Surface Preparation Standards.pdf

PDF 93 KB Posted

Attached to
FY21 Henry Bigelow Drydock Repairs
Solicitation number
1305M220QNMAN0190
Issued by

About this file

This document provides surface preparation standards for various substrates in preparation for coating application or other surface treatments. It outlines 14 different standards established by the Society for Protective Coatings and National Association of Corrosion Engineers for cleaning methods ranging from solvent cleaning to various grit blasting and water jetting. The standards specify the required cleanliness level and remaining residues allowed for iron, steel, galvanized metal, aluminum, stainless steel, non-ferrous metals, plastic, concrete and previously painted surfaces.

The related federal contract opportunity is for FY21 Henry Bigelow Drydock Repairs to be conducted by the Department of Commerce National Oceanic and Atmospheric Administration. No further details are provided on pricing, response dates, set asides or other requirements.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
(134)Knuckle Boom Crane_Part2.pdf PDF
(134)Knuckle Boom Crane_Part1.pdf PDF
Bigelow Trawl Winch Drawings.pdf PDF
VideoXpert.pdf PDF
HB FY21 Dry Dock Repair Spec_Rev 1.pdf PDF
(012)Centerboard_Rev1.pdf PDF
HB 124931 Cover.pdf PDF
HB310 FRV40 225 041 010 Generator 3 Phase Synchronous.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HB-568 (FRV40-225-008-010) Bow Thruster.pdf PDF
HB-300 FE01 Power One Line.pdf PDF
HB-085 FA04 Docking Drawing.pdf PDF
HB-461 FE93 Transducer Arrangement and Installation(1).pdf PDF
VideoXpert Professional v 3 7 Product Specification.pdf PDF
HB167 FH62 STRL Doors Hatches Manholes Scuttles.pdf PDF
HB-512-5010 Assy Unit 5010 HVAC A_D.pdf PDF
AMC 0001F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
AMC-0001F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
HB-100 FH68 BERP _ WERP Key Plan and Details.pdf PDF
Appleton Drawing AMD-2129 REV 0 Jib Pin Assembly.pdf PDF
HB FY20 Liferaft Certificates.pdf PDF
Naval Ships Technical Manual 081 Waterborne Underwater Hull Cleaning of Navy Ships.pdf PDF
HB-160 FH19 Centerboard Bottom Void Scantlings(1).pdf PDF
HB 124622 Sleeve Doubler 3inch NPS.pdf PDF
HB-085 FA01 Outboard Profile.pdf PDF
CC-7137_Plan_001.pdf PDF
Amendment 0002.pdf PDF
Air Box and Generator Pictures (1).pdf PDF
P 1097 19 Henry B. Bigelow LeBus Sleeves.pdf PDF
HB 124930 Casing.pdf PDF
Aft Deck Hatch.pdf PDF
Airmar B17-HP Temp Sensor.pdf PDF
HB-160 FH19 Centerboard Bottom Void Scantlings.pdf PDF
HB-461 FE93 Transducer Arrangement and Installation.pdf PDF
HB-461-002 EM2040 Installation Cable Run Sheets.pdf PDF
Standard - MIL-STD-2199A Glass Reinforced Plastic Covering for Propeller Shafts.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
(005)Line Shaft and Thrust Bearing Manual.pdf PDF
AMC-300-1 Overhaul of Electrical Rotating Machinery.pdf PDF
Amendment 0001.pdf PDF
(006)SternTubeBearing and Shaft Seal Resubmittal.pdf PDF
Furuno FE800 Installation Manual.pdf PDF
HB-461-001 EM2040 MkII 0.4x0.7 Installation.pdf PDF
Airmar Owners Guide _ Installation Instructions - SS577- 33-495-01.pdf PDF
Radial-Rubber-Tile-RBT-Submittal.pdf PDF
MOC-573-2 Overhaul-Repair of Hydraulic Cylinders.pdf PDF
S6900 General Requirement for Electrical-Electronic Items.pdf PDF
MOC-631-3B Underwater Body Ablative Coating System.pdf PDF
(139)Cathelco Antifouling System.pdf PDF
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SURFACE PREPARATION STANDARDS

Your coatings supplier will always designate the degree of surface preparation required for the materials you are using. The basic standards for preparing metal substrates are a joint effort between the Society for Protective Coatings (SSPC) and the National Association of Corrosion Engineers International

(NACE).

SSPC-SP1 Solvent Cleaning Removal of all visible oil, grease, soil, drawing and cutting compounds, and other soluble contaminants from steel surfaces with solvent, vapor, cleaning compound, alkali, emulsifying agent, or steam.

SSPC-SP2 Hand Tool Cleaning Removes all loose mill scale, loose rust, loose paint, and other loose detrimental foreign matter by hand chipping, scraping, sanding, and wire brushing.

SSPC-SP3 Power Tool Cleaning Removes all loose mill scale, loose rust, loose paint, and other loose detrimental foreign matter by power wire brushing, power sanding, power grinding, power tool chipping, and power tool descaling.

SSPC-SP5 / NACE 1 White Metal Blast Cleaning When viewed without magnification, the surface shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products and other foreign matter.

SSPC-SP6 / NACE 3 Commercial Blast Cleaning When viewed without magnification, the surface shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products and other foreign matter of at least 66-2/3% of unit area, which shall be a square 3 in. x 3 in. (9 sq. in.). Light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coating in less than 33-1/3% of the unit area is acceptable.

SSPC-SP7 / NACE 4 Brush-Off Blast Cleaning When viewed without magnification, the surface shall be free of all visible oil, grease, dirt, dust, loose mill scale, loose rust, and loose coating. Tightly adherent mill scale, rust, and coating may remain on the surface. Mill scale, rust, and coating are considered tightly adherent if they cannot be removed by lifting with a dull putty knife.

SSPC-SP10 / NACE 2 Near-White Blast Cleaning When viewed without magnification shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products and other foreign matter of at least 95% of each unit area. Staining shall be limited to no more than 5 percent of each unit area, and may consist of light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coatings. Unit area shall be approximately 3 in. x 3 in. (9 sq. in.).

SSPC-SP11 Power Tool Cleaning to Bare Metal When viewed without magnification, the surface shall be free of all visible oil, grease, dirt, dust, mill scale, rust, paint, oxides, corrosion products, and other foreign matter. Slight residues of rust and paint may be left in the lower portion of pits if the original surface is pitted. The surface profile shall not be less than 1 mil (25 microns).

SSPC-SP12 / NACE 5 Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultra High- Pressure Water Jetting Prior to Recoating This standard requires water jetting at high- or ultra high-pressure to prepare a surface for recoating using pressure above 10,000 psi. Water jetting will not produce a profile; rather, it exposes the original abrasive-blasted surface profile. Water jetting shall be performed to meet four conditions: WJ-1, WJ-2, WJ-3, and WJ-4, and a minimum acceptable surface shall have all loose rust, loose mill scale, and loose coatings uniformly removed.

SSPC-SP13 / NACE 6 Surface Preparation of Concrete Provides requirements for surface preparation of concrete by mechanical, chemical, or thermal methods prior to the application of bonded protective coating or lining systems.

SSPC-SP14 / NACE 8 Industrial Blast Cleaning Removal of all visible oil, grease, dust and dirt, when viewed without magnification. Traces of tightly adherent mil scale, rust, and coating residues are permitted to remain on 10% of each unit area of the surface if they are evenly distributed. Shadows, streaks, and discoloration caused by stains of rust, stains of mill scale, and stains of previously applied coating may be present on the remainder of the surface.

WATER JETTING STANDARDS

SSPC-SP12 / NACE 5

Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultra High- Pressure Water Jetting Prior to Recoating

This standard requires water jetting at high- or ultra high-pressure to prepare a surface for recoating using pressure above 10,000 psi. Water jetting will not produce a profile; rather, it exposes the original abrasive-blasted surface profile. The specifier shall use one of the visual surface preparation definitions (WJ-1 to WJ-4) and one of the non-visual surface preparation definitions (SC-1 to SC-3) to specify the degree of visible and non-visible surface matter to be removed.

Pressure Categorization

Low-Pressure Water Cleaning (LP WC) Cleaning performed at pressures less than 34 Mpa (5,000 psi)

High-Pressure Water Cleaning (HP WC) from 34 to 70 Mpa (5,000 to 10,000 psi)

High-Pressure Water Jetting (HP WJ) from 70 to 170 Mpa (10,000 to 25,000 psi)

Ultrahigh-Pressure Water Jetting (UHP WJ) above 170 Mpa (25,000 psi)

Visual Conditions of Surface Cleanliness

WJ-1

Surface shall be free of all previously existing visible rust, coatings, mill scale, and foreign matter and have a matte metal finish

WJ-2

Surface shall be cleaned to a matte finish with at least 95% of the surface area free of all previously existing visible residues and the remaining 5% containing only randomly dispersed stains of rust, coatings, and foreign matter

WJ-3

Surface shall be cleaned to a matte finish with at least two-thirds of the surface area free of all previously existing visible residues (except mill scale), and the remaining one-third containing only randomly dispersed stains of previously existing rust, coatings, and foreign matter

WJ-4

Surface shall have all loose rust, loose mill scale, and loose coatings uniformly removed

Non-Visual Conditions of Surface Cleanliness

SC-1

Surface shall be free of all detectable levels of contaminants as determined using available field test equipment with sensitivity approximating laboratory test equipment. For purposes of this standard, contaminants are water-soluble chlorides, iron-soluble salts, and sulfates

SC-2

Surface shall have less than 7 μg/cm2 chloride contaminants, less than 10 μg/cm2 of soluble ferrous ion levels, and less than 17 μg /cm2 of sulfate contaminants as verified by field or laboratory analysis using reliable, reproducible test equipment

SC-3

Surface shall have less than 50 μg/cm2 chloride and sulfate contaminants as verified by field or laboratory analysis using reliable, reproducible test equipment

SURFACE PREPARATION BY SUBSTRATE

Iro n or S te el

G al va ni ze d

Al um in um

Pr e-

Fi ni sh ed

M et al s

S ta in le ss S te el

No n-

Fe rr ou s

M et al s

P la st ic

P

VC

/F

R P

Co nc re te

P re vi ou sl y

Pa in te d

Su rfa ce s

SSPC-SP1

Solvent Cleaning X X X X X X X X

SSPC-SP2

Hand Tool Cleaning X X

SSPC-SP3

Power Tool Cleaning X X X

SSPC-SP11

Power Tool Cleaning to Bare Metal X

SSPC-SP7/NACE 4

Brush-Off Blast Cleaning X X X X X X X X

SSPC-SP14/NACE 8

Industrial Blast Cleaning X

SSPC-SP6/NACE 3

Commercial Blast Cleaning X

SSPC-SP10/NACE 2

Near-White Blast Cleaning X

SSPC-SP5/NACE 1

White Metal Blast Cleaning X

SSPC-SP12/NACE 5

High- and Ultrahigh-Pressure Water Jetting Prior to Recoating

X X X X X

SSPC-SP13/NACE 6

Surface Preparation of Concrete X

Concrete can also be cleaned and prepared using ASTM D 4260 (Acid Etch – Floors), ASTM D 4258 (Solvent Cleaning), ASTM D 3359 (To Check Adhesion), and ASTM D 4259 (To Abrade Concrete).