FAIRWEATHER DD Q and A Amendment 3.xlsx
XLSX spreadsheet 49 KB Posted
- Solicitation number
- 1305M221QNMAN0114
About this file
This request for quotation (RFQ) solicits proposals for the drydocking and repairs of the NOAA Ship FAIRWEATHER. The work includes hull treatment, preservation and repairs, machinery repairs and upgrades, interior repairs, lifesaving and fire equipment services, and miscellaneous work. Offerors must have experience with ABS-classed vessels and familiarity with applicable codes and regulations. Proposals are due by March 18, 2022 and the period of performance is scheduled from June 2022 to September 2022 at the offeror's facility. The government will provide ship access for inspection prior to proposal submission. Questions must be submitted by March 4 and responses will be provided via amendment. The award will be made to the responsible offeror whose proposal follows the solicitation instructions and is most advantageous to the government.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA DD Q&A AMENDMENT 3
| Work | ||||
| Item | Paragraph | Contractor Inquiry | Government Response | |
| N/A | N/A | Section A- SF 1449 and Quote Instructions, Volume II: Price. Is it a requirement to complete line items 19– 24 of SF 1449 for each CLIN item or can the contractor provide a completed Attachment IV – Price Schedule and not include pricing information on the SF 1449? | Completion of Attachment IV- Price Schedule is sufficient. Contractor shall populate the Unit and Extended Price Columns under Section B for each CLIN. | |
| all | 2.2.3 & 2.5.1 | How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can gain a clear picture of interferences | |
| 2.2.5 & 2.2.2.7 | If a technical specification does not include a specific requirement to fulfill an ABS survey requirement, what is the expectation for performance? Does the contractor assume that the ship's crew or its Port Engineer's office will handle required inspections such as Hull opening, main engine inspections, etc.? | |||
| In the past the Fairweather CME has coordinated the mandatory ABS inspections that do not involve contractor participation. Will that continue to be the case? | For the non-ABS approved systems or inspections, the PE and the CME will witness and sign off | |||
| 2.2.20 | Ship’s force available to run machinery only between 0800 - 1500 weekdays. That could impact fuel transfer. | |||
| Will address the hours as needed | ||||
| 3.4 | 3.4.4.3 | 1. In paragraph 3.4.4.3, it states to remove all loose paint which is not tightly adhered to the hull. Can NOAA tell us what percent of the area referenced in 3.4.2.1 the contractor is to allow for? Since there is no ship check, the contractor hasn’t the information to know how much failed paint there is. | Spec calls for up to 20 percent. Shipcheck is granted. | |
| 3.4.4.6.3 | 2. In paragraph 3.4.4.6.3, it is not recommended to use GMA 571 on the Underwater hull painted surfaces. Do you mean to use GMA 571 exclusively on the Freeboard hull surfaces? | Pressure washing/cleaning in acordance with SP-10. | ||
| 3.4.4.7 | 3. In paragraph 3.4.4.7, it states to accomplish additional surface preparation to a total 20% of surfaces in paragraph 3.4.4.7.3. Where is paragraph 3.4.4.7.3 and what surfaces are to have additional surface preparation? | |||
| Of the 20% region of the underwater hull that is to receive surface preparation, what percentage of this 20% region is to be mechanically prepped? Are both SSPC-10 and WJ-2 acceptable for all remaining non-mechanical prep areas? | This paragraph was modified Rev 1.0. SP-10 is accepatble for remaining areas | |||
| 3.4.4.8 | 4. In paragraphs 3.4.4.8, which surfaces is NOAA referring to? | This was corrected on Rev 1.0 | ||
| 5. In paragraph 3.4.4.9, which surfaces is NOAA referring to? | This was corrected on Rev 1.0 | |||
| 6. Is paragraph 3.4.4.13.1 a spot coat of paint to areas that had spot surface preparation done? | This was corrected on Rev 1.0 | |||
| 7. Is paragraph 3.4.4.13.2 a spot coat of paint to areas that had spot surface preparation done? | This was corrected on Rev 1.0 | |||
| 8. Is paragraph 3.4.4.13.3 a spot coat of paint to areas that had spot surface preparation done? | This was corrected on Rev 1.0 | |||
| 3.4.4.13 | Are we correct in our interpretation of the spec that the first two coats (1 coat primer and 1 coat intertuf) to the freeboard areas are to be applied to 20% of the freeboard square footage? If so, what percentage of this 20% is to be mechanically prepped? Can you please send photographs of the inboard bulwarks, cap rails, and handrail areas that are to be included in the spot preservation? | Shipcheck will be granted and contractor can identify areas of concern | ||
| 9. In paragraph 3.4.4.14, it states to wash the entire hull and then to apply one full of to the entire freeboard surfaces. International Paint does not recommend washing down the surfaces between coats, does NOAA want this to be done? | ||||
| Has a paint system from reference 631-2D been selected for this freeboard region, and if so which one? | This was corrected on Rev 1.0 | |||
| 3.5 | 3.5.4.6.1 | The wind break is constructed of fiberglass which could potentially be damaged by an SP-10 sandblast. May the contractor substitute SP-11 mechanical preparation for sandblasting. | SP-11 can be substituted | |
| Lacking the opportunity to inspect the wind break, can NOAA specify what percentage of the surface area needs to be mechanically prepared (5%, 10%, 20%...) | Around 20% | |||
| 3.6 | Photos shown in the specification are from the top of the stack, please take pictures of the G deck surfaces to be prepped and painted. | |||
| Take pictures of all interferences | Shipcheck will be granted and contractor can note interferences at that time | |||
| 3.7 | Are all the fittings on the hydraulic hoses to be steel or stainless steel? | Inside the HPU the fittings can be steel but fiitings on the exterior should be stainless | ||
| How many HN-9001 HPUs are there in total? | 4 in total | |||
| How many internal flexible hoses are there to each HN-9001 HPU? | Once the cover is removed, the number can be verified. | |||
| Can NOAA provide photos of each davit, crane, A Frame, control stations and HPUs showing hoses to replace to show location, interferences, ability to access locations because of not being able to ship check the vessel for bidding purposes? | Shipcheck will be granted and contractor can note interferences at that time | |||
| Can NOAA supply drawings and Technical Publications on each davit, crane, A Frame, control station and HPUs showing hydraulic hoses that are to be replaced for bidding purposes? | Manuals were provided | |||
| 3.8 | 3.8.4.2 | Need Pictures of all interferences | ||
| Need a detailed list of all interferences | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| Is the intent of this paragraph to crop out and renew a 5' x 5' section of the outbd longitudinal bulkhead? | Report 49702 was provided to show the pitted areas in need of replacement. 25 sq ft was provided to give contractor an estimate for bidding but item will require shipchecking for actual footage | |||
| 3.8.4.3 | Need Pictures of all interferences | |||
| Need a detailed list of all interferences | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| Is the intent of this paragraph to crop out and renew a 5' x 5' hull plating, specifications suggest that the proposed insert is only 3' wide? | Report 49702 was provided to show the pitted areas in need of replacement. 25 sq ft was provided to give contractor an estimate for bidding but item will require shipchecking for actual footage | |||
| 3.8.4.4 | Need Pictures of all interferences | |||
| Need a detailed list of all interferences | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3.8.4.5 | Need Pictures of all interferences | |||
| Need a detailed list of all interferences | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| Is the attached photo of a double bottom tank top rather than hull plate of bulkhead plating. | The photo only shows the access to the Shaft Alley to give the contractor a picture of where the work will be located | |||
| 3.8.4.7 | Is NOAA providing ABS for inspections | Noaa will be providing only the ABS required inspections i.e. Annuals, major systems, and actual cuts to the hull | ||
| 3.8.6.3 | 3.8.6.3 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.9 | 3.9.5.5.1 | For estimating purposes, How many 2"x2" clad welds are there? |
What are the frame numbers?
| Please provide pictures of each area to be clad welded. | See the UT report that was provided | ||
| 3.9.5.7.1 | Please provide additional pictures. |
Need Pictures of all interferences
| Need a detailed list of all interferences | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| Are we to replace the existing manhole with a new manhole assembly? | This manhole requirement will be revisited during the next shipcheck period | |||
| 3.9.5.8 | Please provide additional pictures. |
Need Pictures of all interferences
| Need a detailed list of all interferences | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| How thick is the concrete? | See the shell plating drawings previously provided | |||
| 3.9.5.9 | Please provide pictures of the two areas that need to be cropped and inserted along with the frame numbers. |
Need Pictures of all interferences
| Need a detailed list of all interferences | See then UT report that was provided | |||
| 3.9.7.4 | 3.9.7.4 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.10 | 3.10.2.2 | Missing Reference FA-S4803-1 Rev3 (Diagram Firemain system) | FA-RA 183/S48-3-2L Arrangement Firemain System | |
| 3.10.2.3 | Missing Reference FA-S4803-2 Rev11 (Arrangement Firemain system) | FA-S4803-5 Rev A Firemain Piping System | ||
| 3.10.4.1 | Need pictures and videos of all firemain piping to be replaced. |
What are the frame numbers for each repair site?
| Need quantity and sizes of the following: 90 degree elbows, 45 degree elbows, tee's, Pipe hangers, offsets, through hull penetrations, flanges, reducers and valves. | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3.10.4.2 | Need pictures and videos of all interferences> | |||
| Need a detailed list of all interferences. | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3.10.4.3 | Need pictures of the two international fire connections. | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.10.5.2 | With the amount of firemain piping needing replaced, will adequate fire protection suffice in lieu of 3.10.5.2 | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| Is it possible to isolate the repair areas and maintain the system in an operational state during piping replacement? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| Can NOAA provide a fittings list and a list of hull and bulkhead penetrations for the pipe replacements? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3.10.6.3 | 3.10.6.3 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.11 | Are we correct in our interpretation that replacement of steel plate, if necessary, will be the subject of a change order? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.12 | Please provide pictures of all areas of non-skid to be renewed. | |||
| Provide pictures and a detailed list of interferences | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3.13 | The following paragraphs seem to reference one anode, which paragraph is contractor to follow? |
3.13.4.3.2. Anode P Frame 33.5 to P Frame 100
3.13.4.3.3. The Port anode at Frame 33.5 will remain in the same location
Contractor would like photos of location and interferences around where new materials to be installed
| Please provide Pictures, a Rip out Drawing for current system and a Lay out Installation Drawing for the refit | After 3.13.4.2.1 is accomplished, any ambiguity should be cleared up at that time. MD20017 drawing was provided to the contractor | ||
| 3.14 | 3.14.4.2 | Need Pictures of each Port Light inside and outside. |
Please provide a list of all interferences for each portlight What is the size, make and model?
| Are the Port Lights Government furnished? | Port lights are not GFM. Contractor will need to replace in kind from existing | |||
| 3.14.4.2.2 | 3.14.4.2.2 says to Renew in kind but 3.14.4.2.5 states to fit Refurbished port lights. Please clarify. | |||
| What are the frame numbers of each port light? | Replace in kind | |||
| 3.14.4.3 | Provide pictures of the interferences on the interior side of the bulkhead. | Shipcheck will be granted so contractor can view interefences | ||
| 3.14.4.4 | Provide pictures of the underside of the abandoned pipe. |
What are the frame numbers?
| Provide a list of interferences. | Shipcheck will be granted so contractor can view interefences | |||
| What type of floor covering in present? | Poured terrazzo as stated in 3.14.4.8.1 | |||
| What are the under deck interferences, if any? | Shipcheck will be granted so contractor can view interefences | |||
| Do joiner bulkheads and insulation need to be removed and later restored to accomplish repairs? | Not sure which item you are referencing here? However, a shipcheck will be granted and contractor can view interefences at that time | |||
| 3.14.4.5.1.1 | Spec says (Aft of the pin for the gangway). Provide a repair plan of what repairs are needed included materials. |
What are the frame numbers?
Provide pictures detailing the repairs.
| Provide pictures of all interferences and a list of interferences. | Pictures were provided of projected repairs needed | ||
| 3.14.4.5.1.2 | Spec says (Aft side of the bow thruster control box area will need to be repaired). Provide a repair plan of what repairs are needed included materials. |
What are the frame numbers?
Provide pictures detailing the repairs.
| Provide pictures of all interferences and a list of interferences. | Pictures were provided of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer | ||
| 3.14.4.5.1.3 | Spec says (Base of vertical support in corner). Provide a repair plan of what repairs are needed including materials. |
What are the frame numbers?
Provide pictures detailing the repairs.
| Provide pictures of all interferences and a list of interferences. | Pictures were provided of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer | ||
| 3.14.4.5.1.4 | Spec says (Base of vertical support closer to ladder down). Provide a repair plan of what repairs are needed including materials. |
What are the frame numbers?
Provide pictures detailing the repairs.
| Provide pictures of all interferences and a list of interferences. | Pictures were provided of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer | ||
| 3.14.4.5.1.5 | Spec says (Small pin hole in deck below navigation light box). Provide a repair plan of what repairs are needed including materials. |
Provide pictures detailing the repairs.
| Provide pictures of all interferences and a list of interferences. | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interreferences will be clearer | |||
| 3.14.4.5.2 | Provide pictures detailing the repairs needed. | |||
| Provide pictures and a list of all interferences. | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interreferences will be clearer | |||
| 3.14.4.6 | Provide pictures detailing the repairs needed. | |||
| Provide pictures and a list of all interferences. | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interreferences will be clearer | |||
| 4 square feet or 4 lineal feet? | Linear feet | |||
| Is the description correct, photos depict angle frames rather than formed web frame? | The upcoming shipcheck will better define area in question | |||
| 3.14.4.7 | Please provide additional pictures of the exterior and interior. |
What are the frame numbers?
Need Pictures of all interferences
| Need a detailed list of all interferences | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | |||
| Are we correct in assuming the repair area starts at the horizontal weld seam contained within the yellow circle? | Circle identifies the area in question | |||
| 3.14.4.8 | Need additional pictures of the proposed insert. |
What are the frame numbers?
Need pictures of the underdeck interferences.
| Does this insert transit through the adjacent bulkheads? If so, please provide pictures and a list of interferences. | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | |||
| Are the boundaries of the plate replacement going to be within the galley? | See The General Plans and the contractor can see what boundaries are impacted | |||
| How big will the deck insert be, 12" in diameter? | Shipcheck is granted | |||
| Should we assume that the bulkhead linings will have to be partially removed to perform specified repairs? | That assumption may be correct however a shipcheck is being granted so contractor can be have a clearer picture of interefernces | |||
| 3.14.4.9 | Provide addional pictures of the repair | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | ||
| Is this actually a hull penetration rather than a blkhd penetration? | See the applicable drawing previously provided | |||
| Is the hull plate actually 15.3# steel plate rather than 10.2#? | See the applicable drawing previously provided | |||
| Won't ABS be satisfied with an 18" diameter hull plate insert rater than a 4 square foot insert. | Can't speak for ABS but will consult with them | |||
| 3.14.4.9.1 | Provide pictures and a list of interferences. | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | ||
| 3.14.4.10 | Provide pictures of the interior side interferences. | |||
| What are the frame numbers? | Interferences need to be shipchecked by the contractor during the granted period | |||
| 3.14.4.11 | How many studs are to be removed? |
How many brackets are to be removed?
How many fwd deck light switches need to be removed?
Is staging required to safely access these repairs?
Are there through hull penetrations that need inserted? If so, please provide pictures and a list of all the interferences.
Proved pictures of each item to be removed along with pictures of any interferences in the interior side.
| If steel is required to be replace, will that be subject to a change order. | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. Contractor can determine, based on their capabilities, if staging will be required. | ||
| 3.14.4.4.12 | Provide pictures of each outlet that needs removed. |
Provide pictures and a detailed list of all interferences interior and exterior.
Is staging required to safely access these repairs?
| Is the vessels crew dealing with the existing cables? | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. Contractor can determine, based on their capabilities, if staging will be required. | ||
| 3.14.4.13 | Without knowing where the 10ea kickpipes are located, the contractor cannot account for interferences therefore, will all interferences, coverup and staging will be subject to a change order? |
What size insert is to be estimated for each kick pipe?
| What pound plate is to be used when inserting the 10ea kick pipes? | Kickpipes will be identified during the first week of the availability. | |||
| Can NOAA provide photos of the interior interferences at each kick pipe? | Upon identification of the kickpipes at the star of the availability, contractor can gain a cleared picture of interferences | |||
| 3.14.4.14 | How many frames are to be cropped and renewed? |
How many linear feet of each frame needs renewed?
What size is the flange and web of each frame?
Please proved pictures of each repair.
Please proved pictures of all exterior and interior interferences along with a detailed list of interferences.
| What are the frame numbers of each frame to | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | ||
| 3.14.4.15 | How many frames are to be cropped and renewed? |
How many linear feet of each frame needs renewed?
What size is the flange and web of each frame?
Please proved pictures of each repair.
Please proved pictures of all exterior and interior interferences along with a detailed list of interferences.
| What are the frame numbers of each frame to | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | ||
| 3.14.4.16 | How many frames are to be cropped and renewed? |
How many linear feet of each frame needs renewed?
What size is the flange and web of each frame?
Please proved pictures of each repair.
Please proved pictures of all exterior and interior interferences along with a detailed list of interferences.
| What are the frame numbers of each frame to | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | ||
| 3.14.4.18 | Please provide additional pictures. |
Need Pictures of all interferences Need a detailed list of all interferences
| What frame number is this valve at? | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | |||
| Is this actually a hull penetration rather than a blkhd penetration? | See the applicable drawing previously provided | |||
| Is the hull plate actually 15.3# steel plate rather than 10.2#? | See the applicable drawing previously provided | |||
| 3.14.4.19 | Please provide additional pictures. |
Need Pictures of all interferences Need a detailed list of all interferences
| What frame number is this deck drain at? | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | ||
| 3.14.4.20 | Please provide additional pictures. |
Need Pictures of all interferences Need a detailed list of all interferences
| What frame number is this deck drain at? | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. | |||
| 3.14.6.3 | 3.14.6.3 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.15 | 3.15.4.2 | What size is the vent piping? |
What schedule is the vent piping?
Is it seamless?
What type of material is the ball made out of?
Provide addional pictures of the top side and pictures of the under deck side.
| Provide pictures of all interferences and a detailed list. | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.15.4.3 | Need pictures and videos of all reefer flat piping to be replaced. |
Provide drawing of the reefer flat piping.
What are the frame numbers for each repair site?
| Need quantity and sizes of the following: 90 degree elbows, 45 degree elbows, tee's, Pipe hangers, offsets, through hull penetrations, flanges, reducers and valves. | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3.15.4.3. | Can NOAA provide a fittings list and a list of hull and bulkhead penetrations for the pipe replacements? | Contractor can compile list upon completion of shipcheck which has been granted | ||
| 3.15.4.4 | Need pictures and videos of all interferences> | |||
| Need a detailed list of all interferences. | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3.15.4.5 | Need pictures where piping penetrates the bulkhead on both sides. | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.15.6.3 | 3.15.6.3 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.16 | 1. On the 3.16 title, is the word "Lighting" supposed to be Lifting? | See revised work item | ||
| 2. Can NOAA provide photos of each davit, crane, A Frame, J Frame, bridge wing gangway arm davit, gangway, control stations and HPUs showing locations, areas of inspections, interferences, ability to access locations because of not being able to ship check the vessel for bidding purposes? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3. Can NOAA supply drawings and Technical Publications on each davit, crane, A Frame, J-Frame, bridge wing gangway arm davit, control stations and HPUs that are listed in the specifications under references for bidding purposes? | All manuals were provided on previous Q&A period | |||
| 3.18 | 3.18.7.18.2 | Specifications refer to "inspections" of the rudder and shaft bearings, but do not instruct the contractor to remove shaft rope guards and fairwaters to accomplish inspections. Could NOAA elaborate that "shaft rope guards and fairwaters are to be removed, and shaft bearing clearances are to be taken and recorded in accordance with NAVSEA 9997-1, following NOAA and ABS acceptance, rope guards and fairwaters are to be reinstalled". | Please be specific in what you are proposing to fulfill your requirements to the government. | |
| 3.18.6.1 | The specification requires the drydock to be certified by a Naval Architect within twelve months of the drydocking evolution. | |||
| The USCG's program for certifying drydocks operates on a two year inspection cycle. If the contractor's facility proposes using a drydock that meets or exceeds the USCG's requirements for drydocking a vessel (SFLC Std Spec 8634, 2020) would that satisfy the requirements? | Yes, using the USCG's requirement sh0uld satisfy | |||
| 3.19 | N/A | |||
| 3.20 | 1. Can NOAA supply the Ingersoll-Rand UP6-25 Operational and Maintenance Manual under References for bidding purposes? | Previously answered that this could be found on Ingersoll Rand's website; however, it is being provided | ||
| 2. Can NOAA provide photos of each air compressor and air dryer showing locations, areas of servicing, interferences, ability to access locations because of not being able to ship check the vessel for bidding purposes? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3.21 | 1. Can NOAA supply photos of the Port Main Engine Coupling area showing location, interferences, ability to access locations because of not being able to ship check the vessel for bidding purposes? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.22 | 3.22.4.4.3 | Without knowing where the two inserts are located, the contractor cannot account for interferences therefore, will all interferences, coverup and staging will be subject to a change order? |
Provide addional pictures of the area.
| Work item calls for a UT inspection to be performed to identify areas needing replacement. Pictures provided are proposed areas requiring replacement | |||
| 3.22.6.3 | 3.22.6.3 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |
| What are the frame numbers relating to the location of the deck inserts? | Work item calls for a UT inspection to be performed to identify areas needing replacement. Pictures provided are proposed areas requiring replacement | ||
| 3.23 | 3.23.4.1 | For estimating purposes, how many sqft of deck prep is there? | Shipcheck will be granted and contractor can get a clearer idea of amount of square footage |
| 3.23.4.5 | Without knowing where the two inserts are located, the contractor cannot account for interferences therefore, will all interferences, coverup and staging will be subject to a change order? |
Provide addional pictures of the area.
| What are the frame numbers for these repairs? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3.23.6.3 | 3.23.6.3 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 3.24 | 1. In paragraph 3.24.1.2.2.1. Welin Lambin Type TWPIV 9.0A Davit (2port/2 stbd), Is NOAA referencing to the (4) four Vest Davits and not Welin Lambin? | Vestdavit davits are installed on the ship | ||
| 2. Can NOAA provide photos of each davit showing locations, areas of protection needed and inspections, interferences, ability to access locations because of not being able to ship check the vessel for bidding purposes? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3. Can NOAA supply drawings and Technical Publications on each davit that are listed in the specifications under references for bidding purposes? | Manuals were provided during the last round of references submitted | |||
| 4. Is there only going to be (2) two boats to be dealt with and not (6) six boats for each of the (6) six davits called out for in the specifications? | The assumption is that all of the boats will be stored prior to drydocking | |||
| 5. On paragraph 3.24.4.6, it states to blast davits to an SSPC-11 profile. SSPC-11 is a mechanical power tool to bare metal. SSPC-6 is a commercial sand blast and a SSPC-10 is a sand blast to near white metal. Can NOAA clarify the intent of the preparation? | SSPC-11 is recommended; If any other method is suggested for use, how does the contractor intend to contain the grit/sand? | |||
| 6. Normally when sandblasting of davits is accomplished, disassembly of the davits is required to protect sensitive areas and be able to prepare and paint all areas of the davit needed to prevent rusting of areas not able to reach when davits are assembled. IF NOAA is not requiring the davits to be disassembled for sandblasting and painting, you must know 100% of the areas on the davit won’t be able to be properly prepped and painted. Is this NOAAs intention? | For those areas that are hard to reach, the assumption is that the contractor will dissamble in that area and accomplish prservation and reassemble. | |||
| 3.25 | 3.25.2.4 | Missing Reference PPI NBR 63421-006H (Rev 04), Please Provide | Deleted | |
| 3.25.4.1-3.25.4.9 | Is it NOAA's intention to repair the patched area around the existing protruding pipes in the picture only? Or remove and install all new decking in the entire Fwd Oceanographic Lab (D-07-102) | |||
| The installation material identified in 3.25.4.1 thru 3.25.4.9 is not Mil-D-3134J as 3.25.2.8 identifies. | Only the area in question | |||
| 4.1 | Reference in 4.1.2.11 pre commissioning check list is not available. Contractor cannot start work item until list is complete and reviewed by the owner per 4.1.4.26. Please provide Pre commissioning check list. | Statement is somewhat incorrect but the Pre-Commissioning checklist will be provided hopefully prior to the start of the availability | ||
| 4.2 | 4.2.4.10 | Provide pictures and a detailed list of all interferences for each insert, frame stiffener, deck drain mods, bulwark mod, and mooring chocks relocation. | Shipcheck will be granted and contractor will gain a clearer picture of interferences | |
| 4.2.3.1. | Who is the manufacturer/supplier of the NOAA specified Panama Chocks ? | Called out in the drawing provided, FA-582-001 Bulwark Renewal and Chock Installation | ||
| 4.2.4.6 | Provide a detailed procedure on how to test the 6ea new mooring chocks. | Wii revisit requirements and provide at a later date | ||
| 4.2.6.2 | The spec in multiple sections references 4.2.2.1.2, but 4.2.6.2 states that 4.2.2.1.2 does not represent the as-found location of all the chocks nor the number of chocks. Is the Contractor to bid reference 4.2.2.1.2? If the quantity of chocks and location of chocks are not represented correctly on ref. 4.2.2.1.2 will that be subject to a change order? | No, the contractor should shipcheck this item for actual condition found | ||
| 4.2.6.5 | 4.2.6.5 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted | ||
| Can NOAA provide photos of the below deck interior interferences for each chock? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 4.3 | 4.3.1.1 | Provide photos of the topside and bottom sides of G deck and E deck. | ||
| Provide a detailed list of interferences | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 4.3.6.10 | 4.3.6.10 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| Can NOAA provide photos of the below deck interferences? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| Can NOAA provide photos of the existing gangway installations? | Pictures can be provided after the next inport period | |||
| 4.4 | 1. Can NOAA supply photos of the existing Oily Water Separator and components and area showing locations, piping, interferences, insulation, electrical, foundations that are to be removed and that are listed in paragraphs 4.4.1.2 through 4.4.1.2.5 because of not being able to ship check the vessel for bidding purposes? | Shipcheck will be granted and contractor can get a clearer picture of interferences | ||
| 2. Can NOAA supply photos of the existing location where the new foundation and the new ELWA Water Heating Unit is to be installed to show interferences because of not being able to ship check the vessel for bidding purposes? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3. Can NOAA supply Photos of the new Oily Water Separator and the new Water Heating Unit? | See N2451BM200_9913_LAY020A is provided | |||
| 4. Can NOAA supply the manuals for the new oily water separator and the new water heating unit to show dimensions, weights, hook up points for electrical, mounting, piping, electrical requirements for each of the components? | Manuals will be supplied with the equipment. However, N2451BM200_9913_LAY020A is provided | |||
| 5. Can NOAA supply photos of where the new oily water separator and the new water heater is to be hooked up to the switchboard and the power panel 421? | N145BM200_9913_PID020A is provided | |||
| 6. Is the contractor to supply and install new circuit breakers in the switchboard and power panel 421? | All GFM material was identified on work item; any additional material is the responsibility of the contractor | |||
| 4.4 | 4.4.7.3 | This paragraph has the contractor supplyine 1 year of sapre parts and maintenance items.The manufacturer has informed us that 1 year of spare parts and maintenance items was included with their contract when NOAA purchased the Oily Water Separator. Do you want us to include the spare parts as indicated in the specification? | See revised WI. | |
| 4.5 | 4.5.4.11 | How many linear feet of normally submerged conduit piping and how many feet of conduit in dry area will need to be inspected? | ||
| What is the inside diameter of the conduit? | This item will require shipchecking once ship is in drydock | |||
| Please name the number and size of the following anodes | Requires further research; answer forthcoming | |||
| 4.5.4.30 | Please see the attached email from the OEM Kongsberg regarding the SAT plan and provide detail on how to advise the OEM for bid preparation. | See revised WI. | ||
| 7.1 | Please provide pictures | |||
| Please provide pictures and a detailed list of interferences | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 7.2 | What brand of doors are these? | See image provided in Amendment 3 | ||
| Does NOAA have a contact that has performed specified repairs previously. | No historical information could be found or obtained from prior repairs | |||
| Can NOAA provide photos and name plate data for the doors | See image provided in Amendment 3 | |||
| 7.3 | 1. Can NOAA supply a drawing showing the Emergency Generator Exhaust System? | Researching drawings and will provide if avaialable | ||
| 2. Can NOAA supply photos of the complete Emergency Generator Exhaust system which would include interferences, exhaust insulation blanks, access for entire exhaust system? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 3. Can NOAA tell us how many gaskets are to be replaced and what size exhaust flanges they are? | This item can be shiphecked at the next inport period | |||
| 4. Can NOAA tell us what the exhaust pipe size is and what is the length of the pipe to be reinsulated? | This item can be shiphecked at the next inport period | |||
| 5. Can NOAA tell us how many exhaust blankets there are and what are their lengths and diameters? | This item can be shiphecked at the next inport period | |||
| 6. Can NOAA tell us what type of exhaust insulated blanket material is to be used? | This item can be shiphecked at the next inport period | |||
| 7. Can NOAA supply photos of the Lube Oil Cooler with the insulated blankets which would include interferences and access to the lube oil cooler? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |||
| 8. What space or compartment is the lube oil cooler in? | Engine Room | |||
| 9. Can NOAA tell us how many lube oil cooler blankets there are? | See the pictures provided | |||
| 10. Can NOAA tell us what type of insulated blanket material is to be used on the lube oil cooler? | See the pictures provided | |||
| 7.4 | Advise/provide any NOAA-preferred published vibration standards. Note that CPM's analysis is more thorough than "meets standard/does not meet standard," but these can be included if desired. | Preference is to use CPM. CPM has conducted these type of analyses in the past has the sufficient database to perform this scope | ||
| Vibration sensor mounting as close as possible to bearing housing is preferred. Please advise if there are access restrictions to equipment or measurement locations requiring more than basic tools to access, reinstall, or replace. | This will have to be shipchecked during the next availability | |||
| 7.6 | Please provide pictures | |||
| Please provide pictures and a detailed list of interferences | Pictures were provided. Interferences need to be shipchecked which will be granted | |||
| 8.2 | Can NOAA provide additional photos of the affecter interior interferences? | Pictures were provided. Interferences need to be shipchecked which will be granted | ||
| Can NOAA provide photos of the below deck interior interferences ? | Pictures were provided. Interferences need to be shipchecked which will be granted | |||
| Can NOAA provide a description of the deck covering that will be disturbed? | Pictures were provided. Interferences need to be shipchecked which will be granted | |||
| 8.4 | 3.25.4.7-3.25.4.9 | Mil-D-3134J Type 1, Class 1: This classification specification has been dropped from our suppliers some years back. | ||
| Can NOAA specify a material as stated in 3.25.4.7-3.25.4.9 of the interior deck repairs? | MIL SPEC MIL-PRF-32584 Type IV and Type V | |||
| 8.5 | Can NOAA provide photos of the interior interferences ? | Metal sheathing will have to be taken down at the time of the availability to identify interferences; ship's normal operation during this time cannot be disrupted | ||
| 8.6 | Can NOAA confirm that the Fairweather geometry file will be provided and the Trim and Stability booklet and damage stability calculations are not required? | Applicable drawings were called out in the work item |
| Reference Document Request | Government Response | ||
| 3.16.2.8. NOAA Ship Fairweather – Lifting Appliance Test Report FY22 | Answered in Amendment 1 | ||
| 8.1.2.1. List: MACS Updates required by the CME and/or the Chief Engineer | Answered in Amendment 1 | ||
| 4.1.2.12. ROXTEC Cable & Pipe Transits for Marine Applications | Answered in Amendment 1 | ||
| ECS Drawing: 15/20KVA Ups Systems Work Package Supplement Diagram; | |||
| DWG # ECS-313-001 REV- | See revised work item | ||
| FA-S1106-1 Plating & Framing- Main Deck | See revised work item | ||
| FA-S1106-1 Plating & Framing- Superstructure Deck & Above | See revised work item | ||
| FA-RA-512-S3801 (Vent & AC Arrgt Fan Room) | See revised work item | ||
| NOAA Standard Item AMC-634-1B, Deck Coverings | See revised work item | ||
| Ships’ DWG RA S2806-2, Painting and Identification Scheme (RAINIER AND FAIRWEATHER) | See revised work item | ||
| Oceanographic Research Vessel (ORV)- 46 CFR chapters 188-196 | May be obtained via internet search | ||
| NOAA Standard Specification AMC-631-2C, “Coating Systems for Steel Surfaces” | Revised to AMC-631-2D, “Coating Systems for Steel Surfaces” | ||
| FA-S9301-2 Rev E: Fire Control Plan | Revised to FA-S9301-2 Rev F Fire Control Plan | ||
| APC UPS Solution Pre-commissioning Checklist | UPS Solution Pre-Commissioning Checklist is sent by Schneider Electric to the customer in accordance with the Installation Services Agreement reference (previously provided, See pdf page 3, section 4.0 - Assumptions, for more details) |
FA DD Q&A AMENDMENT 2
| Work | |||
| Item | Paragraph | Contractor Inquiry | Government Response |
| 3.5 | The wind break is constructed of fiberglass which could potentially be damaged by an SP-10 sandblast. May the contractor substitute SP-11 mechanical preparation for sandblasting. |
Lacking the opportunity to inspect the wind break, can NOAA specify what percentage of the surface area needs to be mechanically prepared (5%, 10%, 20%...)
SP-11 can be substituted Shipcheck available, around 20%.
3.7 Are all the fittings on the hydraulic hoses to be steel or stainless steel?
How many internal flexible hoses are there to each HN-9001 HPU?
Can NOAA provide photos of each davit, crane, A Frame, control stations and HPUs showing hoses to replace to show location, interferences, ability to access locations because of not being able to ship check the vessel for bidding purposes?
Can NOAA supply drawings and Technical Publications on each davit, crane, A Frame, control station and HPUs showing hydraulic hoses that are to be replaced for bidding purposes? Inside the HPU the fittings can be steel but fiitings on the exterior should be stainless.
4 in total.
Once the cover is removed, the number can be verified.
Shipcheck will be granted and contractor can note interferences at that time.
Manuals were provided.
3.8 3.8.4 “Crop out and renew approximately 5 x 5 square feet of the heavy pitting that was found in the hull plating on the outboard longitudinal bulkhead of DB D/O Tank A-07-102 between Frames 70 and 71 in accordance with 3.8.2.5. Assume plate thickness is 1/2 inch however it must be verified by the contractor”
Please confirm the area to be renew is 5 FT X 5 Ft for a total of 25 sq ft. Square footage is provided in an effort to give the contractor an idea of the wastage area. Report 49702 previously provided shows the pitted areas identified for repairs.
| 3.8 | 3.8.4.5 | Is the intent of this paragraph to crop out and renew a 10' x 10' hull plating, specifications suggest that the repair area is bounded by frames 70-71 (2 frames), but wouldn't a 10' x 10' insert would affect at least 5 frames? | |
| Is the attached photo of a double bottom tank top rather than hull plate of bulkhead plating? | Report 49702 was provided to show the pitted areas in need of replacement. 25 sq ft was provided to give contractor an estimate for bidding but item will require shipchecking for actual footage. |
The photo only shows the access to the Shaft Alley to give the contractor a picture of where the work will be located
3.9 3.9.5.5.1 For estimating purposes, How many 2"x2" clad welds are there?
What are the frame numbers?
| Please provide pictures of each area to be clad welded. | See the UT report that was provided | |||
| 3.9 | 3.9.5.7.1 | Are we to replace the existing manhole with a new manhole assembly? | This manhole requirement will be revisited during the next shipcheck period | |
| 3.9 | 3.9.5.8 | How thick is the concrete? | See the shell plating drawings previously provided | |
| 3.9 | 3.9.5.9 | Please provide pictures of the two areas that need to be cropped and inserted along with the frame numbers. |
Need Pictures of all interferences
| Need a detailed list of all interferences | See then UT report that was provided | |||
| 3.9 | 3.9.7.4 | 3.9.7.4 encourages the contractor to perform a field inspection prior to submitting a bid proposal. How can the Contractor be held responsible for inspecting the vessel and identifying and providing an allowance for any and all interferences when the Government is not able to provide the Contractor access to the vessel? | Shipcheck will be granted and contractor can get a clearer picture of interferences | |
| 3.13 | The following paragraphs seem to reference one anode, which paragraph is contractor to follow? |
3.13.4.3.2. Anode P Frame 33.5 to P Frame 100
3.13.4.3.3. The Port anode at Frame 33.5 will remain in the same location
Contractor would like photos of location and interferences around where new materials to be installed
| Please provide Pictures, a Rip out Drawing for current system and a Lay out Installation Drawing for the refit | After 3.13.4.2.1 is accomplished, any ambiguity should be cleared up at that time. MD20017 drawing was provided to the contractor | |||
| 3.14 | 3.14.4.4 | What type of floor covering in present? | Poured terrazzo as stated in 3.14.4.8.1 | |
| 3.14 | 3.14.4.6 | 4 square feet or 4 lineal feet? | Linear feet | |
| 3.14 | 3.14.4.6 | Are we correct in assuming the repair area starts at the horizontal weld seam contained within the yellow circle? | Circle identifies the area in question | |
| 3.14 | 3.14.4.4.8 | Are the boundaries of the plate replacement going to be within the galley? | See The General Plans and the contractor can see what boundaries are impacted | |
| 3.14 | 3.14.4.2 | The government's response to the request for make and model of port light ("Replace In Kind") does not provide any detail to what port lights to purchase. Other NOAA vessels have a drawing identifying all of the port lights including manufacturer, model and size. Does the Fairweather have a similar drawing for the port lights. | Drawing for Portlights on the Fairweather is not available, however Cornell Carr is the manufacturer. Portlights should be around 16" diameter with dead light covers and they come hinged or fixed. After shipcheck, the contractor can verify actual diameter. |
Port lights are not GFM.
| 3.14 | 3.14.4.2.2 | 3.14.4.2.2 says to Renew in kind but 3.14.4.2.5 states to fit Refurbished port lights. Please clarify. | |
| What are the frame numbers of each port light? | Replace in kind | ||
| 3.14 | 3.14.4.13 | Without knowing where the 10ea kickpipes are located, the contractor cannot account for interferences therefore, will all interferences, coverup and staging will be subject to a change order? |
What size insert is to be estimated for each kick pipe?
| What pound plate is to be used when inserting the 10ea kick pipes? | Kickpipes will be identified during the first week of the availability. | ||
| 3.14 | 3.14.4.11 | How many studs are to be removed? |
How many brackets are to be removed?
How many fwd deck light switches need to be removed?
Is staging required to safely access these repairs?
Are there through hull penetrations that need inserted? If so, please provide pictures and a list of all the interferences.
Proved pictures of each item to be removed along with pictures of any interferences in the interior side.
| If steel is required to be replace, will that be subject to a change order. | Pictures were provide of projected repairs needed; shipcheck will be granted and contractor can interferences will be clearer. Contractor can determine, based on their capabilities, if staging will be required. | |||
| 3.15 | 3.15.4.3. | Can NOAA provide a fittings list and a list of hull and bulkhead penetrations for the pipe replacements? | Contractor can compile list upon completion of shipcheck which has been granted | |
| 3.18 | Specifications refer to "inspections" of the rudder and shaft bearings, but do not instruct the contractor to remove shaft rope guards and fairwaters to accomplish inspections. Could NOAA elaborate that "shaft rope guards and fairwaters are to be removed, and shaft bearing clearances are to be taken and recorded in accordance with NAVSEA 9997-1, following NOAA and ABS acceptance, rope guards and fairwaters are to be reinstalled". | Please be specific in what you are proposing to fulfill your requirements to the government. | ||
| 3.18 | 3.18.6.1 | The specification requires the drydock to be certified by a Naval Architect within twelve months of the drydocking evolution. |