This is a request for quote (RFQ) for ship repair and maintenance services for the NOAA Ship Thomas Jefferson. Key details include the required completion of 326 work items involving drydocking, structural and piping repairs, coating and preservation, machinery and equipment servicing, inspections, and certifications. The work is to be performed at the contractor's facility between December 2021 and January 2022. The Department of Commerce National Oceanic and Atmospheric Administration is the contracting agency. Pricing is to be provided using the attached spreadsheets.

View the file

Other files

File Type Posted
Amendment 0006.pdf PDF
TJFY22 Dry Docking and Repairs 20210804.pdf PDF
TJ FY22DD new references 20210804.zip ZIP file
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Attachment D.1 NOAA Ship THOMAS JEFFERSON FY22 DRYDOCK SPECIFICATION_REVISED 7.21.2021.pdf PDF
Summary of Changes 7.21.2021.docx DOCX document
TJ FY22DD new references 20210721.zip ZIP file
Attachment D.5 Price Schedule-Revised 7.21.2021.xlsx XLSX spreadsheet
TJ FY22DD new references 20210713.zip ZIP file
Summary of Changes 7.13.2021.docx DOCX document
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
TJ FY22DD References - Manuals 1 of 2.zip ZIP file
TJ FY22DD References - Manuals 2 of 2.zip ZIP file
TJ FY22DD References - Drawings 2 of 2.zip ZIP file
TJ FY22DD Refereences - Other.zip ZIP file
TJ FY22DD References - Drawings 1 of 2.zip ZIP file
TJ FY22DD References - Standard Specifications.zip ZIP file
Attachment D.3 Past Performance Questionnaire.docx DOCX document
Attachment D.1 NOAA Ship THOMAS JEFFERSON FY22 DRYDOCK SPECIFICATION.pdf PDF
Attachment D.4 US DOL POSTER.pdf PDF
Attachment D.2 Past Performance Information Form.rtf RTF text file
RFQ_1305M221QNMAN0111.pdf PDF
Attachment D.5 Price Schedule.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA Ship Thomas Jefferson

Drydocking and Repairs

MOA2-09(21)

DATE: June 29, 2021

Revised: July 13, 2021

Written by:

Reviewed by:

Marine Engineering Branch - MOA2 Marine Operation Center, Atlantic

439 West York Street Norfolk, VA 23510

Record of Changes

Change Date: July 13, 2021 (Changes are highlighted with a single vertical line in the right margin.)

References

• Reference “085-6980285E TJ Tank Capacities & Soundings” file name should read “085-6980295E TJ Tank Capacities & Soundings”

• Provided missing references o 512-004_-_HVAC Makeup Air Modifications o 514-003_-_Refrigerant System and Condensate Piping Modifications o 562-6634741D Rudder Arrangement and Details o TJ-079-01, Rev C Intact Stability_97515713 o TJ-079-02, Rev C Damage Stability_97300935_97516072 o TJ-320-005_P1 Ventilation System Electrical Modifications (Preliminary)

• Provided new references:

o 142313a - Wirepuller HN-9003 o Paint spec. NOAA touch-up o TJ Fire System Devices 2021-07-11 o TJ-436-001 Fire Detection and Alarm System

Item 308

• Corrected reference (e) drawing number from “CC-7137” to read “CC-7157”

Item 311

• Added reference (f)

• Added reference (g)

• Added new paragraph (i) to provide OEM services to update the fire detection system programing.

• Added new paragraph (j) to revise reference (g) to “as-Built”

• Added deliverable to read “Update fire detection system’s program”

• Added deliverable to read “Revised drawing TJ-436-001, ‘Fire Detection and Alarm System’”

Item 312

• Added reference (d)

• Added reference (e)

• Added new paragraph 3.12.4 6. d) and subparagraphs for repairing the stbd forward wirepuller.

Item 504

• Modified paragraph 5.4.4 b. 3. to include additional information for the expansion joints

• Adjusted paragraph numbering following paragraph 5.4.5

• Added paragraph 5.4.7 g to provide SSDG Engine Exhaust Expansion Joint manufacture information

Item 507

• Modify paragraph 5.7.4 c. 2. c) to add “SS304 material construction” prior to marine grade for the new tempered air fan.

• Modify paragraph 5.7.4 c. 2. d) to add “SS304 material construction” prior to marine grade for the new tempered air booster fan.

Item 509

• Added paragraph 5.9.4 e. 3. To read “Remove local/remote switch and retain for installation in the modified console.”

• Added paragraph 5.9.4 e. to read “Install retained local/remote switch in the aft lower panel of the modified console.”

MOA2-09(21)

July 13, 2021 i | P a g e

Table of Contents

1. SCOPE

2. GENERAL

3. BASIC ITEMS

3.1 ITEM NO. 301: Temporary Services

3.2 ITEM NO. 302: Dry Docking and Routine Dry Dock Work

3.3 ITEM NO. 303: Cathodic Protection: Inspect & Repair

3.4 ITEM NO. 304: Elinca System: Inspect & Repair

3.5 ITEM NO. 305: ABS Load Line Certification

3.6 ITEM NO. 306: ABS Tank Inspections

3.7 ITEM NO. 307: Underwater Body Coating - Maintenance

3.8 ITEM NO. 308: Above Water Hull/Freeboard Preservation

3.9 ITEM NO. 309: Machinery Space Bilges Preservation

3.10 ITEM NO. 310: Fixed Ballast Modifications

3.11 ITEM NO. 311: Fire Fighting System Periodic Servicing

3.12 ITEM NO. 312: Davits Annual Servicing

3.13 ITEM NO. 313: CHT Tank Aeration System Installation

3.14 ITEM NO. 314: Liferaft Periodic Servicing

3.15 ITEM NO. 315: Pressure Vessels Inspections

3.16 ITEM NO. 316: Range Anchor Chain & Replace Hawse Pipe

3.17 ITEM NO. 317: Steel Replacements & Repairs

3.18 ITEM NO. 318: Piping Repairs

3.19 ITEM NO. 319: Various Deck Covering Replacements

3.20 ITEM NO. 320: Tanks Preservations

3.21 ITEM NO. 321: Reach Rod and Block Valve Replacements

3.22 ITEM NO. 322: Ship Inclining and Stability Test

3.23 ITEM No. 323: Diesel Engines Servicing

3.24 ITEM NO. 324: Lifelines and Handrails Repairs

3.25 ITEM NO. 325: Dock Trials

3.26 ITEM NO. 326: Sea Trials

4. OPTIONAL ITEM 400: ADDITIONAL ITEM REQUESTS

5. OPTIONAL ITEMS

5.1 ITEM NO. 501: ADCP Transducer Installation

5.2 ITEM NO. 502: Telephone System Installation

ii | P a g e

5.3 ITEM NO. 503: Reduction Gear Periodic Servicing

5.4 ITEM NO. 504: Diesel Engine Exhaust System Maintenance

5.5 ITEM NO. 505: Shaft Cooling Water Containment System

5.6 ITEM NO. 506: Stateroom Furniture Maintenance

5.7 ITEM NO. 507: HVAC Modifications for Controlling Humidity ... 143

5.8 ITEM NO. 508: Cathodic Protection: Anode Shield Repairs

5.9 ITEM NO. 509: CMCS Upgrade Support

5.10 ITEM NO. 510: Superstructure Preservation

5.11 ITEM NO. 511: Masts Preservation

5.12 ITEM NO. 512: Line & Net Cutter Replacement

REFERENCES

1 | P a g e

1. SCOPE

1.1 These Detail Specifications contain the requirements for

drydocking and general repairs on the NOAA Ship Thomas Jefferson (formerly USNS Littlehales, T-AGS 52, Hull 1169).

1.1.1 The National Oceanic and Atmospheric Administration

(NOAA) operates a fleet of research vessels that supports research and mapping for the National Marine Fisheries Service, National Ocean Service, Office of Atmospheric Research and the National Weather Service, as well as provides support to other Federal agencies. These research missions are time sensitive and therefore the data must be collected at specific times during the sailing season to be meaningful. At the end of each sailing season the vessels enter a repair period (drydock or dockside) to address repairs that have been previously identified, perform upgrades to mission systems or ship systems that either extend the life of the ship or provide new data collection capabilities or for safer operations of ships systems as well as address any emergent work that would adversely affect the ships ability to safely perform its mission on schedule , while meeting all regulatory body requirements (American Bureau of Shipping and United States Coast Guard) and all habitability requirements, including any that may be required as a result of contracts for personnel to augment ship staff.

1.1.2 The work items in the repair specification are

identified well in advance of the performance period in order meet the contracting lead times. Additional work items (emergent work) may arise during the period between the work package submittal, contract award, or even prior to the start of or during the contract performance period. In accordance with Commerce Acquisition Regulation (CAR) clause 1352. 271- 72, the Contracting Officer may order additional changes during the contract period of performance to address any additional work items identified as necessary to ensure the intent of the drydock or dockside repair contract is met; that is, that the vessel shall be able to safely perform its mission, that it will meet all habitability requirements and regulatory body requirements, and that such repairs will be timely performed to ensure to the maximum extent practicable that the ship's schedule is not adversely impacted.

2 | P a g e

2. GENERAL

2.1 References

2.1.1 NOAA Standard Specification MOC-000-1H, “General

Requirements for Ship Repair Contract Work on NOAA Ships”

2.1.2 NOAA Standard Specification AMC-631-2D, “Coating

Systems for Steel Surfaces”

2.1.3 NAVSEA Standard Item 009-32, “Cleaning and Painting

Requirements: Accomplish”

2.1.4 NOAA Ship Thomas Jefferson drawing TJ-085-002, “Booklet of General Plans”

2.1.5 ABS Marine Vessel Rules

2.1.6 NOAA Ship Thomas Jefferson procedure “1701-09 TJ - Hot

Work Operations”

2.1.7 NOAA Ship Thomas Jefferson form “NF 57-17-09 - Hot

Work Permit”

2.1.8 NOAA Ship Thomas Jefferson FY22DD Work Item

Interdependency Matrix

2.2 Requirements

2.2.1 Review and have all subcontractors regardless of tier

review all work items under this contract to determine the interrelationship/interdependency between each of the work items. Many of the definitions relating to performance of these work items are found in references included in each work item.

Reference 2.1.8 is provided as a source to assist in determining the interdependency between work items.

2.2.2 Reference 2.1.1 forms a part of these Detail

Specifications. All provisions and requirements contained therein are applicable to all work items, including all additional work items which are authorized by the Contracting Officer.

a. Provide an electronic copy, in Adobe Portable Document Format (PDF), and two hard copies of all Condition Reports.

b. Include in the Safety Plan detailed procedures for the following:

3 | P a g e

1. Confined and Enclosed Spaces and Other Dangerous Atmospheres – All confined spaces must be considered to have a hazardous atmosphere until demonstrated to be safe via testing by the Competent Person. Confined spaces may contain high concentrations of harmful gases and other environmental conditions that can cause injury, illness, or death. Include in this section the procedures for personnel to enter and work within confined spaces.

2. Control of hazardous energy (lockout/tagout (tags-plus)) – All machines, equipment, and pressurized systems are to be isolated from their energy source and at a minimum tagged out in addition to locking out (if the equipment can be fitted with a locking device) before any servicing or repair work is performed where the unexpected start up or release of energy could cause injury or death. In addition, lockout/tagout shall be used whenever personnel are required to remove a guard or other safety device or required to place any part of personnel’s body in a danger zone of any machine, equipment, or system. Include in this section the procedures for lockout/tagout for servicing of machinery, equipment, and systems when the energization or startup of machinery, equipment, or systems, or the release of hazardous energy, could endanger personnel.

3. Hotwork Operations –

a) Include in this section the procedures used for preparing for hotwork including Marine Chemists and Competent Persons requirements, notifications of hotwork operations, fire prevention during hotwork operations and fire prevention after completion of hotwork operations.

b) Procedure must meet or exceed the requirements of reference (2.1.6).

c) Use reference (2.1.7) for identification of hotwork. Ship’s force will be available to verify and sign completed copies of reference (2.1.7) at the beginning of each day hotwork is anticipated.

4. Fall Protection – The ship is equipped with systems to protect personnel from falls during normal operations. Include in this section temporary safe guards, systems, equipment, restraints and/or procedures used to protect

4 | P a g e personnel from falls during accomplishment of work required by these Detail Specifications.

c. Definition of terms as related to drawings:

1. As-built drawing – A drawing that reflects the as-constructed conditions of the system. As-built drawings include current and previous undocumented changes to the system.

2. Develop ACAD “As-Built” drawing – Convert the drawing from the provided format and create in an ACAD format.

2.2.3 Project Schedule - Provide an electronic copy, in

Adobe Portable Document Format (PDF)

a. Develop and maintain a Project Schedule for the work required by these specification using a Gantt chart format.

b. Include the following minimum information in the Project Schedule for each Work Item:

1. Major tasks within each Work Item

2. Planned start and completion dates for all tasks

3. Actual start and completion dates for all tasks

4. Milestones

5. Critical path

c. Keep the schedule current with schedule modifications and completed tasks. Submit the Project Schedule weekly along with the Progress Report. The provided information will be used to evaluate overall progress.

2.2.4 Prepare and submit daily a Plan of the Day (POD), in

Adobe Portable Document Format (PDF), identifying by work item anticipated work that will be accomplished onboard the ship that day, attending subcontractors, and areas of hotwork.

2.2.5 Maintain a Quality Assurance (QA) Test and Inspection

Plan applicable to all work items, including all additional work items which are authorized by the Contracting Officer. The form shall include the following minimum information for each work item and additional work item:

a. Specification item and paragraph number

5 | P a g e

b. Component/Equipment name

c. Test or Inspection description

d. Acceptance Criteria

e. QA Inspection Report

2.2.6 Develop and maintain a separate Test Schedule.

2.2.7 Develop, in consultation with the local attending ABS

Surveyor, a written ABS Survey Schedule that lists the items to be inspected and the scheduled dates and times of the inspections. The ABS survey schedule shall list all initial inspections required by the ABS Surveyor. Submit the ABS Survey Schedule to the COR within 48 hours after the start of the contract performance period and update weekly at the Progress Meeting.

2.2.8 Provide a copy of ABS approved welding procedures and

active welder certificates prior to starting any work. Update the active welder certificates throughout the contract performance period as changes occur.

2.2.9 Unless otherwise stated in these work items, prepare

and coat all new steel, disturbed, or otherwise required painted surfaces in accordance with reference 2.1.2. If no paint system is identified in the item, apply the appropriate coating system to the area being coated as identified by paragraph 5.2 of this reference except that the topcoat color shall match the surrounding area. Reference 2.1.2 may be amended with reference

2.1.3 when approved by the COR.

a. For all surface preparation and coating applications, use contractors and subcontractors who have current and active QP1 certification. Provide copies of QP1 certificates

b. Maintain environmental records for days when coating systems are applied. Obtain environmental readings prior to application of any coating and at maximum of 1 hour intervals during application of the coating.

2.2.10 Weight Report: Weigh all materials and items removed, installed, or relocated on the ship. Provide a summary report to the COR indicating the total weight in pounds of the item and a breakdown of their locations by space, deck, frame, distance from centerline, and height off of the deck. A sample form is attached to these specifications.

6 | P a g e

2.2.11 The cleanliness of the ship at the time of redelivery

to NOAA shall be equal to or better than the cleanliness of the ship at the time of delivery to the contractor. Digital documentation may be helpful to validate existing conditions prior to commencing any work.

2.2.12 NOAA Ship Thomas Jefferson is ABS Classed. All

fabrication and materials are to be in accordance with reference

2.1.5. so as to retain her ABS Class.

2.3 Deliverables

2.3.1 General - Condition Reports (see requirement in

reference 2.1.1)

2.3.2 General – Project Schedules

2.3.3 General - Progress Reports (see requirement in

reference 2.1.1)

2.3.4 General - List of Contractor’s Supervisors (see

requirement in reference 2.1.1)

2.3.5 General - Safety Plan (see requirement in reference

2.1.1)

2.3.6 General - Gas Free Certifications (see requirement in

reference 2.1.1)

2.3.7 General - Completed NF 57-17-09, “Hot Work Permit”

(Multiple) (see requirement in references 2.1.1 and 2.1.6)

2.3.8 General - Hazardous Material List and MSDS (see

requirement in reference 2.1.1)

2.3.9 General – Plan of the Day (Daily)

2.3.10 General - Quality Assurance Test and Inspection

Plan(s)

2.3.11 General - Test Schedule(s)

2.3.12 General - ABS Approved Welding Procedure

2.3.13 General - ABS Approved Welder Certificate(s)

2.3.14 General - ABS Survey Schedule(s)

2.3.15 General - QP1 certification(s)

7 | P a g e

2.3.16 General - Coating Environmental Report(s)

2.3.17 General - Weight Report

2.4 Notes

2.4.1 Hazardous Materials:

a. NOAA Ship Thomas Jefferson was constructed between 1988 and 1991. There was no asbestos used during the construction and any asbestos requirements contained in the referenced Standard Specifications do not apply.

b. Several items in this specification require gas freeing of tanks, in order to accomplish the required work.

Prospective bidders should be careful not to duplicate the costs of gas freeing where tank(s) are required to be gas freed to perform work in more than one item.

c. The contractor is responsible for the control, handling, and disposal of any hazardous materials generated during accomplishment of this contract.

2.4.2 Reference 2.1.4 was used in the identification, location, and naming of spaces within these Detail Specifications. Even though reference 2.1.4 has been modified since construction, differences still exist.

2.4.3 Ship’s force may schedule work items to be

accomplished by ship’s force concurrent with these Detail Specifications. Ship’s force work items will be scheduled and coordinated with the contractor to not interfere with the work required in these Detail Specifications.

2.4.4 Ship Safety Procedures. NOAA Ship Thomas Jefferson has

her own safety procedures to include Confined Space Entry Program, Lockout/Tagout, Hotwork Operations, and Marine Operations Fall Protection Program. Ship’s force will continue to use the ship’s safety procedures during accomplishment of ship’s force work items.

2.4.5 Ship’s force is scheduling to demobilized from their

last mission at the beginning of the shipyard availability and mobilize for their next mission at the end of the shipyard availability. Anticipate additional ship’s force activities during these times.

8 | P a g e

2.4.6 Habitability

a. The ship shall be deemed uninhabitable when any one or a combination of the following conditions exist and it is impossible for management to correct the problem in a timely manner (4 hours or as noted below):

1. Heat and/or air conditioning is not furnished.

2. Potable water (hot or cold) is not provided for a period of 12 or more consecutive hours.

3. When a working toilet, shower, and sanitary drainage are not furnished.

4. At all times when the vessel is in drydock overnight, unless the ship is fully habitable with all facilities including heat and/or air conditioning, lights, hot and cold running water, shower and sanitary facilities (working toilets and sanitary drainage). Portable toilets do not meet the requirements for sanitary facilities.

5. Work such as chipping, welding, riveting, hammering and/or pounding, or other noises of a similar nature are being performed in or around vessel personnel quarters or noxious fumes are present that disrupts the employees’ ability to rest for more than three (3) hours. Note: Wage mariners not assigned to a watch, are assigned to work during eight (8) hours of duty between 0800 and 1700 hours Monday through Friday.

6. Flooding of quarters or common areas due to bilge or sewage backup not repaired within 24 hours.

b. When a vessel is in port and declared uninhabitable, no employee will be allowed to live on board. Individual quarters may be deemed uninhabitable when the respective quarters have been painted, the paint is not absolutely dry, and other suitable quarters are not furnished aboard. It is also not intended that any wage mariner shall be assigned to sleep in a flooded berthing area.

9 | P a g e

E

2.4.7 The following general characteristics of the ship are

provided for information:

ABS Class Number...9105067 Delivery Date..01 Dec 1991 Length Overall.........208 feet Beam (Molded)...........45 feet Propulsion.............Diesel, single screw Cruising Speed..........12 knots Electric Service.......345 KW, 225/450 volts AC Officer size Crew size ABS Class Notations....✠A1, , ✠AMS, ✠ACCU

End of Section

10 | P a g e

3. BASIC ITEMS

3.1 ITEM NO. 301: Temporary Services

3.1.1 Abstract – This item covers the requirements for

providing temporary services during the contract performance period at the contractor’s facility.

3.1.2 References

(a) NOAA Standard Specification 000-2D, “Temporary Services at Contractor Facilities”Error! Bookmark not defined.Error!

Bookmark not defined.

3.1.3 Government-Furnished Material

a. None

3.1.4 Requirements

a. Provide all temporary services required in accordance with reference (a) for the entire performance period.

b. The following additional information and requirements apply:

1. Electric: Provide and maintain 400 amps, 60 hz, 460 volts ac, 3 phase electrical shore power services. Estimated demand load is 250 amps average when the ship is habitable. The ship’s two receptacles are for NATO (Joy type) plugs rated at 400 amps each. Ship’s force will identify which of the ship’s receptacles to connect to for this availability at the time of hookup.

2. Telephone Service: Not required.

3. Steam: Not required.

4. Toilet Facilities: Required during uninhabitable period. Include a hand washing station that is serviced daily.

5. Parking Spaces: Provide parking spaces for eight vehicles. Provide the follow labels for the parking spaces:

a) One each: “NOAA - COR”

b) One each: “NOAA - CO”

c) One each: “NOAA - CME”

11 | P a g e

d) Five each: “NOAA”

6. Dockside Office Space: Three Office Spaces plus a Common Space for the crew. Two office spaces to include ten chairs and power receptacles for five remote workstations (laptops) and three admin machines and 1-2 printers that NOAA will setup. The Common Space to include a full size refrigerator, tables with chairs, drinking water service with dispensing of hot and cold water (a bathroom sink is unacceptable), and power receptacles for a microwave and coffee pots. Provide additional drinking water service onboard the ship.

7. Security Services: Required from and including December 18, 2021 to and including January 16, 2022.

8. Air: Provide 32 CFM (minimum), 125 psi dry, filtered compressed air connected to the ship's service airline on the Main Deck.

9. Internet Service: Required. Provide the proper number of connections necessary to satisfy the ship's wet berth and dry dock locations, as well as the ship’s and COR's dockside office spaces. All necessary cabling, DSL or cable modem(s), or fiber translators shall be provided for an RJ-45 network connection to the ship and the dockside office(s) routers.

Provide a minimum of one Internet Protocol (IP) address with Directory Name Server (DNS) service for each ship and dockside office(s) locations. The ship will provide the necessary routers and switches.

10. ABS Surveyor: Schedule the services of an ABS Surveyor as required by ABS for performing inspections of all new installations, modifications, and tank inspections. NOAA will pay for all normal ABS surveys and surveys associated with the work required by these specifications. The contractor shall provide a credit for any additional ABS charges associated with rescheduling of surveys and rework surveys which are directly under the control of the contractor.

11. Additional Crane Services: Provide 30 hours of crane service for loading /offloading ship’s supplies and equipment.

12 | P a g e

12. 48 hours prior to completion of the contract repair period, remove temporary deck covering.

a) Wash all non-carpeted decks that were covered with temporary deck covering including each decks’ passageway and the Ship's Mess.

b) Steam clean all carpets that were covered with temporary deck covering.

13. Climate Control Storage

a) Provide approximately 250 ft2 of secure climate controlled storage for the storage of ship’s materials. Maintain the temperature between 55°F and 85°F with humidity no more than 55%

1) Ship’s force will pack and unpack the storage unit.

2) Only ship’s force will be allowed access to the storage facility.

3.1.5 Quality Assurance

a. No additional requirements

3.1.6 Deliverables

a. Safe Drinking Water Report (see requirements of reference (a))

3.1.7 Notes

a. None

End of Item

13 | P a g e

3.2 ITEM NO. 302: Dry Docking and Routine Dry Dock Work

3.2.1 Abstract - This item provides the ship specific

requirements for routine and additional work to be accomplished while the ship is hauled.

3.2.2 References

(a) NOAA Standard Specification 997-1B, “Drydocking & Routine Drydock Work”Error! Bookmark not defined.

(b) NOAA Ship Thomas Jefferson drawing 161-6634743, “Shaft Strut”Error! Bookmark not defined.

(c) NOAA Ship Thomas Jefferson drawing 562-6634741, “Rudder Arrangement and Details”Error! Bookmark not defined.

(d) NOAA Ship Thomas Jefferson drawing 243-6634740, “Propeller Shafting, Arrangement and Details”Error! Bookmark not defined.

(e) NOAA Ship Thomas Jefferson drawing 801-6634640, “Hull Lines”Error! Bookmark not defined.

(f) NOAA Ship Thomas Jefferson drawing 801-6634641, “Table of Offsets”Error! Bookmark not defined.

(g) NOAA Ship Thomas Jefferson drawing TJ-568-004D, “NOAA Ship Thomas Jefferson Bow Thruster Installation”Error! Bookmark not defined.

(h) NOAA Ship Thomas Jefferson drawing 245-6634744, “Propeller Diagram”Error! Bookmark not defined.

(i) NOAA Ship Thomas Jefferson drawing TJ-079-03, “Trim & Stability Booklet”Error! Bookmark not defined.

3.2.3 Government Furnished Material

a. One box: HSS-GF0-HPMP-1 High Performance Marine packingError! Bookmark not defined.Error! Bookmark not defined.

(Estimated value $1,500)

3.2.4 Requirements

a. Prior to hauling the ship, prepare a Liquid Transfer/Removal Plan (Plan) containing comprehensive procedures for transfer and removal of all liquids loads. Include the

14 | P a g e quantities and location of transfer liquids between tanks, the quantities and location of liquids to be removed, quantities to be stored off the ship, estimated quantities to be disposed of and quantities and locations to be returned. The dockmaster shall approve the Plan if there are plans to transfer liquid loads while the ship is on blocks. Submit a copy of the Plan to the COR at least 3 work days prior to hauling the ship.

b. Provide dry-docking and routine dry-dock work in accordance with GENERAL Section reference 2.1.4 and reference (a).

c. The following additional requirements apply:

1. Haul the ship within 72 hours of arrival at the contractor’s facility.

2. The minimum acceptable forward and after drafts and corresponding displacement tons permitted to dry-dock the ship consistent with safe stability and structural integrity are as follows:

a) Fwd = 10 feet - 3 inches

b) Aft = 10 feet - 9 inches

c) Displacement ≈ 1440 LT

3. Haul the ship in position 1 at a minimum keel block height of 5 feet.

4. After positioning and before hauling the ship, conduct a diver’s inspection of the underwater keel blocks positions relative to the centerline multi-beam dome to verify that the keel blocks will not come in contact with the dome.

5. Record inspection results on the attached NOAA DOCKING REPORT S0700/SWB997 in lieu of Docking Report form 2410.

6. Additional requirements for the propeller:

a) CLEANING AND POLISHING: Clean and polish forward and after surface of the propeller blade tips between 0.7 and 1.0 radius lines and the leading edges of the propeller blades over 0.2 of the blade width to a finish equal to the “B” specimen of the Rubert Comparator having a roughness average

15 | P a g e

(RA) of 76.8 micro-inch. The remainder of the propeller blades shall be polished to a finish equal to the “C” specimen of the Rupert Comparator having an RA of 188.0 micro-inch.

b) Measure and record the following data on the propeller:

1) Pitch of each blade at 0.7 radius, and

0.9 radius.

c) Read and record all data stamped on the propeller to include

1) Diameter

2) Manufacturer and propeller number

3) ABS number(s)

4) Weight

7. Additional requirements for the bow thruster propeller:

a) CLEANING AND POLISHING: Clean and polish to a finish equal to the “C” specimen of the Rupert Comparator having an RA of 188.0 micro-inch.

8. Install GFM packing for the tailshaft and rudder post instead of "TFE-impregnated square flax packing", as required in reference (a), para 3.8.

3.2.5 Quality Assurance

a. Inspect the condition of the dielectric Capastic shield around the four cathodic protection anodes and identify repair areas in lots of 10 square foot sections.

3.2.6 Deliverables

a. Docking Report S0700/SWB997

b. Propeller Inspection Data

3.2.7 Notes

16 | P a g e

a. References (b) through (i) are listed as sources for obtaining information.

b. Intersleek 1100SR with a final coat FXA992-Blue is an approved coating system for all transducer faces.

17 | P a g e

3.3 ITEM NO. 303: Cathodic Protection: Inspect & Repair

3.3.1 Abstract – This item provides the requirements for

periodic servicing and repairs to the ship’s cathodic protection system.

3.3.2 References

(a) NOAA Ship Thomas Jefferson drawing 633-6634726, “Cathodic Protection Elementary Wiring Diagram”

(b) NOAA Ship Thomas Jefferson drawing 633-6634907, “Cathodic Protection System”

(c) NOAA Ship Thomas Jefferson manual no. TJ-633-01, “Cathodic Protection System”

(d) NOAA Ship Thomas Jefferson drawing 633-67635, “Installation Drawing ICCP Equipment”

3.3.3 Government-Furnished Material

a. None

3.3.4 Requirements

a. Perform the following work on the ship’s cathodic protection system under the on-site and off-site guidance of a manufacturer-authorized field service technician and references (a), (b), and (c):

1. Troubleshoot the reference anodes to ensure they are delivering the proper hull potential signal to the CAPAC controller.

2. Open, clean, and inspect the automatic controller and power supply for deterioration, damage, or excessive wear that may affect operation of the system. Tighten all connections.

3. Adjust the automatic controller and power supply for correct output for each reference electrode and anode.

4. Calibrate all system meters.

5. Inspect each anode and dielectric shield immediately upon dry docking the vessel.

18 | P a g e

6. Inspect anode connection boxes and cofferdams.

7. Replace the two reference electrodes.

8. Install protective covers over anodes and reference electrodes of the impressed current cathodic protection system.

a) Protective covers shall remain in place during the entire dry-docking period, except while accomplishing work associated with anodes and reference cells.

b) Remove the protective covers prior to undocking the vessel and carefully remove all paint and contaminants from the anodes and reference cells.

9. Perform the following work on the shaft grounding assembly:

a) Repair and bright dip brush holder assemblies.

b) Renew the brushes.

c) Inspect the grounding strap and grounding strap connections for deterioration, damage, or excessive wear that may affect operation of the system.

10. Measure and record the output current readings versus the reference electrode voltage for each anode prior to hauling and after floating the ship.

3.3.5 Quality Assurance

a. Perform an operational test of system to determine operating condition of all system equipment prior to hauling the ship.

b. Perform another operational test after completion of all other work and floating the ship to verify proper operation of the system.

19 | P a g e

3.3.6 Deliverables

a. Cathodic Protection – Operational test prior to hauling

b. Cathodic Protection – Operational test after floating

c. Cathodic Protection Manufacturer – Service Report

d. Cathodic Protection – Output current readings prior to hauling

e. Cathodic Protection – Output current readings after floating

3.3.7 Notes

a. The ship’s cathodic protection system is composed of the following parts:

1. One unit each automatic power supply/controller P/N 58612-2 located port side upper level in the Engine Room (Space 4-55-0).

2. Two assemblies each anode P/N 36460-1 relocated in 2006 port and starboard in Fuel tanks 4-16-1&2 at frame 22½.

3. Two assemblies each anode P/N 36460-1 located port and starboard in the Fuel tank 4-75-3&4 at frame 78½.

4. Two assemblies each reference electrode P/N 32622 located port and starboard at frame 54½ in the Anti-Roll Tank 3- 51-0).

5. One assembly each shaft grounding assembly P/N 37000-5 located at frame 73 in the bilge in the Engine Room (Space 4-55-0).

6. One assembly each rudder grounding device located at frame 93 in the Steering Gear Room (Space 4-87-0).

b. Cathodic Protection Manufacturer contact information:

Siemens Industry, Inc.

Water Technologies Business Unit 2 Milltown Ct.

Union, NJ 07083 Robert Weddle 972-346-8159

20 | P a g e

3.4 ITEM NO. 304: Elinca System: Inspect & Repair

3.4.1 Abstract - This item contains the requirements for

inspection, parts replacement and repairs to the ship’s Elinca system.

3.4.2 References

None

3.4.3 Government-Furnished Material

a. None

3.4.4 Requirements

a. Perform the following work on the ship’s Elinca anti-fouling system under the on-site and off-site guidance of a manufacturer-authorized field service technician.

b. Inspect the condition of wiring between control panel and each anode.

c. Clean the internals of the control panel and inspect for loose or broken connections and other discrepancies. Adjust the output current to each anode to manufacturer recommended levels.

d. Inspect and test all other system components to determine proper installation and operation of system.

e. Procure and replace the two each CU and two each FE system anodes.

3.4.5 Quality Assurance

a. Perform an operational test of system to determine operating condition of all system equipment prior to hauling the ship.

b. Perform another operational test after completion of all other work and floating the ship to verify proper operation of the system.

3.4.6 Deliverables

a. Elinca – Operational test prior to hauling

21 | P a g e

b. Elinca – Operational test after floating

c. Elinca Manufacturer – Service Report

3.4.7 Notes

a. The ship’s Elinca system is composed of the following parts:

1. Elinca anode control panel assembly model EL/4 located starboard side lower level in the Engine Room (Space 4- 55-0)

2. Two 4", ANSI 12" long copper anodes (P/N EL40012-

9) located one assembly each in the port & starboard seachest

3. Two 4", ANSI 12" long iron anodes (P/N EL40014-9) located one assembly each in the port & starboard seachest.

b. Manufacturer information:

Parmatic Pollution Control Corp 88 Ford Road Denville, NJ 07834

COM: (973) 586-9200

Attn: Steve Keller

22 | P a g e

3.5 ITEM NO. 305: ABS Load Line Certification

3.5.1 Abstract – This item contains the requirements for

providing support and support data for an ABS special survey.

3.5.2 References

(a) NOAA Standard Specification AMC-100-1A, "ABS Load Line Survey”

(b) NOAA Standard Specification 101-6634879, “Deck and Bottom Scantlings”

3.5.3 Government-Furnished Material

a. None

3.5.4 Requirements

a. Perform a Special Periodic Hull Survey Number 5 (ABS Load Line Survey) in accordance with reference (a) and as follows:

1. As a minimum, take 1500 UT readings. The UT analysis report shall be in inches and may cover the following areas:

a) Three girth belts.

b) The keel plating.

c) The weather portion of the Main deck and Forecastle Deck over interior spaces.

d) The wind and waterline portion of the hull.

e) Disregard reference (a) requirements for tank inspections. These requirements are covered under a separate item.

3.5.5 Quality Assurance

a. No additional requirements

3.5.6 Deliverables

a. UT Analysis Report

23 | P a g e

3.5.7 Notes

a. Reference (b) is identified as a source for obtaining information.

24 | P a g e

3.6 ITEM NO. 306: ABS Tank Inspections

3.6.1 Abstract - This item contains the requirements for

opening, cleaning, inspecting, and closing the ship’s Ballast tanks.

3.6.2 References

(a) NOAA Standard Specification AMC-100-1A, "ABS Load Line Survey”

(b) NOAA Ship Thomas Jefferson drawing 085-6980295, “Tank Capacities and Soundings”

3.6.3 Government-Furnished Material

a. None

3.6.4 Requirements

a. General:

1. Perform work in this item in accordance with paragraph 3.4 Tank Inspections of reference (a).

b. Open, ventilate, and clean the ballast tanks specified in Table 306-1 safe for entry of workers. In addition to the requirements of reference (a), post a gas-free certificate at the brow and a competent person daily check sheet at each tank.

Table 306-1: Ballast Tanks

LOCATION CAPACITY

GALLONS

Low Suction LOCATION CAPACITY

GALLONS

Low Suction

4-0-0 17,547 41 4-8-1 11,044 95 4-8-2 11,044 224 4-22-0 6,407 770 4-22-1 4,081 292 4-22-2 4,081 281 3-51-0 23,583 1,295 4-59-0 5,884 770 4-75-0 11,786 1,295

c. Except as otherwise specified, NOAA will pump down tanks to the low suction level of the installed ship's piping system. The contractor shall pump out and properly dispose of all remaining water, sludge, and other tank contents.

25 | P a g e

d. High pressure water wash tanks’ interior including sides, overhead, bottom and all internals to remove slime and light scale. Light scraping may be necessary but take care not to damage coatings. Pump out, remove, and properly dispose of all residual water and debris.

e. After all tanks have been inspected by the ABS Surveyor remove installed lighting. When all other work is completed and the interior is accepted by the COR, close each opened tank using new gaskets compatible with the tanks designated content. Renew all missing and broken fasteners, chase all manhole cover threads, and apply an anti-seize lubricant to the threads of all fasteners. Estimate 10% missing or broken fasteners. Notify the COR at least four hours in advance of closing each tank. Immediately prior to closing each tank, the COR or a designated member of the ship's engineering force will inspect the tank’s interior to verify that the interior is clear of plugs, rags, and other residual debris.

f. When all other work and inspections are complete, refill ballast tanks in accordance with the contractor’s Liquid Transfer/Removal Plan using municipal water and carefully top off the tanks. Some of the ballast tanks have common vents. DO

NOT OVERFILL TANKS.

3.6.5 Quality Assurance

a. Perform a 2.0 psig air test on each tank after closing. Hold the pressure and check manhole covers for leaks using a soapy water solution.

b. During the filling process, recheck manhole covers and vents for leaks.

3.6.6 Deliverables

3.6.7 Ballast Tank Inspection – Tank Air Test

3.6.8 Notes

a. Notify the COR and ABS 24 hours before tank inspections.

b. Ballast Tanks were previously filled with municipal water.

26 | P a g e

c. Reference (a) is listed as a source for obtaining information.

27 | P a g e

3.7 ITEM NO. 307: Underwater Body Coating - Maintenance

3.7.1 Abstract - This item provides the requirements for

preservation of the underwater body of the ship with a maintenance system.

3.7.2 References

(a) NOAA Standard Specification MOC-631-3B, “Underwater Body Ablative Coating System”

3.7.3 Government-Furnished Material

a. None

3.7.4 Requirements

a. General:

1. Provide a certificate that the anti-fouling system is TBT-free.

2. For this item, using an ultrahigh, between 30,000 and 40,000 psig, water pressure preparation is preferred over abrasive blasting.

b. Prepare and coat the entire boottop and 20% of the underwater hull using a “complete system” in accordance with reference (a). Provide a unit cost, in 100 ft2 units, for additional areas of “complete system” preservation of the underwater hull.

c. Prepare and coat the rest of the underwater body using a “maintenance system” in accordance with reference (a).

d. The following additional requirements apply:

1. Wash the entire underwater hull to remove the hydrolyzed layer of the existing ablative antifouling coating.

2. Use the details in Table 307-1 “Parabolic Boottop” to cut in the top of boottop. Reestablish the bottom of the boottop to the light load level. Use the 10 ft forward draft mark and 11 ft aft draft marks to establish the cut in line for the bottom of the boottop.

3. Fair in hull transducers areas using a two component epoxy compound similar to Philadelphia Resins Corp., 28 | P a g e

Montgomery, PA. "Phillybond Blue 6A, 2 component epoxy compound."

4. Coat all hull frame numbers and Plimsoll marks with a contrasting top coat color (e.g., white anti-fouling within the black boot top).

Table 307-1: Parabolic Boottop

PARABOLIC BOOTTOP

(The offsets below are the vertical distances from the 14' 0" waterline to the upper edge of the boottop P/S. Boottop color is black.)

FRAME NUMBER OFFSET

(INCHES)

FRAME NUMBER OFFSET

(INCHES)

0 18 55 0 ⅞

5 16 60 0 ⅜

10 14 65 0

15 12 ¼ 70 0 ¼

20 10 ½ 75 0 ¾

25 8 ⅝ 80 1 ½

30 7 ⅛ 85 2 ½

35 5 ½ 90 3 ⅝

40 4 ⅛ 95 5 ⅛

45 2 ⅞ Across Transom 6

50 1 ¾

e. Perform the following on the three bolt-on overboard discharge split pipe scuppers:

1. Prepare and coat all surfaces of the scuppers in accordance with reference (a). The top coat color shall match the surrounding color when installed on the ship.

2. Turn the scuppers over to the ship for future installation.

29 | P a g e

3.7.5 Quality Assurance

a. In the event the contractor elects to use an ultrahigh water pressure preparation, perform a 25 ft2 test patch area for inspection and acceptance by the paint manufacturer prior to preparing the remaining underwater hull sections.

3.7.6 Deliverables

a. Hull – TBT free certificate

b. Hull – Coating Environmental Reports

3.7.7 Notes

a. Underwater Hull Coating Data:

1. Complete system installed FY14. Last maintenance system applied FY19.

2. Epoxy anti-corrosive - Intertuf 262 (red and grey)

3. Controlled Depletion Polymer Antifouling - Interspeed 6200NA and 6400NA

30 | P a g e

3.8 ITEM NO. 308: Above Water Hull/Freeboard Preservation

3.8.1 Abstract – This item provides the requirements for

preparation and preservation of the above water hull and servicing of the portlights.

3.8.2 References

(a) SSPC-SP 18, “Thorough Spot and Sweep Blast Cleaning for Industrial Coating Maintenance”

(b) NOAA Instruction VC 06, “Color and Identification of NOAA Ships”

(c) NOAA Standard Specification AMC-635-2, “Thermal Insulation for Compartments”

(d) NOAA Ship Thomas Jefferson drawing CC-7135, “Airport 4 Dog, NO Cover, ¾” tempered Glass, Bronze Lens Frame, “Weld-In” Main Frame”

(e) NOAA Ship Thomas Jefferson drawing CC-7157, “16" DIA Fixed Portlight with Deadcover”

3.8.3 Government-Furnished Material

a. None

3.8.4 Requirements

a. Perform the following on all 26 portlights for the 2nd and Main Decks:

1. Remove all parts, except the steel frame, from the ship and blank the opening.

2. Clean all parts, rework all knife edges, chase all threads for the dog assemblies, and polish the glass.

3. Install in their original locations using new gaskets, seals, and stainless steel fasteners after completion of the freeboard preservation.

b. Perform the following on all 24 airports for the 01 and 02 Decks:

1. Remove all parts, except the steel frame, from the ship and blank the opening.

31 | P a g e

2. Clean all parts, rework all knife edges, chase all threads for the dog assemblies, and polish the glass.

3. Replace the screen assembly.

4. Install in their original locations using new gaskets, seals, and stainless steel fasteners.

c. Power wash the above water hull, bulwark, and railing to remove ingested salts from surfaces.

d. Prepare and preserve the above water hull, safety rails, outboard side of the bulwarks, inboard side of the bulwark, and steel frames for all portlights and airports in accordance with GENERAL Section reference 2.1.2. with the following modifications and clarifications:

1. Prepare all surfaces in accordance with reference (a).

2. Preserve the prepared surfaces using a minimum two coat epoxy polysiloxane type coating system with a total dry film thickness between 9 – 16 mils.

3. Follow the color scheme as outlined in reference

(b) for the top coat colors.

3.8.5 Quality Assurance

a. Perform a fire hose test on all reworked portlights and airports after installation.

b. Perform a chalk test of the knife edge for the interior portlight and airport deadcovers prior to and after completion of associated work.

3.8.6 Deliverables

a. Portlight/airport deadcover prework chalk test

b. Portlight/airport deadcover post work chalk test

c. Portlight/airport fire hose test

3.8.7 Notes

a. References (c) and (d) are listed as sources for

32 | P a g e

b. Sherwin-Williams’ Sher-Loxane 800 is a known epoxy polysiloxane coating system.

c. Pantone Process Blue (CMYK: C-100 M-10 Y-0 K-10| RGB:

R-0 G-147 B-208) is a known substitute for NOAA Process Blue and Pantone Reflex Blue (CMYK: C-100 M-73 Y-0 K-2 | RGB: R-0 G-84 B- 164 is a known substitute for NOAA Reflex Blue when using Sherwin-Williams’ Sher-Loxane 800.

33 | P a g e

3.9 ITEM NO. 309: Machinery Space Bilges Preservation

3.9.1 Abstract

a. This item provides the requirements to clean and degrease both the Engine Room and Steering Gear Room Bilges as well as prepare and preserve the Steering Gear Room bilge and a portion of the Engine Room bilge.

3.9.2 References

(a) NOAA Ship Thomas Jefferson drawing 101-6634863, “Structural Module 4”

(b) NOAA Ship Thomas Jefferson drawing 622-6634895, “Machinery Space Floor Plates and Grating”

3.9.3 Government-Furnished Material

a. None

3.9.4 Requirements

a. General:

1. Bilge is defined as the region below the deck plates and is inclusive of all structures below the bilge plates, such as pipes, transverse and longitudinal frames and supports.

b. Perform the following work in both the Engine Room and Steering Gear Room bilges.

1. Remove all deck plates in order to accomplish the required work. Install the deck plates in their original locations after completion of bilge preservation.

a) Drill out broken fasteners.

b) Chase all threads.

c) Replace all fasteners with stainless steel allen head ¼-28 x ¾” long countersunk fasteners with an anti-seize lubricant applied to the threads.

d) Replace hinges for bilge access plates.

34 | P a g e

2. Clean, degrease and remove salt deposits.

3. Properly dispose of all trash and debris generated from the cleaning and degreasing of the bilges in accordance with local hazardous material codes and regulations.

4. Cleaning to be inspected and approved by the chief engineer and COR upon completion.

c. Spot prepare and preserve areas of failed preservation of the Engine Room bilge in accordance with GENERAL reference

2.1.2. Apply paint system STL-3 or equal to the prepared

surfaces. For bidding purposes assume approximately 1000 ft2 of noncontiguous area for spot power tool preparation and preservation.

d. Prepare and preserve the entire Steering Gear Room bilge in accordance with GENERAL reference 2.1.2. Apply paint system STL-3 or equal to the prepared surfaces.

3.9.5 Quality Assurance

a. Perform a chloride test of the cleaned surfaces to verify removal of salts.

b. Inspect the Engine Room bilge and identify areas of failed or failing preservation system in a condition report.

3.9.6 Deliverables

a. Engine Room Bilge - chloride test

b. Steering Gear Room Bilge - chloride test

c. Engine Room Bilge – Bilge Preservation Condition

3.9.7 Notes

a. Engine Room bilge is between frames 55 to 75 which includes the port and starboard tank tops between frames 55 to 71 and the centerline tank top between frames 55 to 65.

b. Steering Gear Room is between frames 87 and 96.

c. References (a) and (b) are identified as sources for

35 | P a g e

3.10 ITEM NO. 310: Fixed Ballast Modifications

3.10.1 Abstract – NOAA Ship Thomas Jefferson keeps Ballast

Tank (4-8-1-W) full to correct a tendency for the ship to list towards the port side. NOAA intends to rectify this and regain some ballast capacity in the forward tanks by installing 94 LT of fixed ballast and structural additions to Ballast Tank (4-8- 1-W). As part of this modification, the contractor will divide Ballast Tank (4-8-1-W) into two separate tanks, designated Ballast Tank (4-10-1-W) and Fixed Ballast Tank (4-8-1-V), as shown in Figure 1 and Figure 2. This specification contains the requirements for all modifications necessary to carry out these modifications. The two portions of new Ballast Tank (4-10-1-W) in Figure 2 are connected by a cross-connect pipe near the keel extending from frame 12 to 14.

Figure 1 - Plan View of Hold before Installation

36 | P a g e

Figure 2 - Plan View of Hold after Installation

3.10.2 References

(a) NOAA Ship Thomas Jefferson drawing TJ-101-001, “Fixed Ballast Installation”

(b) NOAA Ship Thomas Jefferson drawing 101-6634860, “Hull 1969 (TAG 52) Only, Structural Module, Assembly 1”

(c) NOAA Ship Thomas Jefferson drawing TJ-835-003, “Permanent Ballast Installation Engineering Data Package”

(d) COMDTINST M9085.1B, Naval Engineering Computer Aided Design Standards

(e) NOAA Standard Specification MOC-631-3B, “Underwater Body Ablative Coating System”

(f) NOAA Standard Specification AMC-634-1A, “Deck Covering”

(g) NOAA Standard Specification AMC-505-2, “Hydrostatic Pressure Tests”

(h) NOAA Ship Thomas Jefferson drawing 525-6634754, “Fill, Vents & Soundings Arrangement and Details”

(i) NOAA Ship Thomas Jefferson drawing 525-6634776, “Fill, Vents & Sounds Diagram”

37 | P a g e

(j) NOAA Ship Thomas Jefferson drawing 085-6980295, “Tank Capacities and Soundings”

3.10.3 Government-Furnished Material

a. None

3.10.4 Requirements

a. General

1. Grind smooth or snipe all sharp edges which could cause injury to personnel.

2. Provide adequate limber holes in all spaces or areas which could trap liquids to ensure effective drainage.

b. Structural Modifications

1. Modify structure as detailed in Reference 0.

These modifications include:

a) Make frame 14 watertight on the starboard side.

b) Add a new longitudinal watertight bulkhead 3’-0” off centerline from frame 10 to 12.

c) Add a new transverse watertight bulkhead at frame 10 from centerline to 3’-6” off centerline.

d) Add two new manholes for access through the Lower Deck. Both manholes must be 12” aft of frame 10 on the starboard side, as shown in Reference 0.

e) Install two new vertical ladders below the manholes. The ladders must have a rung within 12” from the hull, and they must be removable without hot work.

38 | P a g e

2. Cut temporary vent and fill holes.

a) Before installing ballast, cut seven temporary fill and vent holes in the Lower Deck for use during fixed ballast installation in the locations shown in Error! Reference source not found..

Figure 3 - Temporary Fill and Vent Hole Locations

b) Each hole is to be 6” to 12” diameter and fitted with an annulus, backing bar, or similar means of welding an insert plate after the fixed ballast is installed and settled (see Figure 3).

c) At each hole, install two 5/8-11 UNC studs, each 2” long and provide each stud with a nut and washer for use during fixed ballast installation.

d) Use Grade 5 or better studs spaced 17” center-to-center and in line with the center of the hole. The hole and stud details are shown in Figure 3.

39 | P a g e

Figure 3 – Temporary Fill and Vent Hole Standard Details

3. Install a corrosion test plate in the fixed ballast tank.

a) Install a 1/2” thick ASTM A36 corrosion test plate which is no smaller than 24” x 4”.

b) Prep and coat the test plate in the same manner as the fixed ballast tank structure.

Connect the test plate to the…