S6900 General Requirement for Electrical-Electronic Items.pdf

PDF 28 KB Posted

Attached to
FY21 Henry Bigelow Drydock Repairs
Solicitation number
1305M220QNMAN0190
Issued by

About this file

This document provides general requirements for electrical and electronic work on government vessels. It specifies that all such work must comply with IEEE and Coast Guard standards and use best marine practices. Contractors must replace any government materials damaged with items of like quality and finish. All machinery, wiring, panels and other components removed or disturbed must be properly repaired, replaced or renewed. Electronic racks must be securely fastened and any painted surfaces refinished to match. Cables and wires must be run in existing wireways and properly labeled at both ends. Manufacturers' warranties must be assigned to the government along with all technical documentation and surplus materials. Tests and inspections will be conducted as required by the work item to ensure all systems are fully operational upon completion.

The related federal contract opportunity is a solicitation for drydock repairs to the NOAA ship Henry Bigelow in fiscal year 2021. The soliciting agency is the Department of Commerce National Oceanic and Atmospheric Administration.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
(134)Knuckle Boom Crane_Part2.pdf PDF
(134)Knuckle Boom Crane_Part1.pdf PDF
Bigelow Trawl Winch Drawings.pdf PDF
VideoXpert.pdf PDF
HB FY21 Dry Dock Repair Spec_Rev 1.pdf PDF
(012)Centerboard_Rev1.pdf PDF
HB 124931 Cover.pdf PDF
HB310 FRV40 225 041 010 Generator 3 Phase Synchronous.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HB-568 (FRV40-225-008-010) Bow Thruster.pdf PDF
HB-300 FE01 Power One Line.pdf PDF
HB-085 FA04 Docking Drawing.pdf PDF
HB-461 FE93 Transducer Arrangement and Installation(1).pdf PDF
VideoXpert Professional v 3 7 Product Specification.pdf PDF
HB167 FH62 STRL Doors Hatches Manholes Scuttles.pdf PDF
HB-512-5010 Assy Unit 5010 HVAC A_D.pdf PDF
AMC 0001F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
AMC-0001F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
HB-100 FH68 BERP _ WERP Key Plan and Details.pdf PDF
Appleton Drawing AMD-2129 REV 0 Jib Pin Assembly.pdf PDF
HB FY20 Liferaft Certificates.pdf PDF
Naval Ships Technical Manual 081 Waterborne Underwater Hull Cleaning of Navy Ships.pdf PDF
HB-160 FH19 Centerboard Bottom Void Scantlings(1).pdf PDF
HB 124622 Sleeve Doubler 3inch NPS.pdf PDF
HB-085 FA01 Outboard Profile.pdf PDF
CC-7137_Plan_001.pdf PDF
Amendment 0002.pdf PDF
Air Box and Generator Pictures (1).pdf PDF
P 1097 19 Henry B. Bigelow LeBus Sleeves.pdf PDF
HB 124930 Casing.pdf PDF
Aft Deck Hatch.pdf PDF
Airmar B17-HP Temp Sensor.pdf PDF
HB-160 FH19 Centerboard Bottom Void Scantlings.pdf PDF
HB-461 FE93 Transducer Arrangement and Installation.pdf PDF
HB-461-002 EM2040 Installation Cable Run Sheets.pdf PDF
Standard - MIL-STD-2199A Glass Reinforced Plastic Covering for Propeller Shafts.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
(005)Line Shaft and Thrust Bearing Manual.pdf PDF
AMC-300-1 Overhaul of Electrical Rotating Machinery.pdf PDF
Amendment 0001.pdf PDF
(006)SternTubeBearing and Shaft Seal Resubmittal.pdf PDF
Furuno FE800 Installation Manual.pdf PDF
HB-461-001 EM2040 MkII 0.4x0.7 Installation.pdf PDF
Airmar Owners Guide _ Installation Instructions - SS577- 33-495-01.pdf PDF
Radial-Rubber-Tile-RBT-Submittal.pdf PDF
MOC-573-2 Overhaul-Repair of Hydraulic Cylinders.pdf PDF
MOC-631-3B Underwater Body Ablative Coating System.pdf PDF
(139)Cathelco Antifouling System.pdf PDF
IEEE.pdf PDF
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revision A, April 1, 1987 (6/95)

NOAA Standard Specification S6900

GENERAL REQUIREMENTS FOR ELECTRICAL/ELECTRONIC ITEMS

1. SCOPE

1.1 Objective: This specification provides general requirements for work performed on electrical and electronic systems.

2. REFERENCE DOCUMENTS

2.1 Standards: IEEE STD 45-1983, Recommended Practice for

Electric Installations on Shipboard (most recent revision)

2.2 Regulations: 46 CFR Subchapter J - Electrical Engineering

3. GOVERNMENT FURNISHED EQUIPMENT (GFE)

3.1 As specified in invoking work item.

4. REQUIREMENTS

4.1 The contractor shall accomplish all work in these

specifications in accordance with the requirements of Reference

2.1 and 2.2, and using the best marine and shipbuilding practices.

4.2 All material removed from the ship, both scrap and surplus, is the property of the Government. Surplus material shall be delivered to:

NOS/Pacific Marine Center ATTN: PMC Warehouse/MOP12 1801 Fairview Avenue East Seattle, Washington 98102-3767

4.3 When the COTR determines that the contractor has damaged any materials, including removals, those materials shall be replaced with new. New material provided by the contractor shall be of the same quality, size, shape, color, and finish as the damaged materials when they were new.

4.4 All machinery, piping, wiring, ducts, insulation, paint

work, deck tile, or any other article removed, disturbed, or damaged in the process of accomplishing the work required by these specifications shall be replaced, renewed or repaired. All paneling removed shall be replaced, including any required alterations. Paneling damaged by the contractor shall be renewed equal to the original when new. All flanges and joints broken or loosened shall be properly remade using new gaskets of the proper size and material.

4.5 All electronic racks installed shall be securely fastened to

General Requirements for Electrical/Electronic Items S6900 overhead and deck structural or steel members to prevent movement.

4.6 Any painted or varnished surfaces damaged or soiled shall be cleaned, painted, and/or varnished with original type and color of paint or varnish.

4.7 Any extension of wires shall be through a junction box. Any removal of wires shall be to the nearest junction box.

4.8 All electrical junction boxes, receptacles, hangers, and

miscellaneous electrical fittings shall be equal in quality to those originally installed on the ship.

4.9 All electrical cables installed by the contractor shall be run behind paneling in existing wireways and shall be securely banded to the hangers. If existing wireways are not available, new wireways shall be established.

4.10 All cables installed by the contractor shall be identified at each end with embossed metal tags. Where wires or cables are marked within a junction or terminal box, nonconductive labels shall be used. The contractor shall number cables and wires with a marking system similar to that used on the ship.

4.11 All manufacturer's or supplier's standard warranties on

equipment installed on the ship shall be assigned in writing by the contractor to the Government.

4.12 Three (3) copies all manufacturer's technical manuals, prints, and drawings shall be delivered to the COTR. Spare parts and surplus installation materials shall be delivered to the

COTR.

5. QUALITY ASSURANCE (Tests/Inspections/Reports)

5.1 As required by the invoking work item.

5.2 All items disturbed and all devices used, repaired, altered, furnished, or installed by the contractor shall be demonstrated to be fully operational upon completion of work.

Page 1
Page 2

File details come from the government source that posted it. Updated .