Attachment I Specification Rev 1.0.pdf
PDF 5 MB Posted
- Solicitation number
- 1305M221QNMAN0114
About this file
This request for quotation (RFQ) solicits proposals for drydocking and repair work for the NOAA ship FAIRWEATHER. The scope of work includes routine maintenance, inspections, certifications, and repairs of various ship systems and equipment. Major work items include temporary services, life raft inspections, firefighting system certifications, underwater hull preservation, hydraulic hose replacement, and repairs of various structures and systems. The solicitation provides detailed specifications for materials, quality assurance requirements, and completion timelines for individual work items. Interested contractors must request reference documents and drawings from the points of contact provided to submit a responsive proposal before the deadline. The federal contracting agency is the National Oceanic and Atmospheric Administration within the Department of Commerce.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
1305M221QNMAN0114
NOAA Ship Fairweather (S-220)
FY 2022
DRYDOCK REPAIR SPECIFICATIONS
Written by: Shelia Dailey Rev (1.0) – 12 July 2021
NOAA Ship Fairweather
Drydock Repair – Rev 1.0
2 | P a g e
Revision History
Name Date Reason for Change Version
Initial Issue 6/30/2021 FY 2022 Drydock Package Submission 0.1
Revision 7/13/2021
The following revisions were made to the repair package:
2.1- deleted references 2.1.19, 2.1.20, and
2.1.22 3.4.4.4.3- changed SP-12 to SSPC-11 3.4.4.7- corrected para to 3.4.4.6.3 3.4.4.7.3- changed 3.4.4.7.3 to 3.4.4.6.3 3.4.4.8- changed 3.4.4.8 to 3.4.4.7 3.4.4.4.9- changed 3.4.4.9 and 3.4.4.9.3 3.4.4.16-- changed to 3.4.4.17 3.4.4.10- corrected paras to read 3.4.4.8 &
3.4.4.9
3.10.2.2 & 3.12.2.3- revised titles to reflect correct dwg numbers 3.11.4.7- removed rqmnt to house the crew 3.12.1.2.4- deleted
3.16.2.1 thru 3.16.2.5- revised titles to reflect correct dwg numbers 3.18.2.4- revised titles to reflect correct dwg numbers 3.23.2.7- revised titles to reflect correct dwg numbers 3.24.4.6-m revised to read SSPC-10 3.25.2.4- deleted reference
4.2.2.1.6 & 4.2.2.1.7- revised titles to reflect correct dwg numbers 7.1.2.4- added new reference FA-RA-61-
S1101-1 Rev 14 Shell Expansion 7.5.2.1- revised titles to reflect correct dwg numbers
7.5.2.2 & 7.5.2.3- deleted references
1.0
NOAA Ship Fairweather
3 | P a g e
FY 2022 Drydock Repairs for NOAA Ship Fairweather
Work Items Index Description/Title Page
1. SCOPE
2. GENERAL
2.1. References
2.2. Requirements
2.3. Quality Assurance
2.4. Government Furnished Equipment (GFM)
2.5. Notes
3. ORF BASE ITEMS
3.1. Temporary Services
3.2. Annual Life Raft Inspections
3.3. Fire Fighting Systems Certifications
3.4. Underwater Hull and Freeboard Preservation
3.5. Windbreak Preservation
3.6. Top of House Deck Preservation
3.7. Hydraulic Hose Replacement
3.8. Shaft Alley Access Plating Renewal
3.9. Prep Room (Butcher Shop) Deck Repair
3.10. Firemain Piping Replacement
3.11. Aft Grey Water Tank Repair
3.12. Weather Deck Non-Skid Renewal
3.13. Impressed Current Cathodic Protection (ICCP) Refit
3.14. Various Steel and Structural Repairs
3.15. Various Pipe Repairs
3.16. Lighting Gear Appliance Inspection & Certification
3.17. Dock and Sea Trials
3.18. Drydocking and Berthage
3.19. MSD Groom
3.20. Air Compressor Servicing
3.21. Main Engine Coupling Replacement
NOAA Ship Fairweather
4 | P a g e
3.22. Boat Shop Deck Repairs
3.23. Fan Room (F-06-101) Deck Repair
3.24. Davits Preservation
3.25. Various Compartment Repairs, Inspections and Servicing
4. PAC BASE ITEMS
4.1. UPS Upgrade
4.2. Aft Chocks and Bulwarks Redesign
4.3. Gangway Replacement
4.4. Oily Water Separator Replacement
4.5. EM712 Transducer Upgrades
5. ORF Growth Funds
5.1. ORF Additional Work Items
6. PAC Growth Funds
6.1. PAC Additional Work Items
7. ORF Option Items
7.1. Shaft Alley Deck Preservation
7.2. Watertight Door Maintenance
7.3. Emergency Generator Exhaust Gaskets/Blankets Replacement
7.4. Vibration Analysis
7.5. Ventilation Duct Cleaning
7.6. Freezer and Refer Door Replacement
8. PAC Option Items
8.1. MACS Update
8.2. Pilot House Deck Repair
8.3. Pilot House Desk Replacement
8.4. Prep Room (Butcher Shop) Terrazzo Installation
8.5. Pilot House Window Replacement (Phase One)
8.6. Stability Test
NOAA Ship Fairweather
5 | P a g e
1. SCOPE
1.1. The National Oceanic and Atmospheric Administration (NOAA) operates a fleet of 15 research vessels that supports research and mapping for the National Marine Fisheries Service, National Ocean Service, Office of Atmospheric Research and the National Weather Service, as well as provides support to other Federal agencies. These research missions are time sensitive and therefore the data must be collected at specific times during the sailing season to be meaningful. At the end of each sailing season the vessels enter a repair period (drydock or dockside) to address repairs that have been previously identified, perform upgrades to mission systems or ship systems that either extend the life of the ship or provide new data collection capabilities or for safer operations of ships systems as well as address any emergent work that would adversely affect the ships ability to safely perform its mission on schedule, while meeting all regulatory body requirements (American Bureau of Shipping and United States Coast Guard) and all habitability requirements, including any that may be required as a result of contracts for personnel to augment ship staff.
1.2. The work items in the repair specification are identified well in advance of the performance period in order meet the contracting lead times. Additional work items (emergent work) may arise during the period between the work package submittal, contract award, or even prior to the start of or during the contract performance period. In accordance with Commerce Acquisition Regulation (CAR) clause 1352.271-72, the Contracting Officer may order additional changes during the contract period of performance to address any additional work items identified as necessary to ensure the intent of the dockside repair contract is met; that is, that the vessel shall be able to safely perform its mission, that it will meet all habitability requirements and regulatory body requirements, and that such repairs will be timely performed to ensure to the maximum extent practicable that the ship’s schedule is not adversely impacted.
1.3. These Detail Specifications contain the requirements for Drydock repairs and modifications to NOAA Ship Fairweather.
2. GENERAL
2.1. References
2.1.1. NOAA Standard Specification No. MOC-000-1G, “General Requirements for Ship Repair Work on NOAA Ships.”
2.1.2. NOAA Standard Specification S1600, “Structural Access Cuts.”
2.1.3. NOAA Standard Specification, S2906, “Arc Welding on Waterborne Vessels.”
2.1.4. NOAA Standard Specification MOC-631-2D, “Coating Systems for Steel Surfaces.”
2.1.5. ABS: American Bureau of Shipping "Rules for Building and Classing Steel Vessels Under 90 Meters in Length"
2.1.6. CFR: U. S. Coast Guard "Subchapter F - Marine Engineering", 46 CFR 50 through 46 CFR
2.1.7. CFR: U. S. Coast Guard "Subchapter J - Electrical Engineering", 46 CFR 110 through 46
CFR 113
2.1.8. Oceanographic Research Vessel (ORV)- 46 CFR chapters 188-196
2.1.9. Standard: IEEE Std 45-2002, "IEEE Recommended Practice for Electric Installations on Shipboard"
NOAA Ship Fairweather
6 | P a g e
2.1.10. NOAA General Technical Requirements (GTR)
2.1.11. NOAA Standard Specification MOC-300-3, “General Requirements for Electrical/ Electronic Items
2.1.12. NOAA Standard Specification AMC-631-4, “Coating Systems for Aluminum Surfaces”
2.1.13. NOAA Standard Specification MOC-631-3B, “Underwater Body Ablative Coating System.”
2.1.14. AMC-997-1A: Drydocking and Routine Drydock Work
2.1.15. AMC-000-2C: Temporary Services at Contractor Facilities
2.1.16. MOC-100-1A: ABS Load Line Survey
2.1.17. AMC-505-1B: Valve Overhaul and Test
2.1.18. AMC-533-1: Potable Water Tank Disinfection
2.1.19. MOC-573-2: Overhaul/Repair of Hydraulic Cylinders
2.1.20. AMC-581-1A: Inspection and Preservation of Ground Tackle
2.1.21. NOAA Form 57-17-09- NOAA Hot Work Permit
2.1.22. Drydock Worksheet
2.1.23. FA-S0201-1 Rev B: Booklet of General Plans
2.1.24. FA-S2901-1 Rev 3: Tank Capacities & Soundings
2.1.25. FA-S2901-6-2 Rev G: Trim & Stability Booklet
2.1.26. NOAA Standard Item AMC-634-1B, Deck Coverings
2.2. Requirements
2.2.1. Reference 2.1.1 forms a part of these Detail Specifications. All provisions and requirements contained therein are applicable to all work items, including all additional work items which are authorized by the Contracting Officer.
2.2.2. References 2.1.2 and 2.1.3 are amplifications of the requirements contained in reference 2.1.1 sections 4.17 and 4.21.
2.2.3. Some of the ship’s drawings have not been updated to reflect modifications to the ship during reactivation in 2004. These drawings and reference documents are for planning purposes only. Actual shipboard configurations and conditions may be different from what is listed. Contractor shall be responsible for verifying all current configuration, construction, and arrangement changes, as necessary, to comply with and perform the work requirements of these specifications. Contractors are encouraged and expected to review ship’s drawings and to perform a field inspection to inspect the locations and shipboard conditions where services are to be performed aboard the Fairweather prior to submitting a bid proposal. This inspection should satisfy potential contractors regarding all general and local conditions, (including locations, interferences, tolerances and necessary “work-arounds, etc.) that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the sites constitute grounds for a change order or claim after contract award.
2.2.4. Ship’s drawings and technical publications may be borrowed during the performance period. It would be preferable for the contractor to make copies of these drawing and technical publications if their intended use will be outside an
NOAA Ship Fairweather
7 | P a g e office environment. All reference materials borrowed by the Contractor shall be signed for, and then returned to the COR after no further use of the reference materials is required.
2.2.5. Provide and maintain a status report of all American Bureau of Shipping (ABS) inspections and technical reviews required by ABS, during the course of this contract, to ensure the ship’s ABS certification requirements are in compliance.
Submit weekly ABS status reports to the COR, along with the preliminary progress reports.
2.2.6. All visual examination, hydrostatic testing, and non-destructive testing shall be in accordance with ABS Rules for Building and Classing Steel Vessels, Survey After Construction 2005, Part 7. All contractors performing NDT and hull gauging shall be certified under the ABS external specialist program.
2.2.7. On the first day of the contract performance period, provide the COR a detailed resource loaded production schedule. Then, on a weekly basis (24 hours preceding the Weekly Progress Meeting) provide the COR a revised and updated production schedule reflecting actual work progress. Provide the COR with a project staffing plan (paper and electronically) by trade/craft and subcontractor showing how the project will be appropriately staffed to be completed by the end of the performance period. The plan should be “resource loaded” showing the planned labor needed and actual labor hours assigned Schedules shall have enough granularity to show the number of workers, by trade, for all given tasks. Once a Notice to Proceed (NTP) is issued, all additional work shall be added to and reflect in the resource loaded production schedule within 24 hours. These deliverables shall be in Microsoft Project electronic format and 3 paper copies.
2.2.8. The contractor shall have daily production meetings with trade supervisors and the COR to discuss progress, milestones, labor staffing levels and other project issues.
These production meetings shall be attended by both the project manager and project superintendent (trade superintendent or ship manager)
2.2.9. Contractor shall have a project manager and/or ship superintendent assigned exclusively to the Fairweather for the duration of the project. Project Manager or COR approved alternate shall attend all shipboard safety meetings (normally at 0800 on the bridge) during the contract period for all days in which the contractor will be performing work on the ship.
2.2.10. Safety and housekeeping walkthrough inspections of the ship, pier, and other productions areas shall be conducted on a regular basis (daily or more frequent) by the contractor as per section 4.11.5 of reference 2.1.1.
2.2.11. Contractor shall clean up all production areas, sweep up messes, clear all trash and debris and roll back all lines and leads at the end of each shift.
2.2.12. All subcontractors and contractors shall clean areas to the condition they were in prior to the beginning of work. Any areas of concern shall be documented by the Contractor prior to commencing work
2.2.13. Any and all areas damaged by media blasting and/or paint overspray shall be sanded, primed and painted to match the surrounding area.
2.2.14. The contractor and subcontractors shall not use the shipboard restrooms/heads, sinks, electrical outlets or other shipboard services.
NOAA Ship Fairweather
8 | P a g e
2.2.15. All new equipment and furnishings purchased by the Contractor for installation on the vessel shall be provided with factory or vendor supplied certificates, technical manuals, and data sheets, complete with parts listings. Faxed copies of this information are not acceptable. This documentation shall be turned over to the COR after installation is completed. Equipment technical manuals shall provide detailed information necessary to operate, maintain, troubleshoot, and repair the equipment.
The manuals shall include detailed procedures for disassembly of equipment, parts lists, drawings, inspection criteria, troubleshooting, and test procedures. Provide four paper copies of each manual, plus one electronic copy in Abode Acrobat (PDF) format.
2.2.16. Submit all inspection, test, and quality reports to the COR in PDF or Microsoft Word electronic formats, in addition to providing hard paper copies.
2.2.17. Weigh all materials and items removed, installed, or relocated on the ship. Provide a summary report to the COR indicating the total weight in pounds of items and a breakdown of their locations by space, deck, frame, distance from centerline, and height above the deck. Reference 2.1.22 has been provided for the Contractor to identify, record, and document all weight changes for submitting the summary reports. Contractor may use their own weight report form for documenting weight changes. All the information required must be tracked and documented on any form provided.
2.2.18. Unless otherwise stated, the removal of all recyclable material from the ship (valves, steel, etc.) shall be coordinated with COR for scrap recycling with the value credited to the Government
2.2.19. Unless otherwise stated in these work items, prepare and coat all new steel, disturbed, or otherwise repaired painted surfaces in accordance with reference
2.1.4. If no paint system to the area being coated as identified by paragraph 5.2 of this reference except that the topcoat color shall match the surrounding area.
2.2.19.1. Painting shall be completed by a QP1-certified paint contractor or an industry recognized certified alternate with approval of the COR.
2.2.19.2. Maintain environmental records for days when coating systems re applied.
Obtain environmental readings prior to application of any coating and at maximum of 1-hour intervals during application of the coating.
2.2.20. Ship’s force will maintain a minimal presence during accomplishment of work to these specifications. Their availability to operate ship’s equipment will be limited.
Crew availability is generally limited to the hours of 0800 and 1500 local time, Monday through Friday. Unless otherwise specified, provide a minimum of two working days’ prior notice for any equipment operations or system tag-outs.
2.2.21. All new and disturbed machinery and services shall be operated for a period sufficient to indicate satisfactory performance, but not less than one hour, after all adjustments and deficiency corrective actions have been made, without further adjustment.
2.2.22. Provide manufacturer’s technical representatives where required in the individual work items, to witness and to provide technical guidance during operational testing of equipment and systems. All tests and trials of equipment or systems shall be witnessed by the COR, ABS, and/or USCG as applicable, to ensure compliance with
NOAA Ship Fairweather
9 | P a g e regulatory body requirements to maintain the ship’s ABS class certification, and to complete all requirements of these specifications.
2.2.23. The Contractor and COR shall designate a “on-load/off-load” area of the ship that shall be covered by the appropriate media (planks/tarps/etc.) as to not damage the existing deck or surrounding structures. Rails, handrails and gunnels shall have appropriate chaffing protecting as to protect the paint from any cables hanging over the side.
2.2.24. These Detailed Specifications are a combination of “performance specifications” and “design specifications.” Whenever possible, the Government has provided performance specifications, giving the Contractor the opportunity to accomplish the work requirements as best as he or she sees fit, while providing a fully functional repair and/or equipment/system installation in accordance with all work requirements. When specific details are required, the Government will provide design/detail specifications; this will be more the exception, than the rule.
2.2.25. Frame numbers and space names are derived from ship’s drawings. All equipment changes and space modifications over the ship’s life span may not all be reflected in the referenced drawings. Contractors are encouraged to review all referenced drawings and to perform a field inspection of the ship prior to submitting a bid.
Copies of drawings and technical manuals not included herein may be made available for review during any scheduled pre-bid inspection and during the performance period. Contractors may review available drawings and technical manuals on board ship.
2.2.26. During the last three weeks of the contract period, the contractor shall develop a requirements tractability matrix (Punchlist) of all outstanding items from the contract and have daily meetings to go through all remaining items. During the final 14 days, the meetings shall be conducted twice daily.
2.2.27. Maintenance of ABS Class and Certificates
2.2.27.1. All ABS rules required to maintain the ship’s Class and Certificates shall be adhered to by the contractor. This includes all rules for material, fabrication, quality control, inspection, and ABS on-site survey of work. Specifications may call out ABS surveyor inspection, but not all ABS inspections are necessarily identified in the specifications. The contractor shall consult with ABS on the entire work package and changes and assure ABS involvement where required to maintain Class and Certificates.
2.2.27.2. Contractor shall develop, in consultation with the American Bureau of Shipping (ABS) Surveyor, a written survey schedule that lists the items to be inspected and the scheduled dates and times of the inspections. Submit the survey schedule to the COR within 48 hours after the start of the contract performance period. The survey schedule shall list all initial inspections required by the ABS Surveyor. In addition, the Contractor shall schedule the services of an ABS Surveyor as required by ABS for performing inspections of all new installations, hull modifications, tank inspections, gauging inspections, and load tests.
2.2.27.3. The contractor is responsible for initiating, scheduling and facilitating all ABS inspections and surveys and shall provide NOAA with copies of all
NOAA Ship Fairweather
10 | P a g e correspondence with ABS. The costs of ABS ship surveys/inspections will be borne by NOAA unless otherwise stated.
2.2.27.4. The following is a partial list of ABS Surveys and Inspections due during the contract performance period and shall be scheduled and facilitated by the contractor:
2.2.27.4.1. Annual Machinery Survey
2.2.27.4.2. Annual Hull Survey
2.2.27.4.3. Annual Load Line Survey
2.2.28. Contractor shall empty, open, clean and certify (safe for entry) all shipboard ballast tanks, Bilge tanks, CHT, grey water, fuel oil, potable water and Waste Oil tanks to support work items.
2.2.29. The Ship’s crew will empty all tanks to the lowest point possible using the ships systems. All remaining fluid in the tanks that must be removed by the contractor to complete the tasks associated with these specifications will be the responsibility of the contractor at no additional cost to the Government.
2.2.30. In addition to the contractor’s requirements for hotwork and firewatches – Firewatches for hotwork shall be required as outlined in section 4.11.3 of Reference
2.1.1. Additionally, the contractor is required to fill out, maintain and comply with reference 2.1.21 (NOAA Hot Work Chit) for all hotwork completed on the ship.
2.2.31. The contractor shall provide electronic copies all material certificates to COR and ABS within 24 hours of work being completed. Material certificates include, but are not limited to, pipe, valves, gauges, steel and equipment.
2.2.32. The contractor shall be responsible for all TWIC (Transportation Worker Identification Card) requirements and escorts.
2.3. Quality Assurance
2.3.1. All welders shall be certified and only perform welding or brazing for processes and filler materials in which they are certified. A list of all welders and their respective certifications who will be performing work aboard the vessel during the period of performance shall be provided to the COR within 3 days after the beginning of the period of performance.
2.3.2. Contractors shall ensure the ship remains water tight during the repair period. This includes rain water, hydrostatic testing, system drainage and water from high pressure water jetting.
2.3.3. The contractor shall repair all damaged paint, insulation, flashing and nonskid preservation as a result of work performed by these specifications. Paint shall match surrounding area. Non-skid shall be repaired with American Safety Technologies MS-7CZ Anti-Corrosive Low VOC Metal Primer (MIL-PRF-24667B) (5 mils DFT), and a full coat of American Safety Technologies AS-2500 epoxy anti-slip deck coating, 8 mils DFT, color: gray.
2.3.4. All paint preparations and application shall be completed in accordance with NACE, SSPC, IMO or QP1 Standards. Other paint certifications may be submitted for consideration. A paint inspector shall be onsite during all painting and painting
NOAA Ship Fairweather
11 | P a g e preparation activities and continually inspect the process, product, preparation and application during the process.
2.3.5. All steel repairs shall conform to the standards of ABS and shall be inspected and approved by ABS.
2.3.6. Offers, and the successful Contractor, are herewith notified that Regulatory Body and NOAA inspections are independent of the Contractor’s function of Quality Assurance. The Contractor is not to rely upon NOAA or Regulatory Bodies or their agents to perform quality assurance inspections or tests.
2.3.7. Where possible, all tests and inspections shall be witnessed and inspected by the contractor prior to inspection or witness by the COR.
2.4. Government Furnished Equipment (GFM)
2.4.1. The contractor shall take receipt of, secure and store Government Furnished Equipment up to 30 days before the beginning of the contract performance period.
The Government will have up to 30 days following the start of the period of performance to deliver Government Furnished Equipment.
Government Furnished Material/Equipment
Item No. Description Part Number Qty
4.1 APC SmartUPS RT 20 kVA RM 208/240 VAC XLT; Rack-Mount 12U; 208/240 VAC Input/Output
APC- Schneider Electric Mfr.
Part#: SURT20KRMXLT (consists of UPS Controller and Battery Pack)
1 EA
4.1 APC SmartUPS RT 15 kVA RM 208/240 VAC XLT; Rack-Mount 12U; 208/240 VAC Input/Output
APC- Schneider Electric Mfr.
Part#: SURT15KRMXLT (consists of UPS Controller and Battery Pack)
1 EA
4.1 APC SmartUPS RT External Battery Pack;
Rack-Mount 6U
APC-Schneider Electric Mfr.
Part# SURT192RMXLBP2
1 EA
4.1 APC Service Bypass Panel - 200/208/240 V; 100 A; MBB; Hardwire input/output
APC-Schneider Electric Mfr.
Part#: SBP16KP
1 EA
4.3 Gangway
Schellorn-Albrecht BG-30RP-
30-UR
1 EA
4.3 Upper Rotating Platform
Schellorn-Albrecht BURP-
36RC
1 EA
4.3 J-Davit and Electric Winches Schellorn-Albrecht 2 EA
4.4 WTC 2 Bilge Master D 200 Clean Design w/15 kw Heater for 15 ppm (480V/60Hz/3Ph)
Separator Spares & Equipment
1 EA
NOAA Ship Fairweather
12 | P a g e
4.5 EM712 TX1 Modules Kongsberg 2 EA
4.5 EM712 RX1 Module Kongsberg 1 EA
4.5 EM712 Transmitter Unit Kongsberg 1 EA
4.5 EM712 Receiver Unit Kongsberg 1 EA
4.5 EM712 Rack-Mounted Processing Unit Kongsberg 1 EA
7.6 Cospolich Stainless Steel, “A-60” Rated, Walk-In Cooler Door & Frame Assembly
Model: WIDFC60 1 EA
7.6 Cospolich Stainless Steel, “A-60” Rated, Walk-In Freezer Door & Frame Assembly
Model: WIDFF60 1 EA
2.5. Notes
2.5.1. Contractors are encouraged to review ship’s drawings and are expected to attend the Fairweather pre-bid inspection to inspect the locations and shipboard conditions of the work items in this package prior to submitting a bid proposal. This inspection should satisfy potential contractors regarding all general and local conditions, compatibility, locations, material sizes and types, components, and accessibility that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the sites during the pre-bid inspection constitute grounds for growth work, change order or claim after contract award.
2.5.2. Much of the ship’s original paint contains zinc chromate. Contractors will encounter this paint during the work aboard the vessel and should take this into account when preparing their bid as it relates to the necessary work required to accomplish the specific tasks.
2.5.3. The contractor and all subcontractors, regardless of tier, shall review other work items under this contact to determine their effect on each other.
2.5.4. The contractor Project Manager shall schedule, facilitate and conduct material status meetings daily with the COR for the first 7 days of the contract and then twice weekly after the first week until the COR is satisfied of the delivery dates of all required material.
2.5.5. The following descriptive data of the ship is provided for information:
Length, Overall.....................................231’ 0” Length, BP..............................................194’ 0” Beam, Molded.......................................42’ 0”
NOAA Ship Fairweather
13 | P a g e
Mean Draft, Loadline.........................14’ 3” Displacement........................................1800 TONS Cruising Speed......................................11 knots
Electric Service.....................................450 VAC, 60 Hz, 3 PH, 800 Amp Service Propulsion..............................................Diesel electric, twin screw
2.5.6. NOAA Ship Fairweather is classed A1, E, and AMS and identified with the following:
Hull Number – MA197
ABS ID - 6800389
IMO NUMBER – 6710920
2.5.7. Contractors are encouraged to review ship’s drawings, reference documents and submit written questions requesting any needed additional details, photos, or measurements necessary to provide an accurate bid package prior to submitting a bid proposal. These questions should satisfy potential contractors regarding all general and local conditions, compatibility, locations, material sizes and types, components, and accessibility that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to submit questions constitute grounds for growth work, a change order or claim after contract award.
http://upload.wikimedia.org/wikipedia/commons/thumb/9/97/Cross-Pattee-Alisee.svg/600px-Cross-Pattee-Alisee.svg.png http://upload.wikimedia.org/wikipedia/commons/thumb/9/97/Cross-Pattee-Alisee.svg/600px-Cross-Pattee-Alisee.svg.png
NOAA Ship Fairweather
14 | P a g e
3. ORF BASE ITEMS
3.1. Temporary Services
3.1.1. Abstract
3.1.1.1. This item describes the requirement to provide general services to the ship for the duration of the contract period of performance and facilities requirements including office space, communications, and Government Furnished Material (GFM) support requirements for all the Work Items contained in this specification package.
3.1.1.2. Item Location, Quantity, and Description: Various
3.1.2. References
3.1.2.1. NOAA Standard Specification AMC-000-2C, "Temporary Services at Contractor Facilities"
3.1.3. Government Furnished Equipment (GFM)
3.1.3.1. None.
3.1.4. GFM Support
3.1.4.1. Receipt of Material Requirements
The Contractor shall receive all GFM listed in this work package, whether on board the ship or delivered to the Contractor by common carrier, or other means.
The Contractor shall inspect the GFM at the time of receipt and verify that the material received is the same as that indicated on the GFM listing. Any physical / visible damage or defects to the equipment / packaging will be noted on the carrier’s Bill of Lading or Delivery Confirmation to include obtaining a printed name and signature of the individual transferring custody indicating acknowledgement of condition at time of delivery. The Contractor shall immediately notify the COR of the condition and schedule a joint surveyed with the COR.
Contractor receiving report which notes discrepancies of document observed damage to the GFM will only be signed by the COR if the COR concurs that the discrepancy/damage was not the result of Contractor negligence.
3.1.4.2. Storage Requirements and Definitions
The Contractor shall provide storage facilities as specified below and in this Work Package. Access to storage areas in all cases shall be limited to Authorized personnel only. The COR shall have access to all GFM storage facilities for the duration of the performance period.
Outside Storage - Outside storage shall be limited to material not subject to environmental degradation. Protection against physical abuse and theft is required. Designated outside storage shall require prior approval of the COR.
NOAA Ship Fairweather
15 | P a g e
Inside Storage - Inside storage shall be dry, protected, ventilated, and fork truck accessible. Sufficient inside storage area is required and shall be adequately lighted with an integral structure of floor(s), walls, roof, and capable of being locked.
Temperature Controlled Storage: - Sufficient temperature-controlled storage area shall be provided in a building in which the temperature is maintained in a range of 65 to 85 degrees Fahrenheit year-round. This area shall be segregated from other areas in the same building and be capable of being locked.
Environmentally Controlled Storage – Sufficient environmentally controlled storage area shall be provided in a building in which the relative humidity does not exceed 50 percent and the temperature is maintained at 70 degrees Fahrenheit. This area shall be segregated from other areas in the building and be capable of being locked.
Locked - The term Locked shall mean that the storage area has a physical separation from all other areas. The physical separation shall be by means of durable walls or expanded metal, and shall be of such construction and arrangement so that a normally locked door controls entry to the area. The Contractor shall, in the case of locked storage, provide security.
3.1.4.3. The Contractor shall be responsible for the security of all classes of storage.
Security measures shall prevent unauthorized entry to the storage areas.
Means to accomplish this shall include high quality security locks.
3.1.4.4. The Contractor shall at all times protect GFM from physical or other types of abuse. Protective dust covers and other appropriate means of protecting stored equipment shall be used. The Contractor shall use care in handling, moving, transporting, and rigging all GFM. Damage occurring to the GFM, subsequent to receipt, shall be corrected at the Contractor's expense as required by the COR
3.1.4.5. GFE and GFM Handling Requirements
The Contractor shall provide all the services necessary to safeguard, inventory, record, document, administer, control and document, issue, and install of the GFE /GFM received at the shipyard.
The Contractor shall take delivery and maintain documented accountability of all GFM whether stored on board the ship or delivered to the Contractor's designated location. The Contractor shall maintain accountability over the material at all times to include documentation of release, current location, installation, or approved disposal.
It is the Contractor's responsibility to handle, care, protect, and provide security for all GFE / GFM. The Contractor shall provide all labor and equipment necessary to properly handle and deliver all GFE/GFM to the job site when it is scheduled for installation.
All unused GFE/GFM shall be returned to the Government in the same condition as received. All equipment that requires special preparation such as being properly drained, cleaned and/or special packaging will be
NOAA Ship Fairweather
16 | P a g e organized for safe overland transportation in accordance with state and federal regulations by the Contractor.
Material and equipment designated for turn over to the Government shall be packed, crated, and prepared for shipment by the Contractor. Each work item or specification item will be prepared for shipment in its own unique container; containers may be consolidated into a larger shipping crate, but each crate must be clearly marked and copies of documents enclosed as noted below.
NOTE: An accurate material inventory to include, Nomenclature, Part Number and quantity shall be done for each container/crate. Copies of the inventory will be placed on the inside of the crate/container as well affixed to outside of crate/container. Both copies will be in a suitable weather resistant Packing Envelope. Two (2) additional copies shall be provided to the government onsite ILS Representative.
All crating shall be in accordance with the “International Standards for Phytosanitary Measures (ISPM): Guidelines for Regulating Wood Packaging Material in International Trade” (ISPM Publication No. 15) to include certifying that the wood packaging material bears the mark has been subjected to an approved measure.
Markings on outside of box/crate/container shall consist of a minimum 2-inch stenciled letters with ship’s name, hull number, job number, work item number and specification number. Any previous markings that contradict current material inventory shall be painted over / removed.
Contractor will provide weight and cube of materials prepared for shipment to the COR. The Government will arrange transportation and freight
3.1.4.6. Report Requirements
GFM/CFM Summary List - The Contractor shall prepare and update weekly a summary list of GFM and CFM received at commencement of the contract until contract completion. The list shall describe the material, receiving date, storage location, installation date, condition, etc. The summary report shall also indicate any GFM and CFM material which was not used in the course of the contract. These items shall be identified as residual assets.
Damage Report - Any damage to the GFM, while in the custody of the Contractor, shall be reported immediately to the COR so that arrangements for joint survey can be made. The Contractor shall prepare a damage report outlining the damage, conditions that led to the damage, and proposed method of repair. Concurrence of the COR is required prior to initiation of recommended repairs.
Scrap Report – Material and equipment permanently removed from the vessel as a result of work accomplished in this work package and not identified in this work package for turnover to the Government, and determined by the COR to be unusable, shall be classified as scrap. The Contractor shall prepare and submit a scrap report for all material and
NOAA Ship Fairweather
17 | P a g e equipment permanently removed from the vessel. The scrap report shall include the specification work item and paragraph under which the Contractor was required to remove the material, scrap description, weight, and current scrap value. All scrap shall be separated by material composition and weighed separately. The Contractor shall obtain current scrap market prices for the separately identified and weighed variations of scrap, prior to hauling and disposing of it. Prepare and submit two (2) copies of the scrap report, including price quotes to the COR. Scrap value will be the subject of a negotiated credit change order.
Residual Asset Report – The Contractor shall provide a list of government furnished material (GFM) and Contractor furnished material (CFM) that are residual assets at completion of the availability. Report will list part number, nomenclature, quantity, associated work item, condition code, weight, and cube. Data shall be submitted in electronic EXCEL spreadsheet format. This report shall be submitted to the COR no later than the last day of the contract performance period.
3.1.5. Office Space Requirements
3.1.5.1. General Requirements:
The Contractor-provided office facilities for use by the overhaul management team shall be exclusive from Contractor personnel. The office and services described herein shall be provided 24 hours/day, 7 days/week, commencing (5) days before arrival of the vessel and terminating (4) days after redelivery of the vessel.
Offices shall be land based, air conditioned, heated and located near the ship and other shipyard shops and offices.
The minimum acceptable size of each office workstation layout is 100 square feet, and the minimum size of each private office within the facility is 100 square feet. All office facilities shall be provided with adequate lighting for accomplishment of normal office work.
All offices designated for the overhaul management team shall be in close vicinity to one another. If separate facilities are utilized to outfit the management team, the facilities shall be located adjacent to one another with a maximum distance of 40 feet between facilities. Easy walking access shall be provided between the separate facilities, with no obstructions, obstacles, including fences, roads, etc.… separating the overhaul management team.
3.1.5.2. COR Offices and Workstation Requirements:
Provide (2) private offices and (3) individual workstations in the Overhaul Management Team office facility. The private offices shall be completely enclosed with floor to ceiling walls and shall have lockable doors. Workstations, at a minimum, shall have three (3) cubical walls with minimum height of 5 ft.
Each private office and workstation shall be equipped with:
One (1) ea. desk with central drawer.
NOAA Ship Fairweather
18 | P a g e
One (1) ea. swivel chair
One (1) ea. two drawer legal size file cabinet with lock
One (1) ea. bookcase (72 in x 40 in) with three shelves
One (1) ea. wastebasket
White board with dry erase markers and eraser, min. board size 4’ X 3’
A minimum of one (1) LAN drop/high speed internet connection shall be provided at each workstation and private office.
In addition to the (1) LAN drop at each computer, each private office shall have an additional internet connection (Cat 5) cable to permit connection of personnel’s laptop computers to the internet. A Wireless Internet connection with sufficient bandwidth for all users is an acceptable substitute for wired connections.
3.1.6. Provide janitorial services to empty the wastebaskets on daily basis, clean office facilities twice weekly, clean bathroom daily, and mop the floor on a weekly basis.
3.1.7. Provide, install, and maintain for the duration of the performance period the following office equipment and supplies:
One (1) ea. automatic drip coffee maker.
One (1) ea. refrigerator, minimum of 18 cubic feet capacity.
One (1) ea. microwave oven.
Two (2) ea. coat racks.
Provide a source of chilled drinking water, meeting state and local health standards. Lavatory sinks are not an acceptable source of drinking water.
Adjustable automatic climate control system sufficient to maintain 75 degrees Fahrenheit in office facilities.
Private restrooms (one designated as Male and one designated as Female) located within each office facility, including sink, mirror, and toilet.
Provide soap, toilet paper, paper towels, and hand-sanitizer on a daily basis.
Provide locks with FIVE (5) sets of keys for each access door leading into the office.
3.1.8. Provide the following safety equipment
3.1.8.1. Five (5) ea. Hard hats
3.1.8.2. Five (5) ea. Safety glasses.
3.1.8.3. 200 pack of EARsoft yellow neon corded earplugs, or equivalent – NRR 33 dB.
3.1.9. Provide parking spaces for project office personnel:
3.1.9.1. Provide minimum of Seven (7) independently accessible parking spaces adjacent, and within 200 ft, of the COR offices.
NOAA Ship Fairweather
19 | P a g e
3.1.9.2. Mark the parking spaces with weather resistant signs that read: “RESERVED
FOR NOAA SHIP FAIRWEATHER PROJECT OFFICE PERSONNEL ONLY.”
3.1.10. Provide storage spaces for project office personnel:
3.1.10.1. Provide three (3) standard 20’ lockable steel shipping containers, such as Connex boxes, for use as storage. One of the provided shipping containers shall be temperature controlled and provided with associated power.
3.1.10.2. One of these steel shipping containers shall be provided with 120VAC and 480VAC power as well as lighting and ventilation. This container will be used as a temporary workshop while the ship’s shops are out of commission.
3.1.11. Telephone Service: Provide a total of 4 general use telephone lines, two on the ship and two in the 5.2.2 office(s). These phone lines shall access local and toll free 800 numbers. Long distance charges shall be billed directly to the Ship.
3.1.12. Potable Water: Provide potable water at 50 PSIG, 15 GPM to the Ships’ potable water connection. Install a pressure regulator and pressure gauge to monitor and regulate the supply.
3.1.13. Sanitary Flushing and General Service Water: Provide sanitary flushing and general service water at 55 PSIG, 100 GPM. Air conditioning and refrigeration cooling water and sanitary flushing water may be fresh or salt water. Install a pressure regulator and pressure gauge to monitor and regulate the supply.
3.1.14. Trash and Garbage Disposal: Provide a receptacle within 100 feet of the gangway for disposal of ships garbage and refuse. This container shall be emptied as required.
The contractor shall clean up dirt and debris incidental to shipyard work on board daily and remove same from the ship.
3.1.15. Gangways: Two suitable gangway or ladder shall be provided while the ship is drydocked or berthed at the yard. Safety nets will be provided at all gangways. One gangway shall be located forward and the second aft.
3.1.16. Fire Protection: All times when the ship is pierside or on drydock in the Contractor’s facility, provide 2 each charged fire manifolds each served by 2-1/2- inch hose shall be located on the foredeck and fantail. Provide firefighting water at 100 PSIG and 400 GPM to the manifolds. Each manifold shall be fitted with enough 1-1/2” hose to reach any space on the Ship. Each fire hose so supplied shall be fitted with fog fire nozzle.
3.1.17. Electric Power: Furnish the ship with 440 VAC, 3 phase, 300 amperes electric power to the Ships’ shore power connection box. The shore power tie cable shall be provided by the Contractor and shall be suitable for the maximum service.
3.1.18. Steam: Provide 15 boiler horsepower of saturated steam at 35 PSIG at the service steam connection on D Deck. Install a pressure regulator and pressure gauge to monitor and regulate the steam supply.
3.1.19. Sewage Disposal: Provide a shore connection for disposal of the Ships’ sewage.
3.1.20. Mooring Lines: The ship’s mooring lines shall be utilized while alongside at the contractor’s pier. The contractor’s lines shall be used for handling and positioning the vessel during drydocking and undocking.
NOAA Ship Fairweather
20 | P a g e
3.1.21. High Speed Internet Service: Provide Secure DSL or equivalent Internet access service that can be accessed by all NOAA computers in offices provided by the contractor or aboard the vessel both alongside and while in dry dock. Contractor shall provide and install a Cat-5 cable terminated with RJ-45 connector to a location on the vessel that allows connection to the vessel’s computer network at a location designated by the COR. Alternatively, the Contractor may provide a wireless Internet service. Internet service bandwidth shall be 25Mbs minimum.
3.1.22. Refrigerated Storage: Provide 200 cubic feet of freezer storage for the Stewards Department for the duration of the availability.
3.1.23. Ship’s Boats: Provide covered storage on cradles or boat trailers furnished by the contractor for the Ship’s Fast Rescue Boat and the Ship’s Ambar Utility Boat for the duration of the availability. Moorage and storage facilities shall have 110VAC power available for each craft. Note: the 110VAC requires either a 30-amp or 50-amp plug-in. The ship’s boats require access to stable power to preserve battery life.
3.1.24. Ship’s Gasoline Tank: Remove from the ship and provide covered storage for the Ships’ Gasoline Tank located on the Port Fantail. Reinstall prior to the ship’s departure for Sea Trials.
3.1.25. Water Depth and Height Restrictions: At no time shall the ship be moored at any dock or transit any waterway which as a water depth at low tide less than that required to provide a minimum clearance of one foot under the lowest underwater projection.
3.1.26. Pump, clean and maintain dry the Main Engine Room and Shaft Alley bilges. Dispose of up to 8,000 gallons of oily bilge water. Main Engine Room and Shaft Alley bilges shall be cleaned free of oil, sludge or other liquids, dirt, rags, foreign material and industrial debris and maintained in this condition for the entire period the contractor is working on the ship.
3.1.27. Ship’s Mooring: The contractor shall provide adequate pier or dock space acceptable to the Contracting Officer for safely mooring the ship.
3.1.27.1. The facilities and services shall be sufficient to permit the contractor to comply with all other requirements of the contract.
3.1.27.2. The contract is based, in part, on information provided by the contractor during the pre-award survey regarding the pier or dock facilities which will be used to moor the ship. Unless specifically approved in writing by the COR, the ship shall not be moored at any pier or dock space other than those proposed during the pre-award survey.
3.1.27.3. When shifting of the ship is required, the COR shall be given a minimum of three days advance notice of the proposed shift. Shifting the ship shall be performed only during regular work days and hours except when dry docking and refloating the ship.
3.1.27.4. The mooring space to for the ship shall be under the complete and legal control of the contractor. If the contractor proposes to use any mooring space which is not owned by the contractor, a legally binding lease or agreement must be signed by the owner which clearly gives the
NOAA Ship Fairweather
21 | P a g e contractor complete control of the mooring for the entire period of the contract, including any time extensions which may be approved by the Contracting Officer. A copy of the agreement will be required to be submitted as part of the pre-award survey.
3.1.28. Transiting and Mooring Requirements:
3.1.28.1. Water Depths and Height Restrictions: At no time will the ship be moored at any dock or transit any waterway which has a water depth less than that required to provide a minimum clearance of one foot under the lowest underwater projection.
3.1.28.2. Vessel Arrival Conditions: The minimum liquid load, drafts and displacement of the ship at which the government intends to transit and arrive at the Contractor's facility will be provided upon request prior to arrival. Also included will be information concerning any changes in the ships liquid load which the Contractor will be permitted to make in order to meet the minimum underwater clearance requirements.
3.1.28.3. Transit Restrictions: At no time will the ship transit a waterway which has non-opening bridge or other overhead structure that would cause less than one-foot clearance over the ship's highest projection. In order to permit passage of the ship under bridges or other overhead structures in the waterway, the government will lower masts which have hinged connections for that purpose. However, the government will not remove, and will not permit the Contractor to remove, any part of the ship's structure or equipment for the purpose of providing the required overhead clearance.
3.1.29. Quality Assurance Requirements
3.1.29.1. None Additional
3.1.30. Notes
3.1.30.1. The Contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the Contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.
3.1.30.2. The Contractor and all subcontractors, regardless of tier, are advised to review other work items under this contract to determine their effect on the work required under this work item.
3.1.30.3. Contractors are encouraged and expected to review ship’s drawings and to perform a field inspection to inspect the locations and shipboard conditions where the work is to be performed aboard the Fairweather prior to submitting a bid proposal. This inspection should satisfy potential contractors regarding all general and local conditions, that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the sites constitute grounds for a change order or claim after contract award.
End of Work Item
NOAA Ship Fairweather
22 | P a g e
3.2. Annual Life Raft Inspections
3.2.1. Abstract
3.2.1.1. Complete regulatory inspection and certification of life rafts
3.2.1.2. Item Location, Quantity, and Description:
3.2.1.2.1. Elliott 25-person Life Raft Serial Number R6629
3.2.1.2.2. Elliott 25-person Life Raft Serial Number R6605
3.2.1.2.3. Elliott 25-person Life Raft Serial Number R6631
3.2.1.2.4. Elliott 25-person Life Raft Serial Number R6604
3.2.1.2.5. Elliott 25-person Life Raft Serial Number R6621
3.2.1.2.6. Elliott 25-person Life Raft…