300-3 Gen Reqmts for Electrical-Electronic Items.pdf

PDF 22 KB Posted

Attached to
FY24 DRYDOCKING AND REPAIRS TO NOAA SHIP PISCES
Solicitation number
1305M223QNMAN0181
Issued by

About this file

This specification provides general requirements for electrical and electronic work on National Oceanic and Atmospheric Administration (NOAA) Marine Operations Center vessels. It outlines standards for materials, cabling, equipment installation, identification labeling, and warranty assignment. The related federal contract opportunity is a solicitation from the Department of Commerce NOAA for drydocking and repair services to the NOAA ship Pisces in FY24. The specification establishes guidelines for contractor work to be compliant with IEEE and Coast Guard standards and use best marine practices. It specifies requirements for new materials matching originals, low smoke cabling, machinery replacement, equipment fastening, painting, junction boxes, cable routing, identification tagging, and warranty assignment.

View the file

Other files

File Type Posted
AMEND 0003.pdf PDF
PISCES Gauge Calibration List_Updated.xlsx XLSX spreadsheet
PISCES FY24 SPEC_AUG2023_REV 3.pdf PDF
300-1.pdf PDF
000-3C.pdf PDF
533-1A Potable-Water-Tank-System-Disinfection.pdf PDF
Sperry Marine 2018 Gyro maintenance report.pdf PDF
SH-461-FE93-Transducer Arrangement and Installation.pdf PDF
SH-072-FR05-Resiliently Mounted Equipment.pdf PDF
(048)Trawling and Scientific Winch System Part 2.pdf PDF
FP10-001-05AB Scaubbers - Drains System Diagram.pdf PDF
PC FY24 SPEC_JULY2023_REV 2.pdf PDF
SH-085-FF01-Insulation Arrangement.pdf PDF
AMEND 0002.pdf PDF
SH-541-FP04-Fuel Service Transfer System Diagram.pdf PDF
Radar As-built dwgs.pdf PDF
PC-551-FP07 Compressed Air System Diagram.pdf PDF
SH-330-FE22-Fire Alarm System BOM Legend and Notes.pdf PDF
SH-461-FE89-Mission Scientific Block Wiring Diagram.pdf PDF
FC12-001-01 Trim-Stability Booklet.pdf PDF
PC-256-FP08-Main-SW-Cooling-System-Diagram.pdf PDF
PC-524-FP18 Scientific SW System Diagram (2 sheets).pdf PDF
PP3010-073-Piping Resilient Mounts.pdf PDF
SH-461-PE86-Centerboard Block Elem Wiring Diagram.pdf PDF
DY-461-OD-461A-001 ME-70 TRANSDUCER INSTALL.pdf PDF
Hydraulic System HPU.pdf PDF
PC-514-FP16 Chilled Water System Diagram.pdf PDF
FRV40-226-047-010 Trawling Sci Winch.pdf PDF
(085)fuel oil purifier.pdf PDF
PISCES Immersion Suit Inventory.xlsx XLSX spreadsheet
PC FY24 SPEC_JULY2023_REV 1.pdf PDF
SKF C 3184 KM Bearing Dismounting.pdf PDF
5.6 Ref. 2.1 Consilium SAL T2 & SAL T2+.pdf PDF
NAVSEA Drawing 167-7379882.pdf PDF
(143)6.15m RHIB Rescue Boat.pdf PDF
SH-111-FH18-Rev2-BOSSING AND STERN FRAME SCANTLINGS.pdf PDF
6001-Table-1-US Standard Bus Connection Bolt Torque Values.pdf PDF
AMENDMENT 1.pdf PDF
0606- Standards for Lifting Appliances on NOAA Ships.doc DOC document
SH-235-PE32-Bow Thruster Control System Terminal List.pdf PDF
Sh-100-FH11-Forward-House-Scantlings-01-03-Level-FR-39-Fwd.pdf PDF
SH-100-FH68-Berp-Werp Key Plan and Details.pdf PDF
OSCAR DYSON Centerboard Conduit Installation.pdf PDF
PC-101-M282-100-FH14-Rev3-Sht1 THRU 3-PILOTHOUSE SCANTLINGS-03-04 LEVEL.pdf PDF
SH-100-FH12-Aft-House-Scantlings-01-03-Lvl-Fr-39-Aft.pdf PDF
SH-111-FH17-Rev6-BULWARKS LAYOUT-SCANTLINGS.pdf PDF
ieee.45.2002.pdf PDF
ADCP tank detalied drawing 124068 Revision A.pdf PDF
Radar.pdf PDF
(010)Capstan.pdf PDF
Show 40 more

Latest 50 of 187 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-300-3

September 2000

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATIONS CENTER

STANDARD SPECIFICATION MOC-300-3

GENERAL REQUIREMENTS FOR ELECTRICAL/ELECTRONIC ITEMS

1. SCOPE. This specification provides general requirements for work performed on electrical and electronic systems.

2. REFERENCES.

2.1 IEEE STD 45-1988, Recommended Practice for Electric

Installations on Shipboard (series)

2.2 U. S. Coast Guard 46 CFR 110 through 113, “Subchapter J - Electrical Engineering”

3. REQUIREMENTS.

3.1 The contractor shall accomplish all work in these

specifications in accordance with the requirements of References

2.1 and 2.2, and using the best marine and shipbuilding practices.

3.2 The quality of all materials provided by the contractor

shall be in accordance with References 2.1 and 2.2, suitable for marine service, and have the same shape, color, and finish as the existing or damaged materials when they were new.

3.3 All new cabling shall be low smoke and sized for the cable’s intended use.

3.4 All machinery, piping, cabling, ducts, insulation, paint

work, deck tile, or any other article removed, disturbed, or damaged in the process of accomplishing the work required by these specifications shall be replaced, renewed, or repaired.

All paneling removed shall be replaced, including any required alterations. Paneling damaged by the contractor shall be renewed equal to the original when new. All flanges and joints broken or loosened shall be properly remade using new gaskets of the proper size and material.

3.5 All electronic racks installed shall be securely fastened to overhead and deck structural or steel members to prevent movement.

3.6 Any disturbed painted or varnished surfaces shall be

cleaned, painted, and/or varnished with original type and color of paint or varnish.

MOC-300-3

September 2000

3.7 Any extension of electrical cabling shall be through a

junction box. Any removal of electrical cabling shall be to the nearest junction box.

3.8 All electrical junction boxes, receptacles, hangers, and

miscellaneous electrical fittings shall be in accordance with References 2.1 and 2.2.

3.9 All electrical cabling installed by the contractor shall be run behind paneling in existing cableways and shall be securely banded to the hangers. If existing cableways are not available, new cableways shall be established.

3.10 All electrical cabling installed by the contractor shall be identified at each end with embossed metal tags. Where cables are marked within a junction or terminal box, nonconductive labels shall be used. The contractor shall number cabling with a marking system similar to that used on the ship.

3.11 All manufacturer's or supplier's standard warranties on

equipment installed on the ship shall be assigned in writing by the contractor to the Government.

3.12 Three copies all manufacturer's technical manuals, prints, and drawings shall be delivered to the COTR. Spare parts and surplus installation materials shall be delivered to the COTR.

4. QUALITY ASSURANCE.

4.1 All items disturbed and all devices used, repaired, altered, furnished, or installed by the contractor shall be demonstrated to be fully operational upon completion of work.

END OF SPECIFICATION