a PDF copy of the vessel's "watertight closures?” This drawing should include specifications necessary to replicate the existing doors.
A: The doors are weather tight, not water tight. The water tight doors are for spaces closer to the water line.
Q: Item 7.1 Bridge Weather Doors - Do the new Pilot House Doors require ABS/USCG approval?
A: Yes.
Q: Item 7.1 Bridge Weather Doors - Please clarify if the doors are weather tight versus watertight.
A: Weather tight.
Q: Item 7.3 Trawl Winch Repairs - Could the government provide a more detailed definition of the specific inspections and repairs to be made to the trawl winches?
A: The Trawl winches have not been working since they were originally installed in 2020. We would like the tech rep (Marco, in Spain) to come to the shipyard to troubleshoot and fix the problem.
Any repairs would be completed via change order.