Kemel Report - Shaft Seal Inspection (09-24-19)_Rev. 2.pdf

PDF 141 KB Posted

Attached to
FY21 Henry Bigelow Drydock Repairs
Solicitation number
1305M220QNMAN0190
Issued by

About this file

This document contains a service report from KEMEL USA regarding an inspection of shaft seal leakage on the vessel Henry Bigelow owned by NOAA. The report details a leakage rate of 40-60 gallons per day was noted by the Chief Engineer. Upon inspection, the mating ring recently installed by the ship's crew was found to have irregular wear indicating misalignment of the seal box. Measurements between the shaft journal and seal housing showed maximum centering deviation of 0.244 inches and squareness of approximately 0.060 inches, exceeding tolerances of 0.020 inches for both. Spare seals in satisfactory condition were noted. The seal housing and mounting hardware were in satisfactory integrity, with old leakage around some bolt holes likely due to gasket imperfection or improper sealant application to be rectified at the next drydock period. The recommendation is to accurately measure and realign the housing per KEMEL specifications at drydock, with the adapter plate possibly needing machining to offset misalignment and bring it back to center and square. New gaskets should be installed between the stern tube, adapter plate and seal housing and sealed with sealant.

The related federal contract opportunity is a solicitation from the Department of Commerce National Oceanic and Atmospheric Administration for FY21 Henry Bigelow Drydock Repairs.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
(134)Knuckle Boom Crane_Part2.pdf PDF
(134)Knuckle Boom Crane_Part1.pdf PDF
Bigelow Trawl Winch Drawings.pdf PDF
VideoXpert.pdf PDF
HB FY21 Dry Dock Repair Spec_Rev 1.pdf PDF
(012)Centerboard_Rev1.pdf PDF
HB 124931 Cover.pdf PDF
HB310 FRV40 225 041 010 Generator 3 Phase Synchronous.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HB-568 (FRV40-225-008-010) Bow Thruster.pdf PDF
HB-300 FE01 Power One Line.pdf PDF
HB-085 FA04 Docking Drawing.pdf PDF
HB-461 FE93 Transducer Arrangement and Installation(1).pdf PDF
VideoXpert Professional v 3 7 Product Specification.pdf PDF
HB167 FH62 STRL Doors Hatches Manholes Scuttles.pdf PDF
HB-512-5010 Assy Unit 5010 HVAC A_D.pdf PDF
AMC 0001F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
AMC-0001F General Requirements for Contract Repair Work on NOAA Ships.pdf PDF
HB-100 FH68 BERP _ WERP Key Plan and Details.pdf PDF
Appleton Drawing AMD-2129 REV 0 Jib Pin Assembly.pdf PDF
HB FY20 Liferaft Certificates.pdf PDF
Naval Ships Technical Manual 081 Waterborne Underwater Hull Cleaning of Navy Ships.pdf PDF
HB-160 FH19 Centerboard Bottom Void Scantlings(1).pdf PDF
HB 124622 Sleeve Doubler 3inch NPS.pdf PDF
HB-085 FA01 Outboard Profile.pdf PDF
CC-7137_Plan_001.pdf PDF
Amendment 0002.pdf PDF
Air Box and Generator Pictures (1).pdf PDF
P 1097 19 Henry B. Bigelow LeBus Sleeves.pdf PDF
HB 124930 Casing.pdf PDF
Aft Deck Hatch.pdf PDF
Airmar B17-HP Temp Sensor.pdf PDF
HB-160 FH19 Centerboard Bottom Void Scantlings.pdf PDF
HB-461 FE93 Transducer Arrangement and Installation.pdf PDF
HB-461-002 EM2040 Installation Cable Run Sheets.pdf PDF
Standard - MIL-STD-2199A Glass Reinforced Plastic Covering for Propeller Shafts.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
(005)Line Shaft and Thrust Bearing Manual.pdf PDF
AMC-300-1 Overhaul of Electrical Rotating Machinery.pdf PDF
Amendment 0001.pdf PDF
(006)SternTubeBearing and Shaft Seal Resubmittal.pdf PDF
Furuno FE800 Installation Manual.pdf PDF
HB-461-001 EM2040 MkII 0.4x0.7 Installation.pdf PDF
Airmar Owners Guide _ Installation Instructions - SS577- 33-495-01.pdf PDF
Radial-Rubber-Tile-RBT-Submittal.pdf PDF
MOC-573-2 Overhaul-Repair of Hydraulic Cylinders.pdf PDF
S6900 General Requirement for Electrical-Electronic Items.pdf PDF
MOC-631-3B Underwater Body Ablative Coating System.pdf PDF
(139)Cathelco Antifouling System.pdf PDF
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEMEL USA Service Report

Vessel Henry Bigelow

Owner NOAA Service

Dates

Date:

FROM: 9/24/19

Location Newport, RI TO: 9/24/19

Purpose Investigation of KW-450 leakage

Detailed Summary : Leakage rate of 40-60 gallons/day noted by Chief

Engineer, being collected and monitored accordingly. New mating ring recently installed by ship’s crew, old mating ring noted to have irregular wear, indicating misalignment of seal box, noted .005” deep wear pattern at 12 o’clock position and .060” at 6 o’clock. Feeler gauge measurements taken between shaft journal and seal housing and noted that centering max deviation is .244”, and squareness approx .060”, tolerances on both of these measurements are .020”. Two spare seals in satisfactory condition noted on shaft journal. Integrity of seal housing and mounting hardware noted in satisfactory condition, old leakage noted around some bolt holes most likely due to gasket imperfection/improper sealant application, to be rectified at next drydock period.

Recommendation: At drydock period, housing should be accurately measured and re-aligned per KEMEL specs. Adapter plate may need to be machined to offset the misalignment and bring back to center and square. New gaskets to be installed between stern tube/adapter plate/seal housing and sealed with Permatex or similar sealant.

Quinn Newton 9/26/19

KEMEL USA INC.

KEMEL USA INC.

275 Madison Ave, 14 th floor

NEW YORK, NY 10016

USA

www.kemel.com

File details come from the government source that posted it. Updated .